PRESS
RELEASE
16 September
2024
KAVANGO RESOURCES PLC
("Kavango" or "the
Company")
Hillside Prospect 3 Assay
Results
ZIM: Multiple zones confirmed at
Hillside
Kavango Resources plc (LSE: KAV), the Southern
Africa focussed metals exploration company, is pleased to announce
further positive assay results from Prospect 3 ("Prospect 3") at
the Hillside Gold Project ("Hillside") in Matabeleland, southern
Zimbabwe.
Highlights
·
Hole NSDD002 was a follow-up hole sited to target
mineralisation approximately 200m along strike from gold
mineralisation intersected in NSDD001 (announced
>>> 10 May 2024).
o Highlights from
NSDD001 included 40m of gold mineralisation grading >0.5 g/t
over multiple shear zones.
·
NSDD002 was drilled to a total depth of 358.40m and
successfully intersected multiple shear zones hosting sets of gold
bearing quartz veins and associated sulphide mineralisation,
totalling more than 20m grading > 0.5 g/t gold.
o Gold mineralisation
starts from surface and may be open-pit mineable.
·
NSDD003 was drilled as an infill hole between NSDD001 and
NSDD002 to a total depth of 352.40m. NSDD003 also intersected
multiple zones of mineralisation associated with quartz veins,
totalling a similar mineralised width.
·
Best results* in the holes include:
- 8.20m @
2.93 g/t gold from 66.69m in NSDD002
o And includes 0.35m @
13.82 g/t gold from 68.39m in NSDD002.
- 5.00m @
1.80 g/t gold from 104.40m in NSDD003
o And includes 0.40m @
5.79 g/t gold from 104.40m in NSDD003.
·
Induced Polarisation (IP) anomalies suggest the shears extend
to depth.
·
Results provide further confirmation of what Kavango believes
to be a likely extensive mineralised system, with an open strike
>200m.
*All quoted
thicknesses are apparent down hole intersection
thicknesses.
Ben Turney,
Chief Executive of Kavango Resources, commented:
"These
results take us a step closer to defining a first bulk minable
target at Hillside. The widths and grades at Prospect 3 are
encouraging, as is the proximity of gold mineralisation to
surface.
Hole NSDD002
was designed to test the strike extension of gold mineralisation
200m from the gold we previously intersected in Hole NSDD001.
NSDD003 was designed to infill between the two holes before
additional drilling is carried out for a future resource. We are
delighted to have achieved success in all three holes. These
positive results confirm the apparent extension of mineralisation
between NSDD001 and NSDD002, the presence of gold mineralisation
from surface in NSDD002, and of mineralised packages totalling 40m
down the length of NSDD001 and 20m down the length of both of holes
NSDD002 and NSDD003.
Our drill rig
will now test further targets at Prospects 1, 4, & 6. Once this
work is complete, we expect to return to Prospect 3 for drilling
aimed at establishing a mineral resource. Our goal will be to
define a maiden minable gold resource at Hillside that Kavango can
bring into production in H1 2025."
Holes NSDD002
& NSDD003
Drill hole NSDD001 successfully tested the
geology underneath current active artisanal workings at Prospect 3.
Drill hole NSDD002 was then aimed at extending this along strike,
and NSDD003 was drilled to infill the gap between the two holes.
Geology was comparable with NSDD001, with units including diorite
with meta-sediment xenoliths and at depth garnet rich
meta-sediments. Gold mineralisation across the area is hosted
within multiple shear zones, which appear to be related to dominant
WNW trending structures.
Prospect 3
Open Pit Potential
Kavango is encouraged by multiple zones of gold
mineralisation encountered in NSDD002 and NSDD003, within 100m
vertical depth, at grades of >0.5 g/t gold. The Company plans to
examine the potential for a possible open pit mineable
deposit.
The assay results received to date demonstrate
a mineralised strike extent of 200m. Kavango's technical team
believes this may extend further.
Best results* in the holes in order of sequence
include:
Hole NSDD002
- 3m @
0.66 g/t gold from 0m (surface)
- 2m @
1.21 g/t gold from 6m depth
- 1m @
1.77 g/t gold from 13m depth
- 6m @
0.51 g/t gold from 21m depth
- 8.20m @
2.93 g/t gold from 66.69m depth
o And includes 0.35m @
13.82 g/t gold from 68.39m depth.
Hole NSDD003
- 1.50m @
0.78 g/t gold from 6.50m depth
- 2m @
0.75 g/t gold from 13m depth
- 1m @
2.08 g/t gold from 28m depth
- 2.76m @
0.69 g/t gold from 62.50m depth
- 5.00m @
1.80 g/t gold from 104.40m depth
o And includes 0.40m @
5.79 g/t gold from 104.40m depth
Prospect 3 Assay Results
A table of significant results (>0.5 g/t Au)
is provided below, up to 2m internal dilution has been allowed in
reporting intercepts, consistent with the identified broad
mineralised packages, and which Kavango is targeting for open-pit
potential. All the hole was assayed.
