Xtierra Inc. (TSX VENTURE:XAG) ("Xtierra" or the "Company"), is pleased to
announce the results of a 2,032 metre 9-hole programme of infill drilling on the
main Bilbao deposit. The objectives of the campaign were to check grade
variability and to increase confidence in the resource blocks that would be
mined within the first three to four years of underground production. 


The drilling, which was centred in the previously drilled 50m grid, also
permitted a refinement of the morphology of the main zone of mineralization
which comprises the bulk of the deposit resource which currently stands at 10.62
million tonnes grading 2.00% lead, 2.13% zinc, 53.81 g/t silver and 0.19% copper
in the indicated category. The drill-holes were designated Z1 to Z10,
distinguishing them from previous holes which were designated X1 to X100.
Results presented in the table below show very strong mineralization of
excellent thickness has been intersected during the infill drilling programme.
Hole Z4 intersected an almost continuous zone of mineralization at an average
grade of 6.47% Pb+Zn together with 54g/t Ag over approximately 194m.
Intersections of over 50m of resource grade or better mineralization were
encountered in most drill holes which were equal to or better than anticipated.


The results of the infill drilling are now being incorporated into the
geological model and a revised and updated independent resource estimate will be
calculated for the feasibility study.


Conclusions



--  The recently completed infill drilling has confirmed the continuity of
    the main mineralization between the previous 50m spaced grid pattern in
    the core of the Bilbao resource on 25m spacing which may enable some of
    the resources to be upgraded from indicated to a measured category. 
--  Intersection of the various mineralized horizons during the infill
    drilling program will enable a refinement of the precise morphology of
    the main mineralized zone thereby allowing a more accurate tonnage
    estimate of the resource. 
--  Good to excellent base metal and silver grades have been substantiated
    in all of the verification drill-holes. 
--  Drill hole Z10 encountered a small extension of the massive sulfide pod
    in the eastern part of the main mineralized zone although with lower
    lead-zinc-silver grades but with a stronger copper-gold signature
    (0.29g/t Au and 0.41% Cu over 6.0m). 
--  There is good overall agreement with grades intersected in the infill
    drill-holes when compared with those drilled earlier and which were used
    for calculation of the existing resource estimate. There appears to be a
    slight increase overall in zinc grades in the infill drill holes
    compared to earlier drilling.



Silver-Rich Zone

This infill-drilling is separate from the silver-rich breccia zone which was
reported previously and which lies immediately to the south of the main Bilbao
deposit. This zone extends over an area 350 x 100m in a north-south direction
and appears to occupy a brecciated zone within the limestone sequence, the
thickness of which is variable from about four to 20 metres. The resource
estimate for Bilbao does not include these newly found silver rich veins and
mantos (flat-lying replacement deposits) which are expected to eventually
contribute to the silver resource at Bilbao. 


Qualified Person

Information of a scientific or technical nature contained in this release has
been prepared by or under the supervision of Terence N. McKillen, P.Geo., Chief
Executive Officer, Gerald J. Gauthier, P.Eng., Chief Operating Officer and Dr.
Anthony C. Gallon, C.Eng., Chief Geologist, all 'Qualified Persons' within the
meaning of National Instrument 43-101 - Standards of Disclosure for Mineral
Projects of the Canadian Securities Administrators.




