Symbol: TSX: ME
TORONTO, Feb. 20, 2020 /CNW/ - Moneta Porcupine
Mines Inc. (TSX:ME) (OTC:MPUCF) (XETRA:MOP) ("Moneta" or the
"Company") is pleased to announce the results from five (5)
drill holes testing the southern extensions of gold mineralization
on the Windjammer South deposit beyond the updated November 2019 NI 43-101 mineral resource
estimate. The drilling is part of the expanded 2019/2020 winter
drill program currently underway on the Company's Golden Highway
Project, 110 km east of Timmins,
Ontario, (see Figure 1).
Highlights:
Drilling was conducted to expand the
mineralization south and west of the updated November 2019 43-101 mineral resource at the
Windjammer South Deposit
- Extended gold mineralization up to 400 m south of the Banded Iron Formation
(BIF)
- Extended gold mineralization over 200
m west of the November 2019
mineral resource update
- Drilling confirmed up to 17 mineralized zones with a
combined thickness of up to 75.00
m
- MGH19-132: Intersected 5.10 m
@ 2.45 g/t Au including 0.50 m @ 8.82
g/t Au from a new zone, 0.60 m @
15.00 g/t Au from a second new zone and 2.15
m @ 5.34 g/t Au from the K Zone
- MGH19-128: Intersected 6.00 m
@ 1.61 g/t Au including 1.00 m @ 7.61
g/t Au from the J Zone
- MGH19-130: Intersected 1.00 m
@ 8.58 g/t Au from a new vein and 3.40
m @ 2.28 g/t Au including 0.80
m @ 8.21 g/t Au from the L Zone
- MGH20-136: Intersected 5.50 m
@ 2.10 g/t Au including 0.75 m @ 7.05
g/t Au from the I Zone and 1.00 m @
7.08 g/t Au from a new zone
Gary O'Connor, CEO & Chief
Geologist commented, "We are pleased to have intersected gold
mineralization in large step-outs to the south and west at
Windjammer South. Gold mineralization has been intersected in
multiple zones over large combined thicknesses up to 400 m south of the BIF. The drill program has
successfully confirmed the extensions of gold mineralization with
significant step-outs west and east of the updated November 2019 Resource Estimate and has now
extended mineralization to the south. The program has confirmed the
new geological interpretation at Windjammer South confirming both
numerous wide shallow dipping zones and steeper high-grade veins at
the Windjammer South deposit. The fully funded drill program is
ongoing and will continue over the winter."
The latest assay results are from five (5) drill holes,
MGH19-128, MGH19-130, MGH19-132, MGH19-134 and MGH20-136, completed
on the 2019/2020 winter drill program for a total 2,628.00 m at the Windjammer South Deposit
(Figure 1 and Table 2). The drill holes were testing the southern
extensions of the current mineral resource within the newly
identified shallow dipping but thicker extensional veins. The
drilling was conducted to test the southern extensions along the W
Structure up to 400 m south of the
Banded Iron Formation (BIF) contact (Figures 2 and 3).
Table 1:
Windjammer South: Selected Significant Drill Results
|
Hole
|
From
|
To
|
Length
|
Au
|
Vein
|
#
|
(m)
|
(m)
|
(m)
|
(g/t)
|
Name
|
MGH19-128
|
281.80
|
287.80
|
6.00
|
1.61
|
J Zone
|
includes
|
285.80
|
286.80
|
1.00
|
7.61
|
J Zone
|
MGH19-128
|
318.70
|
320.70
|
2.00
|
1.26
|
K Zone
|
includes
|
319.70
|
320.70
|
1.00
|
2.00
|
K Zone
|
MGH19-128
|
424.00
|
424.75
|
0.75
|
2.68
|
O Zone
|
MGH19-130
|
117.00
|
120.00
|
3.00
|
1.32
|
D Zone
|
MGH19-130
|
158.00
|
159.00
|
1.00
|
8.58
|
Vertical
|
MGH19-130
|
322.00
|
326.60
|
4.60
|
1.09
|
K Zone
|
includes
|
326.00
|
326.60
|
0.60
|
2.39
|
K Zone
|
MGH19-130
|
337.60
|
341.00
|
3.40
|
2.28
|
L Zone
|
includes
|
338.20
|
339.00
|
0.80
|
8.21
|
L Zone
|
MGH19-130
|
372.00
|
375.00
|
3.00
|
1.09
|
M Zone
|
includes
|
373.00
|
374.00
|
1.00
|
2.20
|
M Zone
|
MGH19-132
|
171.60
|
175.00
|
3.40
|
2.30
|
F Zone
|
includes
|
172.35
|
173.00
|
0.65
|
5.35
|
F Zone
|
