Curlew Lake Resources Inc. Announces Drilling to Commence With Rig Scheduled to Arrive Today
18 March 2011 - 12:10AM
Marketwired
Curlew Lake Resources Inc. (TSX VENTURE: CWQ) (PINK SHEETS: CWLXF)
announces well-site construction is complete for the FBA 9-14-57-24
W4M well, and a drilling rig is expected to arrive on site today,
March 17th, 2011. The drilling target depth should be reached is
less than one week.
The exploration hole is a New Pool Wildcat and is intended to
evaluate a number of formations on the way to a target depth of
1116 metres. The primary targets in this well are at least two
Ellerslie sedimentary channels.
A successful well will lead the way to a 3-D seismic survey on
portions of Curlew lands in the township. Curlew Lake has a
substantial position in Township 57, Range 24 West 4th Meridian
that has not been shot using 3-D seismic and it is expected that
multiple targets can be identified if 9-14 indicates a number of
prospective targets.
On Behalf of the Board of Directors
Robert B. Pincombe, President
For additional information or to be added to the corporate
mailing list please visit the following page:
http://www.curlew-lake.com/curlew/contactus.html.
Warning: The Company relies on litigation protection for
"forward looking" statements. Actual results could differ
materially from those described in the news release a result of
numerous factors, some of which are outside the control of the
Company.
The TSX has not reviewed and does not does accept responsibility
for the adequacy or accuracy of this News Release.
Contacts: Curlew Lake Resources Inc. David D. McKee Chief
Financial Officer (647) 722-3454 (647) 722-4337 (FAX)
david.mckee@curlew-lake.com
(TSXV:CWQ)
Historical Stock Chart
From May 2024 to Jun 2024
(TSXV:CWQ)
Historical Stock Chart
From Jun 2023 to Jun 2024
Real-Time news about (TSX Venture Exchange): 0 recent articles
More Curlew Lake Resources Inc. News Articles