ICN Resources Announces Further Phase II Drill Results From the Goldfield Bonanza Project
25 January 2012 - 4:53AM
Marketwired Canada
ICN Resources Ltd. ("ICN" or the "Company") (TSX VENTURE:ICN) is pleased to
announce assays results from the remaining reverse circulation (RC) drill holes
completed late last year as part of its Phase II drill program at the Goldfield
Bonanza Project. The project, under option from Lode Star Gold, Inc. ("Lode
Star"), a private Nevada corporation, is located in the historic Goldfield
mining district of Nevada. The Goldfield district is well known for multi-ounce,
bonanza grade gold ores and has recorded historic production in excess of 4.1
million ounces of gold at an average grade of greater than 17 g/t Au (0.5 oz/t).
For further information on the option to acquire an 80% interest in the
Goldfield Bonanza Project from Lode Star see the Company's news releases of
March 29, 2011 and April 13, 2011.
Highlights Include:
-- 50.3 metres of 1.32 g/t Au, including 3.0 metres of 10.87 g/t Au;
-- 18.3 metres of 1.24 g/t Au;
-- 4.6 metres of 3.23 g/t Au; and
-- 70.1 metres of 0.50 g/t Au.
Table 1. RC Drill Results for Holes ICR-048 to ICR-063
---------------------------------------------------------------------------
UTM UTM Bear- From To Length Au
Hole ID North East ing Angle TD (m) (m) (m) (g/t)
---------------------------------------------------------------------------
ICR-048 4173598.9 480146.8 95 -75 57.9 33.5 44.2 10.7 0.51
---------------------------------------------------------------------------
ICR-049 4173599.9 480175.5 275 -80 99.1 47.3 56.4 9.1 0.93
---------------------------------------------------------------------------
ICR-050 4173620.5 480170.9 90 -75 122 44.2 114.3 70.1 0.5
---------------------------------------------------------------------------
incl 44.2 51.8 7.6 1.33
---------------------------------------------------------------------------
ICR-053 4173670.2 480191 270 -75 140.2 51.8 56.4 4.6 0.69
---------------------------------------------------------------------------
111.3 115.9 4.6 1.05
---------------------------------------------------------------------------
ICR-054 4173439.2 480085.1 270 -85 91.5 32 41.2 9.2 0.51
---------------------------------------------------------------------------
48.8 53.4 4.6 3.23
--------------------------
67.1 74.7 7.6 0.48
---------------------------------------------------------------------------
ICR-056 4173700 480198.8 270 -70 129.6 35.1 53.4 18.3 1.24
---------------------------------------------------------------------------
ICR-057 4173727.1 480183.9 270 -80 76.2 32 35.1 3.1 0.58
---------------------------------------------------------------------------
ICR-059 4173225.6 480619 60 -80 170.7 160.1 161.6 1.5 2.19
---------------------------------------------------------------------------
ICR-061 4173681.5 480209.5 270 -75 128 57.9 62.5 4.6 1.65
---------------------------------------------------------------------------
68.6 118.9 50.3 1.32
--------------------------
incl 106.7 109.8 3.1 10.87
---------------------------------------------------------------------------
Notes:
1. Intervals are calculated using a 0.01 oz/ton (0.34 g/t) cutoff over a
minimum width of 10 feet (3.05 m).
2. True widths are unknown as dips of mineralized zones are variable.
3. Exploration Holes with no significant values include ICR-052, 55 and 60.
4. Geophysical Targets with no significant results include ICR-051, 58, 62
and 63.
The Phase II drill program was completed last year, with a total of 11 core
holes for just over 1,000 metres and 34 reverse circulation (RC) holes for
approximately 3,750 metres. The 16 RC holes reported herein complete results for
the 34-hole RC program, as the Company's news release dated November 23, 2011
reported the assay results from the initial 18 RC holes. Those holes included
results of 36.6 metres of 1.68 g/t Au and 21.3 metres of 2.30 g/t Au from the
area above the Newmont Lode, 12.2 metres of 1.56 g/t Au from an area in the
vicinity of the January shaft, and 13.7 metres of 6.63 g/t Au in a new area
located southeast of the Silver Pick shaft, near the eastern claim boundary. The
results of the 11 core holes should be available within the next several weeks.
