TIDMATM

RNS Number : 4608C

AfriTin Mining Ltd

11 October 2022

11 October 2022

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

AfriTin Mining Limited

("AfriTin" or the "Company")

Lithium and Tantalum Infill Drill Programme Update

AfriTin Mining Limited (AIM: ATM), an African technology metals mining company with a portfolio of mining and exploration assets in Namibia, is pleased to announce results for the lithium and tantalum infill drilling programme at the Company's flagship operation, the Uis Mine ("Uis").

The infill drilling programme is being conducted over the V1/V2 pegmatite at Uis, which is currently being mined to produce a tin concentrate. The 50-hole drilling programme aims to increase the confidence of the existing lithium and tantalum mineral resource estimates over the deposit; 47 drill holes have been completed and are being processed. The results of 9 previous diamond drill (DD) holes were announced on 8 June 2022 and 20 July 2022, and this announcement reports the assay results of the next 11 drill holes, comprising both diamond and reverse circulation (RC) drilling (Figure 1). The results of the outstanding 27 drill holes will be provided when received.

Highlights:

   --      Significant pegmatite intersections include: 

o 35 m at 0.149% Sn, 77 ppm Ta, and 0.94% Li(2) O within drill hole V1V2032, from 150 m to 185 m;

o 25 m at 0.197% Sn, 140 ppm Ta and 0.60% Li2O for hole V1V2076, from 46 m to 71 m;

o 34 m at 0.186% Sn, 116 ppm Ta, and 0.57% Li(2) O from 13 m to 48 m; and 0.92m at 5.154% Sn, 582 ppm Ta and 0.32% Li(2) O from 5 m to 6 m for drill hole V1V2072.

-- Pegmatite was intersected in all holes at the depths and apparent widths predicted by the geological model.

Anthony Viljoen (CEO) commented:

"We are pleased to report these exploration drill results which are very much in line with our high expectations. They relate to the north-eastern portion of the V1/V2 pegmatite ore body, which is an area known to contain higher tantalum and tin grades. For the pegmatite intersections reported here, the average tantalum grade is approximately 40% higher than the average of the existing mineral resource estimate (119 ppm vs 85 ppm), and the tin grade is approximately 30% higher than the average of the resource estimate (0.174% vs 0.134%).

The infill drill programme continues to deliver results that we believe confirm the scale and quality of the deposit. We look forward to upgrading our mineral resource estimate and bringing on tantalum and lithium by-product revenue streams alongside our existing tin production."

Exploration Programme

The current exploration programme aims to upgrade the existing resource classification for lithium and tantalum over the areas where tin is currently classified within the measured and indicated categories for the 2019 JORC (2012) compliant mineral resource estimate (MRE) (see announcement dated 16 September 2019). The pegmatite intersections of the reported holes align with the current geological model, confirming its spatial accuracy. The drill holes intersected the pegmatite where the V1 and V2 bodies have bifurcated into individual units, and in some holes the V1 pegmatite has an offshoot into the hanging wall (referred to as the V1 Upper in Table 1). The dip angle of the pegmatites varies from 24 degrees to 48 degrees and the majority of the reported drill holes are orientated vertically such that reported intersections represent apparent thickness.

Table 1 : Exploration results of diamond drill holes V1V2028, V1V2032, V1V2070, V1V2072, V1V2075, and V1V2077 and RC drill holes V1V2069, V1V2071, V1V2074, V1V2076 and V1V2079 indicating the pegmatite intersection widths and pegmatite grades. Intersections indicate apparent thickness and not true thickness. The apparent thickness is greater than the true thickness .