----------------------------------------------------------------------------
                                                                            
                                                                            
Drill-             From          Width  Lead  Zinc Pb+Zn Silver  Gold Copper
 hole  Ore Type     (m)  To (m)    (m)   (%)   (%)   (%)  (g/t) (g/t)    (%)
----------------------------------------------------------------------------
Z1     Total      85.00  150.50  65.50  0.91  2.58  3.49   18.0  0.01   0.12
----------------------------------------------------------------------------
Inc Z1 Oxide      85.00  100.00  15.00  1.69  2.46  4.15   32.0  0.01   0.26
----------------------------------------------------------------------------
Z1     Sulfide   127.00  151.00  24.00  0.86  4.12  4.98   10.0  0.01   0.11
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z2(i)  Mixed     115.40  128.70  13.30  7.59  3.37 10.96  108.0  0.02   0.94
----------------------------------------------------------------------------
Inc Z2 Mixed     123.00  127.00   4.00 16.23  0.52 16.75  275.0  0.03   2.06
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
       Sulfide,                                                             
        Mixed &                                                             
Z4      Oxide     53.25  247.00 193.75  3.20  3.27  6.47   54.0  0.06   0.29
----------------------------------------------------------------------------
Inc Z4 Oxide      53.25  131.00  77.75  5.52  3.32  8.84   27.0  0.04   0.38
----------------------------------------------------------------------------
Inc Z4 Sulfide   150.00  211.00  61.00  2.31  4.65  6.96   78.0  0.08   0.18
----------------------------------------------------------------------------
Inc Z4 Sulfide   219.00  237.00  18.00  1.60  3.28  4.88   77.0  0.06   0.37
----------------------------------------------------------------------------
Inc Z4 Sulfide   231.00  237.00   6.00  1.12  4.26  5.38  118.0  0.04   0.64
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z5     Sulfide   183.00  210.00  27.00  2.93  3.13  6.06   55.0  0.01   0.25
----------------------------------------------------------------------------
Z5     Sulfide   226.00  262.00  36.00  2.58  3.80  6.38  120.0  0.02   0.20
----------------------------------------------------------------------------
Inc Z5 Sulfide   232.00  236.00   4.00  6.79  7.96 14.75  282.0  0.01   0.31
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z6     Sulfide   187.15  218.00  30.85  2.08  2.50  4.58   86.0  0.02   0.15
----------------------------------------------------------------------------
Inc Z6 Sulfide   187.15  195.00   7.85  4.29  2.76  7.05   51.0  0.02   0.20
----------------------------------------------------------------------------
Inc Z6 Sulfide   207.00  218.00  11.00  1.93  4.67  6.60  145.0  0.02   0.27
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z7     Mixed     130.35  188.00  57.65  2.25  4.09  6.34  142.0  0.01   0.46
----------------------------------------------------------------------------
Inc Z7 Sulfide   139.00  156.00  17.00  3.87  7.35 11.22  232.0  0.01   0.76
----------------------------------------------------------------------------
Z7     Sulfide   189.00  197.00   8.00  0.45  1.82  2.27   75.0  0.29   0.83
----------------------------------------------------------------------------
Z7     Sulfide   228.00  242.00  14.00  2.61  4.75  7.36  161.0  0.04   0.81
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z8(i)  Oxide      51.10   57.15   6.05  2.74  3.68  6.42   82.0  0.08   0.45
----------------------------------------------------------------------------
Z8     Mixed     113.00  121.40   8.40  5.66  2.16  7.82   59.0  0.06   0.32
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z9     Sulfide   164.00  216.00  52.00  1.80  3.71  5.51  110.0  0.06   0.36
----------------------------------------------------------------------------
       Oxide+Sul                                                            
Inc Z9  fide     171.00  188.00  17.00  4.31  7.87 12.18  256.0  0.01   0.63
----------------------------------------------------------------------------
Inc Z9 Sulfide   164.00  190.00  26.00  3.47  6.14  9.61  192.0  0.01   0.47
----------------------------------------------------------------------------
Z9     Sulfide   205.00  211.00   6.00  0.02  1.43  1.45    8.0  0.28   0.34
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Z10    Sulfide   189.00  195.00   6.00  0.03  0.06  0.09   24.0  0.29   0.41
----------------------------------------------------------------------------
Z10    Sulfide   205.00  211.00   6.00  1.32  0.93  2.25   38.0  0.01   0.15
----------------------------------------------------------------------------



(i)The planned drill-hole Z3 was not drilled and was substituted by hole Z10.
Two drill-holes Z2 and Z8 were terminated prematurely before reaching the main
ore body because of encountering water loss in cavernous fault zones. 


Analytical Method

Core from each of the drill-holes was halved by diamond saw and samples taken
for analysis usually at 1 metre intervals, or where a change in lithology
occurred. These samples were submitted to the SGS laboratories in Durango for
analysis by Inductively Coupled Plasma Optical Emission Spectrometer ICP-OES/14B
by aqua regia digestion for 36 elements. Where analyses of the samples exceeded
the upper detection limit for this method they were reanalyzed by ICP-AES/90Q
which used a sodium peroxide fusion in order that high accuracy could be
achieved and a precise grade (greater than 5% precision) determined on ore grade
material. For analysis of silver and gold, where initial grades exceeded 10g/t
Ag, these were re-checked by Fire Assay (FAG323). Check analyses of 10% of the
samples are being sent to the laboratories of ALS Minerals in Zacatecas.


About Xtierra Inc.

Xtierra Inc. is a Toronto based exploration and development company listed on
the TSX Venture Exchange under the symbol "XAG". There are 103,272,142 shares
issued and outstanding. The Company is completing a feasibility study on its
Bilbao silver-zinc-lead-copper project in Zacatecas, Mexico which is expected to
be completed in Q4 2012. Xtierra's objective is to become a mid-tier producer of
precious and base metals through the development of its Bilbao project as well
as through exploration, organic growth and M & A opportunities.


For further information visit www.xtierra.ca.

Xtierra (TSXV:XAG)
Historical Stock Chart
From Apr 2024 to May 2024 Click Here for more Xtierra Charts.
Xtierra (TSXV:XAG)
Historical Stock Chart
From May 2023 to May 2024 Click Here for more Xtierra Charts.