MGH19-132
|
181.75
|
182.85
|
1.10
|
3.97
|
G Zone
|
MGH19-132
|
201.00
|
202.00
|
1.00
|
2.22
|
H Zone
|
MGH19-132
|
245.00
|
245.60
|
0.60
|
15.00
|
Vertical
|
MGH19-132
|
273.75
|
281.00
|
7.25
|
1.89
|
Vertical
|
includes
|
275.90
|
281.00
|
5.10
|
2.45
|
Vertical
|
includes
|
278.50
|
281.00
|
2.50
|
4.25
|
Vertical
|
includes
|
280.50
|
281.00
|
0.50
|
8.82
|
Vertical
|
MGH19-132
|
285.10
|
287.25
|
2.15
|
5.34
|
K Zone
|
MGH19-132
|
432.30
|
434.05
|
1.75
|
2.36
|
New Zone
|
MGH19-134
|
102.50
|
110.38
|
7.88
|
0.63
|
D Zone
|
includes
|
102.50
|
103.50
|
1.00
|
2.22
|
D Zone
|
MGH20-136
|
250.00
|
255.50
|
5.50
|
2.10
|
I Zone
|
includes
|
250.75
|
251.50
|
0.75
|
7.05
|
I Zone
|
MGH20-136
|
353.40
|
358.00
|
4.60
|
0.94
|
L Zone
|
includes
|
353.40
|
354.40
|
1.00
|
2.07
|
L Zone
|
MGH20-136
|
475.00
|
479.75
|
4.75
|
1.03
|
P Zone
|
includes
|
476.85
|
477.20
|
0.35
|
4.59
|
P Zone
|
MGH20-136
|
499.00
|
502.85
|
3.85
|
1.31
|
R Zone
|
includes
|
500.85
|
501.40
|
0.55
|
5.30
|
R Zone
|
MGH20-136
|
564.00
|
565.00
|
1.00
|
7.08
|
Vertical
|
MGH20-136
|
647.50
|
650.50
|
3.00
|
1.31
|
U Zone
|
includes
|
648.10
|
648.75
|
0.65
|
2.54
|
U Zone
|
MGH20-136
|
665.00
|
667.75
|
2.75
|
1.10
|
V Zone
|
Intercepts are
calculated using a 1.0 g/t Au cut-off unless noted (*), a maximum
of 3m internal dilution and no top cap applied. All intercepts are
reported as drill widths and estimated to be 80% to 95% of true
width.
|
Windjammer South Deposit Drill Results
Drill holes
MGH19-128 and MGH19-130 were drilled on a
section 100 m to the south of drill
holes MGH19-124 and MGH19-125 (Press release ME PR 01-2020 dated
09 January 2020: Drill results up to
29.00 m @ 2.33 g/t Au including
11.00 m @ 4.24 g/t Au at Windjammer
South). The drill holes tested the extensions of flat lying and
vertical zones over 200 m south of
the BIF contact and up to 200 m west
of the November 2019 mineral resource
estimate. The drill holes confirmed the extensions of 13 new zones
with a combined thickness of up to 44.00
m. Drill hole MGH19-128 intersected zones of up to
6.00 m @ 1.61 g/t Au including
1.00 m @ 7.61 g/t Au from the J Zone.
Drill hole MGH19-130 intersected zones of up to 1.00 m @ 8.58 g/t Au from a vertical zone and
3.40 m @ 2.28 g/t Au including
0.80 m @ 8.21 g/t Au from the L Zone.
Drill holes MGH19-132 and MGH20-136 were drilled
on a section 100 m to the south of
drill holes MGH19-130 and MGH19-128, located over 300 m south of the BIF contact. The drilling also
confirmed zones up to 200 m west of
the November 2019 mineral resource
estimate. Drill hole MGH20-136 intersected up to 17 zones with
combined thicknesses of 75.00 m.
Drill hole MGH19-132 intersected up to 0.60
m @ 15.00 g/t Au in a new vertical zone, 7.25 m @ 1.89 g/t Au including 0.50 m @ 8.82 g/t Au in a second new vertical
zone, and 2.15 m @ 5.34 g/t Au from
the K Zone. Drill hole MGH20-136 intersected up to 5.50 m @ 2.10 g/t Au including 0.75 m @ 7.05 g/t Au from the I Zone,
3.85 m @ 1.31 g/t Au including
0.55 m @ 5.30 g/t Au from the R Zone
and 1.00 m @ 7.08 g/t Au from a new
vertical zone.
Drill hole MGH19-134 was drilled 100 m south of the MGH19-132 and MGH20-136 drill
section, over 500 m south of the BIF.
The drill hole was testing the southern extensions of the flat
lying and vertical veins along the W Structure, south of the
November 2019 mineral resource
estimate. MGH19-134 intersected 12 mineralized zones with a
combined thickness of 32.00 m.
Drilling intersected up to 7.88 m @
0.63 g/t Au including 1.00 m @ 2.22
g/t Au from the D Zone. With distance from the BIF, gold grades and
the thickness of mineralized sections decreased. Further drilling
is to be concentrated along the 200 m
adjacent to the BIF contact where gold mineralization is better
developed.
