UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT
TO RULE 13a-16 OR
15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of February 2024
Commission File Number 001-35297
Fortuna Silver Mines Inc.
(Translation of registrant’s name into English)
200 Burrard Street, Suite 650, Vancouver, British
Columbia, Canada V6C 3L6
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual
reports under cover of Form 20-F or Form 40-F.
FORM 20-F ¨ FORM
40-F x
Indicate by check mark if the registrant is submitting the Form 6-K
in paper as permitted by Regulation S-T Rule 101(b)(1): ¨
Indicate by check mark if the registrant is submitting the Form 6-K
in paper as permitted by Regulation S-T Rule 101(b)(7): ¨
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934,
the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
Fortuna Silver Mines Inc. |
|
(Registrant) |
|
|
Date: February 16, 2024 |
By: |
/s/ "Jorge Ganoza Durant" |
|
|
Jorge Ganoza Durant |
|
|
President and CEO |
Exhibits:
Exhibit 99.1
Fortuna
Silver Mines Inc: Séguéla Gold Mine,
Côte
d’Ivoire
TECHNICAL
REPORT
Effective
Date: December 31, 2023
Prepared by |
Paul Weedon |
|
Senior Vice President – Exploration: Fortuna Silver Mines Inc. |
|
|
|
Eric Chapman |
|
Senior Vice President – Technical Services: Fortuna Silver Mines Inc. |
|
|
|
Raul Espinoza |
|
Director of Technical Services: Fortuna Silver Mines Inc. |
|
|
|
Mathieu Veillette |
|
Director, Geotechnical, Tailings and Water: Fortuna Silver Mines Inc. |
|
|
|
Paul Criddle |
|
Technical Consultant |
Suite 650, 200 Burrard St, Vancouver, BC,
V6C 3L6 Tel: (604) 484 4085, Fax (604) 484 4029
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Contents
| 1.2 | Property Description, Location and Access |
15 |
| 1.4 | Geology Setting, Mineralization and Deposit Types |
16 |
| 1.5 | Exploration, Drilling and Sampling |
17 |
| 1.7 | Mineral Processing and Metallurgical Testing |
20 |
| 1.8 | Mineral Resource Estimates |
20 |
| 1.9 | Mineral Reserve Estimates |
23 |
| 1.11 | Processing and Recovery Methods |
25 |
| 1.14 | Environmental Studies and Permitting |
26 |
| 1.15 | Sustaining Capital and Operating Costs |
27 |
| 1.18 | Risks and Opportunities |
28 |
| 1.19.4 | Tailings Management |
31 |
| 1.19.5 | Environmental and Social |
31 |
| | |
|
| 2.4 | Scope of Personal Inspection |
33 |
| 2.6 | Previous Technical Reports |
34 |
| 2.7 | Information Sources and References |
34 |
3 | Reliance on Other Experts |
35 |
| |
|
4 | Property Description and Location |
36 |
| 4.3 | Mineral Tenure and Surface Rights |
36 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 4.6 | Social and Environmental Considerations |
39 |
| 4.7 | Comments on Section 4 |
39 |
| | |
|
5 | Accessibility, Climate, Local Resources, Infrastructure
and Physiography |
40 |
| 5.2 | Topography, Elevation and Vegetation |
40 |
| 5.4 | Local Resources and Infrastructure |
40 |
| 5.4.2 | Water and Consumable Supplies |
41 |
| 5.5 | Comment on Section 5 |
41 |
| | |
|
| 6.1 | Exploration History |
42 |
7 | Geological Setting and Mineralization |
43 |
| 7.2 | Prospect and Local Geology |
44 |
| 7.4 | Agouti and Boulder Deposits |
47 |
| 7.8 | Comment on Section 7 |
57 |
| | |
|
| 8.1 | Mineralization Styles |
58 |
| 8.2 | Comments on Section 8 |
59 |
| | |
|
| 9.6 | Comments on Section 9 |
64 |
| | |
|
| 10.1 | Summary of Drilling |
65 |
| 10.1.1 | Historical Drilling |
65 |
| 10.1.2 | Roxgold Sango Drilling |
66 |
| 10.1.3 | Extent of Drilling |
75 |
| 10.1.4 | Grade Control Drilling and Drilling Conducted Post Resource
Estimation Data Cut-off Date |
75 |
| 10.2 | Drill Techniques and Procedures |
78 |
| 10.2.1 | Apollo RC Drilling |
78 |
| 10.2.2 | Newcrest and Roxgold Sango AC and RC drilling |
78 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 10.2.3 | Newcrest and Roxgold DD Drilling |
79 |
| 10.3.1 | Newcrest and Roxgold Sango AC and RC Logging |
79 |
| 10.3.2 | Newcrest and Roxgold DD Core Logging |
79 |
| 10.5 | Drill hole Surveying |
79 |
| 10.5.1 | Collar Surveying |
79 |
| 10.5.2 | Downhole Surveying |
80 |
| 10.6 | Representative Drill Sections |
80 |
| 10.7 | Sample Length Versus True Thickness |
84 |
| 10.8 | Summary of Drill Intercepts |
84 |
| 10.9 | Comments on Section 10 |
84 |
| | |
|
11 | Sample Preparation, Analyses and Security |
85 |
| 11.1.1 | AC and RC Sampling |
85 |
| 11.2 | Sample Preparation and Analytical Laboratories |
85 |
| 11.3 | Sample Preparation |
86 |
| 11.5 | Analytical Methods |
86 |
| 11.6 | Bulk Density Determinations |
87 |
| 11.7 | Quality Assurance and Quality Control |
87 |
| 11.7.1 | Overview and Summary of Methodology |
87 |
| 11.7.3 | Certified Reference Materials |
87 |
| 11.7.4 | Field Duplicates |
88 |
| 11.8 | Comments on Section 11 |
91 |
| | |
|
| 12.1 | Laboratory Inspection |
92 |
| 12.3 | Verification of Geological Data |
92 |
| 12.4 | Verification of Sampling and Assaying |
92 |
| 12.4.1 | Visual Inspection |
92 |
| 12.5 | Geotechnical and Hydrogeology |
93 |
| 12.6 | Metallurgical Recoveries |
93 |
| 12.7 | Mineral Resource Estimation |
93 |
| 12.8 | Mineral Reserve Estimation |
93 |
| 12.9 | Comments on Section 12 |
94 |
| | |
|
13 | Mineral Processing and Metallurgical Testing |
95 |
| 13.1 | ALS Laboratories Preliminary Economic Assessment Testwork Program (A19864 and
A20661) |
96 |
| 13.1.3 | Bond Impact Crushing Work Index |
97 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.1.5 | Bond Abrasion Index |
98 |
| 13.1.6 | Bond Rod Mill Work Index |
98 |
| 13.1.7 | Bond Ball Mill Work Index |
98 |
| 13.1.9 | Mineralogical Analysis |
99 |
| 13.1.10 | Bulk Mineralogy |
100 |
| 13.1.11 | Gold Mineralogy |
100 |
| 13.1.14 | Agouti Deposit |
102 |
| 13.1.15 | Bond Abrasion Index |
102 |
| 13.1.16 | Bond Rod Mill Work Index |
102 |
| 13.1.17 | Bond Ball Mill Work Index |
102 |
| 13.1.20 | Boulder Deposit |
103 |
| 13.1.21 | Bond Abrasion Index |
104 |
| 13.1.22 | Bond Rod Mill Work Index |
104 |
| 13.1.23 | Bond Ball Mill Work Index |
104 |
| 13.1.26 | Ancien Deposit |
105 |
| 13.1.29 | Acid Mine Drainage |
106 |
| 13.2 | ALS Laboratories FS Testwork Program (A20721) |
106 |
| 13.2.1 | Metallurgical Samples |
106 |
| 13.2.3 | Bulk Mineralogy |
107 |
| 13.2.4 | Gold Mineralogy |
107 |
| 13.2.6 | Comminution Results |
109 |
| 13.2.7 | Flowsheet Options Tested |
110 |
| 13.3 | Gravity-Cyanidation Results for the A20721 Program |
110 |
| 13.3.1 | Grind and Cyanide Addition Optimization |
110 |
| 13.3.2 | Other Leach Parameters Optimization |
111 |
| 13.3.3 | Satellite Pits Variability Sample Test Results |
114 |
| 13.3.4 | Miscellaneous Test Results |
116 |
| 13.3.5 | Gravity Recoverable Gold Test |
117 |
| 13.3.6 | Carbon Adsorption Test |
117 |
| 13.3.7 | Sedimentation and Rheology Test Results |
119 |
| 13.4 | ALS Laboratories Feasibility Study Koula Update Testwork Program (A21926 and
A21707) |
121 |
| 13.4.1 | Metallurgical Samples |
121 |
| 13.4.3 | Comminution Results |
122 |
| 13.4.4 | Gravity-Cyanidation Results |
122 |
| 13.5 | ALS Laboratories Feasibility Study Sunbird Update Testwork Program (A23013) |
125 |
| 13.5.1 | Metallurgical Samples |
125 |
| 13.5.3 | Comminution Results |
126 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.5.4 | Gravity-Cyanidation Results |
126 |
| 13.6 | ALS Metallurgy Update Testwork Program – Sunbird (A23013) |
127 |
| 13.6.1 | Comminution Testwork Samples |
127 |
| 13.6.2 | Master Composite |
127 |
| 13.6.3 | Variability Composite |
127 |
| 13.6.4 | Unconfined Compressive Strength |
127 |
| 13.6.5 | Bond Impact Crushing Work Index |
127 |
| 13.6.6 | Bond Rod Mill Work Index |
128 |
| 13.6.7 | Bond Ball Mill Work Index |
128 |
| 13.6.9 | Gravity/Cyanide Leach Testwork |
128 |
| 13.7 | Miscellaneous Testwork – Oxygen Sparging Requirement |
130 |
| 13.8 | Recovery Equations for Mine Modelling |
131 |
| 13.9 | Process Design Criteria |
131 |
| 13.10 | Comments on Section 13 |
132 |
| | |
|
14 | Mineral Resource Estimates |
133 |
| 14.4 | Geological Interpretation |
134 |
| 14.5 | Preparation of Mineralization Wireframes |
138 |
| 14.5.1 | Antenna, Ancien, Koula and Sunbird Deposits |
138 |
| 14.5.2 | Agouti and Boulder Deposits |
140 |
| 14.8 | Statistical Analysis |
142 |
| 14.9 | Drill hole Coding |
142 |
| 14.10 | Sample Compositing |
142 |
| 14.11 | Geostatistical Analysis |
142 |
| 14.11.1 | Spatial Domaining |
142 |
| 14.11.2 | Global Summary Statistics |
143 |
| 14.12 | Treatment of Outliers (Top-Cut Selection) |
147 |
| 14.14 | Quantitative Kriging Neighborhood Analysis |
152 |
| 14.16 | Grade Interpolation |
153 |
| 14.17 | Bulk Density Assignment |
153 |
| 14.18 | Model Validation |
154 |
| 14.19 | Mineral Resource Classification |
157 |
| 14.19.1 | Mineral Resource Classification Parameters |
157 |
| 14.19.2 | Reasonable Prospects for Eventual Economic Extraction |
161 |
| 14.20 | Mineral Resource Estimate |
161 |
| 14.21 | Previous Mineral Resource Estimates |
163 |
| 14.22 | Comments on Section 14 |
163 |
| | |
|
15 | Mineral Reserve Estimates |
164 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 15.2 | Cut-off Grade Derivation |
164 |
| 15.3 | Mineral Reserve Estimate |
166 |
| 15.4 | Comparison with Previous Mineral Reserves |
167 |
| 15.5 | Comments on Section 15 |
167 |
| | |
|
| 16.2 | Mine Geotechnical |
168 |
| 16.2.1 | Data Confidence |
168 |
| 16.2.2 | Ground Conditions |
169 |
| 16.2.3 | Slope Design Analysis |
169 |
| 16.2.4 | Slope Design Parameters |
170 |
| 16.4 | Pit Optimizations |
174 |
| 16.4.1 | Mining Block Model |
174 |
| 16.4.2 | Optimization Parameters |
175 |
| 16.4.3 | Optimization Outcomes |
178 |
| 16.5.2 | Summary of Mineral Reserves and Waste by Pit |
189 |
| 16.6 | Mining Area Layout |
190 |
| 16.7 | Mining Operations |
191 |
| 16.7.1 | Drill and Blast, Excavate, Load and Haul |
191 |
| 16.7.2 | Ancillary and Support Fleet |
192 |
| 16.7.3 | Other Mining Infrastructure |
192 |
| 16.7.4 | Equipment and Personnel Requirements |
192 |
| 16.8 | Mining and Production Schedule |
196 |
| 16.8.1 | Scheduling Parameters |
196 |
| 16.8.2 | Schedule Results |
196 |
| 16.9 | Comments on Section 16 |
198 |
| | |
|
| 17.2 | Process Plant Performance |
199 |
| 17.3 | Process Plant Design Criteria |
200 |
| 17.4 | Process Plant Description |
202 |
| 17.4.1 | Materials Handling and Crushing Circuit |
202 |
| 17.4.2 | Reclaim, Grinding and Classification Circuit |
202 |
| 17.4.3 | Gravity Recovery Circuit |
202 |
| 17.4.4 | Intensive Cyanidation Reactor |
203 |
| 17.4.5 | Pre-Leach Thickening |
203 |
| 17.4.6 | Leaching and Adsorption Circuit |
203 |
| 17.4.7 | Carbon Acid Wash, Elution and Regeneration Circuit |
204 |
| 17.4.8 | Electrowinning and Gold Room |
205 |
| 17.5 | Reagent Handling and Storage |
205 |
| 17.6 | Control Systems and Instrumentation |
206 |
| 17.7 | Electrical Reticulation |
206 |
| 17.8 | Services and Utilities |
206 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 17.8.1 | High- and Low-Pressure Air |
206 |
| 17.8.3 | Raw Water Supply System |
207 |
| 17.8.4 | Process Water Supply System |
207 |
| 17.9 | Comments on Section 17 |
207 |
| | |
|
18 | Project Infrastructure |
208 |
| 18.2 | Mine Services Area |
209 |
| 18.3 | Tailings Storage Facility |
209 |
| 18.4 | Sediment Management |
211 |
| 18.6 | Water Storage Facility |
211 |
| 18.7 | Water Supply and Sewage |
212 |
| 18.7.2 | Raw and Fire Water |
212 |
| 18.7.3 | Filtered (Including Gland Seal) Water |
213 |
| 18.7.5 | Raw Water Supply Pipeline |
213 |
| 18.7.6 | Water Supply Development |
213 |
| 18.7.8 | Water Management |
213 |
| 18.8 | Mine Access and Haulage Roads |
214 |
| 18.9 | Mining Contractor’s Infrastructure |
214 |
| 18.10 | Administration and Plant Buildings |
215 |
| 18.11 | Accommodation Camp |
216 |
| 18.16 | Comments on Section 18 |
218 |
| | |
|
19 | Market Studies and Contracts |
219 |
| 19.2 | Commodity Pricing |
219 |
| 19.4 | Comments on Section 19 |
219 |
| | |
|
20 | Environmental Studies, Permitting and Social or
Community Impact |
221 |
| 20.1 | Environmental Studies |
221 |
| 20.3 | Environmental Monitoring |
222 |
| 20.4 | Social and Community Impact |
224 |
| 20.4.1 | Stakeholder Engagement |
224 |
| 20.4.2 | Social Investment and the Local Development Fund |
225 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 20.4.3 | Land Acquisition |
225 |
| 20.6 | Comments on Section 20 |
227 |
| | |
|
21 | Capital and Operating Costs |
228 |
| 21.1 | Sustaining Capital Costs |
228 |
| 21.2 | Operating Cost Estimate |
228 |
| 21.3 | Comments on Section 21 |
229 |
| | |
|
| 22.1 | Comments on Section 22 |
230 |
| | |
|
23 | Adjacent Properties |
231 |
| |
|
24 | Other Relevant Data and Information |
232 |
| |
|
25 | Interpretation and Conclusions |
233 |
| 25.2 | Mineral Tenure, Surface Rights, Royalties and Agreements |
233 |
| 25.3 | Geology and Mineralization |
233 |
| 25.4 | Exploration, Drilling and Analytical Data Collection in Support of Mineral Resource
Estimation |
234 |
| 25.5 | Data Verification |
235 |
| 25.6 | Metallurgical Testwork |
236 |
| 25.7 | Mineral Resource Estimation |
237 |
| 25.10 | Processing and Infrastructure |
240 |
| 25.11 | Health, Safety, Environmental and Social |
243 |
| 25.12 | Capital and Operating Costs |
244 |
| 25.13 | Economic Analysis |
244 |
| | |
|
| 26.5 | Environmental and Social |
247 |
| 26.5.1 | Data Collection |
247 |
| 26.5.2 | Stakeholder Engagement |
247 |
| 26.5.4 | Acid Rock Drainage |
247 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 27.2 | Abbreviations and Units of Measurement |
251 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figures
Figure
1: |
Location
plan, Séguéla Gold Mine |
36 |
Figure
2: |
Séguéla
Gold Mine – permit and deposit locations |
37 |
Figure
3: |
Archaean-Proterozoic
of the West African Craton (Peucat et al., 2005) |
43 |
Figure
4: |
Local
geology of the Séguéla Gold Mine |
45 |
Figure
5: |
Antenna
deposit geology |
46 |
Figure
6: |
Example
drill core from Antenna deposit – SGDD002 (Note – core tray length is 1 meter) |
47 |
Figure
7: |
Agouti
and Boulder geology |
48 |
Figure
8: |
Structural
interpretation of the Boulder-Agouti corridor over ground/aeromagnetic imagery |
49 |
Figure
9: |
Example
of mineralization from Boulder and Agouti deposits – SGRD437 at Boulder deposit (Note – core tray length is 1 meter) |
50 |
Figure
10: |
Geology
map for Ancien deposit |
51 |
Figure
11: |
Ancien
deposit schematic geological cross-section |
52 |
Figure
12: |
Example
of mineralization from Ancien deposit – SGRD513 (Note – core tray length is 1 meter) |
53 |
Figure
13: |
Geology
map for Koula deposit |
54 |
Figure
14: |
Example
of mineralization from the Koula deposit – SGDD072 (Note – core tray length is 1 meter) |
55 |
Figure
15: |
Geology
map for Sunbird deposit |
56 |
Figure
16: |
Schematic
representation of the variety of proposed models for orogenic gold and fluid sources in the crust. Goldfarb and Groves (2015); Groves
and Santosh (2016). |
58 |
Figure
17: |
Xcalibur
2019/2020 Séguéla aeromagnetics/radiometrics survey – grey scale second vertical derivative of TMI magnetics
imagery (Yellow stars represent identified prospects) |
61 |
Figure
18: |
Xcalibur
2019/2020 Séguéla aeromagnetics/radiometrics survey – total count radiometrics imagery |
62 |
Figure
19: |
Séguéla
prospects (yellow stars) superimposed on gridded auger and soil gold (Au) geochemistry. Background image is 2VD TMI magnetics |
63 |
Figure
20: |
Collar
plan showing location of Newcrest drill holes by type |
66 |
Figure
21: |
Collar
plan showing location of Roxgold Sango drill holes by type |
67 |
Figure
22: |
Antenna
deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
69 |
Figure
23: |
Ancien
deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
70 |
Figure
24: |
Agouti
deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
71 |
Figure
25: |
Boulder
deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
72 |
Figure
26: |
Koula
deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
73 |
Figure
27: |
Sunbird
deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
74 |
Figure
28: |
Antenna
deposit cross-section (894725mN) showing modelled mineralization |
81 |
Figure
29: |
Ancien
deposit cross-section (888560mN) showing modelled mineralization |
81 |
Figure
30: |
Koula
deposit cross-section (895435mN) showing modelled mineralization |
82 |
Figure
31: |
Agouti
deposit cross-section (896425mN) showing modelled mineralization |
82 |
Figure
32: |
Boulder
deposit cross-section (893980mN) showing modelled mineralization |
83 |
Figure
33: |
Sunbird
deposit cross-section (893980mN) showing modelled mineralization |
83 |
Figure
34: |
Half-core
duplicate results (Source: Roxgold Sango, 2023) |
88 |
Figure
35: |
Re-split
drill chip duplicate results (2016-2018. Source: Roxgold Sango, 2023) |
89 |
Figure
36: |
Umpire
analysis - drill core samples |
90 |
Figure
37: |
Umpire
analysis - RC Chip samples (Source: Roxgold Sango, 2023) |
90 |
Figure
38: |
Residue
gold grade versus grind P80 for A20721 Antenna MC (ALS, 2020) |
110 |
Figure
39: |
Residue
gold grade versus cyanide strength for A20721 Antenna MC (ALS, 2020) |
111 |
Figure
40: |
A20721
Antenna variability samples leach kinetics (ALS, 2020) |
112 |
Figure
41: |
Gold
Recovery versus gravity recovery - all A20721 variability samples (ALS, 2020) |
113 |
Figure
42: |
Gold
Recovery versus head grade for Antenna variability samples A20721 (ALS, 2020) |
113 |
Figure
43: |
Residue
gold grade versus head grade for Antenna variability samples (ALS, 2020) |
114 |
Figure
44: |
A20721
satellite pits variability and MC samples leach kinetics (ALS, 2020) |
115 |
Figure
45: |
Gold
recovery versus gravity recovery - A20721 satellite pits (ALS, 2020) |
116 |
Figure
46: |
Adsorption
equilibrium - Antenna MC (ALS, 2020) |
118 |
Figure
47: |
Adsorption
kinetics sequential tripe contact batch test - Antenna MC (ALS, 2020) |
118 |
Figure
48: |
Viscosity
versus shear rates at three densities (%slides) for the Antenna MC slurry (ALS, 2020) |
119 |
Figure
49: |
Shear
Stress versus rate for three densities (% solids) for the Antenna MC slurry (ALS, 2020) |
119 |
Figure
50: |
BASF
flocculant screening results – flocculant type versus settling rate (ALS, 2020) |
120 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 51: |
BASF flocculant screening results – flocculant type versus overflow clarity (ALS, 2020) |
121 |
Figure 52: |
BASF settling testwork results – feed solids versus flux rate (ALS, 2020) |
121 |
Figure 53: |
Residue gold grade versus head grade for Antenna tests (ALS, 2020) |
131 |
Figure 54: |
Geology cross-section 894550 mN, Antenna deposit (±25 m) |
135 |
Figure 55: |
Geology cross-section 888445 mN, Ancien deposit (±12.5 m) |
135 |
Figure 56: |
Geology cross-section 895395 mN, Koula deposit (±12.5 m) |
136 |
Figure 57: |
Geology cross-section 896425 mN, Agouti deposit (±12.5 m) |
136 |
Figure 58: |
Geology cross-section 893980mN, Boulder deposit (±12.5 m) |
137 |
Figure 59: |
Geology cross-section 892880 mN, Sunbird deposit (±12.5 m) |
137 |
Figure 60: |
Mineralization wireframes – Antenna deposit |
138 |
Figure 61: |
Mineralization wireframes – Ancien deposit |
139 |
Figure 62: |
Mineralization wireframes – Koula deposit |
139 |
Figure 63: |
Mineralization wireframes – Sunbird deposit |
140 |
Figure 64: |
Mineralization wireframes – Agouti deposit |
141 |
Figure 65: |
Mineralization wireframes – Boulder deposit |
141 |
Figure 66: |
Main Domain histogram and log-probability plot – Antenna deposit |
143 |
Figure 67: |
Histogram and log-probability plot – Ancien deposit |
144 |
Figure 68: |
Histogram and log-probability plot - Agouti deposit |
145 |
Figure 69: |
Histogram and log-probability plot – Boulder deposit |
145 |
Figure 70: |
Histogram and log-probability plot – Koula deposit |
146 |
Figure 71: |
Histogram and log-probability plot - Sunbird deposit |
147 |
Figure 72: |
Antenna validation plots |
154 |
Figure 73: |
Ancien validation plots |
155 |
Figure 74: |
Koula validation plots |
155 |
Figure 75: |
Agouti validation plots |
156 |
Figure 76: |
Boulder validation plots – Combined domains (101-216) |
156 |
Figure 77: |
Sunbird validation plots |
157 |
Figure 78: |
Antenna deposit Mineral Resource classification |
158 |
Figure 79: |
Ancien deposit Mineral Resource classification |
158 |
Figure 80: |
Koula deposit Mineral Resource classification |
159 |
Figure 81: |
Agouti deposits Mineral Resource classification |
159 |
Figure 82: |
Boulder deposits Mineral Resource classification |
160 |
Figure 83: |
Sunbird deposit Mineral Resource classification |
160 |
Figure 84: |
Pit slope design elements, geometries, and terminology (source: Read & Stacey, 2009) |
170 |
Figure 85: |
Antenna pit optimization results – selected ultimate pit shell |
179 |
Figure 86: |
Agouti pit optimization results – selected ultimate pit shell |
180 |
Figure 87: |
Ancien pit optimization results – selected ultimate pit shell |
180 |
Figure 88: |
Boulder pit optimization results – selected ultimate pit shell |
181 |
Figure 89: |
Koula pit optimization results – selected ultimate pit shell |
181 |
Figure 90: |
Sunbird pit optimization results – selected ultimate pit shell |
182 |
Figure 91: |
Pit wall design terminology |
182 |
Figure 92: |
Antenna pit stage designs |
183 |
Figure 93: |
Agouti pit stage designs |
184 |
Figure 94: |
Ancien pit stage designs |
185 |
Figure 95: |
Boulder pit stage designs |
186 |
Figure 96: |
Koula pit stage designs |
187 |
Figure 97: |
Sunbird pit stage designs |
188 |
Figure 98: |
Mining area layout showing pits, waste rock dumps, haul roads, explosives magazine and bulk storage facility, mining services area, and ROM pad |
190 |
Figure 99: |
Volume mined by deposit |
197 |
Figure 100: |
Tonnes mined by deposit |
197 |
Figure 101: |
Crusher feed tonnes and grade |
197 |
Figure 102: |
Stockpile tonnes |
198 |
Figure 103: |
Séguéla Gold Mine process flow (Source: Roxgold Sango, 2023) |
201 |
Figure 104: |
Layout of the Séguéla Gold Mine |
208 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Tables
Table 1: |
Mineral Resources as of December 31, 2023 |
21 |
Table 2: |
Mineral Reserves as of December 31, 2023 |
23 |
Table 3: |
Permis de’Exploitation No. 56, corner coordinates, UTM Zone 29P, WGS84 |
37 |
Table 4: |
Permis de Recherche Miniére No. 638 (first renewal), corner coordinates, UTM Zone 29P, WGS84 |
38 |
Table 5: |
Côte d’Ivoire government royalty rates |
39 |
Table 6: |
Exploration history |
42 |
Table 7: |
Summary of Newcrest drilling over the Séguéla Project 2016 and 2017 |
65 |
Table 8: |
Summary of Roxgold Sango Séguéla Gold Mine drilling |
66 |
Table 9: |
Summary of Roxgold Sango Séguéla Gold Mine resource drilling |
68 |
Table 10: |
Exploration drilling results at the Séguéla Mine post data cut-off date – intervals of interest |
75 |
Table 11: |
Example of typical drill results at the Séguéla Gold Mine |
84 |
Table 12: |
Key results from the Antenna metallurgical testwork program |
96 |
Table 13: |
Details of the Antenna variability samples |
97 |
Table 14: |
Summary of the Antenna Bond impact crushing work index (CWi) results |
97 |
Table 15: |
Summary of the Antenna SMC testwork results |
98 |
Table 16: |
Summary of the Antenna Bond abrasion (Ai) results |
98 |
Table 17: |
Summary of the Antenna Bond rod mill work index (RWi) results |
98 |
Table 18: |
Summary of the Antenna Bond ball mill work index (BWi) results |
99 |
Table 19: |
Summary of the Antenna head assay results |
99 |
Table 20: |
Antenna master composite cyanide leach and grind size variability testwork results |
100 |
Table 21: |
Summary of the Antenna variability gravity/cyanide leach testwork results |
101 |
Table 22: |
Summary of the Antenna flotation testwork results |
101 |
Table 23: |
Summary of the Agouti Bond abrasion index (Ai) results |
102 |
Table 24: |
Summary of the Agouti Bond rod mill work index (RWi) results |
102 |
Table 25: |
Summary of the Agouti Bond ball mill work index (RWi) results |
102 |
Table 26: |
Summary of the Agouti head assay results |
103 |
Table 27: |
Summary of the Agouti variability gravity/cyanide leach testwork results |
103 |
Table 28: |
Summary of the Boulder Bond Abrasion (Ai) results |
104 |
Table 29: |
Summary of the Boulder Bond Ball Mill Work Index (BWi) results |
104 |
Table 30: |
Summary of the Boulder head assay results |
104 |
Table 31: |
Summary of the Boulder variability gravity/cyanide leach testwork results |
105 |
Table 32: |
Summary of the Ancien head assay results |
105 |
Table 33: |
Summary of the Ancien variability gravity/cyanide leach testwork results |
106 |
Table 34: |
Summary of the acid mine drainage (AMD) testwork results |
106 |
Table 35: |
A20721 Antenna samples head assays |
107 |
Table 36: |
A20721 Other pits samples head assays |
108 |
Table 37: |
Impact crushability results (CWi in kWh /Mt) |
109 |
Table 38: |
Comminution testwork results |
109 |
Table 39: |
Antenna MC gravity-cyanidation test results (Grind and Cyanide Series) |
110 |
Table 40: |
Antenna MC gravity-cyanidation tests results (other parameters) |
111 |
Table 41: |
Antenna variability samples gravity – cyanidation tests results (A20721) |
112 |
Table 42: |
Ancien, Boulder and Agouti variability samples gravity-cyanidation results (A20721) |
114 |
Table 43: |
Antenna MC detoxification results (SO2 – air method) |
116 |
Table 44: |
Oxygen uptake rate results |
117 |
Table 45: |
Antenna MC gravity recoverable gold |
117 |
Table 46: |
Antenna MC dynamic thickening results |
120 |
Table 47: |
Selected head assays for Koula composites |
122 |
Table 48: |
Koula comminution testwork summary |
122 |
Table 49: |
Koula master composite testwork results for gold |
123 |
Table 50: |
Koula variability testwork for gold |
123 |
Table 51: |
Koula master composite testwork results for silver |
124 |
Table 52: |
Koula variability testwork for silver |
124 |
Table 53: |
Samples used for A23013 testwork |
125 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 54: |
Selected head assays for Sunbird composites |
125 |
Table 55: |
Sunbird comminution testwork summary |
126 |
Table 56: |
Sunbird master composite testwork results for gold |
126 |
Table 57: |
Summary of Sunbird Bond impact CWi results |
127 |
Table 58: |
Summary of Sunbird Bond RWi results |
128 |
Table 59: |
Summary of Sunbird Bond BWi results |
128 |
Table 60: |
Summary of Sunbird head assays |
128 |
Table 61: |
Sunbird master composites gravity/cyanide leach test results |
129 |
Table 62: |
Sunbird variability composites gravity/cyanide leach test results |
129 |
Table 63: |
Oxygen uptake rate testwork for master composite (A21707 program) |
130 |
Table 64: |
Gravity/Cyanide leach testwork for master composite (A21707 program) |
130 |
Table 65: |
Process design criteria |
132 |
Table 66: |
Summary statistics by estimation domain – Antenna deposit |
143 |
Table 67: |
Summary statistics by estimation domain – Ancien deposit |
144 |
Table 68: |
Summary statistics by estimation domain – Agouti deposit |
144 |
Table 69: |
Summary statistics by estimation domain – Boulder deposit |
145 |
Table 70: |
Summary statistics by estimation domain – Koula deposit |
146 |
Table 71: |
Summary statistics by estimation domain – Sunbird deposit |
146 |
Table 72: |
Top-cuts applied for the Séguéla Gold Mine Mineral Resource estimation by mineralized domain |
147 |
Table 73: |
Estimation and search parameters for estimation domains |
150 |
Table 74: |
Block model parameters by deposit |
152 |
Table 75: |
Density values by lithology – Séguéla Gold Mineral Resource estimates |
153 |
Table 76: |
Mineral Resource estimate |
162 |
Table 77: |
Cut-off grade inputs |
165 |
Table 78: |
Estimated cut-off grade by deposit |
165 |
Table 79: |
Mineral Reserve estimate |
166 |
Table 80: |
Slope design parameter recommendations for Agouti. |
170 |
Table 81: |
Slope design parameter recommendations for Ancien |
171 |
Table 82: |
Slope design parameter recommendations for Antenna. |
171 |
Table 83: |
Slope design parameter recommendations for Boulder |
172 |
Table 84: |
Slope design parameter recommendations for Koula |
172 |
Table 85: |
Slope Design parameter recommendations for Sunbird |
172 |
Table 86: |
Financial parameters applied in pit optimization |
175 |
Table 87: |
Selling costs applied in pit optimization |
175 |
Table 88: |
Mining costs applied in pit optimization |
175 |
Table 89: |
Waste load and haul costs in US$/bcm |
176 |
Table 90: |
Ore load and haul costs in US$/bcm |
177 |
Table 91: |
ROM costs applied in pit optimization |
178 |
Table 92: |
Overall slope angles applied in the pit optimizations |
178 |
Table 93: |
Optimization results |
179 |
Table 94: |
Pit Mineral Reserve and waste characteristics |
189 |
Table 95: |
Waste rock dump capacities |
189 |
Table 96: |
Drill and blast assumptions |
192 |
Table 97: |
LOMP mining equipment requirements |
193 |
Table 98: |
LOMP mining personnel requirements |
193 |
Table 99: |
Mining and production schedule results |
196 |
Table 100: |
Process plant performance summary |
199 |
Table 101: |
Summary of the plant design criteria |
200 |
Table 102: |
Electrical load estimates for the Séguéla Gold Mine |
217 |
Table 103: |
Summary of closure and post-closure costs |
227 |
Table 104: |
Estimated annual sustaining capital costs |
228 |
Table 105: |
Life of mine operating cash costs |
229 |
Table 106: |
Life of mine operating cost estimate - cash cost |
229 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Fortuna Silver Mines Inc. (Fortuna) has compiled
a Technical Report (the Report) on the Séguéla Gold Mine (the “Séguéla Mine or the Séguéla
Project) located in the Worodougou Region of the Woroba District, Côte d’Ivoire.
