Southern Arc Minerals (TSX VENTURE:SA)(OTCQX:SOACF) ("Southern Arc" or "the
Company") is pleased to provide Phase 1 drilling results from the Bising target
in the Mencanggah Prospect on Southern Arc's West Lombok Property.


Assay results have been received for drill holes MCG028 to MCG035, as summarized
in Table 1 and Figure 1 (to view Figure 1, please click the following link:
http://media3.marketwire.com/docs/sa0216.pdf). All intersections are reported as
down-hole lengths. A total of eight holes totaling 2,285.7 metres have been
completed to date in the Phase 1 program at the Bising target. Highlight
drilling intercepts include:




MCG028   51.3 m @ 1.5 g/t gold from 35.6 m                               
         including 5.1 m @ 3.5 g/t gold from 53.4 m                      
                   3.8 m @ 4.9 g/t gold from 60.2 m                      
MCG030   39.0 m @ 1.8 g/t gold from 34.0 m                               
         including 9.7 m @ 4.9 g/t gold and 5.9 g/t silver from 56.3 m   
                   0.3 m @ 89.0 g/t gold and 27.6 g/t silver from 69.2 m 
MCG031   4.4 m @ 2.1 g/t gold and 7.3 g/t silver from 74.2 m             
         0.8 m @ 47.7 g/t gold and 13.2 g/t silver from 156.8 m          
MCG032   37.8 m @ 1.0 g/t gold from 11.7 m                               
         including 3.0 m @ 2.7 g/t gold from 19.0 m                      
                   4.8 m @ 4.0 g/t gold from 25.2 m                      



Bising is a high-priority drilling target for Southern Arc based on the presence
of significant surface channel intercepts from banded and brecciated
chalcedonic-quartz vein structures, including 5.0 m @ 12.2 g/t gold, 2.0 m @
228.0 g/t gold and 5.0 m @ 5.22 g/t gold.


"Initial drill results indicate that gold mineralization continues at depth in
the Bising target," said Dr. Mike Andrews, Chief Operating Officer of Southern
Arc. "Given the impressive width of the main mineralized structure and the
extensive network of offshoots and intersecting structures, Southern Arc will
make Bising a high-priority target when full-scale exploration resumes at the
West Lombok property."


The extensive width (up to 66 metres) of the main Bising epithermal body is
inferred to result from the intersection of geological structures: a major
west-northwest trending structure and several north-northwest trending
structures, the latter of which form the dominant gold mineralized trend in the
district. Drill holes were located at 100 m drill spacings to test the main
Bising epithermal structural body, its extensions, and intersections with
several crossing structures.


Further drilling is warranted to map out these broad silification zones, which
have large tonnage potential. Closer-spaced drilling is required to determine
the orientation and continuity of higher-grade gold zones. Southern Arc will
prioritize additional drilling of the Bising target when the Company resumes
full-scale exploration upon receipt of its Pinjam/Pakai forestry permit. In the
interim, the Company is focused on exploration of epithermal gold targets to the
northwest of the property and copper-gold porphyry targets to the southeast and
northeast of the property.


On behalf of the Board of Southern Arc Minerals Inc.

John Proust, Chairman & Chief Executive Officer

About Southern Arc

Southern Arc Minerals Inc. is a Canadian mineral exploration company with an
aggressive exploration, acquisition and growth strategy. The Company's portfolio
includes four exploration projects with epithermal gold and gold-copper porphyry
prospects on the Lombok and Sumbawa islands in Indonesia, three of which are
being advanced in partnership with major mining companies Vale and Newcrest. The
Company's key exploration property is its West Lombok project, with several
gold-rich copper porphyry and epithermal gold vein prospects. Southern Arc is
listed on the TSX Venture Exchange under the symbol SA and on the OTCQX
International under the symbol SOACF. More information is available at
www.southernarcminerals.com or by emailing info@southernarcminerals.com.


Qualified Person

The technical information in this document has been reviewed by Southern Arc's
Chief Geologist, Andrew Rowe, B. App. Sc. Geology, MAusIMM. Mr. Rowe has over 18
years of international mineral exploration experience throughout Southeast and
Central Asia and Australia. During this time he has held such positions as
Principal Geologist - Feasibility Studies, Senior Geologist and Consulting
Geologist. The technical information in this document has also been reviewed by
Southern Arc's President & Chief Operating Officer, Dr. Mike Andrews, PhD,
FAusIMM, who has sufficient experience relevant to the style of mineralization
under consideration and qualifies as a Qualified Person as defined by National
Instrument 43-101.


The drill program and sampling protocol is managed by Southern Arc under the
supervision of Andrew Rowe. The diamond drill holes are drilled at PQ, HQ and NQ
sizes depending on hole depth and core recovery to date has averaged 98.0%. Half
core is cut by rock saw and is generally sampled using nominal 1-metre
intervals; however, sample intervals are varied according to geological contacts
and have ranged between 0.2 to 2.5 metres in length. Three quality control
samples (one blank and two standards) are inserted into each batch of 40
samples. The half core samples are securely transported from the project site to
the Intertek Testing Services ("ITS") sample preparation laboratory in Sumbawa
Besar via private truck hired by Southern Arc. Sample pulps are then sent to the
ITS Jakarta laboratory by ITS. Gold is analysed by fire assay with AAS finish
and a four-acid digestion with ICP-MS finish is used to analyse a full suite of
elements including silver and base metals. ITS is one of the world's largest
product and commodity testing, inspection and certification organizations. The
Jakarta laboratory is ISO 17025 accredited and employs a Laboratory Information
Management System for sample tracking, quality control and reporting.