 
 Hole ID    Dip Angle   Drill    Pegmatite     Pegmatite       Pegmatite     Intersection             Grade 
            (Degrees)    type                Intersection,   Intersection,    Length (m) 
                                               Including       Excluding 
                                                Waste,          Waste, 
                                              From/To (m)     From/To (m) 
                                                                                            Sn (%)     Ta       Li2O 
                                                                                                      (ppm)      (%) 
                                                                                           -------  --------  -------- 
 V1V2028    Vertical      DD        V2          121-136      121.39-135.40      14.01       0.131      95       0.38 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2032       -81        DD        V2          149-185      149.92-185.16      35.24       0.149      77       0.94 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2070    Vertical      DD        V1          69-108       69.32-108.06       38.74       0.177      147      0.49 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2072    Vertical      DD        V1           5-48          5.11-6.03         0.92       5.154      582      0.32 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                                              6.93-12.04         5.11       0.186      143      0.38 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                                              13.32-47.88       34.56       0.186      116      0.57 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2075    Vertical      DD        V1           52-98        52.22-58.61        6.39       0.102      138      0.51 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                                              59.55-93.42       33.87       0.121      98       0.76 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                                              95.03-97.97        2.94       0.040      275      0.28 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2077    Vertical      DD        V1           21-41        21.56-22.31        0.75       0.056      50       0.41 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                                              23.48-41.21       17.73       0.283      128      0.37 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2069    Vertical      RC     V1 Upper        75-82        75.00-82.00         7         0.095      215      0.26 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                    V1          91-154       91.00-147.00         56        0.193      109      0.42 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2071    Vertical      RC        V1           31-86        31.00-86.00         55        0.165      94       0.49 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2074    Vertical      RC        V1          72-105       72.00-105.00         33        0.155      122      0.47 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2076    Vertical      RC     V1 Upper        2-19         2.00-19.00          17        0.083      108      0.47 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
                                    V1           46-71        46.00-71.00         25        0.197      140       0.6 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 V1V2079    Vertical      RC        V1          69-105       69.00-105.00         36        0.141      151      0.52 
           ----------  -------  ----------  --------------  --------------  -------------  -------  --------  -------- 
 

The drilled holes comprised reverse circulation drilling (RC) and diamond drilling (DD). Each drill hole was geologically logged with the DD drill holes also being geotechnically logged before sampling at approximately one-meter intervals. Sample analysis was undertaken by UIS Analytical Services, a certified independent laboratory, using a peroxide fusion and analysis, with ICP-OES utilised for major and minor elements and ICP-MS utilised for trace elements.

Figure 1: Map displaying the localities of the reported holes, together with the drill holes from a previous (2019) exploration programme and holes from the current programme previously reported. The line A-A' indicates the area represented by the cross section in Figure 2.

Figure 2: Section line A-A' displaying a projection of the holes drilled during the current programme for which results are reported in this release

Competent Person Statement

The technical data in this announcement has been reviewed by Michael Cronwright (M.Sc., FGSSA, Pr. Sci Nat. (Geological Sciences)). He is a full-time employee of CSA Global, and provides geological consulting services to AfriTin. Mr Cronwright is a Principal Consultant - Battery Metals for CSA Global and has 22 years of industry related exploration and mineral project development experience, as well as a Competent Person for the reporting of exploration results. He has reviewed both the technical disclosures in this release as well as the quality assurance protocols and results for the assay campaign. Mr Cronwright consents to the release of the information contained in the announcement and is satisfied that the results of the QAQC on the assay results released to date are sufficient to support the planned estimation of Mineral Resources.

Glossary of abbreviations

 
 DD               Diamond Drilling 
 ICP-MS           Inductively Coupled Plasma-Mass Spectrometry 
                 ----------------------------------------------------------------------------------------------- 
 ICP-OES          Inductively Coupled Plasma-Optical Emission Spectrometry 
                 ----------------------------------------------------------------------------------------------- 
 Li               Symbol for Lithium 
                 ----------------------------------------------------------------------------------------------- 
 Li -> Li (2) O   Metal to metal-oxide conversion factor of 2.153 
                 ----------------------------------------------------------------------------------------------- 
 Li (2) O         Lithium oxide 
                 ----------------------------------------------------------------------------------------------- 
 JORC             The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 
                 ----------------------------------------------------------------------------------------------- 
 MRE              Mineral Resource Estimate 
                 ----------------------------------------------------------------------------------------------- 
 PPM              Parts Per Million 
                 ----------------------------------------------------------------------------------------------- 
 QA/QC            Quality Assurance / Quality Control 
                 ----------------------------------------------------------------------------------------------- 
 RC               Reverse Circulation drilling 
                 ----------------------------------------------------------------------------------------------- 
 Sn               Symbol for Tin 
                 ----------------------------------------------------------------------------------------------- 
 Ta               Symbol for Tantalum 
                 ----------------------------------------------------------------------------------------------- 
 V1/V2            Name of the targeted pegmatite unit, V1/V2 denotes where the V1 and V2 pegmatites have merged 
                   at depth. 
                 ----------------------------------------------------------------------------------------------- 
 