The Séguéla open pit gold mine is operated by Roxgold
Sango S.A. (Roxgold Sango), a 90% indirectly-owned Fortuna Subsidiary, with the remaining 10% interest held by the State of Côte d’Ivoire.
The Report discloses updated Mineral Resource
and Mineral Reserve estimates for the Project.
Costs are in US dollars (US$) unless otherwise
indicated.
| 1.2 | Property Description, Location and Access |
The Séguéla Mine is located approximately
500 km from Abidjan, via major highways to the town of Séguéla. The open pit mine is managed by Roxgold Sango. The operation
has a relatively small surface infrastructure consisting primarily of the concentration plant, electrical power station, water storage
facilities, tailings storage facility (TSF), waste dumps, stockpiles, and workshop facilities. The open pits at the Antenna, Ancien, Agouti,
Boulder, Koula and Sunbird deposits are connected by unsealed roads. Additional structures located in the mine area include offices, dining
hall, laboratory, core logging and core storage warehouses.
Roxgold Sango holds an exploration permit (Permis
de Recherche Miniére No. 638) and an exploitation permit (Permis d’Exploitation Minière No.56).
Permis de Recherche Miniére No. 638,
which surrounds Permis d’Exploitation Minière No.56, is a three-year permit that Roxgold Sango has exercised for a second
renewal, having submitted the application on July 20, 2023, and awaiting Ministerial signature. The permit covers an area of 270.1
km2.
Provided minimum expenditure requirements are
met, exploration permits in Côte d’Ivoire are subject to automatic grants of renewal applications for two terms of three years
each, and a special third term of no more than two years.
In addition to the Environmental Permit obtained
on September 22, 2020, the exploitation permit (Permis d’Exploitation No. 56) was granted by the Council of Ministers
on December 9, 2020, and signed as a decree by the President of Côte d’Ivoire (Decree No.2020-960). This permit covers
an area of 353.6 km2 and is valid for 10 years. The permit is thereafter renewable for successive 10-year periods. All the
deposits are located on this permit.
The Séguéla Mine is accessible year-round
by road vehicle. Bituminized national highways facilitate transport between Abidjan, Yamoussoukro, and the nearest major town, Séguéla
(population c. 65,000). From Séguéla, unsealed roads provide access to the mine through the village of Fouio (population
c. 3,000).
The Project is located within a tropical savannah
climatic region on the southern margin of the Sahel savannah. This climatic zone is typified by high average temperatures, and a distinct
wet season and dry season. The average annual temperature for the Séguéla Mine area is 25.3°C, with an annual average
rainfall of 1,268 mm. August and September are the wettest months of the year. Mining operations are conducted year-round.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The Séguéla Project occurs in a
region of low forested hills, with elevations averaging 347 m above sea level. The vegetation of the region is tropical savannah woodland.
The area surrounding the Séguéla Project is extensively cropped for cashews, and to a lesser extent, cacao.
The Séguéla permit (Permis de Recherche
Miniére No. 252) was granted to a local Ivorian company, Geoservices CI in February 2012. The Project was subsequently
transferred to a local Ivorian joint venture company, Mont Fouimba Resource (Mont Fouimba) in late 2012. In 2013 the permit was transferred
to Apollo Consolidated Ltd (Apollo), which was the 51 % shareholder in Mont Fouimba, with Geoservices CI holding the remaining 49 % interest.
In February 2016, Apollo announced the signing of an Option to Purchase Agreement by Newcrest Mining Ltd (Newcrest), for the Séguéla
Project. Newcrest acquired the adjacent permit (Permis de Recherche Miniére No. 638) on 19 October 2016. In February 2017,
the permit was transferred to LGL Exploration CI S.A; a wholly-owned Newcrest subsidiary. In April 2019, Roxgold Inc. (Roxgold) acquired
the Séguéla Project from Newcrest through the acquisition of LGL Exploration CI S.A. In July 2021 Roxgold was acquired
by Fortuna.
On 23 July 2020, Roxgold through its wholly-owned
local entity LGL Exploration CI SA, lodged an application for an exploitation permit (Permis d’Exploitation No. 56). Permis
d’Exploitation No. 56 effectively replaced Permis de Recherche Miniére No. 252. LGL Exploration CI SA subsequently
transferred Permis d’Exploitation No. 56 to Roxgold Sango by Ministerial Order dated May 25, 2021.
Prior to this period, there is evidence to suggest
that the ground contained within permit no. 252 was held by Randgold Resources (Randgold), with press releases from Apollo referring to
trenching completed by Randgold over the Gabbro, Porphyry and Agouti prospects within the current permit limits.
Roxgold Sango commenced construction of the mine
in September 2021 with commissioning activities starting in April 2023 and the first gold doré pour occurring on May 24,
2023.
| 1.4 | Geology Setting, Mineralization and Deposit Types |
The Séguéla Project is situated
within the Paleoproterozoic (Birimian) Baoule-Mossi Domain of the West African Craton. Two cycles of volcanism/sedimentation are recognized
within the Birimian rocks of the Baoule-Mossi Domain; each followed by a period of orogenesis, and together described as the Eburnian
Orogeny which is dated c. 2.19–2.08 Ga. Rocks of the Baoule-Mossi Domain are primarily polyphase granitoids, and volcano-sedimentary
sequences forming granite-greenstone terranes. The first cycle of sedimentation and orogenesis (Eburnian 1) is described by the accumulation
of volcanic and volcaniclastic rocks; then subsequently intruded by early stage granitoids. Following a period of uplift and erosion,
the Eburnian 2 cycle is described by the filling of intra-montaine basins with predominantly arenaceous sediments of the Tarkwaian Series.
The Antenna deposit occurs within a greenstone
package deposited during Eburnian 1, that comprises (west to east) an ultramafic hangingwall, which is in presumed fault contact with
an interlayered package of felsic volcaniclastic rocks and flow banded rhyolitic units, which are then in contact with a mafic (basaltic)
footwall unit. The faulted contacts between the mafic/ultramafic units and the felsic assemblage converge to the south of the deposit
forming a wedge shape to the felsic package.
The Antenna deposit is considered to be an example
of an orogenic lode-style gold system, hosted by a brittle-ductile quartz-albite vein stockwork predominantly contained within flow banded
rhyolite units. The stockwork lode varies in width roughly in proportion with the widths of the rhyolitic units that host it (approximately
3–40 m) and extends over a strike length of approximately 1,350 m. Stockwork veins that host mineralization show two principal orientations:
steep east-dipping and steep west-dipping. Veins in the steep west-dipping orientation range from ptygmatically folded to undeformed,
while veins in the
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
east-dipping direction may be variably boudinaged
to undeformed. This evidence suggests syn-deformational emplacement of the vein sets during west and east movement along the main fault
structures within the region. Mineralization occurs as free gold, associated with pyrite and pyrrhotite. Alteration assemblages associated
with this mineralization assemblage vary from proximal intense silica–albite ± biotite ± chlorite alteration, through
medial silica–albite-sericite ± chlorite assemblages, to more distal sericite-carbonate (ankerite/calcite) and carbonate-magnetite
assemblages. Pyrite is the dominant sulfide associated with higher-grade mineralization within proximal alteration zones, while sulfide
mineralogy is pyrrhotite-dominated in medial and distal assemblages and is associated with lower-grade gold mineralization.
The Ancien deposit is associated with an interpreted
D2 sinistral shear zone, informally referred to as the Ancien shear, within the east domain. The host lithologies comprise (from west
to east) a chloritic pillow basalt footwall overlain by a foliated/sheared tholeiitic basalt unit, which is in turn overlain by a second
chloritic pillow basalt hanging wall unit that is gradational into a coarser grained porphyritic basalt unit. Generally narrow quartz-feldspar–biotite
porphyries crosscut and intrude all other lithologies and are interpreted as late-stage intrusions.
Both the Koula and Sunbird deposits are situated
within the same package of mafic rocks as the Ancien deposit, which is informally referred to as the Ancien–Koula corridor. Similar
to Ancien, both Koula and Sunbird are hosted within a strongly foliated/sheared thoeliitic basalt unit within a broader sequence of pillow
basalt.
At the Ancien, Koula, and Sunbird deposits, significant
mineralization is restricted to the more reactive and competent tholeiitic basalt unit and is best developed in zones of strong brittle–ductile
brecciation and shearing, with selective sericite ± silica alteration and intense quartz and quartz–carbonate veining. Mineralization
occurs as free gold, predominantly as small grains within microfractured milky-white quartz veins and associated with pyrite and lesser
pyrrhotite at Ancien, that trends to being more pyrrhotite dominant at Koula. Generally lower-grade mineralization is also developed at
the margins of felsic porphyries that intrude the tholeiitic basalt, and in zones of increased brecciation and veining within these porphyries.
The Boulder and Agouti deposits are both located
within a distinct northerly-trending litho-structural corridor that extends from Boulder in the south to the Gabbro prospect in the north.
Regional mapping has defined a broad package of pillow basalts and intercalated basaltic sediments, flanked to the west by a discontinuous
gabbro unit and regionally extensive doleritic sequence. The basaltic units are extensively intruded by quartz–feldspar–biotite
porphyritic felsic intrusions.
Gold mineralization at the Boulder and Agouti
prospects is associated with strongly foliated or mylonitized, quartz/quartz–carbonate veined basalt and the margins of the felsic
intrusions. Generally lower-grade mineralization occurs internal to the felsic intrusions where they are brecciated or extensively veined.
The highest gold grades generally correlate with the intersection of north–northeast- and northwest-trending structures. Mineralization
occurs as free gold within a network of milky white quartz veins and associated with foliation or quartz/quartz–carbonate vein-controlled
pyrite and minor pyrrhotite.
| 1.5 | Exploration, Drilling and Sampling |
Exploration has been undertaken by Randgold (pre-2012),
Apollo (2012–2016), Newcrest (2016–2017) and Roxgold Sango (2019 onwards).
Exploration activity included construction of
a 40-person exploration camp and core storage/logging facilities, geological mapping, purchase and interpretation of aeromagnetic data,
soil, trench, and artisanal dump sampling, and aircore (AC) and reverse circulation (RC) drilling. Xcalibur Airborne
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Geophysics Pty Ltd of South Africa conducted an
aeromagnetic survey across the Project area in December 2019 and January 2020, with the results used to further enhance the
prospectivity mapping and structural understanding of the mineralization controls.
As of the effective date of the Report, Roxgold
Sango has completed 248,483 m of RC and core drilling (DD) since Roxgold Inc.’s acquisition of the Séguéla Project
in April 2019 from Newcrest. Roxgold Sango has an ongoing program of reconnaissance AC and RC drilling across the Project area as
new prospects are identified. Those prospects that demonstrate suitable mineral continuity and grade are advanced with additional drilling
to improve confidence and to provide suitable samples for metallurgical and geotechnical testing. Projects that have advanced to resource
definition (RC and DD) drilling include the Antenna, Ancien, Agouti, Boulder, Koula and Sunbird deposits. Core drilling typically used
HQ sized core (63.5 mm diameter) until the final hole depth is reached. A reduction to NQ (47.6 mm diameter) may rarely be required if
poor ground conditions are encountered. Down-hole deviation was monitored using a Reflex Instruments device at 12-m intervals and then
at 30-mintervals thereafter. Core recoveries are high, averaging 99 %, reflecting the competent nature of the host lithologies.
Drill collar surveys were carried out using a
site based differential global positioning system (DGPS) instrument that was calibrated with the regional geodesic system.
Downhole surveys generally used Reflex EZ-GYRO
downhole camera, with the Reflex EZ-SHOT retained for backup and survey check purposes. Instruments were provided by the drilling contractor
and calibrated prior to use on site.
DD holes were generally drilled on patterns of
25 to 30 m centers to support potential classification as Indicated Mineral Resources and approximately 50 m centers for Inferred Mineral
Resources.
Sampling of core was performed by Roxgold Sango
personnel. From the drill site, core was transported by truck to a secure logging facility at the Roxgold field office where it was photographed
and logged by a geologist. Selective sampling was employed where, at the discretion of the geologist, samples were collected from visible
alteration or vein zones outside of the expected intercepts. All core was sampled at 1.0 m intervals, except where a significant geological
change occurred. Core was cut in half lengthwise using an electrical rock saw. Half of the sample was placed inside a labelled plastic
sample bag. The remaining half was returned to the core box for archiving. Samples were then inserted into woven polypropylene bags prior
to being transported by truck to the preparation and assay laboratory.
Roxgold Sango implemented logging onto Maxwell
LogChief data capture software in 2019, enabling the direct capture and traceability of logging data via dropdown menus and pre-set codes
to promote data hygiene. Prior to 2019, all logging was onto pre-set excel spreadsheets before importation into the database. Reviews
of the logging data and associated model interpretation are carried out on a regular basis by the site senior geological team and on each
QP site visit.
Samples were submitted to ALS Laboratories (ALS)
in Yamoussoukro for preparation and analysis. Core samples received by ALS are passed through a primary crush via oscillating jaw crushers
to a >70% pass through a <2 mm size. The AC, RC and DD samples are then passed through a riffle splitter to achieve a 250 g split.
This split material is pulverized in its entirety to a >85% pass through 75 µm. This pulp is then rolled on a plastic sheet for
homogenization, and an aliquot is taken to fill a paper Geochem bag (approximately 200 g).
Prepared samples from the Yamoussoukro laboratory
were then shipped via commercial courier to ALS’s analytical facility in either Ouagadougou, Burkina Faso, or Kumasi, Ghana.
Samples submitted for assay were analyzed by ALS
by fire assay of a 50 g charge using an atomic absorption spectroscopy (AAS) finish (ALS code Au-AA24). Samples returning >10,000 ppb
Au were reanalyzed by fire assay of a 50 g charge with a gravimetric finish (ALS code Au-GRA22). From December
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
2019, all samples with visible gold noted in drill
hole logging, or returning >50,000 ppb Au from the routine fire assay analysis, were also analyzed by the screen fire assay technique
(ALS code Au_SCR24 – 106 µm metal screen) to determine the percentage of gold present in the coarse fraction versus the fine
fraction. These analytical techniques are considered total and appropriate for the style of mineralization. Results of the screen fire
analysis as of the effective report date indicate a reasonable correlation with the primary fire assay analysis.
ALS laboratories are independent of Roxgold Sango.
ALS maintain certification in accordance with the most relevant quality certification standards for the activities which they undertake,
namely ISO9001:2015 for survey/inspection activity and ISO 17025:2005 UKAS ref 4028 for laboratory analysis. Other than initial sample
collection splitting and bagging at the Séguéla Mine, Roxgold Sango personnel and its consultants and contractors were not
involved in the laboratory sample preparation and analysis.
Assay data are electronically reported from the
laboratory in Microsoft Excel and pdf format and imported into the database after validation, along with the corresponding assay certificates.
The quality assurance/quality control (QAQC) program
involves establishing appropriate procedures and the routine insertion of certified reference material (CRMs), blanks, and duplicates
to monitor the sampling, sample preparation and analytical process. Evaluation of the QAQC data indicates that the analytical data are
sufficiently accurate and precise to support the Mineral Resource and Mineral Reserve estimation.
Roxgold Sango staff follow a stringent set of
procedures for data storage and validation, performing verification of data on a monthly basis. The operation employs a Database Administrator
who is responsible for overseeing data entry, verification and database maintenance. A separate Database Auditor is responsible for performing
a detailed independent review of the database on a quarterly basis and submitting a report to Fortuna management detailing the findings.
Any issues identified are immediately resolved by the administrator.
Data used for the Mineral Resource estimation
are stored in the commercial SQL database system Datashed, which hosts both mine-related data and drilling related results (exploration
and infill drilling).
As a component of the 2023 Mineral Resource estimate,
a preliminary validation of the database was performed by the Database Administrator in June 2023. The database has a series of automated
import, export, and validation tools to minimize potential errors. Any inconsistencies identified were corrected during the analysis with
the database then handed over in Microsoft Access format to the QP for final review on June 30, 2023.
In addition, data verification by the QP was also
conducted through the inspection of selected drill core to assess the nature of the mineralization and to confirm geological descriptions
as well as the inspection of geology and mineralization in open pit workings of the Antenna deposit.
A series of plan and cross sections were generated
displaying the lithologic and mineralization interpretation by the Roxgold Sango geology and exploration departments and reviewed by the
QP.
Mr. Veillette has performed an internal audit
on the TSF, water management, waste dump and open pit geotechnical/hydrological aspects. Mr. Veillette is of the opinion that geotechnical
and hydrogeology studies are of a sufficient level to support the estimation of Mineral Reserves and Mineral Resources.
Mr. Criddle has reviewed the extensive body
of metallurgical investigation comprising several phases of testwork and, in addition, has been personally involved in the development
and construction of the Séguéla Mine. In the opinion of the Mr. Criddle, the Séguéla metallurgical samples
tested, and the ore
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
that is presently treated in the plant are representative
of the orebody as a whole in respect to grade and metallurgical response. Differences between deposits are minimal with regard to metallurgical
recovery.
The QPs are of the opinion that the data verification
programs performed on the data collected by Roxgold Sango are adequate to support the geological interpretations, the analytical and database
quality, and Mineral Resource and Mineral Reserve estimation at the Séguéla Gold Mine.
| 1.7 | Mineral Processing and Metallurgical Testing |
Previous owner, Newcrest, conducted a round of
Leachwell assay test work on 61 samples from drill hole SGDD001 in 2018. Comparison of the Leachwell tests to fire assays for the samples
set (four-hour bottle roll used for leach testing of a nominal 1 kg sample) demonstrated a near 1:1 correlation of results. This was used
to conclude that the material is non-refractory, and therefore amenable to standard carbon-in-leach (CIL) treatment for extraction.
Roxgold supervised the metallurgical testing work
completed by the ALS Metallurgy assay lab in Perth, Australia on representative samples from the Antenna, Agouti, Boulder, Ancien, Koula
and Sunbird deposits between 2019 to 2023. Seven test work programs were performed.
As the Antenna deposit hosts the majority of the
estimated Mineral Reserves and this ore will be the majority of mill feed ore projected for the life-of-mine plan (LOMP). As a result,
this mineralization was examined more comprehensively and represents the basis for the mineral processing design criteria. Satellite deposits
in the form of the Agouti, Boulder, Ancien, Koula and Sunbird were also tested throughout the seven programs for confirmation purposes
and in support of Mineral Resource and Mineral Reserve estimation. Test work included comminution test work, head assays, mineralogical
analysis, grind establishment test work, gravity gold recovery and cyanide leach test work, flotation test work, carbon adsorption test
work, oxygen uptake test work, preg-robbing test work, cyanide detox test work, sedimentation and rheology test work, and acid mine drainage
test work.
Samples tested were reasonably competent with
average Bond rod and ball mill work indices of 21.8kWh/t and 19.7 kWh/t respectively. The results showed the mineralization was amenable
to a simple comminution circuit design.
The test work showed that leaching is substantially
complete within 24 hours and there is no apparent preg-robbing or refractory characteristics in the ores tested. Furthermore, it showed
a fast-initial leaching rate with more than 80% of the stage extraction completed within the first two hours of cyanidation. The highest
gold recovery was achieved for tests incorporating gravity recovery and elevated dissolved oxygen levels for the duration of the leach.
The ore tested across all deposits exhibited a
degree of grind sensitivity with an optimal grind size of 75 µm selected for all extraction test work. The results of that
program were very encouraging, indicating free milling of the ore with good leach kinetics and overall recoveries averaging 94.5 %.
A single stage semi-autogenous grind (SAG) circuit
followed by gravity concentration and cyanidation of the gravity tailings was the configuration adopted for the process plant.
It is the opinion of the QP that an average gold
recovery of 94.5 % can be expected, based on the life-of-mine average gold grade of 3.06 g/t.
| 1.8 | Mineral Resource Estimates |
Roxgold Sango, under the supervision of the QP,
has completed Mineral Resource estimates for the Antenna, Ancien, Agouti, Boulder, Koula and Sunbird deposits based on the drill hole
data available to June 30, 2023 and reported as of December 31, 2023, taking into account production related depletion to this
date.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The Mineral Resources are reported insitu, using
the 2014 CIM Definition Standards, exclusive of those Mineral Resources converted to Mineral Reserves. Mineral Resources that are
not Mineral Reserves do not have demonstrated economic viability. A summary of the Mineral Resources is presented in Table 1.
Table 1: |
Mineral Resources as of December 31, 2023 |
Indicated Mineral Resources |
COG (g/t Au) |
Tonnes (Mt) |
Au (g/t) |
Au (koz) |
Open pit |
Antenna |
0.55 |
1.33 |
1.32 |
57 |
Agouti |
0.65 |
0.30 |
1.69 |
16 |
Ancien |
0.65 |
0.19 |
2.79 |
17 |
Koula |
0.60 |
0.05 |
5.84 |
10 |
Boulder |
0.60 |
0.43 |
1.13 |
16 |
Sunbird |
0.55 |
0.55 |
1.77 |
31 |
Total |
0.55–0.65 |
2.86 |
1.60 |
147 |
Underground |
Ancien |
2.40 |
0.19 |
3.79 |
23 |
Koula |
2.40 |
0.04 |
4.54 |
7 |
Sunbird |
2.40 |
1.56 |
4.05 |
203 |
Total |
2.40 |
1.80 |
4.03 |
233 |
Total Indicated Mineral Resources |
|
4.66 |
2.54 |
381 |
|
|
|
|
|
|
Inferred Mineral Resources |
COG (g/t Au) |
Tonnes (Mt) |
Au (g/t) |
Au (koz) |
Open pit |
Antenna |
0.55 |
1.73 |
1.61 |
90 |
Agouti |
0.65 |
0.05 |
1.53 |
2 |
Ancien |
0.65 |
0.02 |
0.89 |
1 |
Koula |
0.60 |
0.37 |
4.44 |
53 |
Boulder |
0.60 |
0 |
- |
- |
Sunbird |
0.55 |
0.02 |
2.29 |
2 |
Total |
0.55–0.65 |
2.19 |
2.09 |
147 |
Underground |
Ancien |
2.40 |
0.15 |
3.82 |
19 |
Koula |
2.40 |
0.29 |
3.24 |
30 |
Sunbird |
2.40 |
0.42 |
3.62 |
49 |
Total |
2.40 |
0.86 |
3.53 |
98 |
Total Inferred Mineral Resources |
|
|
3.05 |
2.50 |
245 |
See notes on following page:
| ● | Mineral Resources are reported insitu, using the 2014 CIM Definition Standards. |
| ● | Mr. Eric Chapman, P.Geo., is the Qualified Person responsible for Mineral Resources and is a full
time employee of Fortuna Silver Mines Inc. |
| ● | Mineral Resources are reported as of December 31, 2023. |
| ● | Mineral Resources are reported on a 100 % basis. Fortuna holds a 90 % interest in the Séguéla
Gold Mine. The remaining 10 % interest is held by the State of Côte d’Ivoire. |
| ● | Mineral Resources are reported exclusive of those Mineral Resources modified to produce Mineral Reserves.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| ● | Mineral Resources potentially amenable to open pit mining methods are reported at a gold cut-off grade
of 0.55 g/t Au for Antenna and Sunbird, 0.60 g/t Au for Koula and Boulder, and 0.65 g/t Au for Ancien and Agouti. Mineral resources are
constrained within optimized pit shells. |
| ● | Mineral Resources potentially amenable to underground mining methods are reported inside MSO shapes
at a gold cut-off grade of 2.4 g/t Au based on sublevel stoping mining method. |
| ● | Mineral Resources are based on a gold price of US$1,840/oz. |
| ● | All figures have been rounded to reflect the relative accuracy of the estimates and totals may not
add due to rounding. |
Factors which may affect the Mineral Resource
estimates include:
| ● | Metal price and exchange rate assumptions. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | Changes to the technical inputs used to estimate
gold content (e.g. bulk density estimation, grade interpolation methodology). |
| ● | Changes to the geological interpretation (e.g.
post-mineralization dykes and structural offsets such as faults and shear zones). |
| ● | Additional depletion due to artisanal mining
activities beyond those already identified and excluded from the estimate. |
| ● | Changes to geotechnical and mining assumptions,
including the minimum mining thickness; or the application of alternative mining methods. |
| ● | Changes to process plant recovery estimates if
the metallurgical recovery in certain domains is lesser or greater than currently assumed. |
| ● | Final negotiated terms of the Mining Convention. |
| ● | Changes to governmental regulations. |
| ● | Changes to environmental, permitting and social
license assumptions. |
The Mineral Resource estimates for the Antenna,
Ancien, Agouti, Boulder, Koula and Sunbird deposits incorporate data from RC and DD holes to date comprising 130,566.75 m of drilling
from 925 holes. Drill hole spacings range nominally from 50 x 50 m to 25 x 25 m within the modelled areas.
The Antenna, Ancien, Koula and Sunbird models
were built using Datamine Studio RM software. The Agouti and Boulder models were developed using Leapfrog Geo and Datamine Studio RM software.
All gold assays from drill holes were composited to 1 m intervals within the mineralized wireframes. Top-cuts were applied to individual
domains based on an analysis of gold grade outliers within the statistical data populations.
Geostatistical exploratory data analysis, variogram
modelling and Mineral Resource model validation was conducted using Snowden Supervisor software.
The Mineral Resource model gold grades were estimated
using a combination of ordinary kriging and inverse distance weighting methods using a multiple pass approach to inform the models. Grade
estimates were validated visually by sectional comparison and through statistical approaches that encompass traditional validation methods,
such as swath plots comparing composite and block model values for each deposit.
Models and drill hole data use the WGS84 (Zone
29N) coordinate system. The Antenna, Ancien, Koula and Sunbird block models used parent cell sizes of 5 x 5 x 5 m, oriented variously
along the ordinate axes to best align with the strike of the mineralization, with subcelling used to ensure exact filling of the domain
wireframes. The Agouti and Boulder deposits used a parent cell of 2.5 x 5 x 5 m and 3.5 x 5 x 5 m, respectively in the respective XYZ
axis to provide sufficient volume resolution to the modelled mineralization lodes. After gold grades had been estimated and densities
assigned to the subcelled model the blocks were regularized to the parent cell size to represent the planned selective mining unit (SMU)
size.
Density values were assigned to the Mineral Resource
models based on ascribed oxidization state and lithological unit, with mineralization being assigned the density of its predominant host.
A density of 1.8 t/m3 was assigned to transported and alluvial sediments, with a range of 1.8–2.5 t/m3
assigned to the oxidized weathered profile and a range of 2.7–3.2 t/m3 assigned to fresh rock lithologies.
The Mineral Resource estimates are reported constrained
by pit optimizations generated in Deswik, and are based on the following parameters:
| ● | Assumed gold price of $1,840/oz. |
| ● | Processing recovery of 94.5 %. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | Overall slope angles of 36.8° for oxide material,
44.2° for transitional material and 51° for fresh material except for Sunbird that used slope angles of 36.8° for oxide material,
36.5° for transitional material and 50° for fresh material. |
| ● | Average mining cost of $3.12/t mined, based on
distance from pit to processing facility. |
| ● | Average total processing costs (including G&A)
of $24.25/t processed. |
| ● | Selling costs which include: |
| o | Refining and transport costs of $7.00/oz with a payability of 99%. |
The Mineral Resource models were classified into
Indicated and Inferred Mineral Resource categories based on analysis of the following criteria: number of samples informing the estimate,
sample spacing, average sample distance, kriging efficiency and slope of regression outputs, drill hole and sample QAQC thresholds, geological
confidence in modelled interpretations, grade continuity, and level of geological understanding at each deposit.
| 1.9 | Mineral Reserve Estimates |
The Mineral Reserve estimate has an effective
date of December 31, 2023, and reported using the 2014 CIM Definition Standards.
Mineral Reserves are based on conversion of Indicated
Mineral Resources to Probable Mineral Reserves within the final pit designs guided by the ultimate pit shells generated from open pit
optimizations at a gold price of $1,600/oz Au. Each deposit has undergone pit optimization, detailed mine design, mine scheduling, and
cashflow analysis, demonstrating a technically achievable and economically viable mine plan supporting the Mineral Reserve estimate. The
Mineral Reserves are reported inclusive of mining dilution and mining recovery represented by regularizing the block models to an appropriate
SMU size.
Proven Mineral Reserves are estimated for stockpiled
material. All Inferred Mineral Resources are treated as non-revenue generating waste rock. Mineral Resources potentially amenable to underground
mining methods have not been converted to Mineral Reserves as additional evaluation is required to confirm reasonable confidence in the
modifying factors applied for reporting.
Mineral Reserves are reported in Table 2 at the
point of delivery to the process plant, using the 2014 CIM Definition Standards.
Table 2: |
Mineral Reserves as of December 31, 2023 |
Location |
Proven |
Probable |
Proven & Probable |
Tonnes
(Mt) |
Grade
(g/t Au) |
Metal
(000 oz) |
Tonnes
(Mt) |
Grade
(g/t Au) |
Metal
(000 oz) |
Tonnes
(Mt) |
Grade
(g/t Au) |
Metal
(000 oz) |
Stockpile |
0.44 |
2.06 |
29 |
- |
- |
- |
0.44 |
2.06 |
29 |
Antenna |
- |
- |
- |
4.35 |
2.30 |
321 |
4.35 |
2.30 |
321 |
Koula |
- |
- |
- |
1.45 |
5.77 |
268 |
1.45 |
5.77 |
268 |
Ancien |
- |
- |
- |
1.81 |
3.80 |
221 |
1.81 |
3.80 |
221 |
Agouti |
- |
- |
- |
0.90 |
2.39 |
70 |
0.90 |
2.39 |
70 |
Boulder |
- |
- |
- |
0.71 |
1.73 |
39 |
0.71 |
1.73 |
39 |
Sunbird |
- |
- |
- |
2.10 |
3.04 |
206 |
2.10 |
3.04 |
206 |
Total |
0.44 |
2.06 |
29 |
11.33 |
3.09 |
1,125 |
11.76 |
3.05 |
1,154 |
Please see notes on following page:
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | Mineral Reserves are reported at the point of delivery to the process plant, using the 2014 CIM Definition
Standards. |
| ● | Mr. Raul Espinoza, P.Eng., is the Qualified Person responsible for Mineral Reserves and is a full
time employee of Fortuna Silver Mines Inc. |
| ● | Mineral Reserves are reported as of December 31, 2023. |
| ● | Mineral Reserves are reported on a 100 % basis. Fortuna holds a 90 % interest in the Séguéla
Gold Mine. The remaining 10 % interest is held by the State of Côte d’Ivoire. |
| ● | Mineral Reserves are reported at an incremental gold grade cut-off of 0.65 g/t Au for Antenna, 0.72
g/t Au for Agouti, 0.69 g/t Au for Boulder, 0.66 g/t Au for Koula, 0.73 g/t Au for Ancien, and 0.66 g/t Au for Sunbird deposit. The estimate
is based on a gold price of US$1,600/oz, metallurgical recovery of 94.5%, surface mining costs of $3.12/t, processing costs of $15.42/t
and G&A costs of 8.83/t. |
| ● | Overall slope angles applied are 36.8° for oxide material, 44.2° for transitional material
and 51° for fresh material except for Sunbird that uses slope angles of 36.8° for oxide material, 36.5° for transitional material
and 50° for fresh material. |
| ● | The Mineral Reserves are reported with modifying factors of mining dilution and mining recovery represented
by regularizing the block models to an appropriate selective mining unit (SMU) block size. |
| ● | Each deposit has undergone pit optimization, detailed mine design, mine scheduling, and cashflow analysis,
demonstrating a technically achievable and economically viable mine plan supporting this Mineral Reserve. |
| ● | All figures have been rounded to reflect the relative accuracy of the estimates and totals may not
add due to rounding. |
Factors which may affect the Mineral Reserve
estimates include:
| ● | Metal price and exchange rate assumptions. |
| ● | Changes to metallurgical recovery assumptions. |
| ● | Changes to the input assumptions used to derive
the mineable shapes applicable to the open pit mining methods used to constrain the estimates. |
| ● | Changes to the forecast dilution and mining recovery
assumptions. |
| ● | Changes to the cut-off values applied to the
estimates. |
| ● | Variations in geotechnical, hydrogeological and
mining method assumptions. |
| ● | Final negotiated terms of the Mining Convention. |
| ● | Changes to environmental, permitting and social
license assumptions. |
Six deposits: Antenna, Ancien, Agouti, Boulder,
Koula, and Sunbird are scheduled for mining in the LOMP. The overall mining and production strategy is to maintain ore tonnes to achieve
an annual production throughput of 1.46 Mtpa, increasing to 1.57 Mtpa by 2026, by sequencing pit stages and processing feed based on grade,
operational requirements, plant throughput and material characteristics for the plant. The mine schedule delivers 12 Mt averaging 3.06
g/t Au to the mill over the remaining 7.5-year mine life.
