Abitibi Royalties Inc. (TSX VENTURE:RZZ) (the "Company" or "Abitibi") is pleased
to announce the receipt of the year-end 2012 gold reserve and resource estimate
completed by Osisko Mining Corporation ("Osisko") in respect of the Company's
interests in the Malartic CHL property and the claim in respect of which the
Company holds a 2% net smelter return royalty (the "Royalty").


Abitibi has commissioned Micon International Limited ("Micon") of Toronto,
Ontario to: (i) audit the year-end 2012 gold reserve and resource estimate
completed by Osisko with respect to the Mammoth/Barnat, and Jeffrey zones only;
and (ii) prepare a corresponding National Instrument 43-101 ("NI 43-101)
compliant technical report with respect to same. 


The Malartic CHL property is the object of a joint venture with Osisko in which
Abitibi holds a 30% free carried interest; it hosts the Mammoth/Barnat, and
Jeffrey zones. The Charlie-Gouldie gold deposits lie within the single claim
held by Osisko in respect of which Abitibi holds the Royalty. Glenn Mullan,
President of Abitibi, notes: "Osisko has indicated that the Gouldie pit area is
currently scheduled to begin production in November of 2013, thereby providing
an expected initial cash flow distribution to Abitibi." 


Information regarding the updated reserves and resource estimates for the
Canadian Malartic Project was published by Osisko by way of a news release dated
February 19, 2013, which can be found under Osisko's issuer profile on Sedar.
The information that follows has been provided to Abitibi by Osisko; only the
data with respect to the Mammoth/Barnat and Jeffrey zones will be independently
audited by Micon:


Table 1 - Mammoth/Barnat Pit Proven & Probable Reserves Estimate(1), (2)



----------------------------------------------------------------------------
                                                     Ore Grade              
Category                          Area    Ore Tons       (g/t)  Contained Oz
----------------------------------------------------------------------------
Proven Reserve          Mammoth/Barnat     376,300        0.93        11,200
----------------------------------------------------------------------------
Probable Reserve        Mammoth/Barnat   1,638,300        0.94        49,447
----------------------------------------------------------------------------
Proven & Probable                                                           
 Reserve                Mammoth/Barnat   2,014,600        0.94        60,647
----------------------------------------------------------------------------



Table 2 - Mammoth/Barnat Pit Resource Estimate(3)

The following Resources are in addition to reserves noted above:



----------------------------------------------------------------------------
Category                          Area        Tons Grade (g/t)  Contained Oz
----------------------------------------------------------------------------
Measured Resource       Mammoth/Barnat     229,300        1.02         7,523
----------------------------------------------------------------------------
Total Measured Resource                    229,300        1.02         7,523
----------------------------------------------------------------------------
Indicated Resource      Mammoth/Barnat   1,842,200        0.77        45,574
----------------------------------------------------------------------------
Total Indicated Resource                 1,842,200        0.77        45,574
----------------------------------------------------------------------------
Measured & Indicated                                                        
 Resource               Mammoth/Barnat   2,071,600        0.80        53,097
----------------------------------------------------------------------------
Total M&I Resource      Mammoth/Barnat   2,071,600        0.80        53,097
----------------------------------------------------------------------------
Inferred Resource       Mammoth/Barnat   1,433,700        1.06        48,965
----------------------------------------------------------------------------



Table 3 - Jeffrey Proven & Probable Reserves Estimate(1), (2)



----------------------------------------------------------------------------
                                                     Ore Grade              
Category                        Area    Ore Tons         (g/t)  Contained Oz
----------------------------------------------------------------------------
Proven Reserve               Jeffrey           -             -             -
----------------------------------------------------------------------------
Probable Reserve             Jeffrey   3,395,200          0.73        79,249
----------------------------------------------------------------------------
Proven & Probably                                                           
 Reserve                     Jeffrey   3,395,200          0.73        79,249
----------------------------------------------------------------------------



Table 4 - Jeffrey Mineral Resource Estimate(3)

The following Resources are in addition to reserves noted above:



----------------------------------------------------------------------------
Category                        Area        Tons   Grade (g/t)  Contained Oz
----------------------------------------------------------------------------
Measured Resource            Jeffrey           -             -             -
----------------------------------------------------------------------------
Total Measured Resource                        -             -             -
----------------------------------------------------------------------------
Indicated Resource           Jeffrey   5,269,000          0.65       110,696
----------------------------------------------------------------------------
Total Indicated Resource               5,269,000          0.65       110,696
----------------------------------------------------------------------------
Measured & Indicated                                                        
 Resource                    Jeffrey   5,269,000          0.65       110,696
----------------------------------------------------------------------------
Total M&I Resource                     5,269,000          0.65       110,696
----------------------------------------------------------------------------
Inferred Resource            Jeffrey     376,200          0.90        10,842
----------------------------------------------------------------------------



Table 5. - Gouldie Proven & Probable Reserves Estimate(1), (2)



----------------------------------------------------------------------------
                                                     Ore Grade              
Category                        Area    Ore Tons         (g/t)  Contained Oz
----------------------------------------------------------------------------
Proven Reserves              Gouldie     666,800          0.99        21,151
----------------------------------------------------------------------------
Probable Reserves            Gouldie     500,300          0.83        13,321
----------------------------------------------------------------------------
Proven & Probable                                                           
 Reserves                    Gouldie   1,167,100          0.92        34,472
----------------------------------------------------------------------------



Table 6 - Gouldie Mineral Resource Estimate(3)

The following resources are in addition to Reserves noted above:



----------------------------------------------------------------------------
                                                  Gold Grade  Contained Gold
Category                       Area       Tons         (g/t)        (ounces)
----------------------------------------------------------------------------
Measured Resources          Gouldie    843,700          1.17          31,816
----------------------------------------------------------------------------
Indicated Resources         Gouldie  4,662,800          0.96         143,815
----------------------------------------------------------------------------
Measured & Indicated                                                        
 Resources                  Gouldie  5,506,500          0.99         175,631
----------------------------------------------------------------------------
Inferred Resources          Gouldie    857,800          0.83          22,935
----------------------------------------------------------------------------



Table 7 - Gouldie Estimated Production subject to Abitibi Royalties interest
during calendar year 2013 




----------------------------------------------------------------------------
                    Area                                                    
             (by royalty                                                    
Month              area)   Tons (metric)   Gold Grad (g/t)  Contained Ounces
----------------------------------------------------------------------------
November         Gouldie          64,900             0.516             1,076
----------------------------------------------------------------------------
December         Gouldie         231,500             0.934             6,950
----------------------------------------------------------------------------
Total                All         296,300             0.842             8,026
----------------------------------------------------------------------------
                                                                            
1    Mineral Reserves are reported at a commodity price of US$1,475/oz Au   
     for Gouldie and Barnat and $1,450/oz Au for Jeffrey, and have an       
     effective date of December 31, 2012. Tonnages have been rounded to     
     nearest hundred tonnes. Numbers may not add up due to rounding.        
2    Mineral Resources are reported exclusive of Mineral Reserves and are   
     determined by Ordinary Kriging and a variable cut-off grade ranging    
     from 0.31 to 0.34 g/t Au. Mineral Resources that are not Mineral       
     Reserves do not have demonstrated economic viability                   
3    Rounding as required by reporting guidelines may result in apparent    
     summation differences between tonnes, grade and contained metal        
     content.                                                               
4    Tonnage and grade measurements are in metric units. Contained gold     
     ounces are reported as troy ounces.                                    
5    A Proven Ore Reserve is economically minable part of a Measured Mineral
     Resource. It includes diluting materials and allowances for losses     
     which occur when the material is mined. A Proven Ore Reserve represents
     the highest confidence category of reserve estimate.                   
6    A Probable Ore Reserve is the economically minable part of Indicated   
     Mineral Resource. It includes diluting material and allowances for     
     losses which may occur when the material is mined. A Probable Ore      
     Reserve has a lower level of confidence than a Proven Ore Reserve but  
     is of sufficient quality to serve as the basis for decision on the     
     development of deposit.                                                
7    Basis for Reserves estimation.                                         



Qualified Person 

Mr. Donald Gervais is the qualified person, as defined in NI 43-101, who has
reviewed and is responsible for the technical information in this new release,
including verification of the data disclosed, the sampling, and the analytical
QA-QC data underlying the technical information. Resources and Reserves have
been classified following the standards and definitions of the CIM. 


A NI 43-101 compliant report, supporting the mineral resources and mineral
reserves estimates with respect to the Mammoth/Barnat, and Jeffrey zones, will
be finalized and filed on SEDAR within 45 days of the date of this news release.
Mr. B. Terrence Hennessey, P.Geo., Mani M. Verma, P. Eng. and Richard Gowans,
P.Eng. of Micon will co-author the report. 


About Micon International 

Since 1988, Micon International has provided consulting services to the
international mining industry with particular focus upon mineral resource
estimations, metallurgical services, mine design and production scheduling,
preparation of pre-feasibility and feasibility studies, independent reviews of
mining and mineral properties, project monitoring, independent engineer roles,
financial analysis and litigation support. Micon's clients include mining and
mineral exploration companies, financial institutions and government agencies
from around the world. A particular expertise has been developed in the economic
evaluation of mining properties, including studies in support of debt and equity
financing. Micon's professional staff has the experience, education and
professional credentials to act as Qualified Persons and/or Competent Persons,
as required by world-wide regulatory agencies. 


About Abitibi Royalties Inc. 

Abitibi Royalties holds title to the Luc Bourdon and Bourdon West Prospects
(also known as the McFaulds Lake Property) and a 30% free carried interest on
the Malartic CHL Property which is the object of a joint venture with Osisko. In
addition, the Company holds a 2% net smelter royalty interest in one claim held
by Osisko, and may acquire and generate other property and royalty interests. 


Forward Looking Statements: 

This news release contains certain statements that may be deemed
"forward-looking statements. Forward looking statements are statements that are
not historical facts and are generally, but not always, identified by the words
"expects", "plans", "anticipates", "believes", "intends", "estimates",
"projects", "potential" and similar expressions, or that events or conditions
"will", "would", "may", "could" or "should" occur. Although the Company believes
the expectations expressed in such forward-looking statements are based on
reasonable assumptions, such statements are not guarantees of future performance
and actual results or realities may differ materially from those in forward
looking statements. Forward looking statements are based on the beliefs,
estimates and opinions of the Company's management on the date the statements
are made. Except as required by law, the Company undertakes no obligation to
update these forward-looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change. 


FOR FURTHER INFORMATION PLEASE CONTACT: 
Glenn J. Mullan
President
819-824-2808, x 1222
glenn.mullan@goldenvalleymines.com

Abitibi Royalties (TSXV:RZZ)
Historical Stock Chart
From Apr 2024 to May 2024 Click Here for more Abitibi Royalties Charts.
Abitibi Royalties (TSXV:RZZ)
Historical Stock Chart
From May 2023 to May 2024 Click Here for more Abitibi Royalties Charts.