Novo Provides Operational Update From Beatons Creek and Millennium
15 October 2020 - 10:55PM
Novo Resources Corp. (“
Novo” or
the “
Company”) (TSX-V: NVO; OTCQX: NSRPF) is
pleased to provide an operational update, including from its
Beatons Creek gold project (“
Beatons
Creek”) on which development activities have
commenced, and from refurbishment works on infrastructure recently
acquired pursuant to the acquisition of Millennium Minerals Limited
(“
Millennium”) which are proceeding on schedule
(please see the Company’s news releases dated August 4, 2020 and
September 8, 2020 for further details).
Refurbishment works on Millennium’s
infrastructure is proceedings as follows:
Plant refurbishment works:
- Novo has executed a contract with
GR Engineering Services (ASX: GNG) (“GRES”) to
undertake refurbishment of Millennium’s processing infrastructure
at an estimated cost of AUD $8.3 million (see Figure 1 below).
- The works substantially consist of
the maintenance and refurbishment of the gold plant, existing CIL
leach tanks, and a gravity circuit capacity upgrade. GRES are
synonymous with gold plant construction and refurbishment
throughout Australia and were selected based upon their experience
and capacity to undertake these works safely, efficiently, and cost
effectively.
Power restoration to site:
- Kalgoorlie Power Systems
(“KPS”) have restored power to the Millennium
infrastructure, enabling GRES works to continue uninterrupted and
for commissioning of the Millennium offices, camp, and other
infrastructure over the coming months. KPS have demonstrated their
intent to work constructively with Novo in regard to
re-establishing full-scale power generation for the Millennium
infrastructure, with commercial discussions ongoing.
Camp upgrade works:
- Pilbara Resources Group
(“PRG”) has been appointed to
undertake a ‘camp readiness’ scope of work to ensure the camp is
safe and ready for operations following 9 months of care and
maintenance by undertaking the following work:
- Testing and tagging of electrical
equipment, servicing air conditioners and hot water systems
- Replacement of unserviceable cooking
facilities and damaged flooring in cooking and dining areas
- Undertaking early camp management
(cooking, cleaning, etc.) whilst the permanent scope is
competitively tendered
Development activities at
Beatons Creek are progressing as
follows:
Commencement of development activities:
- A contract has been awarded to
Edwards Mining and Civil (“EMC”) to undertake
initial Beatons Creek site establishment works (see Figure 2
below). EMC have demonstrated their credentials for this type of
work over the past two field seasons at Novo’s Egina project, with
the current Beatons Creek scope comprising:
- Preparing sites for grade control
drilling
- Eradication of invasive and noxious
Calotropis weed
- Establishment of site access roads and
haulage / light vehicle roads
- Establishment of ROM pad
- Clearing for office, lay down pad and
equipment ‘go bay’
Grade Control Drilling works:
- Castle Drilling
(“Castle”) has been awarded the contract for
initial grade control drilling works. Castle have worked previously
at Beatons Creek and their knowledge of the conglomerate deposit
will prove invaluable. Drilling and sampling activities will
commence in the coming weeks.
- MinAnalytical Laboratories (part of
Perenti Global Limited – ASX: PRN) have been retained to undertake
the assaying of the grade control samples, utilizing award winning
Chrysos technology. This technology is capable of rapidly and
accurately scanning up to 500g of material at a time, an important
capability when dealing with coarse gold systems. Novo are in
discussions with MinAnalytical with regard to establishing an
on-site laboratory facility for Novo at Millennium’s plant.
Major tenders currently under negotiation:
- The primary mining contract is
currently being tendered by a select group of experienced mining
contractors.
- The Millennium camp management
services contract is being tendered with strong interest from a
group of service providers experienced in this style of work in the
Pilbara region.
In addition, the Company is pleased to
announce the following key personnel appointments and ongoing
recruitment activity:
- Trevor Eddie had been appointed
Geology Manager. Mr. Eddie has operational geology experience in
numerous styles of deposits across the West Australian gold mining
industry. His specialist skills in the reconciliation of resources
through the mining and processing cycle will be well utilized as
Novo advances Beatons Creek towards production.
- Leisa Nash has been appointed to
the position of site-based Finance and Administration Manager. Ms.
Nash has extensive site based commercial operational experience,
including having worked previously for Millennium, experience which
will be invaluable as Novo establishes local stakeholder
relationships in an operational context.
- Recruiting continues apace for
other positions as required operationally, with very strong
interest seen from experienced industry participants eager to be
involved with the unique story surrounding the development of
Pilbara conglomerate gold.
Novo CEO and Director Rob Humphryson commented,
“Novo is delighted with the rapid progress being made at Beatons
Creek and the recently acquired Millennium infrastructure. We are
assembling an experienced and enthusiastic operational team who
have a sense that they are integral to pioneering a new era of
conglomerate gold production in Western Australia. This enthusiasm
is being mirrored by our contracting partners, stakeholders and
government regulators alike, with a growing awareness that this
mineralization style has the potential to develop into a basin wide
opportunity.”
About Novo Resources Corp.
Novo is advancing its flagship Beatons Creek
gold project to production while exploring and developing its
highly prospective land package covering approximately 14,000
square kilometres in the Pilbara region of Western Australia. In
addition to the Company’s primary focus, Novo seeks to leverage its
internal geological expertise to deliver value-accretive
opportunities to its shareholders. For more information, please
contact Leo Karabelas at (416) 543-3120 or
e-mail leo@novoresources.com
On Behalf of the Board of Directors,
Novo Resources Corp.
“Quinton Hennigh”Quinton Hennigh President and
Chairman
Neither TSX Venture Exchange nor its Regulation
Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this news release.
Forward-looking information
Some statements in this news release contain
forward-looking information (within the meaning of Canadian
securities legislation) including, without limitation, the
successful completion of plant refurbishments works on time and on
budget at the Beatons Creek and Millennium and that Novo’s board of
directors will take the decision to commence production of Novo’s
Beatons Creek property. Forward-looking statements address future
events and conditions and, as such, involve known and unknown
risks, uncertainties and other factors which may cause the actual
results, performance or achievements to be materially different
from any future results, performance or achievements expressed or
implied by the statements. Such factors include, without
limitation, the successful completion of commercial discussions
with KPS, the successful completion of the camp upgrade work
currently being completed by PRG, the successful completion of site
establishment works at Beatons Creek by EMC, the successful
completion of grade control drilling works by Castle Drilling,
MinAnalytical’s ability to assay the Company drill samples in a
timely and cost-effective manner, the successful completion of
commercial discussions with MinAnalytical regarding the
establishment of an on-site laboratory at Millennium, the
successful completion of mining and camp management services
contracts, and customary risks of the resource industry.
PDFs accompanying this announcement are available
at:
http://ml.globenewswire.com/Resource/Download/60c30e30-e960-459b-b737-653ad5a40298
http://ml.globenewswire.com/Resource/Download/a3de23c5-c513-4726-84c2-f0fd6ff98acc
Novo Resources (TSXV:NVO)
Historical Stock Chart
From Feb 2025 to Mar 2025
Novo Resources (TSXV:NVO)
Historical Stock Chart
From Mar 2024 to Mar 2025