TSXV: CYP | OTCQX: CYDVF
VANCOUVER, BC, Jan. 23,
2023 /CNW/ - Cypress Development Corp. (TSXV:
CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) ("Cypress" or "the
Company") is pleased to provide a progress update on its ongoing
Feasibility Study being conducted on the Company's Clayton Valley
Lithium Project ("Project") near Silver Peak, Nevada, and on its operational Lithium
Extraction Facility ("Pilot Plant") in Amargosa Valley, Nevada.
Highlights
- The Pilot Plant continues to function as designed, working to
optimize the Project's flowsheet. The Plant leaches lithium-bearing
claystone material, through to the production of concentrated
lithium solution using the Company's Direct Lithium Extraction
("DLE") process.
- Additional piloting runs will take place at Saltworks
Technologies, Inc. following the successful production of lithium
carbonate ("Li2CO3") from the Pilot Plant's
concentrated lithium solutions.
- The Project's Feasibility Study is on schedule and is
continuing to advance toward an anticipated second quarter 2023
completion.
- Arrangements are proceeding to initiate federal, state, and
local permitting for the Project, with compilation of data and
evaluation of related infrastructure, including access, water, and
power supply corridors.
- Ahead of the Feasibility Study and permitting, Cypress
management is assessing personnel needs and future Project
financing opportunities and structures, which may include
government grants and loans.
Pilot Plant
Cypress continues to conduct testing at its Pilot Plant with the
support of del Sol Refining, Inc. Since its start-up, the Pilot
Plant has operated in 28 cycles of continuous 24/7 operation, with
minimal down-time and maintenance matters. The test work was
conducted using multiple configurations and equipment to best
replicate the Project flowsheet. In the testing to date, nearly
10,000 samples of solutions, solids and precipitates have been
collected and analyzed. Other data collection, including recording
of flow rates and physical conditions at key sample points
throughout the Pilot Plant, has been conducted, with particular
attention to the DLE section of the Pilot Plant to develop the
Project's mass-balance calculations, and to finalize the flowsheet
for the Feasibility Study.
Pilot Plant testing has achieved targets in most areas,
including operating with 100% recycled solutions. Specific
challenges were addressed with sufficient results to aid in the
completion of the Feasibility Study. Further testing in 2023 is
planned to confirm the overall process, continue to demonstrate the
flowsheet, and produce samples of Li2CO3.
Additional 1000-liter lots of concentrated lithium solution from
the DLE section of the Pilot Plant will be shipped to Saltworks
Technologies, Inc, in Richmond,
B.C., Canada by month
end.
2023 plans for the Pilot Plant include testing alternate
reagents and equipment, which may include identification of
potential by-products, and ways to enhance impurity removal and the
DLE process area. Additional space within the Pilot Plant building
has been prepared for this work.
Feasibility Study
The Feasibility Study is advancing on schedule, with completion
anticipated by mid-year. On-site infrastructure designs, including,
mine, processing plant, and tailings and waste storage facilities
are completed. Cost estimating and market studies are underway,
along with assessments for construction, component lead-time and
off-site infrastructure. Completion of the Feasibility Study will
then await integration of the design and cost estimates for the
acid plant underway by thyssenkrupp nucera.
In addition, Cypress management is assessing personnel needs and
future Project financing opportunities and structures, which may
include government grants and loans.
About Cypress Development
Corp
Cypress Development Corp. is a Canadian based advanced stage
lithium company, focused on developing its 100%-owned Clayton
Valley Lithium Project in Nevada,
USA. Cypress is in the pilot stage of testing on material
from its lithium-bearing claystone deposit and progressing towards
completing a Feasibility Study and permitting, with the goal of
becoming a domestic producer of lithium for the growing electric
vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
www.cypressdevelopmentcorp.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES
PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE
CONTENT OF THIS NEWS RELEASE.
View original content to download
multimedia:https://www.prnewswire.com/news-releases/cypress-development-provides-progress-update-on-feasibility-study-and-lithium-extraction-facility-301727681.html
SOURCE Cypress Development Corp.