Mining activities are conducted using a mining
contractor and use conventional drill, blast, load, and haul mining methods. Drilling and blasting are used for oxide, transitional and
fresh ROM ore material and waste, followed by conventional truck and excavator operations within the pits for the movement of ore and
waste. Some free digging has been assumed for some of the oxide material, but generally drilling and blasting is applied. Bench height
assumption for extraction of ore and waste material is 5 m taken in two digging flitches of 2.5 m in accordance with the capabilities
of the mining equipment. Where possible in high waste stripping pit stages, 10 m bench heights will be used at an appropriate standoff
distance from known mineralization.
Mining costs and equipment requirements are based
on the existing mining contract with the mining contractor Mota-Engil. The mining schedule consists of a lower mining rate for 2024 moving
a total material mined of 5.9 million BCM/annum, with a ramp up in total mining movement in 2025 onwards in line with mill feed requirements
and stripping ratios. The initial mining equipment required to meet the mining schedule for 2024 is one 200 t excavator, one to two 120
t excavator, and one 80 t excavator, and eight to ten 90 t haul trucks. Additional mining equipment required to meet the mining schedule
for 2025 to 2031 includes an additional 200 t excavator and an additional six to eight 90 t haul trucks. The annual
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
mining rate after 2024 peaks in 2026 at 10.0 million
BCM. A common pool of equipment will be used and scheduled across all active pits so that movement between the pits is minimized.
Roxgold Sango will use a mining contractor for
the initial 5.5 years of operations. Afterward, and depending on the extension of the life of mine, mining operations will transition
to an owner-operation model, or the contractor will be retained as the operator.
Detailed pit stage designs were prepared based
on the results of the pit optimizations and incorporating appropriate wall angles, geotechnical berms, minimum mining widths, and access
ramps with sufficient width for the equipment selected. Waste dumps were designed for each individual open pit, with the intention of
minimizing haulage distance for the movement of waste material from the open pit to the adjacent surface waste dump, taking into consideration
surface water drainage, as well as existing and planned infrastructure locations. The dumps were designed using a 37º rill, and a
15-m berm every 10 vertical meters to achieve a footprint consistent with the requirements of rehabilitated waste dumps at closure.
A total of 15 mining stages were designed and
scheduled, consisting of individual pits or pit stages within a final pit design. The mining schedule sequences pit stages such that ROM
ore material within the Mineral Reserve is mined, when practical, to target higher grade ore and lower strip ratios early and balance
plant feed requirements and material characteristic types.
| 1.11 | Processing and Recovery Methods |
The processing facilities comprise a single stage
primary crush/SAG milling comminution circuit where the mineralized material is drawn from the ROM ore bin via an apron feeder, scalped
via a vibrating grizzly with the undersize reporting directly to the discharge conveyor and the oversize reporting to a primary jaw crusher
for further size reduction. All crushed and scalped material is conveyed to a surge bin. Crushed ore and water is fed to the mill.
The mill operates in closed circuit with hydrocyclones,
with cyclone underflow reporting to the mill feed. A portion of the cyclone underflow slurry is fed to the gravity circuit for recovery
of gravity gold. The gravity concentrator tailings flow to the cyclone feed hopper, while the gravity concentrate report to an intensive
leach circuit. Gold in solution is recovered in a dedicated electrowinning system.
Screened cyclone overflow is thickened prior to
the CIL circuit. Loaded carbon drawn from the CIL circuit is stripped by the split AARL method. The resultant gold in solution is recovered
by electrowinning. Recovered gold from the cathodes is filtered, dried, and smelted in a furnace to doré bars.
A forecast gold recovery rate of 94.5 % is estimated
for the LOMP.
The QP considers process requirements to be well
understood, and consistent based on the actual observed conditions in the operating plant. There is no indication that the characteristics
of the material planned for mining will change and therefore the recovery assumptions applied for future mining are considered as reasonable
for the LOMP.
The infrastructure and services adequately support
the current operations and planned open pit operations, as well as the processing plant. This infrastructure consists of a process plant,
a mine service area (offices, workshops, and a warehouse), a TSF, a water storage facility, waste dumps, mine access and haulage roads,
an explosives magazine, an electrical grid connection, and an accommodation camp.
The tailings system consists of two parallel tailings
lines and associated tailings pumps. The TSF is a side-valley storage formed by two multi-zoned earth-fill embankments, designed to accommodate
13.0 Mt of tailings, and built using the downstream construction methodology. The TSF was designed to comply to
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
ANCOLD (2019) guidelines, is currently transitioning
to comply with the Global Industry Standard of Tailings Management criteria, and includes a HDPE geomembrane liner.
A water storage dam supplied with runoff water,
mine dewatering and underground water is the main collection and storage pond for clean raw and process water.
Power supply is through a connection to the Côte
d’Ivoire electricity grid by a 2,400 m tee into the 90 kV powerline from the Laboa to Séguéla substation. The Séguéla
substation is fed via an existing 90 kV transmission line from the 225/90 kV Laboa substation. The Laboa substation is part of a 225 kV
ring main system around the country where various sources of generation are connected and, being a large ring main, offers a great deal
of redundancy at 225 kV. The grid supply from Côte d’Ivoire is, by world standards, economically priced and much more financially
favorable than other options including self-generation as the tariff is based on a mix of hydro and thermal generation with a large portion
of hydro.
The QP is confident that all mine and process
infrastructure and supporting facilities are included in the present general layout to ensure that they meet the needs of the mine plan
and production rate.
Gold is a freely traded commodity on the world
market for which there is a steady demand from numerous buyers.
The Fortuna financial department provides the
mine with gold price projections for inclusion in budget and business plan preparations. Pricing is based on long-term analyst and bank
forecasts, with a gold price of $ 1,600/oz used for estimating Mineral Reserves and cash flow analysis and $ 1,840/oz for estimating Mineral
Resources.
A contract is in place with METALOR Technologies
S.A. for the receipt of gold doré from Roxgold Sango, to process/refine and either to buy or transfer the precious metal to a metal
account designated by Roxgold Sango.
A contract is in place with Mota-Engil Cote d'Ivoire
mining to conduct mining services on behalf of Roxgold Sango and consists of ROM feed, mine development, grade control drilling, drill
and blast, and load and haul activities.
Contracts are in place with Tseebo Solutions Group
Proprietary Limited, Total Energies, Cote d’Ivoire Energies, Group 4 Securities and SGS laboratory testing services to provide catering
services, fuel supply, power supply, security services, and metallurgical assaying and testing for the project on behalf of the client.
| 1.14 | Environmental Studies and Permitting |
Roxgold Sango contracted the consulting firm CECAF
to undertake the project baseline studies and compile the environmental and social impact assessment (ESIA) required to obtain the environmental
decree. The ESIA identifies the potential social and environmental impacts of the development of the project and proposed mitigation measures.
Part of the ESIA included the development of a conceptual resettlement action plan which was necessary for any physical or economic
displacement of people or communities as a result of the project’s development as well as a conceptual mine closure plan.
Following environmental and social studies, public
consultations, and governmental examination, the ESIA for the Séguéla Mine was approved by the Ministry of Environment and
Sustainable Development by decree signed on September 22, 2020 (Decree No.00261 dated September 22, 2020, on ESIA approval for
the exploitation of a gold mine in Séguéla department). This decree allowed the mine to be built and exploited in accordance
with the conditions listed in the environmental permit application file and the decree.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Artisanal and small-scale mining (ASM) activities
in the Séguéla area and its surroundings can be characterized as unauthorized, dispersed, intermittent and not mechanized.
Currently, there is no permanent illegal or authorized ASM settlements on the identified deposits of the Séguéla Mine or
nearby, with only a few hundred ASM miners present from time to time in the Project area outside of the mining operation areas.
The implementation of a stakeholder management
plan has ensured good relationships between Roxgold Sango and the local authorities, village leaders and landowners. In addition, regular
monitoring of the occupancy of the land around the deposits and prospects and the intervention of the authorities to avoid the establishment
of organized ASM has led to an effective control of the ASM activities in the Séguéla mining area.
As at the effective date of this Report, the projected
total cost required to close present and future infrastructure is US$ 11.9 million as developed from the conceptual mine closure plan
prepared by Roxgold Sango with the assistance of specialized consultants CECAF International and Trajectory.
The peak total greenhouse gas emission is projected
at 67,676 tCO2e. Based on fuel and energy consumption and the total production of gold, the energy and GHG emission intensities
are estimated at 4.39 GJ/oz and 0.58 tCO2e/oz, respectively.
| 1.15 | Sustaining Capital and Operating Costs |
Sustaining capital and operating cost estimates
are based on the established cost experience gained from the operation, projected budgets, and quotes from manufacturers and suppliers.
Overall, the cost estimation is of sufficient detail, that, with the current experience of operating at the Séguéla mine,
Mineral Reserves can be declared. All costs are US dollar (US$). The total sustaining capital cost through the LOMP is estimated to be
US$188.5 million, respectively, over the 7.5-year mine life.
Sustaining capital cost requirements over the
LOMP include mainly mine development requirements for each deposit, waste capitalized stripping, subsequent lifts required for the TSF
and related studies, purchase of minor mining equipment and plant equipment, permitting and environmental.
The total LOMP operating cost for the Séguéla
mine is estimated at US$ 80 per tonne of ore processed.
Long-term projected operating costs are derived
from the mining and processing needs throughout the life of mine, outlined in the executed contract between Roxgold Sango and Mota-Engil
Cote d’Ivoire. These costs consider site-related expenses and operating costs essential for the operation and are analyzed based
on a cost structure may not correspond to the operating costs reported by financial statements of Fortuna. Site costs pertain to activities
conducted on the property including mine, plant and indirect costs related to general services and administrative on-site. Additionally,
other operating expenses cover costs associated with gold transportation (distribution), community support activities and management fee
from Fortuna corporate.
Fortuna is using the provision for producing issuers,
whereby producing issuers may exclude the information required under Item 22 of Form 43-101F1 -Technical Reports for technical
reports on properties currently in production and where no material production expansion is planned.
The Mineral Reserve declaration in this Report
is supported by a positive cashflow for the period set out in the LOMP.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The conversion of Mineral Resources to Mineral
Reserves was undertaken using industry-recognized methods, and estimated operational costs, capital costs, and plant performance data.
| 1.18 | Risks and Opportunities |
Analysis of the results of the investigations
has identified a series of risks and opportunities associated with each of the technical aspects considered for the development of the
mining operation.
The key risks include:
| ● | Changes to metal price assumptions. |
| ● | Changes to the technical inputs used to estimate
gold content (e.g. bulk density estimation, grade interpolation methodology). |
| ● | Geological interpretation (e.g. dykes and structural
offsets such as faults and shear zones). |
| ● | Depletion due to artisanal mining activities. |
| ● | Changes to geotechnical, hydrogeological, and
mining assumptions, including the minimum mining thickness; or the application of alternative mining methods. |
| ● | Changes to process plant recovery estimates if
the metallurgical recovery in certain domains is lesser or greater than currently assumed. |
| ● | Changes in the characteristics and/or throughput
of the tailings could result in changes to the achieved densities in the TSF, requiring adjustments to the design. |
| ● | Geochemical testing of the tailings should be
continued at points throughout the life of the facility to ensure that initial testing remains valid. |
| ● | The LOMP assumes that all requisite approvals
and permits for the relocation of the communications antenna adjacent to the Sunbird deposit and those required for the plant expansion
in 2026 will be obtained. It is believed that such approvals and permits can be obtained but there is no certainty that this will be the
case. A delay in permitting would require adjustments to the LOMP that could reduce cash flows in 2026 onwards, however any change would
not be regarded as material based on the current performance of the processing plant and the multiple deposits available to mine at the
Séguéla Project. |
| ● | The most recent wet season proved to be disruptive
causing some delays to deliveries and personnel to site. The road to the Project requires upgrading to an all-weather road including culverts
and crowing and erosion protection. |
| ● | Rip rap armoring was not completed during construction
since no waste rock was available. Rip rap armoring as per design is required for the TSF spillway, water storage dam spillway, and diversion
ditch to prevent downstream sedimentation and improve dam safety (limit erosion of water retaining structures). |
| ● | Any changes to the LOMP or throughput will impact
upon the tailings management requirements for the site. Any significant increases in total throughput may require an expansion review
of the current TSF (in particular, the proximity to the plant site) and reconsideration of the closure plan. |
| ● | The availability and reliability of grid power
supply presents a risk. The extended use of diesel generation will have an impact on power costs. |
| ● | The nearby communities have expectations relating
to job creation, community development and improvement in services and infrastructure. Meeting these expectations and minimizing impacts
to regional infrastructure and community livelihood is a challenge resulting in possible |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
dissatisfaction
with Roxgold Sango and the associated risks of community action against the project and loss of social license to operate.
The key opportunities include:
| ● | The Séguéla Project covers the
entire greenstone belt exposure that hosts the Antenna, Ancien, Agouti, Boulder, Koula and Sunbird deposits. Exploration over the
Séguéla Project has the potential to expand known mineralization, advance known prospects to drill stage, and discover new
prospects. |
| ● | Optimization of the open pit and underground
mining transition of the Koula, Ancien and Sunbird deposits. Optimal transition point from open pit to underground, lifting the pit floor
up, reducing strip ratio and waste movement yielding an increase in the overall project NPV. |
| ● | Optimization in geotechnical pit slope angles
for mine design improvements and reduction in the overall strip ratio. |
| ● | Optimization of plant throughput and investigation
on the potential for future expansion. |
| ● | Investigations into installing a solar farm.
Subject to the successful completion of an economic study, a solar farm should result in lower electricity prices and provide some level
of security around continuous supply to essential services. |
| ● | Potential to implement a system whereby the supernatant
pond is decanted via a barge equipped with submersible pump. This system is reliant on numerous factors, including the resultant beach
slope, and the level of control required over the supernatant pond location. |
| ● | Maximize the benefit of the operation for local
communities as an opportunity for social and economic development, including social infrastructures, professional skills and all the other
aspects of the Sustainability Development Goals (SDGs) where possible. |
| ● | A good working relationship with local government,
state services, traditional authorities, communities and other stakeholders such as the artisanal miners, is in place due to the quality
of the early stakeholder’s engagement at the project. The opportunity to strengthen these existing relationships will help mitigate
the risks associated with unmet expectations amongst the community and other stakeholders. |
Analysis of the results and findings from each
major area of investigation suggests several recommendations for further investigations to mitigate risks and improve the base case designs
to be considered during the operation of the mine. Each recommendation is not contingent on the results of other recommendations and can
be completed in a single phase, concurrently. A summary of the recommendations as provided is as follows:
| ● | Additional definition drilling (infill and extension)
where applicable, in order to support potential upgrade of some or all of the Inferred Mineral Resources and extend the known mineralization
at an estimated drill cost of $2,000,000. |
| ● | Routine collection of density measurements should
be maintained for core and included for in pit sampling to better establish densities in the block model. This recommendation will be
completed in-house with existing personnel and will not incur an additional cost above regular mine operating costs. |
| ● | Target down-dip underground potential at each
deposit, in particular Ancien, Koula and Sunbird at an estimated drilling cost of $2,000,000. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | Review and re-rank existing regional exploration
results and prospects followed by selective drill testing of those proximal to the defined Mineral Resource estimates with a drill program
estimated at $2,000,000. |
| ● | Detailed structural analysis of all deposits,
based on high-quality oriented drill core, with a view to developing exploration models for analogue or related systems elsewhere within
the Séguéla Project. This recommendation will be completed in-house with existing personnel and will not incur an additional
cost above regular mine operating costs. |
| ● | Revising pit optimization parameters, cost estimates,
scheduling, and cashflow forecasts with actual operational data as it is collected. This recommendation will be completed in-house annually
with existing personnel and will not incur an additional cost above regular company operating costs. |
| ● | Conducting a geotechnical investigation into
steeper batter angles of 90˚ and wider berm widths of 10 m in fresh rock. This recommendation will cost approximately $30,000. |
| ● | Ongoing collection of geotechnical data is required
to further refine the geotechnical model, to confirm assumptions made as inputs in this assessment, and to review performance of slopes,
batters, and spill berm widths during operations. This recommendation will be completed in-house annually with existing personnel and
will not incur an additional cost above regular mine operating costs. |
| ● | Ongoing assessment of slope, batter and spill
berm width performance. This recommendation will be completed in-house annually with existing personnel and will not incur an additional
cost above regular mine operating costs. |
| ● | Conducting detailed waste rock dump sequencing
to increase discounted cashflow. This recommendation will be completed in-house with existing personnel and will not incur an additional
cost above regular mine operating costs. |
| ● | Reviewing drill and blast parameters in consultation
with the mining contractor to identify potential areas of improvement. This recommendation will be completed in-house with existing personnel
and will not incur an additional cost above regular mine operating costs. |
| ● | Preparing drill and blast designs and procedures
to achieve acceptable blasting impacts when blasting close to the TSF. This recommendation will cost approximately $30,000. |
| ● | Further optimizations of the mining strategy
as well as optimized mine designs and scheduling resulting in a reduction in stripping ratio and overall project waste movement requirements
to improve mine economics. This recommendation will be completed in-house with existing personnel and will not incur an additional cost
above regular mine operating costs. |
| ● | Optimization on the open pit and potential underground
mining transition of the Koula, Ancien and Sunbird deposits. Review the optimal transition point from open pit to underground. This recommendation
will be completed in-house with existing personnel with assistance of outside consultants to complete the study. This recommendation will
cost approximately $150,000. |
| ● | Study the modifying factors applicable to underground
mining at the Ancien, Koula, and Sunbird deposits to investigate the potential for converting underground Mineral Resources to Mineral
Reserves, including metallurgical test work, geotechnical drilling and study and hydrogeology study. Activities will be completed in-house
with existing personnel with assistance from outside consultants to complete the study. This recommendation will cost approximately $700,000. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | Operations should improve pit slope monitoring
systems (2 x TM50, prisms and monitoring platform), by providing one system for Antenna and another portable system for the other pits
as required at an estimated cost of $150,000. |
| ● | Perform a cost analysis and obtain the necessary
permits for relocating the telecommunication antenna currently situated at the edge of the Sunbird pit design. It is recommended the relocation
study is performed in 2024 to ensure appropriate capital expenditure and time is assigned to the activity to prevent potential delays
in mining the Sunbird deposit, planned to commence in the fourth quarter of 2025. This study will be completed using the internal resources
and will be part of normal operating costs. |
| ● | Carbon adsorption modelling for various combinations
of carbon movement rates and concentration profiles should be considered. The test results from the FS indicate that gold adsorption
is below average for this slurry which was unexpected given the ‘clean’ nature of the ores. Confirmatory test work is recommended
but not essential as the impact on the CIL / elution circuit design will be modest. This will be completed using the internal resources
and will be part of normal operating costs. |
| ● | Installation of a substantial filter system to
improve the raw water quality. This recommendation will cost approximately $100,000. |
| ● | Installation of a reverse osmosis plant to improve
elution performance by utilizing potable water rather than filtered raw water, at an estimated budget of approximately $200,000. |
| ● | Install a rock breaker at the jaw crusher to
improve throughput at an approximate cost of $1.0 M. |
| 1.19.4 | Tailings Management |
| ● | A TSF conceptual study should be completed to
investigate the maximum capacity of the current TSF location and any other new potential locations such as open pit co-disposal if no
additional area is available for some pits to accommodate future growth. This will require a budget of about $50,000. |
| ● | Determine the required TSF buttress size for
the West and East dams to decrease the consequence classification as per Global Industry Standard of Tailings Management guidelines. This
will require moving the tailings delivery and return pipeline trench, powerline and fence alignments along the western area of the TSF.
An estimated cost of $1.0 M will be required during LOMP to execute these activities. |
| ● | Further Global Industry Standard of Tailings
Management work is recommended, such as revising the dam break analysis once the TSF design is updated as per above and updating of the
Operation, Monitoring and Surveillance manual, Trigger Action Response Plan and Emergency Preparedness Response Plan documents is required
at an estimated cost of $100,000. |
| ● | As per Global Industry Standard of Tailings Management
requirements, ongoing visits by the Independent Tailings Review Board and Dam Safety Review are recommended at an estimated cost of $80,000. |
| 1.19.5 | Environmental and Social |
| ● | Continue climate data collection on site to establish
variation between the mine site and other long-term monitoring data sources. This will be completed using existing resources and is part
of the normal operating cost. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | Continue to engage effectively with all the stakeholders
as the mine develops including those concerned by the impact on regional infrastructure. This will be completed using Séguéla’s
resources as part of normal operating costs. |
| ● | Undertake further studies to investigate the
impacts of the Mine on water quality and the long-term potential impacts of the TSF on surface and ground water quality, including the
refinement of a transient state model at an estimated cost of US$50,000 and the creation and updating of a site wide water balance at
an estimated cost of US$75,000. |
| ● | The diversion ditch crossing the main public
road is currently undersized, with two additional 2m x 2m culverts required. This work has an estimated cost of US$100,000. |
| ● | Rip rap armoring was not completed during initial
construction since no waste rock was available. Rip rap armoring as per design is required for the TSF spillway, water storage dam spillway,
and diversion ditch to prevent downstream sedimentation and improve dam safety. The work has an estimated cost of US$600,000. |
| ● | Locate additional air quality and noise monitoring
points at the boundary between the project infrastructure and the closest villages to provide a more robust baseline. This will be completed
utilizing Séguéla’s resources as part of normal operating cost. |
| ● | Cover designs or dust suppression trails be considered
for the waste rock dumps and tailings facilities to minimize the generation of windblown dust from the surface of these facilities. This
will be completed utilizing the projects resources and part of normal operating cost. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
This technical report (the Report) was prepared
by Mr. Paul Weedon, MAIG, Mr. Eric Chapman, P.Geo., Mr. Raul Espinoza, FAusIMM (CP), Mr. Mathieu Veillette, P.Eng.,
and Mr. Paul Criddle, FAusIMM., for Fortuna Silver Mines Inc. (Fortuna) on the Séguéla gold mine (Séguéla
Mine or the Séguéla Project) in accordance with the disclosure requirements of Canadian National Instrument 43-101 –
Standards of Disclosure for Mineral Projects (NI 43-101).
The Séguéla Mine is operated by
Roxgold Sango S.A. (Roxgold Sango), a company incorporated, registered, and operating in accordance with the laws of Côte d’Ivoire,
which is a 90 % indirectly-owned Fortuna subsidiary. The remaining 10 % interest is held by the State of Côte d’Ivoire.
Construction of the mine commenced in September 2021.
Mining of the Antenna pit started in March 2023, commissioning activities started in April 2023, and the first gold doré
pour occurred on May 24, 2023.
The Report discloses updated Mineral Resource
and Mineral Reserve estimates for the Séguéla Project.
Mineral Resource and Mineral Reserve estimates
are reported using the 2014 CIM Definition Standards - for Mineral Resources and Mineral Reserves (the 2014 CIM Definition Standards).
Costs are in US dollars (US$) unless otherwise
indicated.
The following Qualified Persons are responsible
for Report preparation:
| ● | Mr. Paul Weedon, MAIG, Senior Vice President
of Exploration - Fortuna Silver Mines Inc. |
| ● | Mr. Eric Chapman, P.Geo., Senior Vice President
of Technical Services - Fortuna Silver Mines Inc. |
| ● | Mr. Raul Espinoza, FAusIMM (CP), Director
of Technical Services Fortuna Silver Mines Inc. |
| ● | Mr. Mathieu Veillette, P.Eng., Director,
Geotechnical, Tailings and Water - Fortuna Silver Mines Inc. |
| ● | Mr. Paul Criddle, FAusIMM, Technical Consultant. |
| 2.4 | Scope of Personal Inspection |
Mr. Eric Chapman visited the Séguéla
Project on multiple occasions, the most recent site visit being from October 10 to 15, 2023. During his site visits, Mr. Chapman
has reviewed data collection, drill core, storage facilities, database integrity, procedures, and geological model construction. Discussions
on geology and mineralization were held with Roxgold Sango personnel, and field site inspections were performed including a review of
the open pit geology of the Antenna deposit, and inspection of operating drill machines. He worked with site geological personnel reviewing
aspects of data storage (database) and analytical quality control.
Mr. Paul Weedon visited the mine on multiple
occasions, the most recent site visit being from April 21 to 24, 2023. During these visits, Mr. Weedon reviewed drilling performance,
sample and data collection, site quality assurance and quality control (QAQC) records and geological model development for all of the
Project deposits.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Mr. Raul Espinoza conducted a site visit
to the Séguéla Project from June 17 to 23, 2023. During this visit, Mr. Espinoza reviewed current mining methods,
road access, and discussed the Mineral Reserve estimation methodology, metallurgical testwork and processing, operating and capital expenditure
requirements with Roxgold Sango personnel.
Mr. Mathieu Veillette performed a site visit
from September 30 to October 4, 2023. During that visit he performed an internal audit on the tailings storage facility (TSF),
water management, waste rock storage facility (WRSF), and open pit geotechnical/hydrological aspects. Mr. Veillette had numerous
discussions with the Mine Manager, Responsible Tailings Facility Engineer (RTFE), Environmental Superintendent for water management, Séguéla
Project personnel and geotechnical engineers.
Mr. Paul Criddle visited the Séguéla
Project on numerous occasions, the most recent site visit being from July 27 to 29, 2022. During these visits, Mr. Criddle reviewed
all aspects of operational, metallurgical and processing performance, and development activities.
This Report has a number of effective dates, as
follows:
| ● | June 30, 2023: date of database cut-off
for assays used in the estimation of Mineral Resource and Mineral Reserves. |
| ● | December 31, 2023: date of production-related
depletion. |
| ● | Date of the Mineral Resource estimate: December 31,
2023 |
| ● | Date of the Mineral Reserve estimate: December 31,
2023 |
The overall effective date of this Report is the
date of the Mineral Reserves and Mineral Resource estimate and is December 31, 2023.
| 2.6 | Previous Technical Reports |
Fortuna has not previously filed a technical report
on the Séguéla Project. Prior to Fortuna obtaining its Project interest, Roxgold had filed the following report:
| ● | Criddle, P., Anderson, H., Weedon, P., Morgan,
D., Bailey, G., McLeay, S., and Morrison, N., 2021. NI 43-101 Technical Report: Séguéla Project, Feasibility Study, Worodougou
Region, Côte d’Ivoire, prepared for Roxgold Inc., effective date 19 April 2021. |
| 2.7 | Information Sources and References |
Reports and documents listed in Section 27
of this Report were used to support preparation of the Report. Additional information was provided by Roxgold Sango and other consultants
in their areas of expertise.
The QPs would like to acknowledge the support
and collaboration provided by Séguéla site personnel during the preparation of this Report.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 3 | Reliance
on Other Experts |
Roxgold Sango retains copies of the relevant legal
titles as provided by the State of Côte d’Ivoire to the Séguéla permits.
The QPs have not independently reviewed ownership
of the Séguéla Gold Mine and any underlying agreements, mineral tenure, surface rights or royalties. The QPs have fully
relied upon, and disclaim responsibility for, information derived from Roxgold Sango, Fortuna, and legal experts retained by Roxgold Sango
and Fortuna for this information through the following document:
| ● | Abi Koffi Marius Avocat Barreau D’Abidjan,
2024. Legal Opinion Séguéla Mine – prepared for Fortuna and Roxgold Sango dated January 15, 2024. |
The information is used in Sections 4.1 and 4.2.
The information is also used in support of the Mineral Resource estimate in Section 14 and the Mineral Reserve estimate in Section 15.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 4 | Property
Description and Location |
The Séguéla Project is located approximately
500 km from Abidjan, within the Woroba District; part of the Worodougou administrative region in the west of Côte d’Ivoire
(Figure 1).
Figure 1: |
Location plan, Séguéla Gold Mine |
The Séguéla Project is owned 90
percent by Fortuna, and 10 percent by the State of Côte d’Ivoire. Fortuna acquired its project interest in 2021, following
a merger with Roxgold Inc. (Roxgold). The Séguéla Mine is operated by Fortuna’s in-country subsidiary, Roxgold Sango
S.A.
| 4.3 | Mineral Tenure and Surface Rights |
The Séguéla Project consists of
an exploitation permit (Permis d’Exploitation No. 56), and a Mineral Exploration Permit (Permis de Recherche Miniére
No. 638). The permit locations are shown in Figure 2.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 2: |
Séguéla Gold Mine – permit and deposit locations |
Permis d’Exploitation No. 56 was granted
by the Ivorian government on December 9, 2020, and is valid for an initial period of 10 years. The permit is thereafter renewable
for successive 10-year periods. The permit has an area of 353.6 km2.
The permit co-ordinates for Permis d’Exploitation
No. 56 are provided in Table 3.
Table 3: |
Permis de’Exploitation No. 56, corner coordinates, UTM Zone 29P, WGS84 |
Permit Corner |
Easting |
Northing |
A |
738,682.15 |
910,739.83 |
B |
749,703.67 |
910,800.92 |
C |
749,888.40 |
877,610.21 |
D |
738,858.71 |
877,551.29 |
E |
738,812.51 |
886,898.37 |
F |
741,761.91 |
886,919.23 |
G |
741,755.12 |
887,922.64 |
H |
740,489.98 |
889,738.89 |
I |
740,479.35 |
891,732.21 |
J |
738,772.88 |
893,835.85 |
There is an Ivorian State requirement that an
exploitation permit be held directly by a local entity, which may then be beneficially owned by the foreign entity. The State of Côte
d’Ivoire is entitled to a 10 % free-carried interest in this local entity, which cannot be diluted.
The initial four-year term of Permis de Recherche
Miniére No. 638, which surrounds Permis d’Exploitation No. 56, expired on October 28, 2020. Renewal of the
permit required a 25 % reduction in surface area to 270.1 km2. The renewal of Permis de Recherche Miniére No. 638
was approved with an expiry date of October 18, 2023. An application for the second renewal was submitted on 20 July 2023 and
is awaiting
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Ministerial signature. Provided minimum expenditure
requirements are met, mineral exploration permits in Côte d’Ivoire are subject to automatic grants of renewal applications
for two terms of two years each, and a special third term of no more than three years.
The permit co-ordinates for Permis de Recherche
Miniére No. 638 are provided in Table 4.
Table 4: |
Permis de Recherche Miniére No. 638 (first renewal), corner coordinates, UTM Zone 29P, WGS84 |
Permit Corner |
Easting |
Northing |
A |
734,243.08 |
910,716.03 |
B |
738,682.11 |
910,739.86 |
C |
738,858.67 |
877,551.32 |
D |
749,888.36 |
877,610.24 |
E |
749,703.63 |
910,800.95 |
F |
752,949.00 |
910,819.47 |
G |
752,989.43 |
903,750.90 |
H |
753,938.71 |
903,756.32 |
I |
753,971.48 |
898,009.25 |
J |
755,288.40 |
898,016.75 |
K |
755,347.05 |
887,690.41 |
L |
754,182.99 |
887,683.85 |
M |
754,249.40 |
875,790.25 |
N |
741,840.23 |
875,723.10 |
O |
741,832.27 |
877,228.90 |
P |
738,615.33 |
877,212.01 |
Q |
738,551.44 |
889,381.07 |
R |
734,355.32 |
889,359.09 |
Mineral exploration permits, within their boundaries,
entitle the holder exclusive surface rights to explore for the nominated mineral commodities specified (in this case, gold), as well as
encumbrance-free disposal of materials extracted during exploration process. Such permits allow for beneficial ownership to be held by
a foreign entity.
Roxgold Sango has full and unrestricted surface
rights to the land covered by the exploitation permits. The perimeter of the exploitation permit is free to access and is not subject
to any kind of restriction.
Franco-Nevada Corporation holds a 1.2 % net smelter
return (NSR) royalty for gold produced from the Séguéla Mine. Roxgold Sango has the right to repurchase up to 50 % of the
Franco-Nevada Corporation royalty on a pro rata basis based on the sale price of A$20 million for a period of up to three years from March 30,
2021.