Hole no.
|
m from
|
m to
|
Interval m
|
Gold g/t
|
NSDD002
|
0.00
|
3.00
|
3.00
|
0.66
|
NSDD002
|
6.00
|
8.00
|
2.00
|
1.21
|
NSDD002
|
13.00
|
14.00
|
1.00
|
1.77
|
NSDD002
|
21.00
|
27.00
|
6.00
|
0.51
|
NSDD002
|
66.69
|
74.89
|
8.20
|
3.08
|
including
|
68.39
|
68.74
|
0.35
|
13.82
|
NSDD002
|
105.00
|
111.10
|
6.10
|
0.85
|
NSDD002
|
152.48
|
153.19
|
0.71
|
1.52
|
NSDD002
|
196.46
|
197.00
|
0.54
|
0.82
|
NSDD002
|
225.87
|
226.87
|
1.00
|
0.63
|
|
|
|
|
|
NSDD003
|
6.50
|
8.00
|
1.50
|
0.78
|
NSDD003
|
13.00
|
15.00
|
2.00
|
0.75
|
NSDD003
|
23.80
|
24.50
|
0.70
|
0.79
|
NSDD003
|
28.00
|
29.00
|
1.00
|
2.08
|
NSDD003
|
31.40
|
32.40
|
1.00
|
0.68
|
NSDD003
|
37.00
|
37.40
|
0.40
|
0.79
|
NSDD003
|
62.50
|
65.26
|
2.76
|
0.69
|
NSDD003
|
104.40
|
109.40
|
5.00
|
1.80
|
including
|
104.40
|
104.80
|
0.40
|
5.79
|
NSDD003
|
123.50
|
125.00
|
1.50
|
0.80
|
NSDD003
|
152.00
|
153.00
|
1.00
|
0.58
|
NSDD003
|
163.00
|
165.00
|
2.00
|
0.87
|
NSDD003
|
193.00
|
195.00
|
2.00
|
1.09
|
NSDD003
|
198.44
|
199.00
|
0.56
|
0.75
|
*All
thicknesses are apparent downhole intersection
thicknesses.
The Kavango technical team interprets these
results as confirming the previously identified mineralisation in
NSDD001 by some 200m along strike.
Figure 1: Map of Hillside Prospects 2 and 3, showing drillhole
locations superimposed over mapped and interpreted veins and
structures, and artisanal workings
Figure 2: A cross-sectional view looking NW through the
drillholes at Prospects 3 and 2, showing lithology and a histogram
of gold grades, superimposed over IP chargeability. The gold grades
shown range from 0.01 g/t to a maximum cut off at 10
g/t.
Next
Steps
Kavango has so far completed a total of nine
holes across its Hillside prospects (see Table 1).
Prospect
|
Hole no.
|
Initial azimuth O
(True N)
|
Inclination
O
|
Total depth
(m)
|
Easting
|
Northing
|
RL
|
Survey
|
Hillside 1
|
BLDD001
|
206
|
-65
|
196.35
|
728726.63
|
7733796.30
|
1045.69
|
DGPS
|
BLDD002
|
206
|
-65
|
160.40
|
728727.75
|
7733803.76
|
1045.85
|
DGPS
|
Hillside 2
|
BRDD001
|
212
|
-60
|
400.40
|
728009.99
|
7734479.72
|
1038.20
|
DGPS
|
BRDD002
|
212
|
-60
|
364.40
|
727953
|
7734526
|
1051
|
GPS
|
BRDD003
|
212
|
-60
|
355.40
|
728089
|
7734437
|
1051
|
GPS
|
Hillside 3
|
NSDD001
|
216
|
-60
|
301.40
|
727564.07
|
7734104.88
|
1035.44
|
DGPS
|
NSDD002
|
212
|
-60
|
358.40
|
727715
|
7734003
|
1040
|
GPS
|
NSDD003
|
212
|
-60
|
352.40
|
727628
|
7734062
|
1040
|
GPS
|
Hillside 4
|
SKDD001
|
008
|
-60
|
247.40
|
728954.82
|
7745487.45
|
1113.41
|
DGPS
|
|
|
|
|
|
|
|
|
|
|
Table 1:
Kavango Hillside drillholes drilled to date. Co-ordinates of
drillholes are using datum Arc 1950. NSDD002 gold assays are
reported here.
The three holes at Prospect 3 together indicate
the potential to establish a future resource, for which further
drilling is being planned.
Drilling is presently ongoing at Prospect 1,
with further drilling planned at a new prospect, Prospect 6. This
drilling will focus on IP targets, as described below.
IP targets at
Prospects 1 and 6
Kavango recently carried out a total of 18.7
line kilometres of Induced Polarisation ("IP") survey lines over
the Hillside Project.
The IP surveys were designed to identify
sulphide bodies associated with high grade gold bearing shear
structures related to historic and artisanal workings.
A positive IP anomaly was identified below the
tailings dump at Prospect 1 and is planned to be tested at depth
with drillhole BLDD003, while drillhole BLDD004 will drill almost
directly into this target.
Figure 3. Section looking NE through IP anomaly below Bill's
Luck tailings dump, showing planned drillholes BLDD003 and 4 to
test the IP anomaly.
Another IP anomaly is located within the
southeastern corner of the Hillside Project. This area is a new
target, Prospect 6, and which is planned to be drill
tested.
Figure 4. IP anomaly at Prospect 6 to be tested with drillhole
VLDD001.
Further information in respect of the Company
and its business interests is provided on the Company's website at
www.kavangoresources.com and on Twitter at #KAV.
For further information please
contact:
Kavango
Resources
plc
Ben Turney
+46 7697 406 06
First Equity (Broker)
+44 207 374 2212
Jason
Robertson
Kavango
Competent Person Statement
The technical information contained in this
announcement pertaining to geology and exploration have been read
and approved by Brett Grist BSc (Hons) FAusIMM (CP). Mr Grist
is a Fellow of the Australasian Institute of Mining and Metallurgy
with Chartered Professional status. Mr Grist has sufficient
experience that is relevant to the exploration programmes and
geology of the main styles of mineralisation and deposit types
under consideration to act as a Qualified Person as defined in the
2012 Edition of the 'Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves'. Mr Grist is an
employee of Kavango Resources plc.