Windjammer South Deposit
The Windjammer South deposit
is located within a similar geological setting as the South West
deposit located 1,400 m to the
southwest (See Figure 1). Gold mineralization is seen to occur as a
series of mineralized vein structures which occur adjacent to the
regional Timiskaming age banded iron formation "A" unit ("BIF-A")
and dominantly hosted within an overlying coarse grain sandstone.
The mineralized quartz-pyrite veins occur as extensional vein
structures associated with ankerite-sericite-silica-pyrite
alteration haloes. The zones occur as both steeply west dipping
NNW-SSE oriented mineralized zones and as wider shallowly
south-west dipping zones (figure 2 and 3). A significant amount of
historical drilling has defined the mineralized zones.
Click here for Figure 1: Windjammer South
Deposit Location Map- Golden Highway Project
https://www.monetaporcupine.com/uploads/feb-20-2020-2.jpg
Click here for Figure 2: Windjammer South
Deposit: Schematic Section (MGH19-128 & MGH20-130)
https://www.monetaporcupine.com/uploads/feb-20-2020-3.jpg
Click here for Figure 3: Windjammer South
Deposit: Schematic Section (MGH19-132 & MGH20-136)
https://www.monetaporcupine.com/uploads/feb-20-2020-4.jpg
Table 2: Drill
Hole Details
|
Hole
|
Easting
|
Northing
|
Elevation
|
Azimuth
|
Inclination
|
Depth
|
(#)
|
(mE)
|
(mN)
|
(masl)
|
(°)
|
(°)
|
(m)
|
MGH19-128
|
572024
|
5370224
|
330
|
80
|
-62
|
501.0
|
MGH19-130
|
571932
|
5370206
|
330
|
82
|
-57
|
444.0
|
MGH19-132
|
572073
|
5370132
|
330
|
80
|
-62
|
492.0
|
MGH19-134
|
572122
|
5370043
|
331
|
80
|
-60
|
504.0
|
MGH20-136
|
571925
|
5370300
|
328
|
80
|
-58
|
687.0
|
QA/QC Procedures
All core drilling conducted by Moneta
was oriented. Drill core is cut with half sent to AGAT Laboratories
Inc. (AGAT) for drying and crushing to -2 mm, with a 1.00 kg split
pulverized to -75 µm (200#). AGAT is an ISO 17025 accredited
laboratory. A 50 g charge is Fire Assayed and analyzed using an AAS
finish for Gold. Samples above 10.00 g/t Au are analyzed by Fire
Assay with a gravimetric finish and selected samples with visible
gold or high-grade mineralization are assayed by Metallic Screen
Fire Assay on a 1.00 kg sample. Moneta inserts independent
certified reference material and blanks with the samples and assays
routine pulp repeats and coarse reject sample duplicates, as well
as completing third-party check assays at Activation Laboratories
Ltd. Gary O'Connor, FAusIMM is a
qualified person under NI 43-101 and has reviewed and approved the
contents of this press release.
About Moneta
The Company holds a 100% interest in 6
core gold projects strategically located along the Destor-Porcupine
Fault Zone in the Timmins Gold Camp with over 85 million ounces of
past gold production. The projects consist of the Golden Highway,
North Tisdale, Nighthawk Lake,
DeSantis East, Kayorum and Denton
projects. The Golden Highway Project covers 12 kilometres of
prospective ground along the DPFZ of which 4 km hosts the current
43-101 mineral resource estimate comprised of an indicated resource
of 556,500 ounces gold contained within 3.82 Mt @ 4.53 g/t Au and a
total of 1,174,000 ounces gold contained within 8.47 Mt @ 4.31 g/t
Au in the inferred category at a 3.00 g/t Au cut-off.
The Company's public documents may be accessed at
www.sedar.com. For further information on the Company, please visit
our website at www.monetaporcupine.com or email us at
info@monetaporcupine.com.
This news release includes certain forward-looking
information and forward-looking statements, collectively
"forward-looking statements" within the meaning of
applicable Canadian securities legislation. Forward-looking
statements are frequently identified by such words as "may",
"will", "plan", "expect", "anticipate", "estimate", "intend" and
similar words referring to future events and results.
Forward-looking statements include, but are not limited to
information with respect to the future performance of the business,
its operations and financial performance and condition such as the
Company's drilling program and the timing and results thereof; and
the ability of the Company to finance and carry out its anticipated
goals and objectives.
Forward-looking statements are based on the current opinions
and expectations of management. All forward-looking information is
inherently uncertain and subject to a variety of assumptions, risks
and uncertainties, including the speculative nature of mineral
exploration and development, fluctuating commodity prices,
competitive risks and the availability of financing, as described
in more detail in our recent securities filings available
at www.sedar.com. Actual events or results may
differ materially from those projected in the forward
looking-statements and we caution against placing undue reliance
thereon. We assume no obligation to revise or update these
forward-looking statements.
SOURCE Moneta Porcupine Mines Inc.