The State of Côte d’Ivoire is entitled
to production royalties as summarized in Table 5. The royalty is based on the gross revenue from gold produced from exploitation activities
on the land subject to the exploitation permit, and any renewal, extension, variation, conversion, modification, replacement or substitution
thereof, and any mining licence granted in respect of the whole or part of, or which relates to the same ground as, the area which is
from time to time the subject of the exploitation permit, and any similar actions permitted under the local mining laws, after deduction
of transportation and refining costs.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 5: |
Côte d’Ivoire government royalty rates |
Royalty |
Gold Price |
3.0% |
Up to US$1,000 |
3.5% |
US$1,000 to US$1,300 |
4.0% |
US$1,300 to US$1,600 |
5.0% |
US$1,600 to US$2,000 |
6.0% |
Above US$2,000 |
Roxgold Sango is subject to the payment of an
annual surface royalty by area of the exploitation permit each year, payable within 60 days of the anniversary date of the exploitation
permit. A similar annual surface royalty is payable in respect to the exploration permits. The Company confirmed that the payment of surface
royalties is up-to-date with most recent payment made in 2023.
To the extent known, all permits that are required
by the laws of Côte d’Ivoire for the mining operation have been obtained. Permitting is discussed in Section 20 of this
Report.
| 4.6 | Social and Environmental Considerations |
Environmental and social considerations are discussed
in Section 20.
In the opinion of the QPs:
| ● | Fortuna was provided with a legal opinion that
supported that the exploitation and exploration permits held by Roxgold Sango for the Séguéla Mine are valid, and that Roxgold
Sango has a legal right to mine the deposit. |
| ● | Fortuna was provided with a legal opinion that
supported that Roxgold Sango has unrestricted surface rights to the land covered by the exploitation and exploration permits held by Roxgold
Sango. The surface rights are sufficient in area for the mining operation infrastructure and tailings facilities. |
| ● | Fortuna was provided with a legal opinion that
outlined the royalties payable for the exploitation permit held by Roxgold Sango. |
| ● | Fortuna is not aware of any environmental issues
that may impact operational activities at the Séguéla Gold Mine. |
Fortuna advised the QPs that to the extent known,
there are no other significant factors and risks that may affect access, title or right or ability to perform work at the mine.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 5 | Accessibility,
Climate, Local Resources, Infrastructure and Physiography |
The
Séguéla Project is accessed by sealed road from Abidjan, via Yamoussoukro using the A3 National Highway to Yamoussoukro,
then the A6 National Highway to Daloa, and then the A5 National Highway to the township of Séguéla. From Séguéla
town (population c. 65,000), the Séguéla Mine is accessed via dirt roads through the villages of Bolo and Fouio (population
c. 3,000) (refer to Figure 1). The 230 km between Abidjan and Yamoussoukro is via a dual carriageway sealed road. The travel time
between Abidjan and the Séguéla Project (approximately 450 km) is typically eight hours.
Dirt roads within the Séguéla Project
area provide access for year-round exploration activities.
There is an airport at the Séguéla
township that is currently undergoing an upgrade for suitability of use for commercial aircraft. The airport is capable of landing light
to medium propeller aircraft however it is currently out of service due to upgrading of the runway and associated infrastructure; the
resumption of services is at present unclear.
| 5.2 | Topography, Elevation and Vegetation |
The Séguéla Mine and the township
of Séguéla occur in a region of low forested hills, with elevations averaging 347 m above sea level. The vegetation of the
region is tropical savannah woodland (Köppen Classification: Aw).
Proximal to the mine, native vegetation has been
supplanted by cashew plantations, and to a lesser extent, cotton and cacao farms.
The Séguéla Mine is located within
a tropical savannah climatic region, which is typified by high average temperatures, and a distinct wet season and dry season. The average
annual temperature is 25.3°C, with an annual average rainfall of 1,268 mm. August and September are the wettest months of
the year. Temperatures do not vary greatly over the course of the year, with average monthly temperatures ranging from 23.5°C in August,
to 26.9°C in
Mining operations are conducted year-round.
| 5.4 | Local Resources and Infrastructure |
The nearest major settlement to the Séguéla
Mine is the township of Séguéla (population c. 65,000). The town is the administrative centre of both the local Woroba District,
and the greater Worodougou administrative region in the west of Côte d’Ivoire.
The mine is accessed from Yamoussoukro by sealed
road of variable quality and is also home to
Power is supplied to the site via a 90kVa power
line from the National Grid via overhead transmission lines with back-up generating capacity installed at the accommodation village and
the exploration camp.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 5.4.2 | Water and Consumable Supplies |
Non-potable water is obtained at the Séguéla
Mine from local bores. Potable water is obtained from an on-site reverse osmosis plant.
Food supplies are sourced either locally or from
Yamoussoukro and are transported by road.
Fuel, machinery, and equipment supplies are readily
available from the major port city of Abidjan or from Yamoussoukro, transported by road.
Both the closest local village of Bolo and the
township of Séguéla are sources of unskilled labor. Skilled labor and technical staff are readily sourced from both Yamoussoukro
and Abidjan on a fly-in/fly-out or drive-in/drive-out basis.
The surface area of the Séguéla
Project is sufficient for the infrastructure necessary for an open pit mining operation. The area comfortably accommodates the accommodation
camp, tailings storage areas, waste disposal, and processing facilities.
In the opinion of the QPs, the existing infrastructure,
availability of staff, the existing power, water, and communications facilities, the methods whereby goods are transported to and from
the mine site, and any planned modifications or supporting studies are well-established, or the requirements to establish such, are well
understood by Fortuna, and support the declaration of Mineral Resources and Mineral Reserves and the proposed mine plan.
There are sufficient surface rights held to support
the life-of-mine plan (LOMP) and mining operations on a year-round basis.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The exploration history for the Séguéla
Project area, where known, is summarized in Table 6.
Table 6: |
Exploration history |
Year |
Operator |
Work
Completed |
Unknown |
Randgold |
16 trenches (210 m) at the Gabbro, Gabbro South, Porphyry and Agouti prospects. A number of trenches returned elevated gold values at Gabbro, Gabbro South, and Agouti. Minor gold anomalism was encountered at Porphyry. |
2012 |
Geoservices CI |
Permis de Recherche Miniére No. 252, now Permis d’Exploitation No. 56) granted. |
2012 |
Mont Fouimba Resources |
Ownership transferred from Geoservices CI. |
2013 |
Apollo Consolidated Ltd. (Apollo) |
Acquired a 51 % interest in Mont Fouimba Resources.
Soil sampling, trenching and artisanal dump sampling. |
2014–2015 |
Apollo |
Trenching and soil sampling at Antenna South, Kwenko and Gabbro South
prospects.
25 reverse circulation drill holes (2,398 m). Six of the drill holes
did not encounter mineralization; the remainder were weakly to well gold mineralized.
Trenching over Barana prospect; some elevated gold values returned.
Trenching and dump sampling over minor artisanal workings at the Antenna
prospect; a number of elevated gold values returned. |
2016–2019 |
Newcrest Mining Limited |
Option to Purchase Agreement.
Geological mapping, stream sediment sampling (66 samples) and reconnaissance
rock chip sampling (104 samples).
Drilling at Antenna prospect from 2016–2017 including 733 aircore
holes (11,154 m), 27 diamond drill holes (5,790 m), 88 reverse circulation drill holes (10,058 m), and 55 reverse circulation drill
holes with diamond core tails (11,101 m).
Drilling at Agouti prospect from 2017–2018 including 1,092 aircore
holes (11,058 m), 1 diamond drill hole (102 m), and 19 reverse circulation drill holes (3,017 m).
Drilling at Boulder prospect from 2017–2018 including 1,246 aircore
holes (14,742 m), 14 reverse circulation drill holes (1,828 m), and 2 reverse circulation drill holes with diamond core tails (326
m).
Drilling at Ancien prospect from 2018–2019 including 92 aircore
holes (1,756 m), 2 reverse circulation drill holes (221 m), and 1 reverse circulation drill hole with diamond core tail (141 m). |
2017 |
LGL Exploration CI S.A
(LGL Exploration) |
Project interest transferred to LGL Exploration, a Newcrest subsidiary. |
2019 |
Roxgold |
Acquires LGL Exploration. Roxgold Sango set up as the in-country operating subsidiary. |
2021 |
Fortuna |
Acquired Roxgold and continued to use the Roxgold Sango entity as the in-country operating subsidiary. |
Gold production commenced under the management
of Roxgold Sango with the first gold pour taking place on May 24, 2023 (Fortuna, 2023a). In the period up to the end of 2023, the
operation had processed 807,617 tonnes averaging 3.42 g/t Au and produced 83,435 ounces of gold (Fortuna, 2024).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 7 | Geological
Setting and Mineralization |
Côte d’Ivoire is underlain by the
Archaean-Protoerozoic Leo-Man shield, which comprises the lower half of the West African Craton. The shield itself is further divided
into the Archaean Kenema-Man Domain, and the Paleoproterozoic (Birimian) Baoulé-Mossi Domain (Bessoles, 1977) (Figure 3).
Figure 3: |
Archaean-Proterozoic of the West African Craton (Peucat et al., 2005) |
The Paleoproterozoic domain is characterized by
greenstone-granitoid assemblages that principally consist of volcanic, volcano-sedimentary, and sedimentary sequences separated by extensive
tonalite-trondhjemite-granodiorite and granite provinces. The volcanic and volcano- sedimentary rocks belong to the Birimian Supergroup,
which is interpreted to have formed in the context of volcanic arcs and oceanic plateaus. The Birimian volcanic and volcano-sedimentary
units are unconformably overlain at several places across the craton by detrital shallow-water sedimentary rocks, the Tarkwaian sediments
(Feybesse et al., 2006). The volcanic, volcano-sedimentary and sedimentary complex has been intruded by several generations of granitoids,
emplaced during discrete magmatic pulses from 2180 to 1980 Ma.
Two cycles of volcanism/sedimentation are recognized
within the Birimian rocks of the Baoule-Mossi Domain; each followed by a period of orogenesis, and together described as the Eburnian
Orogeny which is dated at 2190–2080 Ma. The first cycle is associated with major crustal thickening (Allibone et al., 2002, Feybesse
et al., 2006) between 2130–2100 Ma, transitioning to a second phase through 1980 Ma which
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
was responsible for the development of regional-scale
transcurrent shear zones. These shear zones are generally the key hosts for gold mineralization in the Birimian rocks.
Metamorphic grades range from greenschist to amphibolite
facies throughout the region and generally show tight to isoclinal folding in a north–northeast to south–southwest orientation,
generally reflecting the development of the regional-scale transcurrent shear zones.
| 7.2 | Prospect and Local Geology |
The geology of the Séguéla Project
area is dominated by two litho-structural domains colloquially termed the West Domain and East Domain, which are separated by a north–south-trending
mylonite zone (Figure 4). The East Domain, which hosts the Agouti, Ancien, Boulder, Sunbird and Koula deposits, predominantly comprises
high strain granitoids, orthogneisses, andesite and basaltic units, and schists. The West Domain, which hosts the Antenna deposit, consists
of mafic volcanic (basalts) and hypabyssal (sills and dykes) rocks, rhyolitic lava flows and volcaniclastic rocks, and minor granitoids.
Regional mapping is suggestive of at least two
stages of deformation:
| ● | D1 manifesting as a steeply-plunging
stretching lineation formed during initial north–northwest-to northwest-directed thrusting with rotation anticlockwise to a sub-vertical
plunge during the subsequent D2 event. |
| ● | D2 resulted in the development of
a stretching lineation in response to sinistral shearing, imparting a project scale steep to near-vertical dip present through the central
part of the project area, and best developed in what are considered to be synkinematic (schistose) granitoid sequences and andesitic/basaltic
units. This contrasts with a sub-horizontal stretching lineation developed in the eastern andesite and schist domains, with the boundary
coinciding with an interpreted thrust. |
Mineralization at Antenna is interpreted to relate
to west–northwest–east–southeast shortening during the D1 event although this is still uncertain. Mineralization in
the East Domain, which hosts the Agouti, Boulder, Ancien, Sunbird and Koula deposits is interpreted to relate to the D2 deformation event.
Mineralization at Antenna is hosted by brittle-ductile
quartz-albite vein stockworks, preferentially associated with sericite-biotite-(silica) altered rhyolite lava flow units.
Mineralization at Boulder and Agouti is hosted
by quartz and quartz–carbonate vein networks, associated with extensive porphyritic felsic intrusions emplaced into sheared to mylonitic,
sericite-biotite altered tholeiitic and pillow basalts.
Mineralization at Ancien, Sunbird and Koula is
hosted by quartz and quartz–carbonate vein networks within sheared, sericite-biotite altered tholeiitic basalt units.
Visible gold (up to 5 mm) is common in all six
deposits, particularly at the high-grade Sunbird, Koula and Ancien deposits, with pyrite and pyrrhotite the dominant sulfide species.
U/Pb zircon dating from a rhyolite sample approximately
1 km north of Antenna returned an age of 2,169 ±11Ma, corresponding to the lower Birimian stratigraphy.
The deposit locations are shown in Figure 8.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 4: |
Local geology of the Séguéla Gold Mine |
Source: Roxgold Sango, 2023
The Antenna deposit occurs within a greenstone
package that comprises (west to east) an ultramafic hanging wall, which is in presumed fault contact with an interlayered package of felsic
volcaniclastic rocks and flow banded rhyolitic units, which are then in contact with a mafic (basaltic) footwall unit.
The faulted contacts between the mafic/ultramafic
units and the felsic assemblage converge to the south of the deposit forming a wedge shape to the felsic package (Figure 5).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 5: |
Antenna deposit geology |
Note: Ultramafic rocks to the west and basaltic rocks
to the east bound an interlayered package of volcaniclastic sediments (brown) and rhyolites (yellow). Mineralization is predominantly
confined to the rhyolites.
Source: Roxgold Sango, 2021
The Antenna deposit is a brittle–ductile
quartz–albite vein stockwork predominantly contained within the flow banded rhyolite units. The stockwork lode varies in width roughly
in proportion with the widths of the rhyolitic units that host it (approximately 3–40 m) and extends over a strike length of approximately
1,350 m. Stockwork veins which host mineralization show two principal orientations: steep east-dipping, and steep west-dipping. Veins
in the steep west-dipping orientation range from ptygmatically folded to undeformed, while veins in the east-dipping direction may be
variably boudinaged to undeformed. This suggests syn-deformational emplacement of the vein sets during west over east movement along the
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
main fault structures within the region. Mineralization
occurs as free gold, associated with pyrite and pyrrhotite. Alteration assemblages associated with this mineralization assemblage vary
from proximal intense silica–albite ± biotite ± chlorite alteration, through medial silica–albite–sericite
± chlorite assemblages, to more distal sericite–carbonate (ankerite/calcite) and carbonate–magnetite assemblages. Pyrite
is the dominant sulfide associated with higher-grade mineralization within proximal alteration zones, while sulfide mineralogy is pyrrhotite-dominated
in medial and distal assemblages, and is associated with lower-grade gold mineralization. An example of the mineralized quartz veining
at the Antenna deposit is provided in Figure 6.
Figure 6: |
Example drill core from Antenna deposit – SGDD002 (Note – core tray length is 1 meter) |
| 7.4 | Agouti and Boulder Deposits |
The Boulder and Agouti deposits are located within
a distinct northerly-trending litho-structural corridor that extends from Boulder in the south to Gabbro in the north (Figure 7). The
deposits consist of a stockwork array of veins and are variable in width up to 40 meters with a cumulative strike length at Boulder of
approximately 1.5 kilometers and 1.3 kilometers at Agouti.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 7: |
Agouti and Boulder geology |
Source: Roxgold Sango, 2021
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Regional mapping has defined a broad package of
pillow basalts and intercalated basaltic sediments, flanked to the west by a discontinuous gabbro unit and regionally extensive doleritic
sequence. The basaltic units are extensively intruded by quartz–feldspar-biotite porphyritic felsic intrusions.
Ground magnetic surveys across the Boulder-Agouti
trend have highlighted two main structural trends, within the overall northerly-trending corridor. Regionally extensive north–northeast-
to northeast-trending structures are interpreted to be early D2 thrusts, with dilational zones potentially facilitating the emplacement
of felsic intrusions. A later set of northwest-striking structures offset the earlier north–northeast- to northeast-trending structures,
with dextral movement in the order of tens of meters (Figure 8).
Figure 8: |
Structural interpretation of the Boulder-Agouti corridor over ground/aeromagnetic imagery |
Source: Roxgold Sango, 2021
Outcrop mapping in the Boulder area suggests the
corridor may represent a broader northwest-trending thrust-fold package, with the felsic intrusions exploiting zones of weakness. The
corridor remains poorly explored to the south of Boulder and north of Agouti.
Gold mineralization is associated with strongly
foliated or mylonitized, quartz/quartz–carbonate veined basalt and the margins of the felsic intrusions. Generally, lower grade
mineralization occurs internal to the felsic intrusions where they are brecciated or extensively veined. The highest gold grades generally
correlate with the intersection of north–northeast and northwest-trending structures. Mineralization occurs as free gold within
a network of milky white quartz veins, and associated with foliation or quartz/quartz-carbonate vein controlled pyrite and minor pyrrhotite
(Figure 9).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 9: |
Example of mineralization from Boulder and Agouti deposits – SGRD437 at Boulder deposit (Note – core tray length is 1
meter) |
The high-grade Ancien deposit is located within
a thick package of magnetically quiet pillow basalts, tholeiitic basalts and minor mafic sediments that form the westernmost part of the
East Domain. The deposit is associated with an interpreted D2 sinistral shear zone, informally labelled the Ancien Shear, (Figure 10)
and comprises (from west to east) a chloritic pillow basalt footwall overlain by a foliated/sheared tholeiitic basalt unit, which is in
turn overlain by a second chloritic pillow basalt hanging wall unit.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 10: |
Geology map for Ancien deposit |
Source: Roxgold Sango, 2021
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Coarser-grained sequences within the pillow basalts
are geochemically equivalent to the pillow basalts and are interpreted to be part of the volcanic stratigraphy, rather than later intrusions.
Generally narrow quartz-feldspar-biotite rhyolite to dacite porphyry intrusions and calc alkaline lamprophyric dykes are altered and foliated
and therefore interpreted to have been emplaced prior to the deformation and mineralizing events.
Multielement
geochemistry and petrology suggests the hanging wall and footwall pillow basalts are the same unit, interpreted to be tightly folded about
a generally north trending, moderately to steeply east dipping anticlinal hinge (Figure 11).
Figure 11: |
Ancien deposit schematic geological cross-section |
Source: Roxgold Sango, 2023
The anticline theory is supported by the thickness
of the tholeiitic basalt unit, which increases from a few meters near surface at the northern end of the deposit, to greater than 120m
at depth. The anticline possibly pinches out at the northern end of the deposit against the Ancien Shear, potentially explaining the apparently
abrupt termination of tholeiitic basalt in this area. The Ancien Shear is interpreted as the main conduit for mineralizing fluids, with
the interaction of folding and later northwest-t and northeast-trending structures important in focusing these fluids.
Significant mineralization is restricted to the
more reactive and competent tholeiitic basalt unit and is best developed in zones of strong brittle-ductile brecciation and shearing,
with selective sericite ± silica
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
alteration and intense quartz and quartz-carbonate
veining. Mineralization occurs as free gold, predominantly as small grains within microfractured milky-white quartz veins and associated
with pyrite and lesser pyrrhotite (Figure 12).
Figure 12: |
Example of mineralization from Ancien deposit – SGRD513 (Note – core tray length is 1 meter) |
Generally, lower-grade mineralization is also
developed at the margins of felsic porphyries that intrude the tholeiitic basalt, and in zones of increased brecciation and veining within
these porphyries. Significant mineralization has been intersected over a strike length of greater than 350m and to a vertical depth of
greater than 300m and has a moderately to steeply south-plunging core of high-grade mineralization. This high-grade core of the deposit
is associated with the most intense deformation and veining and is interpreted to be associated with the hinge zone of the postulated
anticline. The deposit remains open down-dip and down-plunge.
The high-grade Koula deposit is situated within
the same package of mafic rocks as the Ancien deposit located 7 km to the south, which is informally labelled the Ancien–Koula corridor.
The Koula deposit is hosted within a strongly
foliated/sheared tholeiitic basalt unit with a chloritic pillow basalt hanging wall and footwall (Figure 13).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 13: |
Geology map for Koula deposit |
Source: Roxgold Sango, 2023
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Coarser-grained sequences within the pillow basalts
are geochemically equivalent to the pillow basalts which are interpreted to be part of the volcanic stratigraphy, rather than later intrusions.
Felsic intrusions are rare, but geochemically distinct late mafic intrusions of dolerite to gabbro are relatively common in the broader
stratigraphic sequence.
The structural setting and history of the Koula
deposit is developing with ongoing drilling; however, the deposit appears similar to Ancien. The deposit is hosted by a near vertical
north–northeasterly-trending shear zone of up to 15 m true width, with veining logged up to 10 m thick within the shear zone. There
is some evidence from structural measurements from drill core of tight, south plunging, anticlinal folding, with the deposit interpreted
to represent the sheared eastern limb or core of the anticlinal structure. Further drilling is required to confirm this interpretation.
As with Ancien, the north–northeasterly-trending shear zone is interpreted as the main conduit for mineralizing fluids, with the
interaction of folding and later northwest and northeast structures important in focusing these fluids during the mineralization event.
Significant
mineralization at Koula is restricted to the tholeiitic basalt unit and is best developed in discrete zones of strong shearing, biotite–sericite-(silica)
alteration and intense recrystallized quartz and quartz–carbonate veining. Mineralization occurs as free gold, predominantly as
small grains within recrystallized and microfractured milky-white quartz veins, and associated with disseminated to blebby, foliation
controlled pyrrhotite and lesser pyrite (Figure 14).
Figure 14: |
Example of mineralization from the Koula deposit – SGDD072 (Note – core tray length is 1 meter) |
The predominance of biotite and pyrrhotite at
Koula is indicative of higher temperature hydrothermal fluids compared to Ancien, where sericite and pyrite are the more dominant species.
This change in mineral species suggests a temperature gradient (increasing) from south to north, which is important for ongoing exploration
of the Ancien–Koula corridor.
Drilling to date has defined the Koula deposit
over a 650m strike length and to a depth of greater than 350m vertically. The deposit remains open at depth and down plunge to the south,
presenting a priority target for ongoing exploration.
The Sunbird deposit is hosted within the same
package of mafic rocks as both the Ancien and Koula deposits, within the Ancien–Koula corridor. Analogous to the mineralization
setting of Koula, Sunbird is hosted within a strongly foliated/sheared tholeiitic basalt unit with a chloritic pillow basalt hanging wall
and footwall (Figure 15).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 15: |
Geology map for Sunbird deposit |
Source: Roxgold Sango, 2023
Coarser grained sequences within the pillow basalts
are geochemically equivalent to the pillow basalts, which are interpreted to be part of the volcanic stratigraphy, rather than later intrusions.
Felsic and dioritic
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
intrusions, though uncommon, both occur within
the deposit stratigraphy, and are generally foliation/stratigraphy concordant in strike.
Mineralization appears to be hosted along two
preferential planes; that of the general stratigraphy, and that of the pervasive shear foliation within the area, which occurs at a low
angle to the stratigraphy. The deposit is hosted predominantly by a near vertical north-striking shear zone within the generally sub-vertical,
north–northeast-striking stratigraphy. Additional drilling is required to confirm this interpretation.
Significant mineralization at Sunbird is predominantly
restricted to the tholeiitic basalt unit, though minor lenses of mineralization have been interpreted within the rhyolite, diorite and
also the pillow basalts. Mineralization is best developed in discrete zones of strong shearing, biotite-sericite-(silica) alteration and
intense recrystallized quartz and quartz–carbonate veining. Mineralization occurs as free gold, predominantly as small grains within
recrystallized and microfractured milky-white quartz veins, with individual veins up to 5 m wide. The highest grade portions of the Sunbird
deposit exhibit a moderate southerly plunge, which is concordant with the intersection lineation of the prevailing shear orientation and
the stratigraphy within the area.
Drilling to date has defined the Sunbird deposit
over a 1,200m strike length and to a depth of greater than 450m vertically. The deposit remains open at depth and down plunge to the south,
and drilling is continuing to test the deposit’s extents.
In the opinion of the QPs, knowledge of the settings,
lithologies, and structural and alteration controls on mineralization at the Antenna, Ancien, Agouti, Boulder, Koula, and Sunbird deposits
is sufficient to support Mineral Resource and Mineral Reserve estimation.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The
deposits at the Sequala Mine are considered orogenic lode-style systems as per the criteria of Goldfarb and Groves (2015), Groves and
Santosh (2016) (Figure 16). Orogenic deposits may form in a wide range of host lithology environments, however the majority are noted
as associated typically with volcano-plutonic or clastic sedimentary terrains. Across the Birimian terrane of West Africa several notable
examples of orogenic deposits are present, including the Obuasi, Prestea-Bogoso and Ahafo-Subika deposits in Ghana, Fekola, Sadiola, and
Loulo-Gounkoto in western Mali, Yaramoko and Hounde in Burkina Faso, and Tongon, Ity, and Abujar in Cote d’Ivoire amongst others.
Orogenic gold deposits are typically products of structurally controlled hydrothermal mineralization systems. Such deposits exhibit strong
relationships with regional arrays of major structures and shear zones connected to long-lived, crustal-scale faults and deformation zones.
Across West Africa mineralizing systems are typically associated with second and third order shears, usually within 25 km of major first
order, crustal scale faults and shear zones.
Figure 16: |
Schematic representation of the variety of proposed models for orogenic gold and fluid sources in the crust. Goldfarb and Groves (2015);
Groves and Santosh (2016). |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Metamorphism to greenschist facies is typical
although there are examples of amphibolite facies present in the Birimian. Gold mineralization is usually attributed to syn to post peak
metamorphism, although several mineralizing events may be noted and associated with interpreted reactivation of existing structures.
Gold mineralization is typically associated with
a network of quartz veins containing subordinate amounts of carbonate, tourmaline, sulfides, and native gold. Veins may vary from stockwork
in relatively shallow brittle environments through to laminated veins in deeper more ductile systems. Gold in these quartz vein networks
is typically free milling and commonly visible, although several examples of variably refractory systems associated with arsenopyrite
or pyrite have been noted in the Birimian orogenic deposits. Alteration is commonly represented by the presence of albite, carbonate,
hematite, biotite, white mica, and tourmaline overprinting. Alteration halos are relatively poorly developed, commonly in the order of
5-15 meters.
The Antenna, Agouti and Boulder deposits are hosted
by brittle-ductile quartz–albite vein stockworks, often associated with flow banded rhyolite units or porphyritic intrusions. The
Ancien, Sunbird and Koula deposits are hosted by brittle-ductile quartz and quartz–carbonate vein networks associated with strongly
to intensely sheared tholeiitic basalt.
The deposits within the Séguéla
Project are considered examples of orogenic lode-style deposits, based on the following:
| ● | Hosted by high iron ultramafic/mafic and volcaniclastic
units, with local minor rhyolitic units. |
| ● | The Séguéla deposits are hosted
on second order regional structures (interpreted as transcurrent regional shear zones) which have exhibited a complex structural history
and demonstrate clear controls on mineralization. |
| ● | Greenschist metamorphism is prevalent. |
| ● | Mineralization is hosted by brittle-ductile quartz–albite
and quartz-carbonate vein stockworks. |
In the QP’s opinion an exploration model
that uses an orogenic deposit model is reasonable as a regional targeting tool.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Exploration
at the Séguéla Project has been undertaken by Randgold (pre-2012), Apollo (2012–2016), Newcrest (2016–2018)
and Roxgold Sango (2019–present).
Early exploration included construction of a 40-person
exploration camp and core storage/logging facilities, geological mapping, purchase and interpretation of aeromagnetic data, soil, trench
and artisanal dump sampling, aircore (AC), reverse circulation (RC), RC drilling with a core tail (RDC), and core (DD) drilling.
Since April 2019, Roxgold Sango has completed
reconnaissance widespread AC and RC drilling across several areas including, but not limited to, Ancien, Agouti, Boulder, Bouti, P1, Elephant,
Folly, P3, Kwenko West, Gabbro, Porphyry, Rollier, and Sunbird areas, and resource definition RC and DD drilling at Antenna, Ancien, Agouti,
Boulder, Koula and Sunbird..
Data are collected in Universal Transverse Mercator
(UTM) coordinates, in the Zone 29P. The WGS84 datum is used for reference.
Xcalibur Airborne Geophysics Pty Ltd of South
Africa completed an aeromagnetic/radiometric survey across the project in December 2019 and January 2020, with the results used
to further enhance the prospectivity mapping and structural understanding of the mineralization controls (Figure 17 and Figure 18).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 17: |
Xcalibur 2019/2020 Séguéla aeromagnetics/radiometrics survey – grey scale second vertical derivative of TMI magnetics
imagery (Yellow stars represent identified prospects) |
Source: Roxgold Sango, 2023
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 18: |
Xcalibur 2019/2020 Séguéla aeromagnetics/radiometrics survey – total count radiometrics imagery |
Source: Roxgold Sango, 2023
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
At the time of Roxgold Inc.’s acquisition
of the Séguéla Project from Newcrest in April 2019, 28 prospects had been identified from historic geochemistry and
geophysical surveys, with exploration activities actively drill testing nine of these in 2019 and 2020. Ongoing prospect mapping, mapping
and sampling of artisanal workings, rock chip sampling and auger sampling, in conjunction with interpretation of existing geochemical
and geophysical datasets, has so far identified more than 30 prospects (Figure 19). The discovery of the Koula, Sunbird, Barana, Kestral
and Badior deposits, are directly attributable to these target generation activities.
Figure 19: |
Séguéla prospects (yellow stars) superimposed on gridded auger and soil gold (Au) geochemistry. Background image is
2VD TMI magnetics |
Source: Roxgold Sango, 2023
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
To further assist with the interpretation of multielement
geochemistry, a representative suite of 18 core samples from the Antenna, Boulder, Agouti, Ancien and Gabbro deposits was submitted for
petrographic analysis in February 2020. The descriptions provided of lithologies, alteration, veining and mineralization assemblages
were used to further refine the geological and mineralization understanding.
Exploration activities are ongoing with mapping
and auger geochemistry continuing to identify and define priority targets for follow up AC, RC and diamond drilling.
In the opinion of the QPs:
| ● | The mineralization style and setting of the Séguéla
Project is sufficiently well understood to support the Mineral Resource and Mineral Reserve estimation. |
| ● | Exploration methods are consistent with industry
practices and are adequate to support continuing exploration and Mineral Resource estimation. |
| ● | Exploration results support Roxgold Sango’s
interpretation of the geological setting and mineralization. |
| ● | Continuing exploration may identify additional
mineralization that may warrant drill testing. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Drilling across the Séguéla Project
has been conducted by Apollo and Newcrest, and since April 2019 by Roxgold Sango.
| 10.1.1 | Historical Drilling |
No details are available regarding the depths
and locations of RC drill holes completed by Apollo in 2014. No drilling undertaken by Apollo is used in the Mineral Resource estimate.
Between March 2016 and December 2017,
Newcrest conducted a campaign of drilling over the Antenna prospect which included preliminary reconnaissance AC drilling, then resource
definition RC, DD and RCD drilling. In total, 38,104.3 m of drilling was completed over the Antenna prospect (Table 7).
Table 7: Summary of Newcrest
drilling over the Séguéla Project 2016 and 2017
Prospect |
Year |
Hole Type |
No. of Collars |
Total Meters |
Antenna |
2016 |
AC |
544 |
8,057 |
2017 |
AC |
189 |
3,097 |
2016 |
DD |
2 |
310.9 |
2017 |
DD |
25 |
5,479.6 |
2016 |
RC |
9 |
978 |
2017 |
RC |
79 |
9,080 |
2016 |
RCD |
14 |
2,721.3 |
2017 |
RCD |
41 |
8,380.4 |
Total |
903 |
38,104.3 |
Agouti |
2017 |
AC |
992 |
9,871 |
2017 |
RC |
14 |
2,177 |
2017 |
DD |
1 |
102.4 |
2018 |
AC |
100 |
1,187 |
2018 |
RC |
5 |
840 |
Total |
1,112 |
14,177 |
Boulder |
2017 |
AC |
1,196 |
13,844 |
2017 |
RC |
5 |
557 |
2017 |
RCD |
1 |
141.5 |
2018 |
AC |
50 |
898 |
2018 |
RC |
9 |
1,271 |
2018 |
RCD |
1 |
185 |
Total |
1,262 |
16,897 |
Ancien |
2018 |
AC |
92 |
1,756 |
2018 |
RC |
2 |
221 |
2019 |
RCD |
1 |
141.3 |
Total |
95 |
2,118 |
Newcrest’s 150 RC, DD and RCD holes totaling
26,065 m define the Antenna deposit on drill hole spacings that range from 20 m to 100 m apart along a strike extent of 1,700 m. Newcrest
also completed a total of 33,192.2 m of AC, RC, DD and RCD drilling at Agouti, Ancien, and Boulder prior to April 2019. Drill hole
collar locations for all holes drilled by Newcrest are displayed in Figure 20
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 20: |
Collar plan showing location of Newcrest drill holes by type |
10.1.2 | Roxgold Sango Drilling |
Since April 2019 to June 30, 2023, Roxgold
Sango has drilled a total of 6,018 holes totaling 232,398 meters that included auger, diamond and RC drilling (Table 8).
