Logan Copper Inc. (the "Company" or "Logan Copper"), (TSX VENTURE:LC) has begun
detailed field analysis of the mineralization potential of the Dansey, Midway
and Bertha Molly Properties near Logan Lake, BC. Extensive ground geophysics
followed by diamond drilling of specific anomalies has proven successful and
will be continued in the 2011 exploration program.


The Logan Copper technical staff is continuing to conduct a detailed historical
review of all previous exploration and production work on the whole Logan Lake
property tenures owned by the Company and have now identified 4 key areas of
increased potential for success. The geophysical crew is currently on the Bertha
Molly prospect beginning the 2011 work program with 60 to 70 line kilometers of
proton magnetometer, VLF-EM grids and trench sampling of new and existing
showings. Diamond drilling of 8 new deeper holes to test deeper anomalies will
commence in the spring, weather permitting.


Logan Copper found encouraging copper assays in the 2010 diamond drilling
program. Drill targets were located by coincident MMI soil sampling and ground
geophysics. Drill holes 10-LCD-19 and 10-LCD-20 from the 2010 exploration
program will be logged and sampled for assay as soon as weather permits. The
following drill core assay summaries highlight the copper results from the 2010
drilling that was analyzed.




Hole ID               From (m)  To (m)    Interval(m)  Interval (ft)    %Cu
----------------------------------------------------------------------------
09-SND-15                0.00  181.05         181.05         594.00   0.100
 including             124.47  124.64           0.17           0.56   0.452
 including             186.30  187.04           0.74           2.43   0.117
 including             195.30  195.96           0.66           2.17   0.145
                       206.11     EOH                                      
                                                                            
10-LCD-16               73.76   84.43          10.67          35.00   0.104
 including              83.82   84.43           0.61           2.00   1.175
                       105.31  284.68         179.37         588.50   0.101
 including             122.38  122.99           0.61           2.00   1.343
 including             193.24  193.85           0.61           2.00   0.679
 including             269.75  284.68          14.94          49.00   0.477
                       284.68     EOH                                      
                                                                            
10-LCD-17               81.08   81.99           0.91           3.00   0.114
                        96.32   98.15           1.83           6.00   0.104
                       100.58  104.55           3.96          13.00   0.101
 including             103.48  104.09           0.61           2.00   0.544
                       136.86  159.41          22.56          74.00   0.101
 including             147.68  148.74           1.07           3.50   0.733
                       168.25  179.10          10.85          35.60   0.102

Hole ID               From (m)  To (m)    Interval(m)  Interval (ft)    %Cu
----------------------------------------------------------------------------
10-LCD-17              182.42  184.56           2.13           7.00   0.108
Con't                  186.93  187.54           0.61           2.00   0.114
                       189.95  191.72           1.77           5.80   0.137
                       206.81  208.79           1.98           6.50   0.128
                       220.98  225.86           4.88          16.00   0.104
                       251.16  300.84          49.68         163.00   0.102
                       313.33  313.94           0.61           2.00   0.105
                       315.35     EOH                                      
                                                                            
10-LCD-18               24.99   26.52           1.52           5.00   0.129
                        32.61   34.44           1.83           6.00   0.141
                        46.63   47.55           0.91           3.00   0.127
                        94.18  109.73          15.54          51.00   0.117
                       159.11  178.60          19.49          63.96   0.102
  including            178.00  178.60           0.60           2.00   0.541
                       192.35  198.00           5.65          18.54   0.108
                       234.35  246.35          12.00          39.37   0.100
  including            238.35  239.35           1.00           3.28   0.703
                       253.35  254.00           0.65           2.13   0.166
                       268.53     EOH                                      



("EOH" designates the end of hole depth of the drill hole.)

The significant copper drill intersection appears in 10-LCD-16 which coincides
with a ground magnetometer and VLF anomaly outlined by the 2010 geophysical
program, which has also identified other anomalies that we intend to drill in
2011.


Terry Garrow, P.Geo., a Qualified Person by the standards of National Instrument
43-101, has reviewed the results obtained and approved the technical information
included in this news release.


Logan also wishes to announce that the investor relations agreement with Ethos
Consulting has expired effective February 18, 2011 as per the terms of the
contract. We thank Ethos for their efforts on behalf of Logan Copper Inc.


On behalf of the Board of Directors of LOGAN COPPER INC.

Thal S. Poonian, CEO/President/Director

Logan Copper Inc. (TSXV:LC)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Logan Copper Inc. Charts.
Logan Copper Inc. (TSXV:LC)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Logan Copper Inc. Charts.