Forward-looking Statements

This news release contains forward-looking statements relating to expected or
anticipated future events and operations, timing of projects and anticipated
results that are forward-looking in nature and, as a result, are subject to
certain risks and uncertainties, such as general economic, market and business
conditions, the regulatory process and actions, the need to obtain permits, the
need to work with local communities and authorities to advance the properties,
technical issues, new legislation, competitive and general economic factors and
conditions, the uncertainties resulting from potential delays or changes in
plans, the occurrence of unexpected events, and the Company's ability to execute
and implement future plans. Actual results achieved may vary from the
information provided herein as a result of numerous known and unknown risks and
uncertainties and other factors. There is no representation by the Company that
actual results achieved during the forecast period will be the same in whole or
in part as that forecast.




Table 1 - Mencanggah Prospect, Bising Target, Phase 1 Drill Hole    
 Statistics Summary                                                 
--------------------------------------------------------------------
                                           Coordinates
                         Depth   ---------------------
Drill Hole      Target      (m)          E           N     Az    Dip
--------------------------------------------------------------------
MCG028          Bising   326.5   388254.66   9023900.8    195    -50
Including                                                           
Including                                                           
Including                                                           
Including                                                           
Including                                                           
Including                                                           
Including                                                           
--------------------------------------------------------------------
MCG029          Bising     234   388069.26   9023936.1    195    -50
                                                                    
                                                                    
--------------------------------------------------------------------
MCG030          Bising   201.5   388157.06   9023887.5    195    -50
Including                                                           
Including                                                           
Including                                                           
Including                                                           
Including                                                           
--------------------------------------------------------------------
MCG031          Bising   283.9    388331.2   9023866.8    195    -50
                                                                    
                                                                    
                                                                    
--------------------------------------------------------------------
MCG032          Bising     250      388562     9023720    195    -50
Including                                                           
Including                                                           
Including                                                           
--------------------------------------------------------------------
MCG033          Bising   387.2   388217.82   9024026.3    230    -50
                                                                    
--------------------------------------------------------------------
MCG034          Bising   304.5      388376     9023678    230    -50
--------------------------------------------------------------------
MCG035          Bising   298.1      388256     9023500    230    -50
--------------------------------------------------------------------

                                       
----------------------------------------------------------------
                          From      To  Interval    Gold  Silver
Drill Hole      Target      (m)     (m)       (m)   (g/t)   (g/t)
----------------------------------------------------------------
MCG028          Bising    35.6   86.85      51.3     1.5      NS
Including                 47.9      52       4.1     2.3      NS
Including                 53.4   58.45       5.1     3.5      NS
Including                 56.4    57.4       1.0    11.0      NS
Including                 60.2    63.9       3.8     4.9      NS
Including                 61.8   62.05       0.3    40.3      NS
Including                 65.6    76.4      10.8     1.4     2.8
Including                 76.0    76.4       0.5    13.4      NS
----------------------------------------------------------------
MCG029          Bising    47.1    47.7       0.6     3.5      NS
                          74.6    75.0       0.4     2.9      26
                          80.0    81.0       1.0     1.0     4.0
----------------------------------------------------------------
MCG030          Bising    34.0    73.0      39.0     1.8     3.1
Including                 38.6    40.0       1.4     1.1      NS
Including                 46.5    50.1       3.6     1.7     2.0
Including                 56.3    66.0       9.7     4.9     5.9
Including                 59.2    59.5       0.3      89    27.6
Including                 71.0    73.0       2.0     1.1       5
----------------------------------------------------------------
MCG031          Bising    37.0    37.6       0.6     6.5     2.2
                          74.2    78.6       4.4     2.1     7.3
                          74.2    75.1       0.9     6.8    27.7
                         156.8   157.5       0.8    47.7    13.2
----------------------------------------------------------------
MCG032          Bising    11.7    49.5      37.8     1.0      NS
Including                 19.0    22.0       3.0     2.7      NS
Including                 25.2    30.0       4.8     4.0     2.5
Including                 44.2    45.2       1.0     1.4      NS
----------------------------------------------------------------
MCG033          Bising   220.4   220.7       0.3     1.7     6.5
                         259.1  259.55       0.4     1.4      NS
----------------------------------------------------------------
MCG034          Bising    10.2    11.6       1.4     1.2    23.2
----------------------------------------------------------------
MCG035          Bising      65    66.4       1.4     1.7      NS
                         176.7   177.3       0.7     2.5      NS
----------------------------------------------------------------

NS - No significant result

Southern Arc Minerals (TSXV:SA)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Southern Arc Minerals Charts.
Southern Arc Minerals (TSXV:SA)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Southern Arc Minerals Charts.