Table 8: Summary of Roxgold
Sango Séguéla Gold Mine drilling
Hole Type |
No. of holes |
Meters |
Auger |
4,482 |
20,441 |
DD* |
93 |
19,795 |
RC |
1,100 |
110,667 |
RCD |
343 |
81,495 |
Total |
6,018 |
232,398 |
*DD includes geotechnical diamond drilling
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Drill
programs targeted a variety of prospects that were identified via geophysical anomalies, surface mapping and surface sampling across the
Séguéla Project (Figure 21). If mineralization was identified at a prospect further drilling was programmed.
Figure 21: |
Collar plan showing location of Roxgold Sango drill holes by type |
Of the prospects drilled, Roxgold Sango identified
six to prioritize where significant gold mineralization had been identified. Resource definition drilling has been conducted for the Antenna,
Agouti, Ancien, Boulder, Sunbird and Koula deposits (Table 9) as at the effective date of this Report.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 9: |
Summary of Roxgold Sango Séguéla Gold Mine resource drilling |
Project |
Hole Type |
No. of Collars |
Total Meters |
Antenna |
DD* |
8 |
1,089 |
RC |
68 |
5,641 |
RCD |
13 |
2,462 |
Agouti |
DD* |
10 |
907 |
RC |
188 |
17,947 |
RCD |
13 |
2,276 |
Ancien |
DD* |
5 |
663 |
RC |
71 |
7,063 |
RCD |
84 |
17,390 |
Boulder |
DD* |
1 |
107 |
RC |
156 |
17,118 |
RCD |
8 |
1,662 |
Koula |
DD* |
8 |
1,283 |
RC |
66 |
7,077 |
RCD |
79 |
16,595 |
Sunbird |
DD* |
29 |
9,072 |
RC |
68 |
8,143 |
RCD |
50 |
14,072 |
Total |
|
925 |
130,567 |
*DD includes geotechnical diamond drilling
All drilling was completed by a third-party drill
contractor, Geodrill Ltd.
Drilling at the Antenna deposit was designed to
infill and support upgrade areas of Inferred Mineral Resource to Indicated Mineral Resources, as well as to try and extend areas of mineralization.
Drilling at the Agouti, Ancien, Boulder, Koula
and Sunbird deposits were designed to advance the projects through the stages of Mineral Resource definition and increased confidence.
Drilling is ongoing at the Ancien, Sunbird and Koula deposits with down-dip exploratory drilling testing for underground mining potential.
AC drilling was used for geochemical data collection
and is not used for any resource modelling.
Drill hole location plans for the Antenna (Figure
22), Ancien (Figure 23), Agouti (Figure 24), Boulder (Figure 25), Koula (Figure 26) and Sunbird (Figure 27) deposits are shown by drill
type.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 22: |
Antenna deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 23: |
Ancien deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 24: |
Agouti deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 25: |
Boulder deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 26: |
Koula deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 27: |
Sunbird deposit collar plan showing mineralization wireframes, pit design outline, and drill holes by type |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The extent of drilling varies for each of the
deposits that have defined Mineral Resources. Most deposits have been drilled based on a grid of exploration holes approximately 20 to
25 m apart.
The Antenna deposit has been drilled over a strike
length of approximately 1,700 m (north to south) and to depths around 250 m from surface. Exploration drilling has increased in depth
to the south.
The Ancien deposit has been drilled over a strike
length of approximately 500 m (north to south) and to depths of 320 m from surface. Similar to Antenna, exploration drilling has increased
in depth to the south.
The Koula deposit has been drilled over a strike
length of approximately 1,000 m (north–northeast to south–southwest) and to depths of 400 m from surface. Exploration drilling
has increased in depth in response to the plunge of the mineralization to the southwest.
The Agouti deposit is split into three main mineralized
zones where resources have been estimated. The Eastern zone has been drilled over a strike length of 700 m (north–northeast to south–southwest)
to a depth of 200 m from surface; the Central zone has been drilled over a strike length of 300 m (north to south) to a depth of 150 m
from surface; and the Western zone has been drilled over a strike length of 300 m (north–northeast to south–southwest) to
a depth of 125 m from surface. The drilling follows the plunge of the mineralization generally getting deeper towards the south–southwest.
The Boulder deposit has been drilled over a strike
length of approximately 1,500 m (northeast to southwest) and to depths of 200 m from surface.
The Sunbird deposit has been drilled over a strike
length of approximately 1,400 m (north to south) and to depths around 400 m from surface. Exploration drilling has increased in depth
to the south, as it follows the plunge of the mineralization.
10.1.4 | Grade Control Drilling and Drilling Conducted Post Resource Estimation Data Cut-off Date |
A campaign of grade control RC drilling has been
conducted at the Antenna, Ancien and Koula deposits to provide additional data for the definition of ore and waste diglines in the first
phase of mining in each pit. All grade control drilling is by RC drill rigs and subject to Fortuna’s standard QAQC program with
the insertion of standards, blanks and duplicates. Results are monitored on an ongoing basis and reported monthly. Drilling comprised
229 holes totaling 7,148 m in Ancien and 133 holes totaling 5,013 m in Koula. Comparisons between the reserve model and grade control
model for both deposits showed lower tonnes, grades and ounces, in the upper levels of the pit associated with oxide and transitional
material that had been exploited by artisanal mining after the initial drilling program had been completed.
Exploration drilling has been conducted at Ancien,
Badior, Barana, Kestral and P11 with a total of 51 holes for 8,430 m completed as at the effective date of this Report. Results of the
drilling are detailed in Table 10.
Table 10: |
Exploration drilling results at the Séguéla Mine post data cut-off date – intervals of interest |
Hole ID |
Hole
Type |
Easting |
Northing |
RL
(m) |
Total
Depth
(m) |
Azimuth
(°)* |
Dip
(°)* |
From (m) |
To
(m) |
Interval
(m) |
ETW**
(m) |
Au
(g/t) |
Deposit |
SGRD1656 |
RC/DD |
743307 |
888573 |
352 |
225.7 |
277 |
-60 |
180 |
182 |
2 |
1.4 |
5.54 |
Ancien |
|
|
|
|
|
|
|
Incl. |
180 |
181 |
1 |
0.7 |
10.3 |
Ancien |
SGRD1657 |
RC/DD |
743346 |
888518 |
349 |
276.1 |
277 |
-60 |
228 |
231 |
3 |
2.1 |
2.76 |
Ancien |
|
|
|
|
|
|
|
|
239 |
250 |
11 |
7.7 |
27.06 |
Ancien |
|
|
|
|
|
|
|
incl. |
241 |
243 |
2 |
1.4 |
138.45 |
Ancien |
SGRD1658 |
RC/DD |
743366 |
888467 |
348 |
348 |
277 |
-55 |
268 |
269 |
1 |
0.7 |
5.47 |
Ancien |
SGRD1659 |
RC/DD |
743335 |
888395 |
354 |
336.3 |
277 |
-55 |
270 |
274 |
4 |
2.8 |
2.99 |
Ancien |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Hole ID |
Hole
Type |
Easting |
Northing |
RL
(m) |
Total
Depth
(m) |
Azimuth
(°)* |
Dip
(°)* |
From (m) |
To
(m) |
Interval
(m) |
ETW**
(m) |
Au
(g/t) |
Deposit |
|
|
|
|
|
|
|
|
306 |
322 |
16 |
11.2 |
1.14 |
Ancien |
SGRD1661 |
RC/DD |
743409 |
888381 |
351 |
400.4 |
277 |
-55 |
|
|
|
|
NSI |
Ancien |
SGRD1663 |
RC/DD |
888361 |
743405 |
356 |
400.4 |
277 |
-55 |
346 |
374 |
28 |
19.6 |
5.98 |
Ancien |
|
|
|
|
|
|
|
incl. |
352 |
354 |
2 |
1.4 |
12.95 |
Ancien |
|
|
|
|
|
|
|
and |
358 |
360 |
2 |
1.4 |
16.38 |
Ancien |
|
|
|
|
|
|
|
and |
362 |
364 |
2 |
1.4 |
36.35 |
Ancien |
SGRD1664 |
RC/DD |
743403 |
888335 |
371.24 |
400.2 |
2.77 |
-55 |
361 |
383 |
22 |
15.4 |
2.23 |
Ancien |
|
|
|
|
|
|
|
incl. |
368 |
369 |
1 |
0.7 |
11.25 |
Ancien |
|
|
|
|
|
|
|
and |
370 |
371 |
1 |
0.7 |
10.15 |
Ancien |
SGRC1520 |
RC |
743062 |
901901 |
393 |
97 |
270 |
-60 |
|
|
|
|
NSI |
Badior |
SGRD1632 |
RC/DD |
743156 |
901797 |
393 |
270.8 |
270 |
-60 |
|
|
|
|
NSI |
Badior |
SGRC1633 |
RC |
743732 |
902550 |
367 |
78 |
270 |
-60 |
39 |
40 |
1 |
0.7 |
5.09 |
Barana |
|
|
|
|
|
|
|
|
55 |
63 |
8 |
5.6 |
1.38 |
Barana |
SGRC1634 |
RC |
743826 |
902549 |
367 |
160 |
270 |
-60 |
77 |
86 |
9 |
6.3 |
1.38 |
Barana |
|
|
|
|
|
|
|
|
90 |
94 |
4 |
2.8 |
2.82 |
Barana |
SGRC1635 |
RC |
743647 |
902700 |
372 |
100 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1636 |
RC |
743694 |
902698 |
371 |
123 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1637 |
RC |
743755 |
902699 |
371 |
120 |
270 |
-60 |
21 |
28 |
7 |
4.9 |
0.83 |
Barana |
SGRC1638 |
RC |
743682 |
902900 |
372 |
100 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1639 |
RC |
743734 |
902902 |
372 |
120 |
270 |
-60 |
76 |
79 |
3 |
2.1 |
2.48 |
Barana |
SGRC1640 |
RC |
743704 |
903001 |
375 |
107 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1641 |
RC |
743748 |
903001 |
376 |
100 |
270 |
-60 |
71 |
73 |
2 |
1.4 |
6.87 |
Barana |
|
|
|
|
|
|
|
incl. |
71 |
72 |
1 |
0.7 |
13.15 |
Barana |
SGRC1642 |
RC |
743713 |
903099 |
372 |
100 |
270 |
-60 |
30 |
36 |
6 |
4.2 |
1.46 |
Barana |
SGRC1643 |
RC |
743757 |
903098 |
380 |
100 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1644 |
RC |
743736 |
903400 |
371 |
104 |
270 |
-60 |
12 |
15 |
3 |
2.1 |
1.71 |
Barana |
|
|
|
|
|
|
|
|
41 |
45 |
4 |
2.8 |
1.72 |
Barana |
SGRC1645 |
RC |
743787 |
903400 |
368 |
100 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1646 |
RC |
743724 |
903301 |
374 |
100 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1647 |
RC |
743773 |
903301 |
376 |
120 |
270 |
-60 |
43 |
45 |
2 |
1.4 |
90.90 |
Barana |
|
|
|
|
|
|
|
Incl. |
43 |
44 |
1 |
0.7 |
180.5 |
Barana |
SGRC1648 |
RC |
743735 |
903498 |
366 |
120 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1649 |
RC |
743783 |
903500 |
366 |
132 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRD1650 |
RC/DD |
743769 |
902799 |
358 |
203.6 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1651 |
RC |
743806 |
902701 |
367 |
112 |
270 |
-60 |
|
|
|
|
NSI |
Barana |
SGRC1652 |
RC |
743819 |
902799 |
370 |
120 |
270 |
-60 |
57 |
64 |
7 |
4.9 |
0.74 |
Barana |
SGRD1653 |
RC/DD |
742113 |
893851 |
421 |
266 |
270 |
-55 |
194 |
200 |
6 |
4.2 |
2.71 |
Kestral |
SGRD1654 |
RC/DD |
742128 |
893804 |
419 |
290.2 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRD1655 |
RC/DD |
742090 |
893751 |
411 |
230 |
270 |
-60 |
|
|
|
|
NSI |
Kestral |
SGRD1654 |
RC/DD |
742128 |
893804 |
419 |
290.2 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Hole ID |
Hole
Type |
Easting |
Northing |
RL
(m) |
Total
Depth
(m) |
Azimuth
(°)* |
Dip
(°)* |
From (m) |
To
(m) |
Interval
(m) |
ETW**
(m) |
Au
(g/t) |
Deposit |
SGRD1655 |
RC/DD |
742090 |
893751 |
411 |
230 |
270 |
-60 |
|
|
|
|
NSI |
Kestral |
SGRC1676 |
RC |
742009 |
893999 |
397 |
50 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRC1677 |
RC |
742033 |
894000 |
414 |
100 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRC1678 |
RC |
742010 |
894050 |
421 |
50 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRC1679 |
RC |
742034 |
894051 |
419 |
100 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRD1680 |
RC/DD |
742113 |
893699 |
426 |
280.4 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRD1681 |
RC/DD |
742141 |
893649 |
403 |
330.3 |
270 |
-55 |
|
|
|
|
NSI |
Kestral |
SGRC1660 |
RC |
743881 |
892798 |
381 |
100 |
90 |
-60 |
|
|
|
|
NSI |
P11 |
SGRC1662 |
RC |
743830 |
892799 |
388 |
100 |
90 |
-60 |
6 |
17 |
11 |
7.7 |
0.62 |
P11 |
|
|
|
|
|
|
|
|
35 |
52 |
17 |
11.9 |
1.64 |
P11 |
SGRC1670 |
RC |
743703 |
892600 |
399 |
131 |
90 |
-60 |
101 |
115 |
14 |
9.8 |
2.6 |
P11 |
SGRC1671 |
RC |
743882 |
892999 |
388 |
100 |
90 |
-60 |
8 |
19 |
11 |
7.7 |
0.58 |
P11 |
SGRC1672 |
RC |
743831 |
892997 |
389 |
100 |
90 |
-60 |
84 |
90 |
6 |
4.2 |
0.91 |
P11 |
SGRC1673 |
RC |
743931 |
893198 |
390 |
100 |
90 |
-60 |
|
|
|
|
NSI |
P11 |
SGRC1674 |
RC |
743881 |
893197 |
401 |
100 |
90 |
-60 |
|
|
|
|
NSI |
P11 |
SGRC1675 |
RC |
743830 |
893200 |
415 |
100 |
90 |
-60 |
|
|
|
|
NSI |
P11 |
SGRC1667 |
RC |
743780 |
892802 |
387 |
107 |
90 |
-60 |
77 |
79 |
2 |
1.4 |
3.2 |
P11 |
|
|
|
|
|
|
|
|
84 |
94 |
10 |
7 |
1.13 |
P11 |
|
|
|
|
|
|
|
|
98 |
105 |
7 |
4.9 |
1.16 |
P11 |
SGRC1668 |
RC |
743804 |
892600 |
377 |
100 |
90 |
-60 |
|
|
|
|
|
P11 |
SGRC1669 |
RC |
743750 |
892599 |
391 |
100 |
90 |
-60 |
10 |
16 |
6 |
4.2 |
3.78 |
P11 |
|
|
|
|
|
|
|
incl. |
14 |
15 |
1 |
0.7 |
15.35 |
P11 |
|
|
|
|
|
|
|
|
47 |
65 |
18 |
12.6 |
2.55 |
P11 |
SGRC1682 |
RC |
743089 |
901800 |
396 |
140 |
270 |
-55 |
65 |
73 |
8 |
5.6 |
16.70 |
Badior |
|
RC |
|
|
|
|
|
incl |
70 |
71 |
1 |
0.7 |
121.00 |
Badior |
|
RC |
|
|
|
|
|
|
77 |
79 |
2 |
1.4 |
13.45 |
Badior |
|
RC |
|
|
|
|
|
incl |
77 |
78 |
1 |
0.7 |
24.20 |
Badior |
|
RC |
|
|
|
|
|
|
83 |
86 |
3 |
2.1 |
13.01 |
Badior |
|
RC |
|
|
|
|
|
incl |
85 |
86 |
1 |
0.7 |
33.00 |
Badior |
SGRC1683 |
RC |
743095 |
901850 |
389 |
130 |
270 |
-55 |
59 |
63 |
4 |
2.8 |
1.66 |
Badior |
|
RC |
|
|
|
|
|
|
67 |
76 |
9 |
6.3 |
17.32 |
Badior |
|
RC |
|
|
|
|
|
incl |
67 |
69 |
2 |
1.4 |
49.50 |
Badior |
|
RC |
|
|
|
|
|
and |
71 |
72 |
1 |
0.7 |
44.60 |
Badior |
|
RC |
|
|
|
|
|
|
86 |
92 |
6 |
4.2 |
2.28 |
Badior |
SGRC1685 |
RC |
743130 |
901950 |
385 |
190 |
270 |
-55 |
75 |
79 |
4 |
2.8 |
2.46 |
Badior |
SGRD1686 |
RC/DD |
743128 |
901851 |
386 |
192.1 |
268 |
|
142 |
144 |
2 |
1.4 |
4.86 |
Badior |
|
RC/DD |
|
|
|
|
|
|
189 |
192.1 |
3.1 |
2.2 |
1.79 |
Badior |
SGRD1687 |
RC/DD |
743165 |
901950 |
383 |
270 |
270 |
-55 |
NSI |
|
|
|
|
Badior |
SGRD1688 |
RC/DD |
743161 |
902003 |
391 |
268 |
268 |
-51 |
NSI |
|
|
|
|
Badior |
SGRD1689 |
RC/DD |
743128 |
902003 |
393 |
190.7 |
270 |
-55 |
159 |
162 |
3 |
2.1 |
10.71 |
Badior |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Hole ID |
Hole
Type |
Easting |
Northing |
RL
(m) |
Total
Depth
(m) |
Azimuth
(°)* |
Dip
(°)* |
From (m) |
To
(m) |
Interval
(m) |
ETW**
(m) |
Au
(g/t) |
Deposit |
|
RC/DD |
|
|
|
|
|
incl |
161 |
162 |
1 |
0.7 |
29.60 |
Badior |
SGRD1690 |
RC/DD |
743133 |
902003 |
396 |
310.3 |
268 |
-52 |
NSI |
|
|
|
|
Badior |
SGRC1691 |
RC |
742887 |
893798 |
431 |
60 |
90 |
-60 |
NSI |
|
|
|
|
Sunbird |
SGRC1692 |
RC |
742861 |
893797 |
432 |
110 |
90 |
-60 |
NSI |
|
|
|
|
Sunbird |
SGRD1693 |
RC/DD |
742584 |
892987 |
518 |
420.5 |
90 |
|
371 |
381 |
10 |
7.0 |
2.88 |
Sunbird |
|
RC/DD |
|
|
|
|
|
|
395 |
397 |
2 |
1.4 |
5.57 |
Sunbird |
|
RC/DD |
|
|
|
|
|
incl |
395 |
396 |
1 |
0.7 |
10.10 |
Sunbird |
SGRD1694 |
RC/DD |
742510 |
892710 |
539 |
134 |
|
|
|
|
0 |
0.0 |
|
Sunbird |
SGRD1695 |
RC/DD |
742532 |
892511 |
538 |
375.1 |
90 |
-60 |
341 |
362 |
21 |
14.7 |
4.99 |
Sunbird |
|
RC/DD |
|
|
|
|
|
incl |
347 |
350 |
3 |
2.1 |
27.70 |
Sunbird |
SGRD1696 |
RC/DD |
742573 |
892512 |
547 |
310.3 |
90 |
-60 |
235 |
240 |
5 |
3.5 |
4.91 |
Sunbird |
|
RC/DD |
|
|
|
|
|
incl |
236 |
237 |
1 |
0.7 |
16.90 |
Sunbird |
|
RC/DD |
|
|
|
|
|
|
263 |
265 |
2 |
1.4 |
6.17 |
Sunbird |
|
RC/DD |
|
|
|
|
|
|
280 |
285 |
5 |
3.5 |
2.82 |
Sunbird |
|
RC/DD |
|
|
|
|
|
incl |
284 |
285 |
1 |
0.7 |
12.70 |
Sunbird |
SGRD1697 |
RC/DD |
742534 |
892461 |
544 |
390 |
90 |
-60 |
NSI |
|
|
|
|
Sunbird |
SGRD1698 |
RC/DD |
742577 |
892460 |
520 |
300.4 |
90 |
-60 |
200 |
212 |
12 |
8.4 |
4.87 |
Sunbird |
|
RC/DD |
|
|
|
|
|
incl |
200 |
201 |
1 |
0.7 |
14.15 |
Sunbird |
|
RC/DD |
|
|
|
|
|
and |
203 |
204 |
1 |
0.7 |
24.50 |
Sunbird |
|
RC/DD |
|
|
|
|
|
|
218 |
236 |
18 |
12.6 |
1.54 |
Sunbird |
|
RC/DD |
|
|
|
|
|
|
242 |
253 |
11 |
7.7 |
0.98 |
Sunbird |
*Azimuth and dip values taken at collar location
**ETW = estimated true width
NSI = No significant intervals of interest |
10.2 | Drill Techniques and Procedures |
Drilling and sampling techniques and procedures
for Apollo RC drilling are unknown.
10.2.2 | Newcrest and Roxgold Sango AC and RC drilling |
For Newcrest and Roxgold Sango drilling, AC and
RC samples were collected from the face sampling auger bit (AC) or face sampling pneumatic hammer (RC - 5.25-inch diameter) via the inside
return tube in their entirety, into 60 L plastic sample bags. Samples were kept dry through the use of sufficient air pressure during
drilling to exclude both dust suppression water injected during drilling and preclude the influx of groundwater.
In the case of RC drilling, if wet samples were
encountered by the Newcrest or Roxgold Sango geologists at the time of drilling, the drilling contractor was given a further 2 m to return
to dry sampling, otherwise the methodology was switched to a core tail.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
10.2.3 | Newcrest and Roxgold DD Drilling |
HQ or NQ2 diameter drill core (63.5 mm and 50.6
mm, respectively) was retrieved via conventional wireline methods and placed into metal core trays, which were clearly marked with hole
IDs and depth ranges, on an embossed aluminum permatag that was attached to the core tray.
10.3.1 | Newcrest and Roxgold Sango AC and RC Logging |
RC and AC drilling samples were logged at the
rig from drill spoils on a per-meter basis, with reference samples of the drill chips for every meter of RC drilling completed collected
into plastic chip trays, clearly labelled with their respective depths and hole IDs and stored under cover at the Séguéla
Project camp sample storage racks.
Geological logging was conducted by the supervising
geologists using a set of standardized Newcrest/Roxgold Sango codes for geology, alteration and veining. Structural measurements were
collected using a kenometer aligned to the bottom of hole orientation line on the core of each drill hole.
All logging was undertaken by qualified geologists.
The level of detail in the RC logging is considered by the QP to be appropriate for use in Mineral Resource estimation.
10.3.2 | Newcrest and Roxgold DD Core Logging |
All Newcrest and Roxgold Sango drill core was
depth marked and orientated at the drilling site by trained field technicians. Orientation marks from each core run were aligned along
pieces of core on a per-tray basis.
The orientation marks were then drawn on the core
as a continuous line where possible; solid lines indicating well oriented core aligned between at least two orientation marks. Dashed
lines were used to represent core that aligned to only a single orientation mark (lower confidence). Orientated and depth-marked drill
core was retrieved from the operating drill rigs at least daily and returned to the core storage and logging facilities at the Séguéla
Project exploration camp. Core to be logged was racked in entire holes at working height, and the core was then logged for recovery (%)
per core run, and geotechnical parameters such as natural breaks per meter, and rock quality designation.
Geological logging was conducted by the supervising
geologists using a set of standardized Newcrest/Roxgold Sango codes for geology, alteration and veining. Structural measurements were
collected using a kenometer aligned to the orientation line on the core of each drill hole.
All logging was undertaken by qualified geologists.
The level of detail in the logging is considered appropriate by the Qualified Person for use in Mineral Resource estimation.
Core recovery for the drilling completed to-date
at the Séguéla Project averages greater than 98 % in oxide material, and 99 % in transitional and fresh material. Core recovery
within mineralized zones is generally high (averaging 99 %).
No record has been recovered of the survey methods
used to locate collars drilled by Apollo.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Collar surveying for Newcrest and Roxgold Sango
drilling was completed on an ad-hoc campaign basis by commercial surveyors using RTK global positioning system (GPS) equipment. Surveys
are reported to be accurate within 0.1 m. No significant errors were noted in the location of the drill holes selected.
No details are available of the downhole survey
methods used by Apollo.
Newcrest and initial Roxgold Sango RC, DD and
RCD drill holes were all surveyed downhole at 18 m, 30 m and 50 m depths, then at either 15 m, 30 m or 50 m intervals, thereafter, depending
on observed deviation. Reflex EZ-SHOT equipment was used to conduct the surveys “in-rod”. From January 2020 onwards,
downhole directional surveys for resource drilling were routinely conducted using a north-seeking Reflex EZ-GYRO, with the Reflex EZ-SHOT
retained for backup and survey check purposes. Gyro surveys were generally conducted at 12 m intervals and then at 30 m intervals thereafter.
Gyroscope surveys were prioritized over EZ-SHOT surveys in the database. AC holes being typically short (maximum depth 42 m) were not
surveyed downhole as deviation was not, and is not, considered to be a material risk over such lengths.
10.6 | Representative Drill Sections |
Representative drill sections are provided for
the Antenna (Figure 28), Ancien (Figure 29), Koula (Figure 30), Agouti (Figure 31), Boulder (Figure 32) and Sunbird (Figure 33) deposits.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 28: |
Antenna deposit cross-section (894725mN) showing modelled mineralization |
Figure 29: |
Ancien deposit cross-section (888560mN) showing modelled mineralization |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 30: |
Koula deposit cross-section (895435mN) showing modelled mineralization |
Figure 31: |
Agouti deposit cross-section (896425mN) showing modelled mineralization |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 32: |
Boulder deposit cross-section (893980mN) showing modelled mineralization |
Figure 33: |
Sunbird deposit cross-section (893980mN) showing modelled mineralization |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
10.7 | Sample Length Versus True Thickness |
The relationship between the sample intercept
lengths and the true width of the mineralization varies in relation to the intersection angle between the steeply-dipping zone of mineralized
veins and the inclined nature of the core holes. Calculated estimated true widths (ETWs) are always reported together with actual sample
lengths by taking into account the angle of intersection between drill hole and the mineralized structure. Exaggeration of the true width
of the mineralization does not occur during modeling as the actual vein contacts are modeled in three-dimensional space to create vein
solids that are subsequently used to constrain the estimation of Mineral Resources.
10.8 | Summary of Drill Intercepts |
Table 11 provides a list of typical drill hole
intercepts encountered at the Séguéla Gold Mine at the Antenna, Ancien, Agouti, Boulder, Koula, and Sunbird deposits. It
should be noted that the intervals listed are a subset for reference purposes only and do not represent the total mineralized intervals
encountered from the 925 drill holes drilled at the Séguéla Gold Mine.
Table 11: |
Example of typical drill results at the Séguéla Gold Mine |
Hole ID |
Easting |
Northing |
Elevation |
Azimuth
(°)* |
Dip
(°)* |
From
(m) |
To
(m) |
Drilled Interval
(m) |
ETW**
(m) |
Au
(g/t) |
Deposit |
SGDD042 |
743576 |
894051 |
367 |
305 |
-55 |
21 |
39 |
18 |
12.6 |
0.29 |
Boulder |
SGRC211 |
743612 |
894097 |
445 |
305 |
-55 |
58 |
77 |
19 |
13.3 |
1.71 |
Boulder |
SGRC291 |
744641 |
896048 |
362 |
295 |
-55 |
19 |
22 |
4 |
2.8 |
2.97 |
Agouti |
SGRC315 |
744660 |
896406 |
386 |
295 |
-55 |
19 |
32 |
13 |
9.1 |
15.27 |
Agouti |
SGRC849 |
742628 |
895409 |
432 |
290 |
-60 |
No Significant Interval |
Koula |
SGRC854 |
742794 |
895560 |
455 |
290 |
-60 |
84 |
96 |
12 |
8.4 |
32.05 |
Koula |
SGRD1409 |
742582 |
892761 |
524 |
384.5 |
-60 |
286 |
287 |
1 |
0.7 |
14.50 |
Sunbird |
SGRC1094 |
742894 |
893512 |
461 |
270 |
-60 |
0 |
7 |
7 |
4.9 |
1.47 |
Sunbird |
SGDD041 |
741836 |
894764 |
366 |
271 |
-55 |
0 |
1 |
1 |
0.7 |
1.21 |
Antenna |
SGRC201 |
741811 |
894764 |
366 |
275 |
-55 |
0 |
28 |
28 |
19.6 |
1.69 |
Antenna |
SGRD244 |
743174 |
888591 |
359 |
272.5 |
-55 |
42 |
50 |
8 |
5.6 |
0.60 |
Ancien |
SGRC329 |
743153 |
888685 |
327 |
282 |
-55 |
1 |
24 |
23 |
16.1 |
19.73 |
Ancien |
SGRC849 |
742628 |
895409 |
432 |
290 |
-60 |
|
No Significant Intervals |
*Azimuth and dip values taken at collar location
**ETW = Estimated True Width |
10.9 | Comments on Section 10 |
The QP has the following observations and conclusions
regarding drilling conducted at the Séguéla Project since 2016:
| ● | Data were collected using industry standard practices. |
| ● | Drill orientations are appropriate to the orientation of the mineralization for the areas where Mineral
Resources have been estimated (see Section 10.6 for representative cross-sections showing drill orientations to mineralization). |
| ● | Core logging meets industry standards for exploration of epithermal-style deposits. Geotechnical logging
is sufficient to support the Mineral Resource estimation. |
| ● | Collar surveys have been performed using industry-standard instrumentation. |
| ● | Downhole surveys performed during the drill programs have been performed using industry-standard instrumentation. |
| ● | Drilling information is sufficient to support the Mineral Reserve and Mineral Resource estimates. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
11 | Sample
Preparation, Analyses and Security |
Sampling techniques for Apollo drilling have not
been recorded.
The same sampling procedures were used for the
Newcrest and Roxgold programs.
AC and RC drilling spoils were collected at the
drill rig on a per-meter basis in their entirety into plastic sample bags (60 L bags). Sufficient air was used in both AC and RC drilling
to maintain dry samples and to ensure very high percentages of recovery per-meter. The Qualified Person is satisfied that samples recoveries
for RC drilling were near complete, and unlikely to materially affect the accuracy or reliability of results. Should the supplied air
for each drilling method be insufficient to maintain a dry hole and to adequately lift the sample, the drilling contractor was permitted
a further 2 m of drilling to rectify the situation before the hole was terminated prematurely by the supervising geologist. Samples were
riffle split at the rig site through a standalone three-tier splitter to yield a 12.5 % split collected in a pre-numbered calico sample
bag for submission to the analytical laboratory. The remaining rejects were stored at the collar site until assay results for that particular
hole were returned.
Once assays had been received, only coarse reject
samples corresponding to significant intercepts (>0.2 g/t Au) were retained, with bulk rejects bags stored at the Séguéla
Project exploration camp in bag farms proximal to the core storage and logging facilities. Reject sample security was maintained through
the positioning of the bag farm proximal to the continuously manned camp, and the movement and storage of samples being supervised by
Newcrest or Roxgold staff. Security of reject samples is not considered a material risk. The remaining samples bags were emptied into
a purpose-dug pit, and backfilled.
The same sampling procedures were used for the
Newcrest and Roxgold programs.
Following logging and meter marking of the core,
intervals selected for assay were cut sub-parallel and slightly offset to the orientation mark using Almonte automated core saws. Core
was sampled comprehensively from top to bottom of hole on standardized 1 m intervals and half-core samples were placed into pre-numbered
calico bags for submission. The same side of the core was consistently sampled down each hole. Samples were exclusively collected at whole
meter intervals and were not broken or truncated at geological boundaries. The decision to do so was driven by the desire to maintain
a uniform sample support across all styles of drilling.
The unsampled half-core was replaced in the respective
core trays and stored at the Séguéla Project exploration camp.
11.2 | Sample Preparation and Analytical Laboratories |
Sample preparation and analysis for the Newcrest
and Roxgold programs were performed by ALS laboratories (ALS) in Yamoussoukro (sample preparation), Ouagadougou, Burkina Faso (analysis),
or Kumasi, Ghana (analysis). ALS is independent of Roxgold Sango and was independent of Newcrest. ALS maintains certification in accordance
with the most relevant quality certification standards for the
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
activities which they undertake, namely ISO9001:2015
for survey/inspection activity and ISO 17025:2005 UKAS ref 4028 for laboratory analysis.
The check assay laboratory was the Bureau Veritas
(BV) laboratory in Abidjan that is also certified in accordance with ISO9001 and ISO 17025 standards for laboratory analysis. BV is independent
of Roxgold Sango and was independent of Newcrest.
