Edf: EDF revises higher its estimate nuclear power generation in France for 2024
11 December 2024 - 7:03PM
UK Regulatory
Edf: EDF revises higher its estimate nuclear power generation in
France for 2024
EDF revises higher its estimate nuclear
power generation in France for 2024
December 11, 2024 - EDF revises higher
its estimate nuclear power generation in France for 2024.
Previously estimated between 340-360 TWh, nuclear
power generation is now estimated between 358-364
TWh1.
This higher nuclear power generation estimate is
based on improved performance of outages and industrial control of
stress corrosion inspections and repair
work.
Since 2019, the Group has implemented the START2 2025
action plan aimed at improving the operational efficiency of
outages. It covers various areas: industrialisation,
capitalisation, and standardisation of outages preparation methods,
a refined strategy for allocating resources and skills, including
the setting up of pooled teams and more employee training in
sensitive actions.
About EDF
The EDF Group is a key player in the energy transition, as an
integrated energy operator engaged in all aspects of the energy
business: power generation, distribution, trading, energy sales and
energy services. The Group is a world leader in low-carbon energy,
with a low carbon output of 434TWh (1), a diverse generation mix
based mainly on nuclear and renewable energy (including
hydropower). It is also investing in new technologies to support
the energy transition. EDF’s raison d’être is to build a net
zero energy future with electricity and innovative solutions and
services, to help save the planet and drive well-being and economic
development. The Group supplies energy and services to
approximately 40.9 million customers (2) and generated consolidated
sales of €139.7 billion in 2023.
(1) See EDF’s 2024 URD sections 1.2.3, 1.3.2 and
3.1
(2) Customers are counted per delivery site. A customer may have
two delivery points.
1 Nuclear power generation estimated for its facilities
currently in service (Detailed information on the Flamanville 3
project on REMIT publication sites).
2 START: Let’s all ensure successful unit shutdowns
- CP-Estimation de production nucléaire 2024_EN
Electricite de France SA... (EU:EDFBP)
Historical Stock Chart
From Dec 2024 to Jan 2025
Electricite de France SA... (EU:EDFBP)
Historical Stock Chart
From Jan 2024 to Jan 2025