Glossary of Technical Terms

 
 Apparent Thickness   The relationship between apparent width and true thickness is based on the formula by Addie 
                       (1968 Economic Geology, vol 63, pp 188-189) 
 Dip Angle            The angle of inclination measured downward from horizontal 
                     ------------------------------------------------------------------------------------------------- 
 Geological Model     The interpretation of mineralisation and geology that controls mineralisation. This is usually 
                       generated in a three-dimensional computer environment 
                     ------------------------------------------------------------------------------------------------- 
 Mineral Resources    Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, 
                       Indicated and Measured categories. An Inferred Mineral Resource has a lower level of confidence 
                       than that applied to an Indicated Mineral Resource. An Indicated Mineral Resource has a higher 
                       level of confidence than an Inferred Mineral Resource but has a lower level of confidence 
                       than a Measured Mineral Resource 
                     ------------------------------------------------------------------------------------------------- 
 Pegmatite            An igneous rock typically of granitic composition, which is distinguished from other igneous 
                      rocks by the extremely coarse and systematically variable size of its crystals, or by an 
                      abundance 
                      of crystals with skeletal, graphic, or other strongly directional growth habits, or by a 
                      prominent 
                      spatial zonation of mineral assemblages, including monomineralic zones 
                     ------------------------------------------------------------------------------------------------- 
 Xenolith             A foreign rock fragment (e.g. schist) within an intrusive body (e.g. pegmatite) that is 
                      unrelated 
                      to the igneous body. 
                     ------------------------------------------------------------------------------------------------- 
 
 
 AfriTin Mining Limited                +27 (11) 268 6555 
 Anthony Viljoen, CEO 
 Nominated Adviser                     +44 (0) 207 220 1666 
 WH Ireland Limited 
  Katy Mitchell 
 Corporate Advisor and Joint Broker 
 H&P Advisory Limited 
  Andrew Chubb 
  Jay Ashfield 
  Nilesh Patel                         +44 (0) 20 7907 8500 
 Stifel Nicolaus Europe Limited 
  Ashton Clanfield 
  Callum Stewart                       +44 (0) 20 7710 7600 
 Tavistock Financial PR (United 
  Kingdom)                             +44 (0) 207 920 3150 
 Emily Moss 
  Catherine Drummond 
  Adam Baynes 
 

About AfriTin Mining Limited

Notes to Editors

AfriTin Mining Limited is a London-listed technology metals mining company with a vision to create a portfolio of globally significant, conflict-free, producing and exploration assets. The Company's flagship asset is the Uis Tin Mine in Namibia, formerly the world's largest hard-rock open cast tin mine.

AfriTin is managed by an experienced board of directors and management team with a current strategy to ramp-up production at the Uis Mine in Namibia to more than 10,000 tonnes of tin concentrate and 350,000 tonnes of lithium concentrate in a Phase 2 expansion, having reached Phase 1 commercial production in 2020. The Company strives to capitalise on the solid supply/demand fundamentals of tin and lithium by developing a critical mass of resource inventory, achieving production in the near term and further scaling production by consolidating assets in Africa.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

MSCZZMMGKMMGZZG

(END) Dow Jones Newswires

October 11, 2022 02:00 ET (06:00 GMT)

Andrada Mining (LSE:ATM)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Andrada Mining Charts.
Andrada Mining (LSE:ATM)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Andrada Mining Charts.