Newcrest and Roxgold samples were submitted to
the ALS Yamoussoukro laboratory for preparation.
Pieces of core submitted are passed through a
primary crush via oscillating jaw crushers to meet a >70% passing <2 mm size.
The AC, RC and DD core samples were passed through
a riffle splitter to achieve a 250 g split. This split material is pulverized in its entirety to >85% passing 75 µm. This pulp
is rolled on a plastic sheet for homogenization, and an aliquot is taken to fill a paper geochemistry bag (approximately 200 g).
No information is available for the Apollo drilling
sample security.
For Newcrest and Roxgold Sango AC, RC, and DD
drilling, samples were collected by trained staff, placed into pre-numbered calico or plastic bags, then placed into double bagged polyweave
bulk bags which were wire or zip tied closed and shipped by commercial courier to the ALS laboratory where they were taken into custody
with a signed receipt.
Prepared samples from the Yamoussoukro laboratory
were then shipped via commercial courier to ALS’s analytical facilities in either Ouagadougou or Kumasi.
The QP believes the security and integrity of
the samples submitted for analyses is un- compromised, given the adequate record keeping, storage locations, sample transport methods,
and the analytical laboratories’ chain of custody procedures.
Assaying techniques for Apollo drilling are not
documented.
Samples submitted for assay by Newcrest and Roxgold
Sango were analyzed by ALS using fire assay of a 50 g charge using an atomic absorption spectroscopy (AAS) finish (ALS code Au-AA24).
Samples returning >10,000 ppb Au were reanalyzed by fire assay (FA) of a 50 g charge with a gravimetric finish (ALS code Au-GRA22).
From December 2019, all samples with visible gold noted in drill hole logging, or returning >50,000 ppb Au from the routine fire
assay (FA) analysis, were also analyzed by the screen fire assay (SFA) technique (ALS code Au_SCR24 – 106 µm metal screen)
to determine the percentage of gold present in the coarse fraction versus the fine fraction. These analytical techniques are considered
total and appropriate for the style of mineralization. Results of the SFA analysis as of the effective date of this Report indicate a
reasonable correlation with the primary FA analysis.
Pulps were analyzed at BV by FA of a 50-g charge
using an AAS finish (BV code FA450). Samples returning >10,000 ppb Au were reanalyzed by FA of a 50-g charge with a gravimetric finish
(BV code FA550). These methods are equivalent and directly comparable to the ALS methods used for the original gold analysis.
Other than initial sample collection splitting
and bagging at the Séguéla Mine, Roxgold Sango personnel and its consultants and contractors were not involved in laboratory
sample preparation and analysis.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
It is the QP’s opinion that security, sample
collection, preparation and analytical procedures undertaken on the Séguéla Mine during the 2016 to 2021 drill programs
are appropriate for the sample media and mineralization type and conform to industry standards.
11.6 | Bulk Density Determinations |
Bulk density values for the Antenna, Ancien, Agouti,
Boulder, Koula and Sunbird deposits have been determined for each individual lithology via the collection of a density measurements using
the Archimedes method (water immersion measurements) based on drill core sampled across each of the deposits. Newcrest and Roxgold Sango
personnel on site were responsible for the collection of this data according to standardized density data collection procedures common
to all Newcrest global operations and continued by Roxgold Sango. Where density measurements had not been collected for a particular lithotype
(e.g. friable or unconsolidated oxides/alluvial sediments) reference densities were assigned from the AusIMM Field Geologist’s Manual
(AusIMM, 2001).
11.7 | Quality Assurance and Quality Control |
11.7.1 | Overview and Summary of Methodology |
No documented QA/QC procedures are available for
the Apollo drilling.
Drilling conducted by Newcrest and Roxgold Sango
was subject to a well-established routine series of QA protocols, with defined QC procedures and parameters for assessment of assay data.
Sample preparation is subject to ALS’s standard QA protocols, which are designed to ensure consistently homogeneous and representative
analytical sub-samples. Site protocol ensures routine use of blind certified reference material (CRM) insertions into the sample stream.
This includes insertion of blank samples at a nominal rate of 1:25, and insertion of field duplicates and coarse crush re-split duplicates.
During active drill campaigns a selection of pulps from significant drill intersections are also re-submitted to BV that acts as a second,
independent check laboratory for analysis.
QC results are automatically scanned upon receipt
and loading of digital data from the analytical laboratory (daily during active drilling campaigns) and are flagged using a set of predetermined
thresholds for CRMs/blanks. Samples outside tolerance trigger an investigation conducted by the supervising site geologists, and if more
than one CRM “fails” within a submitted batch, the entire batch is re-assayed. Assay data are held in quarantine until the
review of the daily QC report has been conducted and approved by the supervising geologist.
The database for the Séguéla Mine
is currently maintained in Maxwell’s Datashed system, managed by two database administrators from the Séguéla Project
exploration office. Data collected in the field (geological logging, collar information, drill hole metadata) are collected digitally
using a Toughbook laptop, validated daily at the end of shift by the supervising geologist, and then digitally directly synchronized into
the database. Additional validation checks are completed weekly by the administrators for relational consistency within the data collected
that week (from-to sample interval overlaps, data exceeding recorded holes depths, missing data intervals etc.).
11.7.3 | Certified Reference Materials |
Analytical data accuracy is monitored through
the insertion of CRMs into the sample stream. These CRMs are sourced from three main commercial suppliers globally: OREAS and Geostats
Pty Ltd in Australia, and AMIS in South Africa.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Analytical values for a given standard that lie
outside a tolerance of ± 2 standard deviations from the reference value are considered warnings. Should two or more CRMs within
a batch trigger warnings, the batch is considered to have failed with respect to accuracy; it is re-assayed, and an investigation is undertaken
into the causes of the spurious results. If a CRM returns a value outside ±3 standard deviations from the reference value, it is
deemed to have failed and the batch is re-assayed, and an investigation undertaken.
Generally, the QAQC results returned from the
analysis of all CRMs from the Newcrest and Roxgold programs are deemed acceptable, and the gold analyses are suitable for use in the estimation
of Mineral Resources. No specific concerns are apparent from the data and control chart plots for all CRM analyses.
Re-splits of the returned drilling chips, or the
second half of drill core were submitted as duplicate samples at a ratio of 1:10 samples. During daily QC analysis, duplicate pairs that
returned relative differences greater than 20 % were considered spurious and triggered investigation into the precision associated with
a particular batch’s results.
Figure
34 and Figure 35 present half-core duplicates and re-split RC chip samples.
Figure 34: |
Half-core duplicate results (Source: Roxgold Sango, 2023) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 35: |
Re-split drill chip duplicate results (2016-2018. Source: Roxgold Sango, 2023) |
In both the case of duplicate core and chips,
the data show very high correlation coefficients, and linear regressions very close to unity. Duplicate results for both core and chips
are deemed acceptable and indicate no concerns with sample quality at the Séguéla Mine.
A sub-set of 281 half-core sample pulps were submitted
to BV for umpire analysis. Similarly, a sub-set of 251 RC chips samples pulps were also submitted. Comparative quantile-quantile (Q-Q)
plots of original and umpire results for both core and RC chip data subsets show excellent correlation between the ALS (original) and
BV (umpire) laboratory results (Figure 36 and Figure 37).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 36: |
Umpire analysis - drill core samples |
Figure 37: |
Umpire analysis - RC Chip samples (Source: Roxgold Sango, 2023) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The performance of the umpire analysis indicates
no concerns with the gold analyses at the Séguéla Mine.
11.8 | Comments on Section 11 |
It is the opinion of the QP that the sample collection
and preparation, analytical techniques, security and QAQC protocols implemented for the Séguéla Mine are consistent with
standard industry practice and are suitable for the reporting of exploration results and for use in Mineral Resource and Mineral Reserve
estimation. The sampling procedures are adequate for and consistent with the style of gold mineralization under consideration.
Analytical results are considered to pose minimal
risk to the overall confidence level of the Mineral Resource estimates.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
12.1 | Laboratory Inspection |
Roxgold Sango staff routinely visit the sample
preparation laboratory operated by ALS Laboratories, in Yamoussoukro. The purpose of the site visits is to inspect the drill sample preparation
facilities, and to discuss QA protocols for sample preparation and dispatch with the ALS staff.
All of the QP’s have visited the Séguéla
Mine on multiple occasions with the most recent site visits detailed in Section 2.5.
There were no negative outcomes from the site
inspections.
12.3 | Verification of Geological Data |
Ground verification consisted of inspection by
Mr. Weedon of sub-cropping geology and mineralization where observable, a review of the core logging and sample storage facilities,
inspection of drill core stored on site, and confirmation of the location of historical drill holes.
The bulk of drilling conducted at the Séguéla
Project is well stored and remains in good condition in secure racks. Core trays are clearly labelled with permatags. Significant assay
intercepts of mineralization were verified against their respective core intervals.
There were no negative outcomes from the above
site inspection.
Mr. Chapman reviewed the data capture procedures
for geological logging and sample interval recording during discussions with the Roxgold Sango database managers. Discussions were also
held with the database managers concerning the receipt and import of assay data from ALS.
Validation of the final database provided to the
QP included checks for overlapping intervals, missing survey data, missing assay data, missing lithological data and missing collars.
No errors were identified in the extracts used to inform the Mineral Resource estimates.
12.4 | Verification of Sampling and Assaying |
Drill core was inspected in the field by Mr. Weedon
during multiple site visits. Drill core was visually compared to assay results and geological logs for numerous holes. Gold mineralization
was evident and visually consistent with the recorded geological logging and reported assay results.
Significant intercepts appear to correlate with
the intensity of host rock alteration and quartz veining recorded in the field.
All AC drilling has been excluded from the Séguéla
Gold Mine Mineral Resource estimates. Hole SGRC151 was excluded from the Mineral Resource estimate for Agouti due to survey errors. All
dedicated geotechnical holes were excluded from the Mineral Resource estimates due to no assays being collected. Otherwise, all RC and
DD drilling conducted by Newcrest and Roxgold Sango were used in the estimation of the Antenna, Ancien, Agouti, Boulder, Koula and Sunbird
Mineral Resources.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
12.5 | Geotechnical and Hydrogeology |
Mr. Veillette has been providing technical
support to the Séguéla Mine since October 2022. Mr. Veillette helps coordinate and manage the Engineer of Record
(EoR) for the TSF and water management. He also provides support with respect to geotechnical and hydrogeological aspects for the open
pits and waste dumps. He reviews all technical documents related to geotechnical, tailings and water for the operation. Mr. Veillette
has performed an internal audit on the TSF, water management, waste dump and open pit geotechnical/hydrological aspects and is of the
opinion that geotechnical and hydrogeology studies for these facilities is of a sufficient level to support the estimation of Mineral
Reserves and Mineral Resources.
12.6 | Metallurgical Recoveries |
Mr. Criddle has reviewed the extensive body
of metallurgical investigation comprising several phases of testwork and, in addition, has been personally involved in the development
and construction of the Séguéla Mine. In the opinion of the Mr. Criddle, the Séguéla metallurgical samples
tested, and the ore that is presently treated in the plant are representative of the orebody as a whole in respect to grade and metallurgical
response. Differences between deposits are minimal regarding metallurgical recovery.
12.7 | Mineral Resource Estimation |
The Mineral Resource estimation methodology, as
described in Sections 14 of this Report, is defined in Fortuna’s MRMR procedural manual, which is based on CIM (2019) best practice
guidelines.
Validation of data used in the estimates from
Mr. Chapman includes the following:
| ● | Site visit to review core, surface workings and
discuss estimation methodology. |
| ● | Database validation checks (as described in Section 12.3). |
| ● | Review of the wireframe modeling to define geological,
structural and mineralization domains. |
| ● | Review of the statistical evaluation to confirm
domaining was appropriate and adhered to the geological interpretation. |
| ● | Modeled variograms review to assess if they correspond
to experimental variography. |
| ● | Review of cross validation and reconciliation
results. |
| ● | Statistical checks on each field contained in
the resource block model to confirm minimum/maximum values are not exceeded. |
| ● | Review of the Mineral Resource confidence classification. |
| ● | Checks that the reported Mineral Resources correspond
with the block model estimates. |
The QP is of the opinion that the Mineral Resource
estimation was performed using standard industry practices and is suitable for use in Mineral Reserve estimation.
| 12.8 | Mineral Reserve Estimation |
The Mineral Reserve estimation methodology, as
described in Section 15 of this Report, is defined in Fortuna’s MRMR procedural manual, which is based on the CIM (2019) best
practice guidelines.
Each step of the process is documented, and a
checklist developed that is signed by Roxgold Sango staff and Mr. Espinoza.
Mr. Espinoza has visited the Séguéla
Mine several times during 2022 and 2023 to personally verify the mine infrastructure, mine operations practices, as well as the conditions
of the rock mass for the
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
development of the open pits as described on Section 16.
Mr. Espinoza holds regular virtual meetings with the Roxgold Sango technical services staff to review operational results on a monthly
basis.
Additional reviews completed by the QP to support
the Mineral Reserve estimation process included:
| ● | Ensuring all aspects of Mineral Reserve estimation
and reporting adhere to Fortuna’s “Technical Information Policy”. |
| ● | Reviewing and confirming that parameters used
in the calculation of cut-off grades are based on current market and operational considerations and conform to CIM (2019) best practices. |
| ● | Reviewing and confirming operational parameters,
including dilution and mining recovery factors, through block model regularization to the selective mining unit size. |
| ● | Discussions on pit optimization results to estimate
Mineral Reserves in conjunction with the technical services and mine operations staff. |
| ● | Discussions with Roxgold staff on various LOMP
scenarios and their operational applicability. |
| ● | Review of monthly reconciliation results using
Fortuna’s internal procedures. |
| 12.9 | Comments on Section 12 |
Data verification undertaken by the QPs has shown
no significant issues with the integrity of the data used in the estimation of Mineral Resources and Mineral Reserves.
Visual validation of the drill hole locations
and mineralized intersections was undertaken against hard copy drill sections. Relative to each other and the cross-sections provided,
the drill holes used as the basis for the Mineral Resource estimates were considered acceptable for confidence classification and public
reporting.
The sampling techniques and data are of sufficient
quality to support Mineral Resource estimates.
The QPs verified the data which underpins this
Report. The QPs are of the opinion that the data verification procedures undertaken adequately support the integrity of the data used
in the estimation of Mineral Resources and Mineral Reserves.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13 | Mineral
Processing and Metallurgical Testing |
Roxgold Sango has undertaken mineral processing
and metallurgical testwork at the Antenna, Agouti, Boulder, Ancien, Sunbird and Koula deposits.
The previous project owner, Newcrest, conducted
a round of Leachwell assay testwork on 61 samples from drill hole SGDD001 in 2018. Comparison of the Leachwell tests to fire assays for
the samples set (four-hour bottle roll used for leach testing of a nominal 1 kg sample) demonstrated a near 1:1 correlation of results.
These results supported the conclusion that the material was non-refractory, and therefore amenable to standard CIL treatment for extraction.
Seven testwork programs were performed at the
ALS Metallurgy laboratory in Balcatta, Perth, Western Australia, Australia under the supervision of Roxgold Inc. or Roxgold Sango:
| ● | A19864 conducted between April and June 2019. |
| ● | A20661 conducted between December 2019 and
January 2020. |
| ● | A20721 conducted between February and July 2020. |
| ● | A21926 conducted between January and February 2021. |
| ● | A21707 conducted between January and February 2021. |
| ● | A23013 conducted between November 2021 and
February 2022. |
| ● | A24535 conducted between April and June 2023. |
Testwork included the following assessments:
| o | Bond impact crushing work index (CWi) determination. |
| o | Bond abrasion index (Ai) determination. |
| o | Bond rod mill work index (RWi) determination. |
| o | Bond ball mill work index (BWi) determination. |
| ● | Gravity gold recovery and cyanide leach. |
| ● | Sedimentation and rheology. |
As the Antenna deposit hosts the majority of the
Mineral Resource and it forms the majority of mill feed ore, it was examined more comprehensively, and the mineralization represents the
basis for the mineral processing design criteria. Satellite deposits in the form of Agouti, Boulder, Ancien, Sunbird and Koula
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
were also tested throughout the seven programs
for confirmation purposes, and in support of Mineral Resource and Mineral Reserve estimates.
| 13.1 | ALS Laboratories Preliminary Economic Assessment Testwork Program (A19864 and A20661) |
The first consignment of samples was received
at ALS Metallurgy on 9 April 2019. A second consignment of (waste) samples was received on July 11, 2019. All assay samples
generated during the preliminary economic assessment (PEA) test program were submitted for analysis to the on-site ALS assay laboratory
in Balcatta. The following analytical methods were employed:
| ● | Gold in solids: Fire assay/ Inductively coupled
plasma optical emission spectroscopy (ICP-OES) Gold in solution: Direct inductively coupled plasma mass spectrometry (ICPMS). |
| ● | Carbon speciation: Labfit CS2000 analyzer. |
| ● | Sulphur speciation: Sherritt method/CS2000 analyzer. |
| ● | Arsenic: D7 acid digest/ICPOES. |
| ● | Antimony, mercury, and tellurium: D1 low-temp
acid digest/ICPOES. |
| ● | General elemental scan: Various acid digests/ICPOES
and/or ICPMS. |
Perth tap water was used for all testwork.
Antenna samples were reasonably competent with
RWi and BWi of 22.7kWh/t and 19.7 kWh/t respectively, indicating the material would be amenable to a simple comminution circuit design.
The mineralized material tested exhibited a degree
of grind sensitivity with an optimal grind size of 75 µm selected for all extraction testwork. The results of that program, which
tested 14 separate samples from Antenna, indicated potential for free milling of the mineralized material with good leach kinetics and
overall extractions. Key results are summarized in Table 12.
Table 12: |
Key results from the Antenna metallurgical testwork program |
Test |
Range of Results |
Average Result |
Calculated Head Assay (g/t Au) |
1.62–10.3 |
3.1 |
Overall Gold Extraction (%) |
92.0–97.1 |
94.5 |
Gravity Gold Recovery (%) |
28–60 |
38 |
Cyanide Consumption (kg/t) |
0.09–0.30 |
0.20 |
Lime Consumption (kg/t) |
0.27–1.96 |
0.45 |
The Antenna samples were prepared by initially
selecting suitable samples for determination of unconfined compressive strength (UCS) and crushing work index (CWi) determinations. No
suitable specimens were available for UCS determination. A single sample was then selected from each individual Antenna sample for CWi
testing. In total, 12 samples were submitted for CWi determination. The CWi test remnants were recovered and combined with the remaining
material for each sample.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Each individual sample was crushed to minus 25
mm, and a sub-sample split out and used to prepare a 50 kg Master Composite. The remaining material from each sample was control-crushed
to 100 % minus 3.35 mm and each sample assigned a Variability Composite number (Table 13).
Table 13: |
Details of the Antenna variability samples |
|
Depth (m) |
|
Hole ID |
From |
To |
ALS Composite ID |
SGRD047 |
175 |
179 |
Antenna VC01 |
SGRD061 |
168 |
172 |
Antenna VC02 |
SGRD069 |
101 |
105 |
Antenna VC03 |
SGRD080 |
174 |
178 |
Antenna VC04 |
SGRD090A |
149 |
153 |
Antenna VC05 |
SGDD001 |
70 |
74.4 |
Antenna VC06 |
SGRD014 |
52 |
56 |
Antenna VC07 |
SGDD002 |
35 |
39 |
Antenna VC08 |
SGDD002 |
107 |
111 |
Antenna VC09 |
SGDD007 |
24 |
28 |
Antenna VC10 |
SGRD103 |
96 |
100 |
Antenna VC11 |
SGDD014 |
96 |
100 |
Antenna VC12 |
SGDD035 |
37 |
42 |
Antenna VC13 |
The variability composites were homogenized and
split into representative 1.0 kg charges for use in the variability extractive testwork program.
The Master Composite (-25 mm) was homogenized,
and sub-samples split out for comminution tests (SMC, Ai, RWi, and BWi). The remaining material from these tests was control-crushed to
100 % passing 3.35 mm, homogenized, and split into representative 1.0 kg charges for use in the Master Composite extractive testwork program.
| 13.1.3 | Bond Impact Crushing Work Index |
Twelve individual samples were selected and prepared
for CWi determination. All samples were cut to ensure they were in the size range -76 +51 mm. The CWi was determined using an Impact Crushability
Test Unit. A summary of results is presented in Table 14.
Table 14: |
Summary of the Antenna Bond impact crushing work index (CWi) results |
Bond Impact Crushing Work Index (kWh/t) |
Ore Type |
Average |
Maximum |
Minimum |
Standard Deviation |
Antenna |
11.0 |
19.3 |
4.8 |
4.8 |
These results are indicative of a material with
moderate hardness.
A sub-sample of the Antenna Master Composite was
submitted for SMC testwork.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The standard (full) JKTech drop-weight testwork
provides ore-specific parameters for use in the JK Sim Met Mineral Processing Simulator Software and JK Sim Met Crusher model. The SMC
test was developed by SMC Testing Pty Ltd to provide a cost-effective means of obtaining these parameters from drill core or broken rock
samples in situations where limited quantities of material are available.
The SMC test generates a relationship between
specific input energy (kWh/t) and the proportion of fragmented/broken product passing a specified sieve size. The results are used to
determine the drop- weight index (DWi), which is a measure of the strength of the mineralized sample when broken under impact conditions.
The DWi is directly related to the JK rock breakage parameters A and b and can be used to determine the values of these parameters.
A summary of results is presented in Table 15.
Table 15: |
Summary of the Antenna SMC testwork results |
Derived Values |
Ore Type |
DWi
(kWh/m3) |
SG |
A |
b |
Mia
(kWh/t) |
Mih
(kWh/t) |
Mi (kWh/t) |
ta |
Antenna |
9.0 |
2.77 |
82.7 |
0.37 |
23.9 |
18.8 |
9.7 |
0.29 |
These results are indicative of a material with
high hardness.
| 13.1.5 | Bond Abrasion Index |
Sub-samples of the Antenna composites were tested
to determine the Ai value. A summary of results is presented in Table 16.
Table 16: |
Summary of the Antenna Bond abrasion (Ai) results |
Composite ID |
Bond Abrasion Index |
Antenna |
0.4128 |
These results are indicative of an abrasive material.
| 13.1.6 | Bond Rod Mill Work Index |
A sub-sample of the Antenna composites was control-crushed
to 100 % passing 12.7 mm. The crushed sample was thoroughly homogenized, and a representative sub-sample submitted for RWi determination
at a closing screen size of 1,180 μm. A summary of results is presented in Table 17.
Table 17: |
Summary of the Antenna Bond rod mill work index (RWi) results |
|
Micrometers |
|
Ore Type |
F80 |
P80 |
Grp (g/rev) |
Test Aperture Pi (μm) |
Bond BWi
(kWh/t) |
Antenna |
9,983 |
833 |
4.066 |
1180 |
22.7 |
These results are indicative of a material with
high hardness.
| 13.1.7 | Bond Ball Mill Work Index |
A sub-sample of the Antenna composites was control-crushed
to -3.35 mm and tested using the standardized procedure to determine the BWi. A closing screen size of 106 μm was used. A summary of
results is presented in Table 18.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 18: |
Summary of the Antenna Bond ball mill work index (BWi) results |
|
Micrometers |
|
Ore Type |
F80 |
P80 |
Grp (g/rev) |
Test Aperture Pi
(μm) |
Bond BWi
(kWh/t) |
Antenna |
2,494 |
78 |
0.896 |
106 |
19.7 |
These results are indicative of a material with
moderate to high hardness.
Sub-samples of each testwork composite were submitted
for comprehensive head assays. A summary of results is presented in Table 19.
Table 19: |
Summary of the Antenna head assay results |
Composite ID |
Au (g/t) |
Au (g/t) |
CTOTAL
(%) |
CORGANIC
(%) |
STOTAL
(%) |
S2- (%) |
Antenna VC1 |
10.9 |
11.3 |
0.27 |
0.03 |
3.02 |
2.82 |
Antenna VC2 |
4.90 |
5.12 |
0.48 |
<0.03 |
1.36 |
1.28 |
Antenna VC3 |
1.76 |
2.05 |
0.30 |
<0.03 |
0.76 |
0.50 |
Antenna VC4 |
2.45 |
2.60 |
0.21 |
<0.03 |
1.04 |
0.96 |
Antenna VC5 |
2.55 |
2.26 |
0.42 |
<0.03 |
0.96 |
0.80 |
Antenna VC6 |
3.85 |
2.48 |
0.75 |
<0.03 |
1.18 |
0.96 |
Antenna VC7 |
3.05 |
2.60 |
0.03 |
<0.03 |
1.02 |
0.88 |
Antenna VC8 |
1.98 |
1.53 |
0.48 |
<0.03 |
1.32 |
1.18 |
Antenna VC9 |
2.51 |
2.65 |
0.51 |
<0.03 |
0.76 |
0.60 |
Antenna VC10 |
2.04 |
2.25 |
<0.03 |
<0.03 |
<0.02 |
<0.02 |
Antenna VC11 |
2.05 |
1.86 |
0.54 |
<0.03 |
1.04 |
0.80 |
Antenna VC12 |
1.48 |
2.03 |
0.42 |
<0.03 |
1.16 |
0.82 |
Antenna VC13 |
1.52 |
1.23 |
2.79 |
<0.03 |
1.12 |
0.78 |
Antenna Master |
3.02 |
2.80 |
0.51 |
<0.03 |
1.20 |
0.94 |
Boulder Master |
31.0 |
21.1 |
0.33 |
0.03 |
0.22 |
0.20 |
Agouti Master |
1.17 |
1.18 |
1.14 |
<0.03 |
0.74 |
0.58 |
Variability in the duplicate gold assays usually
indicates the presence of coarse gold, which appears to be the case for most samples. Negligible organic carbon suggests the samples are
unlikely to exhibit preg-robbing behavior during cyanide leaching. Most samples contain moderate levels of sulfides.
| 13.1.9 | Mineralogical Analysis |
A sub-sample of the Antenna Master Composite was
ground to P80 passing 75 μm and submitted for gravity upgrading/separation ahead of mineralogical analysis. The ground sample was passed
through a 3” Knelson KC-MD3 gravity concentrator, with the following specifications:
| ● | 3.5 L/min fluidizing water. |
The Knelson concentrate was further concentrated
by hand-panning, with the final pan concentrate submitted for detailed mineralogical analysis (QEMSCAN). The pan tailings were combined
with the Knelson tail. A sub-sample of the combined gravity tail was split out and submitted for bulk mineralogy (XRD).
The main findings are summarized in the following
sub-sections.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Pyrite makes up 26.2 % of the gravity concentrate
fraction and approximately 1 % of the gravity tail. In the gravity concentrate, the pyrite has a P80 of approximately 98 μm and is
well-liberated (85.5 % occurring as ‘well-liberated’ and another 11.0 % as ‘high-grade middlings’).
Pyrrhotite is present, making up 7.3 % of the
gravity concentrate and <1 % in the gravity tail. A trace of arsenopyrite (0.11 %) was detected in the gravity concentrate.
Silicates are the main gangue minerals, dominated
by quartz, albite, and micas, followed by chlorite and clay minerals (smectite, vermiculite, illite and kaolinite). A minor amount of
carbonates (dolomite–ankerite/calcite) is also present.
Twenty free, coarse gold grains were found during
the optical examination. The gold grains ranged in size from 50–300 μm.
Thirty-one gold grains were detected by QEMSCAN
analysis. The gold grains had typical compositions of 93–100 % Au + 7–0 % Ag.
Two gold grains out of the total 31 grains detected
by QEMSCAN occurred as free gold. These were about 15 μm in size and contributed approximately one-third of the total elemental gold
detected. Fifteen gold grains occurred in pyrite; these ranged in size from 2–15 μm and contributed nearly half of the total
gold detected. A further 11 gold grains occurred within one single silicate-pyrrhotite particle. These ranged in size from 2–10
μm each and accounted for nearly 18 % of the total gold detected; the last three gold grains occurred in one silicate particle and
were each <5 μm in size, contributing <2 % of the total gold.
Initially, sub-samples of the Antenna Master Composite
were submitted for cyanide leach testwork. The objectives of the tests were to determine:
| ● | Impact of grind size on gold extraction. |
| ● | The presence of gravity-recoverable-gold, and
the impact on overall gold recovery if gravity gold is recovered prior to leaching. |
Following this, sub-samples of the variability
samples were submitted for testing to determine gold recovery via gravity and cyanide leaching.
For all samples, including the Antenna Master
Composite, the gravity/leach tests were conducted at P80 75 μm. A summary of results is presented in Table 20.
Table 20: Antenna master composite
cyanide leach and grind size variability testwork results
Test No. |
Grind Size
P80 |
Au Head Grade (g/t) |
Au Extraction (%) |
Tail Au |
Reagents (kg/t) |
(BK12-) |
(μm) |
Assay |
Calc’d |
Grav. |
4-hr |
24-hr |
48-hr |
Grade
(g/t) |
NaCN |
Lime |
399 |
150 |
|
3.04 |
- |
71.3 |
88.2 |
89.1 |
0.33 |
0.30 |
0.43 |
400 |
106 |
|
3.40 |
- |
70.7 |
90.1 |
91.8 |
0.28 |
0.33 |
0.38 |
401 |
75 |
|
3.45 |
- |
72.3 |
93.9 |
94.3 |
0.20 |
0.33 |
0.47 |
432 |
75 |
2.91 |
3.28 |
34.0 |
89.7 |
93.2 |
94.1 |
0.20 |
0.33 |
0.36 |
The results show that gold extraction improved
at finer grind sizes.
Despite relatively high gravity gold recovery
of 34 %, removal of the gravity component did not result in any improvement in overall extraction after 48 hours of leaching.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Results from the gravity/leach tests on the variability
samples are summarized in Table 21.
Table 21: |
Summary of the Antenna variability gravity/cyanide leach testwork results |
Test No |
Sample ID |
Au Head Grade (g/t) |
Au Extraction (%) |
Au Tail |
Reagents (kg/t) |
[BK12-] |
Assay |
Calc’d |
Grav |
4-hr |
24-hr |
48-hr |
Grade (g/t) |
NaCN |
Lime |
433 |
Antenna VC01 |
11.1 |
10.3 |
37.8 |
89.6 |
90.5 |
92.1 |
0.82 |
0.09 |
0.39 |
434 |
Antenna VC02 |
5.01 |
5.06 |
28.7 |
90.0 |
92.3 |
92.0 |
0.41 |
0.19 |
0.27 |
435 |
Antenna VC03 |
1.91 |
2.25 |
59.7 |
94.3 |
97.1 |
97.1 |
0.07 |
0.16 |
0.34 |
436 |
Antenna VC04 |
2.53 |
2.43 |
40.3 |
88.0 |
91.5 |
92.4 |
0.19 |
0.16 |
0.27 |
437 |
Antenna VC05 |
2.41 |
2.41 |
40.9 |
91.8 |
94.1 |
94.4 |
0.14 |
0.19 |
0.32 |
438 |
Antenna VC06 |
3.17 |
2.51 |
38.8 |
90.0 |
95.1 |
95.4 |
0.12 |
0.30 |
0.38 |
439 |
Antenna VC07 |
2.83 |
2.77 |
29.7 |
92.5 |
95.1 |
94.6 |
0.15 |
0.30 |
0.31 |
440 |
Antenna VC08 |
1.76 |
1.95 |
38.9 |
88.6 |
94.4 |
95.1 |
0.10 |
0.19 |
0.31 |
441 |
Antenna VC09 |
2.58 |
2.90 |
33.7 |
93.2 |
96.6 |
93.8 |
0.18 |
0.16 |
0.28 |
442 |
Antenna VC10 |
2.15 |
1.84 |
35.2 |
91.2 |
95.9 |
97.0 |
0.06 |
0.30 |
1.96 |
443 |
Antenna VC11 |
1.96 |
2.00 |
41.7 |
92.2 |
95.0 |
95.0 |
0.10 |
0.16 |
0.35 |
444 |
Antenna VC12 |
1.76 |
2.02 |
41.8 |
86.8 |
94.9 |
96.3 |
0.08 |
0.16 |
0.34 |
445 |
Antenna VC13 |
1.38 |
1.62 |
28.4 |
87.0 |
90.5 |
92.6 |
0.12 |
0.26 |
0.34 |
Gravity gold recovery was consistently high, ranging
from 28–60 %. Overall gold extraction was also high for all samples, ranging from 92–98 %.
Lime consumption for Antenna VC10 was significantly
higher than all other samples tested. It was noted that this sample contains no carbonates and, therefore, no natural pH buffering capacity.
A sub-sample of the Antenna Master Composite was
ground to P80 passing 150 μm, and submitted for flotation testwork. The objective of the test was to determine the likely gold recovery
to a bulk sulfide flotation concentrate. Depending on flotation response, the concentrate would then be submitted for fine-grinding and
cyanide leach testwork. A summary of results is presented in Table 22.
Table 22: Summary of the Antenna
flotation testwork results
Flotation Concentrate |
Flotation Tail |
Test No.