The RC holes reported herein include:
1. Holes drilled along a northeast trending corridor lying between the
Newmont Lode and the January-Combination open pit, and
2. Five holes (5) that were collared based on CSAMT geophysical results.
These holes were designed to test geophysical anomalies similar to that
lying above the high grade Church Zone discovered last year.
The exploration holes drilled along the corridor returned numerous lower grade
intervals as exemplified by holes ICR-050 and ICR-061. The degree of
silicification, quartz veining and fracturing in these holes indicates that the
gold-bearing intercepts likely represent halos to higher grade mineralization.
The lower grade mineralization appears to occur when drilling in the vicinity
of, but not quite in the right spot, to encounter significant high grade
mineralization. Hole ICR-061 did intercept 3.0 metres of 10.87 g/t Au within a
broader zone of lower grade mineralization similar to that encountered in drill
hole ICR-050.
One of the geophysical targets returned an ore grade intercept of 2.19 g/t,
while the other four geophysical holes did not return any significant results.
Re-interpretation of the CSAMT geophysical targets will be necessary.
When assays from the core hole program are complete, ICN will compile all
results from the Phase I and II drill programs into a 3 dimensional model to
gain further understanding of controls on both the high grade and lower grade
mineralization. Biogeochem results obtained from a vegetation sampling program
last year are also currently being interpreted to further aid in planning future
drilling on the property.
QAQC
All sampling on the Goldfield Bonanza Project follows National Instrument 43-101
-- Standards of Disclosure for Mineral Projects ("NI 43-101") accepted
principles and is being conducted by ICN personnel or consultants. Assays for
the RC holes were completed at American Assay Labs, Reno, Nevada, an accredited
lab. Initial one-ton fire assays with atomic adsorption finish are completed for
all samples, and subsequently, for samples in excess of 10 g/t, a conventional
gravimetric assay is conducted. ICN randomly inserts blind standards, blanks and
duplicate control samples to monitor laboratory performance. Results reported
herein have been checked and have undergone quality control review.
Tim Percival, CPG and a P. Geo., a Qualified Person as defined by National
Instrument 43-101 and Chief Geologist for the Company, has reviewed and approved
the technical information contained in this news release.
About ICN Resources
ICN is primarily focused on exploration for volcanic-hosted precious metal
deposits in western Nevada, emphasizing targets with geological similarities to
Sleeper, Sandman, Hollister, Midas and Aurora. ICN plans to explore the feeder
zones associated with large low-grade gold and silver systems, as well as
explore for high grade deposits at the new Goldfield Bonanza Project located in
western Nevada. ICN continues to evaluate opportunities in established
metallogenic belts elsewhere in the United States. The ICN management and
geological team have extensive experience in Nevada and worldwide, utilizing
this experience to generate prime opportunities for ICN shareholders.
On Behalf of the Board of Directors of ICN Resources Ltd.,
Carl Hering, President & CEO
ICN Resources Ltd.
The forward-looking information contained in this press release is made as of
the date of this press release and, except as required by applicable law, ICN
does not undertake any obligation to update publicly or to revise any of the
included forward-looking information, whether as a result of new information,
future events or otherwise. By its very nature, such forward-looking information
requires ICN to make assumptions that may not materialize or that may not be
accurate. This forward-looking information is subject to known and unknown risks
and uncertainties and other factors, which may cause actual results, levels of
activity and achievements to differ materially from those expressed or implied
by such information.
Icn Resources Ltd. (TSXV:ICN)
Historical Stock Chart
From Nov 2024 to Dec 2024
Icn Resources Ltd. (TSXV:ICN)
Historical Stock Chart
From Dec 2023 to Dec 2024