(BKF-) |
Mass (%) |
Au |
S2- |
Au
(g/t) |
S2-
(%) |
Grade (g/t) |
Recovery (%) |
Grade (%) |
Recovery (%) |
2023 |
5.64 |
50.9 |
85.4 |
18.9 |
96.6 |
0.52 |
0.04 |
Sulfide recovery was very high, at almost 97 %.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Despite the high S2- recovery, gold recovery to
concentrate was only 85 %. This was to be expected, given the mineralogical analysis (at P80 75 μm) found some gold grains associated
with silicates and silicate-pyrrhotite particles.
No further testwork was conducted on the flotation
products.
The sample tested as part of A19864 was crushed
to minus 20 mm. The crushed material was homogenized, and sub-samples split out for comminution tests (Ai, RWi, and BWi). All comminution
test products were retained and on completion of these tests, combined with the reserve minus 20 mm material and control-crushed to 100
% passing -3.35 mm to produce a master composite for extraction testwork. The crushed material was thoroughly homogenized and split into
representative 1.0 kg charges using a rotary sample divider. The 1.0 kg charges were used for the extractive testwork program.
The samples tested as part of A20661 were individually
control-crushed to -3.35 mm. Sub-samples were split out and combined to generate the master composite, which was thoroughly homogenized
and split into representative 1.0 kg charges for us in the testwork program. The reserve material for eight selected samples was used
for variability testing. These samples were (individually) homogenized and split into representative 1.0 kg charges.
| 13.1.15 | Bond Abrasion Index |
Sub-samples of the Agouti composites were tested
to determine the Ai value. A summary of results is presented in Table 23.
Table 23: |
Summary of the Agouti Bond abrasion index (Ai) results |
Composite ID |
Bond Abrasion Index |
Agouti |
0.1253 |
These results are indicative of a moderately abrasive
material.
| 13.1.16 | Bond Rod Mill Work Index |
A sub-sample of the Agouti composites was control-crushed
to 100 % passing 12.7 mm. The crushed sample was thoroughly homogenized, and a representative sub-sample submitted for RWi determination
at a closing screen size of 1,180 μm. A summary of results is presented in Table 24.
Table 24: |
Summary of the Agouti Bond rod mill work index (RWi) results |
|
Micrometers |
Grp
(g/rev) |
Test Aperture Pi
(μm) |
Bond BWi
(kWh/t) |
Ore Type |
F80 |
P80 |
Agouti |
10,336 |
854 |
5.146 |
1180 |
19.8 |
These results are indicative of a material with
moderate to high hardness.
| 13.1.17 | Bond Ball Mill Work Index |
A sub-sample of the Agouti composites was control-crushed
to -3.35 mm and tested to determine the Bond BWi. A closing screen size of 106 μm was used. A summary of results is presented in Table
25.
Table 25: |
Summary of the Agouti Bond ball mill work index (RWi) results |
|
Micrometers |
Grp
(g/rev) |
Test Aperture Pi
(μm) |
Bond BWi
(kWh/t) |
Ore Type |
F80 |
P80 |
Agouti |
2,897 |
77 |
1.066 |
106 |
16.7 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
These results are indicative of a material with
moderate hardness.
Sub-samples of each testwork composite were submitted
for comprehensive head assays. A summary of results is presented in Table 26.
Table 26: |
Summary of the Agouti head assay results |
Composite ID |
Au (g/t) |
Au (g/t) |
CTOTAL
(%) |
CORGANIC
(%) |
STOTAL
(%) |
S2-
(%) |
Agouti Master – A19864 |
1.17 |
1.18 |
1.14 |
<0.03 |
0.74 |
0.58 |
Agouti Master – A20661 |
13.0 |
15.7 |
1.29 |
0.18 |
0.86 |
0.52 |
Agouti SGRC308 |
4.18 |
3.79 |
1.98 |
0.15 |
0.38 |
0.26 |
Agouti SGRC276 |
4.13 |
1.97 |
0.33 |
0.09 |
0.20 |
0.16 |
Agouti SGRC290 |
1.73 |
1.77 |
0.09 |
0.09 |
<0.02 |
<0.02 |
Variability in the duplicate gold assays usually
indicates the presence of coarse gold.
Sub-samples of the Agouti master composite and
variability samples were submitted for cyanide leach testwork. The objectives of the tests were to determine:
| ● | Impact of grind size on gold extraction. |
| ● | The presence of gravity-recoverable-gold, and
the impact on overall gold recovery if gravity gold is recovered prior to leaching. |
Results from the gravity/leach tests are summarized
in Table 27.
Table 27: |
Summary of the Agouti variability gravity/cyanide leach testwork results |
|
|
Au Head Grade (g/t) |
Au Extraction (%) |
Au Tail |
Reagents (kg/t) |
Test No
[BK12-] |
Sample ID |
Assay |
Calc’d |
Grav |
4-hr |
24-hr |
48-hr |
Grade
(g/t) |
NaCN |
Lime |
446 |
Agouti Master |
1.18 |
1.28 |
45.6 |
89.2 |
96.0 |
96.5 |
0.05 |
0.26 |
0.28 |
085 |
Agouti Master – A20661 |
14.4 |
11.5 |
47.4 |
89.5 |
96.4 |
96.8 |
0.37 |
0.26 |
0.69 |
088 |
Agouti SGRC308 |
3.99 |
4.36 |
22.6 |
89.0 |
92.2 |
92.5 |
0.33 |
0.23 |
0.69 |
089 |
Agouti SGRC276 |
3.05 |
2.68 |
54.1 |
94.8 |
97.5 |
97.8 |
0.06 |
0.16 |
0.28 |
090 |
Agouti SGRC290 |
1.75 |
2.34 |
24.2 |
93.4 |
96.4 |
97.0 |
0.07 |
0.26 |
2.65 |
Gravity gold recovery was consistently high, ranging
from 22.6–54.1 %. Overall gold extraction was also high for all samples, ranging from 92.5–97.5 %.
The sample tested as part of A19864 was crushed
to -20 mm. The crushed material was homogenized, and sub-samples split out for comminution tests (Ai and BWi). All comminution test products
were retained and combined with the reserve -20 mm material on completion of these tests. This material was combined with the RC chip
sample (SGRC139 31-35 m). The combined material was control- crushed to 100% passing -3.35 mm to produce a master composite for extraction
testwork. The crushed material was thoroughly homogenized and split into representative 1.0 kg charges using a rotary sample divider.
The 1.0 kg charges were used for the extractive testwork program.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The samples tested as part of A20661 were individually
control-crushed to -3.35 mm. Sub-samples were split out and combined to generate the master composite, which was thoroughly homogenized
and split into representative 1.0 kg charges for us in the testwork program. The reserve material for eight selected samples was used
for variability testing. These samples were (individually) homogenized and split into representative 1.0 kg charges.
| 13.1.21 | Bond Abrasion Index |
Sub-samples of the Boulder composites were tested
to determine the Bond Ai value A summary of results is presented in Table 28.
Table 28: |
Summary of the Boulder Bond Abrasion (Ai) results |
Composite ID |
Bond Abrasion Index |
Boulder |
0.3763 |
These results are indicative of an abrasive material.
| 13.1.22 | Bond Rod Mill Work Index |
The Boulder composite was not submitted for RWi
determination, due to limited sample mass availability.
| 13.1.23 | Bond Ball Mill Work Index |
A sub-sample of the Boulder composite was control-crushed
to -3.35 mm and tested to determine the Bond BWi. A closing screen size of 106 μm was used. A summary of results is presented in Table
29.
Table 29: |
Summary of the Boulder Bond Ball Mill Work Index (BWi) results |
|
Micrometers |
Grp
(g/rev) |
Test Aperture Pi
(μm) |
Bond BWi
(kWh/t) |
Ore Type |
F80 |
P80 |
Boulder |
3,005 |
83 |
0.843 |
106 |
21.1 |
These results are indicative of a material with
moderate to high hardness.
Sub-samples of each testwork composite were submitted
for comprehensive head assays. A summary of results is presented in Table 30.
Table 30: |
Summary of the Boulder head assay results |
Composite ID |
Au (g/t) |
Au (g/t) |
CTOTAL
(%) |
CORGANIC
(%) |
STOTAL
(%) |
S2-
(%) |
Boulder Master – A19864 |
31.0 |
21.1 |
0.33 |
0.03 |
0.22 |
0.20 |
Boulder Master – A20661 |
5.37 |
4.47 |
1.47 |
0.12 |
0.56 |
0.42 |
Boulder SGDD042 |
2.12 |
2.15 |
1.41 |
<0.03 |
0.72 |
0.62 |
Boulder SGRC261 |
2.45 |
1.56 |
1.14 |
0.06 |
0.38 |
0.28 |
Boulder SGRC316 |
4.30 |
4.18 |
1.92 |
0.03 |
0.36 |
0.32 |
Variability in the duplicate gold assays usually
indicates the presence of coarse gold.
Sub-samples of the Boulder master composite and
variability samples were submitted for cyanide leach testwork. The objectives of the tests were to determine:
| ● | Impact of grind size on gold extraction. |
| ● | The presence of gravity-recoverable-gold, and
the impact on overall gold recovery if gravity gold is recovered prior to leaching. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Results from the gravity/leach tests are summarized
in Table 31.
Table 31: |
Summary of the Boulder variability gravity/cyanide leach testwork results |
|
|
Au Head Grade (g/t) |
Au Extraction (%) |
Au Tail |
Reagents (kg/t) |
Test No
[BK12-] |
Sample ID |
Assay |
Calc’d |
Grav |
4-hr |
24-hr |
48-hr |
Grade
(g/t) |
NaCN |
Lime |
447 |
Boulder Master – A19864 |
26.1 |
17.7 |
52.2 |
90.8 |
99.0 |
98.3 |
0.30 |
0.19 |
0.33 |
087 |
Boulder Master - A20661 |
4.92 |
4.46 |
35.2 |
92.6 |
94.8 |
94.8 |
0.23 |
0.19 |
1.03 |
093 |
Boulder SGDD042 |
2.14 |
2.59 |
44.7 |
90.1 |
92.9 |
92.9 |
0.19 |
0.19 |
0.28 |
094 |
Boulder SGRC261 |
2.01 |
1.61 |
37.0 |
92.4 |
94.2 |
93.8 |
0.10 |
0.19 |
0.28 |
095 |
Boulder SGRC316 |
4.24 |
3.87 |
45.5 |
95.1 |
97.3 |
97.3 |
0.11 |
0.23 |
0.58 |
The calculated head grade for the Boulder Composite
(17.7 g/t Au) was significantly lower than the assayed head grade (26.1 g/t Au). This is most likely due to the spotty nature of the gold
in this material. It is expected that repeat tests might yield higher gravity gold recovery, and therefore higher calculated head grade.
If this was the case, overall gold recovery would be higher than the reported 98.3 %.
Gravity gold recovery was consistently high, ranging
from 35.2–52.2 %. Overall gold extraction was also high for all samples, ranging from 92.9–98.3 %.
The samples tested as part of A20661 were individually
control-crushed to -3.35 mm. Sub-samples were split out and combined to an Ancien Master Composite. This Composite was thoroughly homogenized
and split into representative 1.0 kg charges for us in the testwork program. The reserve material for eight selected samples was used
for variability testing. These samples were (individually) homogenized and split into representative 1.0 kg charges.
Sub-samples of each testwork composite were submitted
for comprehensive head assays. A summary of results is presented in Table 32.
Table 32: |
Summary of the Ancien head assay results |
Composite ID |
Au (g/t) |
Au (g/t) |
CTOTAL
(%) |
CORGANIC
(%) |
STOTAL
(%) |
S2-
(%) |
Ancien Master |
15.7 |
17.9 |
1.11 |
0.09 |
0.28 |
0.20 |
Ancien SGRC329 |
35.1 |
32.6 |
0.06 |
0.03 |
<0.02 |
<0.02 |
Ancien SGRC244 |
12.0 |
8.27 |
2.22 |
<0.03 |
0.48 |
0.40 |
Variability in the duplicate gold assays usually
indicates the presence of coarse gold.
Sub-samples of the Ancien master composite and
variability samples were submitted for cyanide leach testwork. The objectives of the tests were to determine:
| ● | Impact of grind size on gold extraction. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| ● | The presence of gravity-recoverable-gold, and
the impact on overall gold recovery if gravity gold is recovered prior to leaching. |
Results from the gravity/leach tests are summarized
in Table 33.
Table 33: |
Summary of the Ancien variability gravity/cyanide leach testwork results |
|
|
Au Head Grade (g/t) |
Au Extraction (%) |
Au Tail |
Reagents (kg/t) |
Test No
[BK12-] |
Sample ID |
Assay |
Calc’d |
Grav |
4-hr |
24-hr |
48-hr |
Grade
(g/t) |
NaCN |
Lime |
086 |
Ancien Master |
16.8 |
15.6 |
45.9 |
95.5 |
97.8 |
98.6 |
0.22 |
0.26 |
1.54 |
091 |
Ancien SGRC329 |
33.9 |
32.6 |
32.7 |
94.8 |
97.0 |
98.2 |
0.58 |
0.23 |
1.33 |
092 |
Ancien SGRD244 |
10.1 |
9.0 |
57.9 |
95.5 |
98.2 |
98.5 |
0.14 |
0.18 |
0.46 |
Gravity gold recovery was consistently high, ranging
from 32.7–57.9 %. Overall gold extraction was also high for all samples, ranging from 98.2–98.6 %.
| 13.1.29 | Acid Mine Drainage |
Acid mine drainage prediction analysis was conducted
on sub-samples of the Antenna Master Composite, as well as the Agouti and Boulder composites and the waste samples. A summary of results
is presented in Table 34.
Table 34: |
Summary of the acid mine drainage (AMD) testwork results |
Composite ID |
ANC |
TAPP |
NAG |
NAPP |
pH |
Conductivity
(ms/cm) |
Kg (H2SO4)/t |
SAMPLES |
Antenna |
81 |
36.6 |
-4 |
-44.4 |
9.88 |
0.539 |
Boulder |
49 |
6.7 |
-4 |
-42.3 |
10.97 |
0.511 |
Agouti |
187 |
22.6 |
-4 |
-164.4 |
10.74 |
0.588 |
WASTE SAMPLES |
SGDD015 - 14m |
10 |
<1 |
-3 |
-9.4 |
6.92 |
0.116 |
SGDD001 - 17m |
12 |
<1 |
-3 |
-11.4 |
6.78 |
0.095 |
SGRC192 - 48m |
46 |
<1 |
-3 |
-45.4 |
10.24 |
0.204 |
SGRC193 - 38m |
47 |
<1 |
-3 |
-46.4 |
10.4 |
0.195 |
SGRC200 - 62m |
44 |
1.22 |
-3 |
-42.8 |
9.72 |
0.163 |
SGRC201 - 84m |
214 |
3.05 |
-3 |
-211.0 |
11.28 |
0.756 |
SGRC206 - 15m |
18 |
<1 |
-3 |
-17.4 |
8.02 |
0.092 |
The results indicate that none of the three composites,
or the seven waste samples, are likely to be acid-generating.
| 13.2 | ALS Laboratories FS Testwork Program (A20721) |
| 13.2.1 | Metallurgical Samples |
Roxgold selected drill core samples for the A20721
metallurgical test program. An individual composite (Comp #3) was not prepared for sample SGDD010 due to insufficient sample being available
(all of it was used for the Master Composite instead).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The Master Composite for the A20721 program was
prepared by splitting and then combining portions from each drill core sample.
A portion of the Antenna Master Composite (A20721
MC) was ground to a P80 of 75 µm and then pre- treated through gravity concentration ahead of the mineralogical analysis. A two-stage
gravity concentration procedure (centrifugal concentrator followed by hand-panning) was used to produce the gravity concentrate. The pan
tailings were combined into the first stage tailings. Detailed mineralogical analysis, using QEMSCAN, was performed on the final concentrate.
The gravity tailings sample was submitted for bulk mineralogical analysis (XRD).
Findings included:
| ● | Pyrite constitutes 20.1 % of the gravity concentrate
and approximately 1 % of the gravity tailings sample. Pyrite grains in the concentrate have a P80 of approximately 92 µm and are
mostly liberated with 84.3 % being classified as well-liberated and another 12.3 % as “high grade middlings”. |
| ● | The pyrrhotite content of the concentrate is
estimated at around 9.6 %, but it is below the detection limit in the tailings sample. |
| ● | Gangue minerals include quartz, albite, and micas
accompanied by lesser quantities of chlorite and clay minerals. Minor occurrences of carbonates were also noted. |
Findings included:
| ● | Twelve native gold grains were detected. These
occur as gold-silver alloy with a low silver content of <10 %. |
| ● | Four of the twelve gold grains detected by QEMSCAN
occurred as free gold. These ranged in size from 5–20 µm and constitute approximately 80 % of the total gold detected. The
remaining eight grains were mostly enclosed in pyrite and ranged in size from 2–15 µm. |
Selected head assays for the A20721 composite
samples from the Antenna pit are tabulated in Table 35.
Table 35: |
A20721 Antenna samples head assays |
Sample ID |
Au 1
(g/t) |
Au 2
(g/t) |
Au
mean
(g/t) |
Ag
(ppm) |
Hg
(ppm) |
As
(ppm) |
Corg
(%) |
Stot
(%) |
S2-
(%) |
COMP # 1 |
2.35 |
2.81 |
2.58 |
<0.1 |
<2 |
<10 |
<0.03 |
0.24 |
0.16 |
COMP # 2 |
1.61 |
1.83 |
1.72 |
<0.1 |
<2 |
<10 |
<0.03 |
0.98 |
0.68 |
COMP # 4 |
1.14 |
1.06 |
1.10 |
<0.1 |
<2 |
40 |
<0.03 |
0.5 |
0.38 |
COMP # 5 |
2.09 |
1.84 |
1.97 |
<0.1 |
<2 |
<10 |
<0.03 |
0.62 |
0.48 |
COMP # 6 |
4.91 |
6.08 |
5.50 |
<0.1 |
<2 |
20 |
<0.03 |
1.46 |
1.18 |
COMP # 7 |
1.69 |
1.74 |
1.72 |
0.3 |
<2 |
40 |
<0.03 |
1.46 |
1.16 |
COMP # 8 |
2.49 |
2.46 |
2.48 |
<0.1 |
<2 |
40 |
<0.03 |
1.04 |
0.9 |
COMP # 9 |
1.30 |
1.76 |
1.53 |
<0.1 |
<2 |
10 |
<0.03 |
0.44 |
0.36 |
COMP # 10 |
1.93 |
1.73 |
1.83 |
<0.1 |
<2 |
30 |
<0.03 |
1.6 |
1.36 |
COMP # 11 |
4.21 |
4.90 |
4.56 |
<0.1 |
<2 |
60 |
<0.03 |
1.58 |
1.2 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Sample ID |
Au 1
(g/t) |
Au 2
(g/t) |
Au
mean
(g/t) |
Ag
(ppm) |
Hg
(ppm) |
As
(ppm) |
Corg
(%) |
Stot
(%) |
S2-
(%) |
COMP # 12 |
4.0 |
3.64 |
3.82 |
<0.1 |
<2 |
140 |
0.15 |
0.46 |
0.32 |
COMP # 13 |
2.24 |
2.28 |
2.26 |
<0.1 |
<2 |
<10 |
<0.03 |
0.62 |
0.44 |
COMP # 14 |
2.45 |
2.87 |
2.66 |
<0.1 |
<2 |
30 |
<0.03 |
1.36 |
1.26 |
COMP # 15 |
2.33 |
2.69 |
2.51 |
<0.1 |
<2 |
40 |
<0.03 |
1.48 |
1.32 |
COMP # 16 |
1.50 |
1.29 |
1.4 |
<0.1 |
<2 |
<10 |
<0.03 |
1.16 |
0.88 |
COMP # 17 |
3.06 |
2.76 |
2.91 |
<0.1 |
<2 |
20 |
<0.03 |
1.78 |
1.3 |
COMP # 18 |
3.26 |
2.28 |
2.77 |
<0.1 |
<2 |
10 |
<0.03 |
0.94 |
0.68 |
Antenna MC |
2.87 |
2.48 |
2.68 |
<0.1 |
0.3 |
20 |
0.06 |
0.94 |
0.72 |
The average gold grade for each sample is the
arithmetic mean of two duplicate separate fire assays. The differences between the duplicate fire assays indicate the presence of coarse
gold grains or coarse high-grade gold-bearing particles such as sulfides. These differences appear to be more pronounced at higher grades
(see comp #18 and #6 for example). This observation strengthened the case for including a gravity concentration step in the flowsheet.
Negligible organic carbon and mercury contents
suggested that these deleterious elements would likely not present significant problems when processing mineralized material.
Silver levels were consistently low and were ignored
for design purposes. Some arsenic was found in most of the samples, but the average level was sufficiently low to assume that it too would
not present a significant problem.
Table 36 shows the head grades measured for the
Ancien, Agouti and Boulder samples tested during the A20721 program. The levels of deleterious elements were also low and do not present
any concerns.
Table 36: |
A20721 Other pits samples head assays |
Sample ID |
Au 1
(g/t) |
Au 2
(g/t) |
Au mean
(g/t) |
Ag
(ppm) |
Hg
(ppm) |
As
(ppm) |
Corg
(%) |
Stot
(%) |
S2-
(%) |
VC01 |
1.22 |
1.25 |
1.24 |
<0.1 |
0.6 |
10 |
0.24 |
0.26 |
0.22 |
VC02 |
1.47 |
1.37 |
1.42 |
<0.1 |
0.3 |
70 |
0.15 |
0.7 |
0.64 |
VC03 |
1.54 |
1.58 |
1.56 |
<0.1 |
0.3 |
60 |
0.15 |
0.86 |
0.76 |
VC04 |
3.4 |
3.07 |
3.24 |
<0.1 |
0.3 |
30 |
0.15 |
1.38 |
1.26 |
VC05 |
9.35 |
8.66 |
9.01 |
<0.1 |
0.9 |
80 |
0.15 |
1.2 |
0.94 |
VC06 |
2.52 |
3.62 |
3.07 |
<0.1 |
<0.3 |
<10 |
0.33 |
0.5 |
0.36 |
VC07 |
2.73 |
3.29 |
3.01 |
<0.1 |
0.3 |
<10 |
0.09 |
0.22 |
0.16 |
VC08 |
2.12 |
1.48 |
1.80 |
<0.1 |
0.6 |
20 |
0.12 |
1.62 |
1.14 |
VC09 |
8.33 |
13.6 |
10.97 |
<0.1 |
0.6 |
20 |
0.06 |
2.94 |
2.44 |
VC10 |
2.0 |
1.62 |
1.81 |
<0.1 |
<0.3 |
100 |
<0.03 |
1.12 |
1.08 |
VC11 |
1.8 |
2.6 |
2.22 |
<0.1 |
<0.3 |
30 |
0.18 |
0.44 |
0.34 |
VC12 |
22.9 |
19.3 |
21.10 |
<0.1 |
0.6 |
20 |
0.15 |
0.44 |
0.34 |
VC13 |
11.3 |
9.4 |
10.35 |
<0.1 |
0.6 |
40 |
0.18 |
0.74 |
0.64 |
VC14 |
16.5 |
14.8 |
15.65 |
<0.1 |
0.6 |
20 |
0.12 |
0.18 |
0.12 |
VC15 |
3.22 |
4.3 |
3.76 |
<0.1 |
<0.3 |
40 |
0.12 |
0.56 |
0.52 |
VC16 |
13.5 |
8.47 |
10.99 |
<0.1 |
0.6 |
20 |
<0.03 |
0.42 |
0.28 |
VC17 |
2.24 |
3.86 |
3.05 |
<0.1 |
0.3 |
<10 |
0.24 |
0.24 |
0.12 |
Boulder Master |
1.17 |
1.17 |
1.17 |
<0.1 |
0.6 |
10 |
<0.03 |
0.72 |
0.58 |
Agouti Master |
1.1 |
1.19 |
1.15 |
<0.1 |
0.3 |
<10 |
<0.03 |
0.46 |
0.28 |
Ancien Master |
9.08 |
10.20 |
9.64 |
<0.1 |
0.6 |
50 |
<0.03 |
0.78 |
0.50 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.2.6 | Comminution Results |
CWi tests were performed on a selection of the
Antenna drill core samples. These results are tabulated in Table 37.
Table 37: |
Impact crushability results (CWi in kWh /Mt) |
Sample # |
Antenna |
Boulder |
Agouti |
Ancien |
1 |
6.4 |
6.7 |
6.4 |
9.6 |
2 |
6.1 |
8.3 |
7.8 |
9.5 |
3 |
12.2 |
8.4 |
6.2 |
6.4 |
4 |
9.5 |
6.3 |
6.0 |
3.2 |
5 |
6.1 |
9.6 |
1.6 |
3.3 |
6 |
6.1 |
6.4 |
4.6 |
6.4 |
7 |
11.0 |
9.4 |
7.7 |
6.4 |
8 |
9.0 |
9.5 |
6.1 |
7.9 |
9 |
13.8 |
6.3 |
6.2 |
9.8 |
10 |
9.4 |
6.6 |
9.5 |
9.7 |
Ave |
9.0 |
7.8 |
6.2 |
7.2 |
85th percentile |
11.8 |
9.5 |
7.7 |
9.7 |
For this set of Antenna samples, the average CWi
was 9.0 kWh/t and the 85th percentile value was 11.8 kWh/t. The average specific gravity (SG) measured for these samples was
2.62. The average and 85th percentile values for these samples were marginally lower than that of the samples tested during
the A19864 phase. When combining these with the previous results the combined average was 10.1 kWh/t and the 85th percentile
value was 13.9 kWh/t.
The Boulder, Agouti and Ancien samples were generally
softer than the Antenna samples.
SMC and bond index comminution testing was performed
on a selection of samples and Master Composites. Table 38 summarizes the result obtained.
Table 38: |
Comminution testwork results |
Sample ID |
DWi
(kWh/m3) |
SG |
JK Parameters |
Bond Indices (kWh/t) |
A |
b |
A x b |
ta |
RWi |
BWi |
Ai |
Antenna MC |
8.0 |
2.75 |
73.7 |
0.47 |
34.6 |
0.33 |
20.8 |
- |
0.4340 |
Antenna COMP # 8 |
9.0 |
2.80 |
100 |
0.31 |
31.0 |
0.29 |
- |
20.5 |
- |
Antenna COMP # 14 |
8.4 |
2.77 |
100 |
0.33 |
33.0 |
0.31 |
- |
20.2 |
- |
Antenna COMP # 16 |
8.6 |
2.81 |
81.1 |
0.40 |
32.4 |
0.30 |
- |
18.5 |
- |
Antenna Average: |
8.5 |
2.78 |
88.7 |
0.4 |
32.8 |
0.31 |
- |
19.7 |
- |
Agouti MC |
8.6 |
2.79 |
77.5 |
0.42 |
32.6 |
0.30 |
- |
18.0 |
- |
Boulder MC |
8.5 |
2.73 |
87.1 |
0.37 |
32.2 |
0.31 |
- |
16.3 |
- |
Ancien MC |
8.0 |
2.78 |
89.4 |
0.39 |
34.9 |
0.32 |
- |
16.8 |
- |
The Antenna samples tested were of above average
hardness but marginally softer than the Antenna Master Composite originally tested. Combining the four new results for Antenna with the
initial data resulted in an average Axb of 32.3 and an 85th percentile value of 30.8. In terms of the BWi, the combined average
is 19.7 kWh/t and the 85th percentile is at 20.4 kWh/t.
The Agouti, Boulder and Ancien samples yielded
similar results to Antenna.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The UCS of four of the Antenna samples were also
tested and yielded a value of 177.1 MPa. This classifies the mineralized material as “hard/strong”. Five samples of each of
the Boulder, Agouti and Ancien samples yielded averaged UCS values of 43, 72 and 55 MPa respectively. This classifies these ores as “medium
hard/strong”.
| 13.2.7 | Flowsheet Options Tested |
Given the consistently high (mid-90 %) overall
gold recoveries as well as the high average gravity gold recovery recorded during previous testing, this program focused entirely on a
conventional CIL flowsheet with gravity concentration.
| 13.3 | Gravity-Cyanidation Results for the A20721 Program |
| 13.3.1 | Grind and Cyanide Addition Optimization |
Table 39 summarizes the results from the grind
and cyanide series of testwork.
Table 39: |
Antenna MC gravity-cyanidation test results (Grind and Cyanide Series) |
Test No. |
Test Conditions |
Residue
Au
(g/t) |
Gold Extraction (%) |
Reagent Consumption
(kg/t) |
Grind P80 (µm) |
Initial
NaCN (%) |
Gravity |
4-hr |
24-h |
48-hr |
NaCN |
Lime |
BK13492 |
150 |
0.05 |
0.220 |
38.9 |
79.3 |
89.7 |
91.8 |
0.17 |
0.46 |
BK13493 |
106 |
0.05 |
0.165 |
38.6 |
86.0 |
91.6 |
93.9 |
0.22 |
0.24 |
BK13494 |
75 |
0.05 |
0.130 |
38.1 |
84.9 |
90.7 |
95.2 |
0.22 |
0.28 |
BK13495 |
75 |
0.10 |
0.125 |
38.8 |
92.2 |
94.1 |
95.3 |
0.39 |
0.29 |
BK13496 |
75 |
0.02 |
0.145 |
40.9 |
70.1 |
93.8 |
94.3 |
0.10 |
0.35 |
Figure 38 presents a graph of the final residue
grades, analyzed by duplicate fire assay, versus the grind size of the sample. The result shows a linear correlation between the fineness
of the grind and the residue grade (confirming a similar trend observed during the PEA testwork program).
Figure 38: |
Residue gold grade versus grind P80 for A20721 Antenna MC (ALS, 2020) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure
39 presents a graph of the final residue grades, analyzed by duplicate fire assay, versus the initial NaCN concentration used in the series.
Figure 39: |
Residue gold grade versus cyanide strength for A20721 Antenna MC (ALS, 2020) |
The graph shows a decrease in residue grade from
0.130–0.125 g/t Au as the cyanide concentration was increased from 0.05–0.1 %. However, the difference of 0.005 g/t Au is
smaller than the analytical error margin (fire assays are reported to 2 decimal places only) and therefore a mathematical averaging difference
only. In contrast, the cyanide consumption increased from 0.22 to 0.39 kg/t is significant. Given this outcome, an initial cyanide addition
of 0.05 % was adopted for the remainder of the program as this allows for complete gold leaching while not overestimating the cyanide
consumption that could be achieved on the full-scale plant.
| 13.3.2 | Other Leach Parameters Optimization |
Table 40 summarizes the results from the tests
exploring the effects of air sparging, lead nitrate addition, a 24-hour residence time as well as pre-oxygenation. All these tests were
performed at a P80 grind of 75 µm and with an initial cyanide concentration of 0.05 %.
Table 40: |
Antenna MC gravity-cyanidation tests results (other parameters) |
Test |
Condition
varied |
Residue
Au
(g/t) |
Gold Extraction (%) |
Reagent
Consumption (kg/t) |
Gravity |
2-hr |
8-hr |
24-h |
48-hr |
NaCN |
Lime |
BK13513 |
Air Sparge |
0.150 |
39.9 |
62.6 |
87.8 |
93.7 |
94.3 |
0.18 |
0.34 |
BK13514 |
50 %w/w solids |
0.135 |
39.5 |
74.8 |
94.5 |
94.9 |
94.9 |
0.12 |
0.35 |
BK13515 |
Pb (NO3)2 |
0.135 |
37.4 |
89.4 |
91.1 |
93.2 |
95.2 |
0.17 |
0.39 |
BK13516 |
CIL |
0.135 |
42.4 |
86.2 |
94.0 |
94.0 |
94.5 |
0.39 |
0.29 |
BK13647 |
24hr |
0.150 |
39.6 |
68.0 |
90.7 |
94.5 |
- |
0.05 |
0.45 |
BK13826 |
24hr; 4hpre-ox |
0.140 |
44.7 |
88.0 |
93.6 |
94.9 |
- |
0.11 |
0.33 |
The residue gold grade values are all very similar
and within the accuracy of the test procedure. However, the two highest residue grades were recorded when air sparging only was used and
at the 24-hour leach duration.
Cyanide consumption was elevated when carbon was
added, however, there is no indication whether the carbon was pre-conditioned in cyanide solution.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure
40 shows the average gold extraction versus leach duration curve for all 17 tests combined (Table 41).
Figure 40: |
A20721 Antenna variability samples leach kinetics (ALS, 2020) |
Individual curves were combined to smooth out
analytical variations to allow for a more precise assessment of the kinetics. Figure 40 shows that leaching is substantially complete
within 24 hours and there is no apparent preg-robbing.
Figure 40 also shows a fast initial leaching rate
for the gravity tailings sample with more than 80 % of the stage extraction completed within the first two hours of cyanidation. This
fast initial leaching rate renders this material amenable to a hybrid CIL configuration, where the conventional CIL is preceded by a pre-leach
tank. Most of the gold will leach in the pre-leach tank, which provides several downstream benefits with respect to the efficiency of
the adsorption process.
Table 41: |
Antenna variability samples gravity – cyanidation tests results (A20721) |
Sample ID |
Head Au Grade (g/t) |
Residue
Au (g/t) |
Gold Extraction (%) |
Reagent
Consumption (kg/t) |
Assayed |
Calc’d |
Gravity |
2-hr |
8-hr |
24-hr |
NaCN |
Lime |
COMP #1 |
2.58 |
2.44 |
0.10 |
24.0 |
85.4 |
94.0 |
95.9 |
0.12 |
1.00 |
COMP #2 |
1.72 |
2.88 |
0.13 |
52.1 |
86.2 |
93.3 |
95.5 |
0.12 |
0.29 |
COMP #4 |
1.10 |
1.20 |
0.07 |
20.0 |
85.8 |
93.4 |
94.2 |
0.04 |
0.74 |
COMP #5 |
1.97 |
1.11 |
0.07 |
34.4 |
86.8 |
91.7 |
94.1 |
0.10 |
0.31 |
COMP #6 |
5.50 |
3.92 |
0.30 |
34.2 |
86.2 |
91.1 |
92.5 |
0.12 |
0.27 |
COMP #7 |
1.72 |
1.58 |
0.15 |
23.1 |
83.1 |
87.4 |
90.8 |
0.12 |
0.28 |
COMP #8 |
2.48 |
2.41 |
0.20 |
35.8 |
86.4 |
90.8 |
91.9 |
0.10 |
0.30 |
COMP #9 |
1.53 |
1.89 |
0.06 |
51.5 |
88.2 |
96.1 |
96.8 |
0.10 |
0.66 |
COMP #10 |
1.83 |
2.55 |
0.15 |
45.2 |
86.7 |
92.0 |
94.1 |
0.09 |
0.23 |
COMP #11 |
4.56 |
4.65 |
0.21 |
41.2 |
72.8 |
92.7 |
95.6 |
0.07 |
0.34 |
COMP #12 |
3.82 |
2.77 |
0.16 |
43.8 |
88.5 |
94.9 |
94.2 |
0.03 |
0.34 |
COMP #13 |
2.26 |
1.40 |
0.07 |
54.8 |
86.2 |
94.4 |
95.4 |
0.11 |
0.31 |
COMP #14 |
2.66 |
2.75 |
0.18 |
33.8 |
81.1 |
89.5 |
93.5 |
0.10 |
0.30 |
COMP #15 |
2.51 |
2.15 |
0.16 |
34.6 |
84.3 |
92.0 |
92.8 |
0.10 |
0.29 |
COMP #16 |
1.40 |
1.67 |
0.06 |
51.2 |
72.4 |
95.3 |
96.7 |
0.10 |
0.31 |
COMP #17 |
2.91 |
2.62 |
0.22 |
22.0 |
78.5 |
89.9 |
91.6 |
0.14 |
0.26 |
COMP #18 |
2.77 |
2.70 |
0.13 |
39.7 |
77.5 |
90.8 |
95.2 |
0.16 |
0.37 |
Averages |
2.55 |
2.39 |
0.14 |
37.7 |
83.3 |
92.3 |
94.2 |
0.10 |
0.39 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The
overall gold recoveries recorded for the 17 Antenna VC samples are plotted against the gravity gold recovery in Figure 41.
Figure 41: |
Gold Recovery versus gravity recovery - all A20721 variability samples (ALS, 2020) |
A straight-line fit indicates a positive correlation,
as expected, but a poor correlation coefficient, which indicates that the recovery achievable is not dependent on the recovery of coarse
gold by gravity concentration.
Figure
42 shows the overall gold recovery versus head grade plot for the 17 Antenna variability samples.
Figure 42: |
Gold Recovery versus head grade for Antenna variability samples A20721 (ALS, 2020) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
It is evident that there is no trend between recovery
and gold grade for this domain. All the samples tested yielded recoveries exceeding 90 %, which indicates that there are no refractory
“pockets” within the mineralization. This confirms and strengthens a similar finding from the PEA variability tests.
Figure
43 presents a graph of the final residue grades, analyzed by duplicate fire assay, versus the assayed head grade for the seventeen Antenna
variability samples.
Figure 43: |
Residue gold grade versus head grade for Antenna variability samples (ALS, 2020) |
A straight-line fit yielded an acceptably high
correlation coefficient (R2) of 0.557. These results are used, in conjunction with the corresponding PEA data, to derive a recovery model.
The average cyanide and lime consumptions for
the 17 variability samples are low at 0.10 kg/t and 0.39 kg/t respectively. While the lime consumption is similar to the PEA results,
the cyanide consumption was significantly lower, likely due to the shorter leach duration.
| 13.3.3 | Satellite Pits Variability Sample Test Results |
Table 42 summarizes the results of tests comprising
of gravity concentration followed by cyanidation of the gravity tailings performed on the variability samples taken from the satellite
pits for the feasibility study program (A20721).
Table 42: |
Ancien, Boulder and Agouti variability samples gravity-cyanidation results (A20721) |
Pit |
Sample ID |
Head Au Grade (g/t) |
Residue
Au (g/t) |
Gold Extraction (%) |
Reagent Cons
(kg/t) |
Assayed |
Calc’d |
Gravity |
2-hr |
8-hr |
24-hr |
NaCN |
Lime |
Boulder |
VC01 |
1.24 |
1.23 |
0.16 |
11.0 |
79.0 |
85.9 |
87.4 |
0.12 |
0.57 |
VC02 |
1.42 |
1.41 |
0.24 |
12.4 |
80.1 |
80.7 |
83.0 |
0.12 |
0.53 |
VC03 |
1.56 |
1.86 |
0.20 |
22.8 |
84.5 |
88.1 |
89.5 |
0.16 |
0.52 |
Agouti |
VC04 |
3.24 |
3.23 |
0.23 |
24.0 |
87.0 |
90.4 |
92.9 |
0.19 |
0.71 |
VC05 |
9.01 |
9.96 |
0.98 |
25.2 |
78.0 |
88.4 |
90.2 |
0.16 |
0.54 |
VC06 |
3.07 |
2.64 |
0.20 |
23.1 |
78.3 |
90.4 |
92.4 |
0.12 |
0.41 |
VC07 |
3.01 |
4.14 |
0.25 |
49.4 |
88.1 |
94.2 |
94.0 |
0.15 |
0.39 |
VC08 |
1.80 |
3.69 |
0.12 |
50.8 |
68.6 |
90.3 |
96.8 |
0.21 |
0.44 |
VC09 |
9.78 |
7.78 |
0.25 |
66.8 |
75.5 |
87.5 |
96.8 |
0.26 |
0.43 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Pit |
Sample ID |
Head Au Grade (g/t) |
Residue
Au (g/t) |
Gold Extraction (%) |
Reagent Cons
(kg/t) |
Assayed |
Calc’d |
Gravity |
2-hr |
8-hr |
24-hr |
NaCN |
Lime |
Ancien |
VC10 |
1.81 |
1.63 |
0.19 |
18.7 |
87.9 |
87.2 |
88.4 |
0.16 |
0.51 |
VC11 |
2.22 |
2.30 |
0.13 |
38.9 |
86.7 |
93.0 |
94.6 |
0.11 |
0.36 |
VC12 |
21.10 |
17.01 |
0.32 |
50.7 |
95.3 |
97.6 |
98.1 |
0.16 |
0.42 |
VC13 |
10.35 |
15.08 |
0.24 |
62.5 |
87.7 |
96.8 |
98.4 |
0.11 |
0.36 |
VC14 |
15.65 |
12.62 |
0.10 |
65.4 |
91.0 |
98.3 |
99.2 |
0.10 |
0.34 |
VC15 |
3.76 |
3.49 |
0.10 |
58.7 |
87.9 |
94.5 |
97.1 |
0.12 |
0.42 |
VC16 |
11.19 |
10.92 |
0.21 |
56.8 |
92.2 |
97.3 |
98.1 |
0.14 |
0.40 |
VC17 |
3.05 |
4.08 |
0.09 |
47.7 |
86.2 |
97.3 |
97.8 |
0.12 |
0.35 |
Ancien MC |
9.65 |
10.73 |
0.38 |
47.8 |
91.5 |
95.2 |
96.5 |
0.05 |
0.44 |
Agouti MC |
1.15 |
1.14 |
0.10 |
37.4 |
85.0 |
89.6 |
91.2 |
0.14 |
0.41 |
Boulder MC |
1.17 |
1.29 |
0.15 |
18.3 |
82.7 |
87.3 |
88.7 |
0.12 |
0.35 |
Ave |
5.76 |
5.81 |
0.23 |
39.4 |
84.7 |
91.5 |
93.6 |
0.14 |
0.45 |
All the tests were performed on samples ground
to a P80 of 75 µm and followed the same cyanidation procedure as described previously. Note that these tests were performed for
24 hours as opposed to the 48 hours duration used in the PEA.
Figure
44 shows the average gold extraction versus leach duration curve for all 17 tests combined.
Figure 44: |
A20721 satellite pits variability and MC samples leach kinetics (ALS, 2020) |
Individual curves were combined to smoothen out
analytical variations in order to allow for a more precise assessment of the kinetics. As was the case for Antenna, the graph shows that
leaching is substantially complete within 24 hours and there is no apparent preg-robbing.
Figure 44 also shows a fast initial leaching rate
for the gravity tailings samples, which supports the decision to include a pre-leach tank.
The overall gold recoveries recorded for the seventeen
variability samples are plotted against the gravity gold recovery in Figure 45. A strong positive correlation validates the decision to
include a gravity recovery step in the flowsheet.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 45: |
Gold recovery versus gravity recovery - A20721 satellite pits (ALS, 2020) |
As was the case for Antenna, there is no discernible
correlation between overall or gravity gold recovery and head grade for these variability composites. Residue grades are weakly correlated
to head grade, but this data is not used in the overall recovery model, which is based on Antenna results only.
The average cyanide and lime consumptions for
the 17 variability samples are similar to Antenna rates at 0.14 kg/t and 0.45 kg/t, respectively. The cyanide consumption is lower
than that recorded during the PEA, likely due to the shorter leach duration.
| 13.3.4 | Miscellaneous Test Results |
A preg-robbing test was conducted on a slurry
of ground Antenna Master Composite. Gold was added to a level of 10 mg/L and the slurry was bottle-rolled for 24 hours with intermediate
sampling and analysis of the solution gold concentration. It was found that none of the gold adsorbed from the solution and hence that
the mineralized sample did not contain any preg-robbing components.
A lime demand test was conducted at a slurry density
of 40 %w/w solids. A total of 0.17 kg/t hydrated lime was added to adjust the slurry pH to 10.5 units. This is well below the lime consumption
recorded during most of the cyanidation tests.
Exploratory cyanide detoxification testing was
conducted for future reference. Table 43 summarizes the results obtained.
Table 43: Antenna MC detoxification
results (SO2 – air method)
Test Conditions |
Residual Total Cyanide
(mg/L) |
Reagent Consumption (kg/t) |
Na2S2O5 |
CuSO4.5H2O |
Lime (60% CaO) |
5:1 SO2:WAD CN |
9.0 |
0.27 |
0.48 |
1.26 |
4:1 SO2:WAD CN |
8.7 |
0.22 |
0.47 |
0.80 |
3:1 SO2:WAD CN |
13.2 |
0.16 |
0.45 |
0.63 |
reduced Cu add'n |
31.6 |
0.16 |
0.22 |
0.46 |
no copper add'n |
137.8 |
0.16 |
0.00 |
0.40 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The total cyanide content of the pregnant leached
solution was 169 mg/L at the start of the 15-minute residence time test and the slurry fed to the reactor contained 50 %w/w solids. Lime
was added to maintain the solution pH at approximately 8.5 units. Sodium metabisulphite powder was added to provide the sulfur dioxide.
A 3:1 sulfur dioxide to weakly acid-dissociable
(WAD) cyanide ratio appeared to be sufficient when targeting a 50 mg/L total cyanide effluent. Comparison of the last three tests, all
performed at a 3:1 SO2:WAD ratio, indicated that a copper addition of around 0.22 kg/t is required to produce a sub-50 mg/L
effluent.
An oxygen uptake test was conducted on an Antenna
Master Composite sample at a pH of 10 and a grind P80 of 75 µm. Table 44 presents the oxygen
uptake rate recorded at specific durations into the test.
Table 44: |
Oxygen uptake rate results |
Time (h) |
Oxygen uptake rate (mg/L/min) |
1 |
0.0184 |
2 |
0.0073 |
3 |
0.0081 |
4 |
0.0078 |
5 |
0.0075 |
6 |
0.0081 |
24 |
0.0035 |
The sample exhibited a low oxygen uptake rate.
| 13.3.5 | Gravity Recoverable Gold Test |
A sample of the Antenna Master Composite (A20721)
was subjected to a staged gravity recovery procedure where the sample was ground finer in increments with a gravity concentration step
executed at each grind. Table 45 summarizes the results obtained.
Table 45: |
Antenna MC gravity recoverable gold |
Product |
Grind Size (µm) |
Mass (%) |
Au (g/t) |
Au Dist'n (%) |
Stage 1 Con |
P80 850 |
0.12 |
449 |
19.9 |
Stage 2 Con |
P50 75 |
0.17 |
410 |
26.2 |
Stage 3 Con |
P80 75 |
0.16 |
188 |
11.4 |
Stage 3 Tail |
P80 75 |
99.55 |
1.14 |
42.5 |
Combined Con |
|
0.45 |
340 |
57.5 |
TOTAL |
|
100.0 |
2.67 |
100.0 |
The results show that most of the gravity recoverable
gold was extracted in the first two coarser grinds.
The total gravity recoverable gold fraction was
57.5 % of the feed, reporting to a concentrate of 0.45 % of the sample mass and at a concentrate grade of 340 g/t Au.
This result exceeds the gravity gold recoveries
recorded during the cyanidation test programs, which averaged around 40 % gravity gold recovery.
| 13.3.6 | Carbon Adsorption Test |
Carbon adsorption tests were performed to assess
the amenability of the slurry to gold recovery from the solution onto activated carbon.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure
46 presents the results of adsorption equilibrium loading test performed by contacting various amounts of carbon to samples of the leached
Antenna Master Composite slurry for a duration of several days.
Figure 46: |
Adsorption equilibrium - Antenna MC (ALS, 2020) |
Figure 46 shows the maximum achievable loading
on carbon at various solution gold concentrations at room temperature. The Freundlich isotherm, Y = 5541 C 0.445 with Y the loading on
the activated carbon at equilibrium (g/t) and C the solution gold concentration (mg/L) in equilibrium with this carbon is shown to fit
the data well.
Figure
47 presents the results of an adsorption kinetic loading test performed by contacting a measured amount of carbon with a 6 kg sample of
leached Antenna Master Composite slurry.
Figure 47: |
Adsorption kinetics sequential tripe contact batch test - Antenna MC (ALS, 2020) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The leached slurry was replaced with a fresh batch
at the 2-hour mark and again at the 4-hour mark to maintain a high gold in solution concentration and simulate the counter-current movement
of carbon in industrial scale adsorption plants.
From the test data the Fleming model constants
were derived as:
| 13.3.7 | Sedimentation and Rheology Test Results |
A
sample of the Antenna Master Composite was subjected to rheology testing. Figure 48 and Figure 49 present the results graphically.
Figure 48: |
Viscosity versus shear rates at three densities (%slides) for the Antenna MC slurry (ALS, 2020) |
Figure 49: |
Shear Stress versus rate for three densities (% solids) for the Antenna MC slurry (ALS, 2020) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
A yield stress lower than 10 Pa was measured for
all but the highest shear rate indicating that the slurry will not be difficult to pump or agitate.
A sample of Antenna Master Composite was subjected
to sedimentation testing by Outotec testing facility using a laboratory scale dynamic high-rate thickener. The P80 of the sample was determined
to be 82 µm and 60 g/t Magnaflocc M10 flocculant was added throughout. Note that Outotec stated that there was insufficient sample
to allow flocculant optimization hence it is possible that lower addition rates would produce equivalent results. Table 46 summarizes
the results from three tests performed at different feed fluxes.
Table 46: Antenna MC dynamic
thickening results
Feed |
Underflow |
Overflow |
Flux
(t/m2.h) |
Liquor Rise Rate
(m/h) |
Density (%
solids w/w) |
Yield Stress
(Pa) |
Suspended Solids
(ppm) |
0.5 |
2.46 |
64.4 |
31 |
230 |
1.0 |
4.93 |
60.6 |
24 |
280 |
1.5 |
7.39 |
59.4 |
53 |
330 |
The desired underflow density of approximately
54 %w/w solids was exceeded over the range tested. For the purposes of maintaining a reasonably clear overflow product and to allow surge
capacity Outotec recommended a design flux rate of 1.0 t/ (m2.h) and a feed density of 22 %w/w solids.
The dynamic thickening testwork conducted by Outotec
used a flocculant dosing rate of 60 g/t. However, flocculant screening tests showed that the settling rate was largely insensitive to
the flocculant addition rate once it exceeded 40 g/t. Due to limited sample quantity, Outotec was not able to perform more thickening
tests to optimize the flocculant dosing rate.
At
the end of 2020, Roxgold Sango was able to conduct additional thickening testwork on a pre-leach thickener sample with BASF to determine
the optimal flocculant dosage and verify the appropriate thickener feed solids. The BASF thickening testwork confirmed that Magnafloc
10 is the best performing flocculant for mineralization in terms of settling rate and overflow clarity. The ideal solids in the thickener
feedwell for efficient settling was determined to be at 15–17 % w/w. The recommended flocculant dosing rate was 20 g/t. Figure 50
to Figure 52 show the BASF testwork results.
Figure 50: |
BASF flocculant screening results – flocculant type versus settling rate (ALS, 2020) |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure
51: BASF flocculant screening results – flocculant type versus overflow clarity (ALS, 2020)
| Figure 52: | BASF settling testwork results – feed solids
versus flux rate (ALS, 2020) |
| 13.4 | ALS Laboratories Feasibility Study Koula Update Testwork Program (A21926 and A21707) |
| 13.4.1 | Metallurgical Samples |
Roxgold Sango selected drill core samples for
both the A21926 and the A21707 metallurgical testwork program.
Selected head assays for the A21926 composite
samples from the Koula deposit are tabulated in Table 47.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| Table 47: | Selected
head assays for Koula composites |
Comp ID |
Au1
(g/t) |
Au2
(g/t) |
Au3
(g/t) |
AuAVE
(g/t) |
Ag
(ppm) |
AS
(ppm) |
C-org
(%) |
Hg
(ppm) |
Stot
(%) |
S2-
(%) |
Master |
4.32 |
4.72 |
7.02 |
5.35 |
1.5 |
40 |
0.09 |
<0.1 |
1.30 |
0.84 |
VC01 |
1.45 |
1.37 |
1.31 |
1.38 |
0.3 |
<10 |
<0.03 |
<0.1 |
0.92 |
0.60 |
VC02 |
2.14 |
2.38 |
2.76 |
2.48 |
0.3 |
20 |
0.09 |
<0.1 |
0.72 |
0.42 |
VC03 |
3.17 |
2.42 |
1.71 |
2.438 |
<0.3 |
30 |
0.03 |
<0.1 |
1.06 |
0.60 |
VC04 |
3.91 |
4.47 |
4.29 |
4.22 |
0.3 |
<10 |
<0.03 |
<0.1 |
1.24 |
0.80 |
VC05 |
7.66 |
7.31 |
6.79 |
7.25 |
2.1 |
<10 |
0.06 |
<0.1 |
0.88 |
0.66 |
VC06 |
9.8 |
8.06 |
7.14 |
8.33 |
2.7 |
40 |
0.06 |
<0.1 |
1.38 |
0.98 |
VC07 |
7.51 |
7.47 |
6.36 |
7.11 |
0.6 |
<10 |
0.06 |
<0.1 |
0.80 |
0.54 |
VC08 |
56.1 |
58.8 |
57.3 |
57.4 |
3.9 |
40 |
0.24 |
0.3 |
1.24 |
0.84 |
VC09 |
18.3 |
17.3 |
16.9 |
17.5 |
1.2 |
30 |
0.06 |
<0.1 |
1.52 |
1.24 |
VC10 |
13 |
14.1 |
15 |
14.0 |
1.8 |
40 |
<0.03 |
<0.1 |
1.12 |
0.78 |
The average gold grade for each sample is the
arithmetic mean of the triplicate fire assays. The large differences between the triplicate fire assays indicates the presence of gold
nuggets in the Koula mineralized samples. The three composites observed as having the least nugget effect were VC01, VC08 and VC09. These
three composites also had the lowest gravity gold recovery. All of the other composites had reasonably high gravity gold recovery, which
again strengthened the case for including a gravity concentration step in the flowsheet.
Negligible organic carbon and mercury contents
suggested that these deleterious elements would likely not present significant problems when processing this deposit.
Silver grades were consistently low compared to
the gold grades, however, silver content in the Koula mineralized material was at a higher level than the Antenna ore. This is expected
since Koula’s mineralogy similar to that of the Ancien deposit.
Some arsenic was found in most of the samples,
but the average level was sufficiently low to assume that it too will not present a significant problem.
| 13.4.3 | Comminution Results |
A summary of various comminution test results
from the A21926 program is presented in Table 48.
| Table 48: | Koula comminution testwork summary |
Ore Type |
Project # |
Unconfined Compressive Strength (MPa) |
Bond Work Indices (kWh/t) |
1 |
2 |
3 |
4 |
5 |
CWi |
RWi |
*BWi |
Koula |
A21926 |
7 |
29 |
8 |
26 |
9 |
6.90 |
19.5 |
16.3 |
*Closing screen size of 106 µm.
Comparing the Koula comminution parameters to
those measured for samples from the other deposits, the average CWi, RWi, BWi values are all within similar ranges. The UCS results for
Koula appear to be lower than results from other deposits indicating that Koula mineralized material is slightly less competent than the
others. The comminution results from the A21926 program have no impact on the existing comminution design.
| 13.4.4 | Gravity-Cyanidation Results |
Table 49 presents a summary of the various tests
conducted on the Koula master composite for gold from the A21926 program.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| Table 49: | Koula master composite testwork results for gold |
Test # |
Comp
ID |
Au Head Grade
(g/t) |
Au Extraction (%) |
Au Tail
Grade
(g/t) |
Reagents (kg/t) |
Assay |
Calc'd |
Grav |
2-hr |
4-hr |
8-hr |
24-hr |
48-hr |
NaCN |
Lime |
BK14863
(Direct Leach) |
Master Comp |
5.35 |
5.35 |
- |
48.4 |
63.2 |
78.3 |
92.4 |
94.6 |
0.29 |
0.17 |
0.67 |
BK14864
(Gravity/Leach) |
5.00 |
53.3 |
89.3 |
93.4 |
94.5 |
95.6 |
95.4 |
0.23 |
0.17 |
0.60 |
BK14865
(Gravity/Leach
– 6 hrs O2) |
4.24 |
37.0 |
87.0 |
92.8 |
93.6 |
94.7 |
94.1 |
0.25 |
0.17 |
0.58 |
Test #BK14863 directly leached the master composite
(no gravity separation) with oxygen sparging. The results showed that gold recovery continued to increase after 24 hours of leaching.
Test #BK14864 had gravity separation followed
by leaching of the gravity tails with oxygen sparging. Test #BK14865 had gravity separation followed by leaching of the gravity tails,
but with oxygen sparging for only six hours. These two tests yielded similar recoveries but faster leach kinetics. Both leach curves began
to plateau at 24 hours. It can be observed from this testwork that if gravity separation was included, a 24-hour leach time would be sufficient.
The highest gold recovery was achieved for the
test incorporating gravity recovery and elevated dissolved oxygen levels for the duration of the leach.
Table 50 presents a summary of the Koula variability
testwork for gold from the A21926 program.
| Table 50: | Koula variability testwork for gold |
Test # |
Comp
ID |
Au Head Grade
(g/t) |
Au Extraction (%) |
Au Tail
Grade
(g/t) |
Reagents (kg/t) |
Assay |
Calc'd |
Grav |
2-hr |
4-hr |
8-hr |
24-hr |
48-hr |
NaCN |
Lime |
BK14878 |
VC01 |
1.38 |
1.65 |
19.5 |
85.7 |
88.0 |
89.7 |
91.9 |
93.0 |
0.12 |
0.22 |
0.41 |
BK14879 |
VC02 |
2.43 |
2.62 |
54.2 |
86.1 |
89.9 |
94.6 |
96.0 |
96.0 |
0.11 |
0.17 |
0.43 |
BK14880 |
VC03 |
2.43 |
2.38 |
46.0 |
88.0 |
92.5 |
94.1 |
95.6 |
96.0 |
0.10 |
0.20 |
0.49 |
BK14881 |
VC04 |
4.22 |
5.62 |
58.3 |
92.3 |
93.8 |
94.8 |
96.0 |
96.4 |
0.20 |
0.20 |
0.41 |
BK14964 |
VC05 |
7.25 |
7.07 |
70.7 |
95.5 |
96.2 |
97.4 |
98.3 |
97.9 |
0.15 |
0.11 |
0.42 |
BK14883 |
VC06 |
8.33 |
7.53 |
42.8 |
83.5 |
89.0 |
91.9 |
93.1 |
96.0 |
0.30 |
0.22 |
0.39 |
BK14884 |
VC07 |
7.11 |
6.43 |
35.0 |
82.2 |
89.7 |
93.5 |
94.7 |
95.5 |
0.29 |
0.20 |
0.44 |
BK14885 |
VC08 |
57.40 |
48.60 |
18.6 |
62.6 |
79.0 |
91.1 |
95.6 |
96.3 |
1.81 |
0.22 |
0.47 |
BK14886 |
VC09 |
17.50 |
22.00 |
18.1 |
71.9 |
80.3 |
92.3 |
94.7 |
94.7 |
1.16 |
0.22 |
0.43 |
BK14887 |
VC10 |
14.00 |
17.30 |
41.5 |
92.5 |
95.2 |
95.5 |
97.6 |
97.4 |
0.46 |
0.30 |
1.90 |
Average |
40.5 |
84.0 |
89.4 |
93.5 |
95.4 |
95.9 |
|
0.21 |
0.58 |
The Koula variability testwork shows an average
gravity gold recovery of 40.5 %. However, one of the composites (VC05) yielded a 70 % gravity gold recovery which increased the average
significantly. Without VC05, the average would be only 37.1 %. Gravity gold recovery at full-scale tends to be about 25 % less than the
testwork results, hence, no impact to the existing gravity circuit design is expected.
The Koula overall gold recovery averaged 95.3
% at the end of 24-hour leach period. This is similar to the design recovery of 95 %, which was based on Antenna variability testwork
results only at the time. Koula
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
mineralized material would likely be blended with
other ore, hence, the existing 95 % gold recovery in the plant design criteria still holds.
The average cyanide consumption was 0.20 kg/t
from the variability testwork; however, the measurement was completed after 48 hours of leaching. Since the targeted leach residence time
was only 24 hours, the cyanide consumption in full-scale should be less, hence no impact to the existing cyanide consumption in the plant
design criteria is expected.
The average lime consumption was 0.58 kg/t from
the variability testwork, however, one of the composites (VC10) had significantly higher lime consumption than the rest. The head analysis
showed VC10 to have the lowest calcium percentage, which could mean the lowest amount of CaCO3 (lime), explaining why that sample’s
lime consumption was higher than the remainder. Without VC10, the average would be 0.43 kg/t. The measurement for lime consumption was
completed after 48 hours of leaching. Since the targeted leach residence time is only 24 hours, the lime consumption in full-scale should
be less, hence, no impact is expected to the existing lime consumption rate in the plant design criteria.
Table 51 presents a summary of the various tests
conducted on the Koula master composite for silver from the A21926 program.
| Table 51: | Koula
master composite testwork results for silver |
Test # |
Comp
ID |
Ag Head Grade
(g/t) |
Ag Extraction (%) |
Ag Tail
Grade
(g/t) |
Assay |
Calc'd |
Grav |
2-hr |
4-hr |
8-hr |
24-hr |
48-hr |
BK14863
(Direct Leach) |
Master Comp |
1.50 |
1.05 |
- |
24.8 |
30.4 |
35.8 |
41.0 |
42.7 |
0.60 |
BK14864
(Gravity/Leach) |
0.69 |
19.2 |
51.2 |
51.2 |
51.2 |
53.8 |
56.4 |
0.30 |
BK14865
(Gravity/Leach – 6 hrs O2) |
0.93 |
11.3 |
39.3 |
39.3 |
39.3 |
33.5 |
35.4 |
0.60 |
The highest silver recovery was achieved for the
test incorporating gravity recovery and elevated dissolved oxygen levels for the duration of the leach. Silver recovery continued to increase
beyond the 24-hour period for the master composite.
Table 52 presents a summary of the Koula variability
testwork for silver from the A21926 program.
| Table 52: | Koula variability
testwork for silver |
Test # |
Comp
ID |
Ag Head Grade (g/t) |
Ag Extraction (%) |
Ag Tail
Grade
(g/t) |
Assay |
Calc'd |
Grav |
2-hr |
4-hr |
8-hr |
24-hr |
48-hr |
BK14878 |
VC01 |
0.30 |
0.41 |
5.9 |
54.6 |
54.6 |
59.2 |
59.2 |
63.5 |
<0.3 |
BK14879 |
VC02 |
0.30 |
0.33 |
19.8 |
49.7 |
49.7 |
49.7 |
55.1 |
55.1 |
<0.3 |
BK14880 |
VC03 |
<0.3 |
0.41 |
14.8 |
54.0 |
58.8 |
58.8 |
63.2 |
63.2 |
<0.3 |
BK14881 |
VC04 |
0.30 |
0.54 |
27.9 |
68.8 |
68.8 |
68.8 |
72.1 |
72.1 |
<0.3 |
BK14964 |
VC05 |
2.10 |
1.07 |
25.5 |
42.3 |
42.3 |
42.3 |
42.3 |
44.0 |
0.60 |
BK14883 |
VC06 |
2.70 |
0.86 |
19.5 |
54.3 |
58.8 |
61.0 |
63.1 |
65.2 |
0.30 |
BK14884 |
VC07 |
0.60 |
0.65 |
14.5 |
45.3 |
48.3 |
51.1 |
51.1 |
53.8 |
0.30 |
BK14885 |
VC08 |
3.9 |
4.1 |
14.0 |
58.5 |
76.9 |
88.7 |
89.2 |
85.4 |
0.60 |
BK14886 |
VC09 |
1.2 |
1.7 |
13.8 |
69.0 |
76.9 |
88.0 |
91.2 |
91.2 |
<0.3 |
BK14887 |
VC10 |
1.8 |
1.4 |
25.6 |
73.6 |
76.4 |
75.0 |
76.3 |
78.8 |
0.30 |
Average |
18.1 |
57.0 |
61.1 |
64.3 |
66.3 |
67.2 |
|
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The gravity silver recovery averaged 18.1 % and
the overall silver recovery averaged at 66.3 % for the Koula variability testwork. Although the existing plant design criteria has not
considered silver, it is expected the carbon loading and the electrowinning capacity has sufficient margin to handle the silver from Koula
ore.
| 13.5 | ALS Laboratories Feasibility Study Sunbird Update Testwork Program (A23013) |
| 13.5.1 | Metallurgical Samples |
Roxgold Sango selected drill samples from eight
drill holes for the A23013 metallurgical testwork program to confirm the characteristics of the Sunbird deposit (Table 53).
| Table 53: | Samples used for A23013 testwork |
Composite ID |
Sample Type |
Mass (kg) |
SCRC1280 |
RC Chip |
5.6 |
SGRC1278 |
RC Chip |
5.8 |
SGRC1297 |
RC Chip |
5.3 |
SGDD089 |
Quarter-core |
21.0 |
SGRC1300 |
RC Chip |
6.1 |
SGRC1296 |
RC Chip |
5.5 |
SGRC1285 |
RC Chip |
5.8 |
SGRC1306 |
RC Chip |
5.7 |
Selected head assays for the A23013 composite
samples from the Sunbird deposit are tabulated in Table 54.
| Table 54: | Selected head assays for Sunbird composites |
Composite ID |
Au-1 (g/t) |
Au-2 (g/t) |
Au-3 (g/t) |
Au (ave) (g/t) |
SCRC1280 |
3.15 |
2.65 |
2.77 |
2.86 |
SGRC1278 |
0.78 |
0.84 |
1.5 |
1.04 |
SGRC1297 |
2.78 |
3.12 |
2.58 |
2.83 |
SGDD089 |
16.4 |
14.2 |
17.1 |
15.9 |
SGRC1300 |
6.51 |
5.02 |
5.35 |
5.63 |
SGRC1296 |
6.58 |
5.69 |
5.07 |
5.78 |
SGRC1285 |
2.28 |
2.18 |
2.34 |
2.27 |
SGRC1306 |
3.09 |
3.37 |
3.49 |
3.32 |
The average gold grade for each sample is the
arithmetic mean of the triplicate fire assays. The differences between the triplicate fire assays indicate the presence of gold nuggets
in the Sunbird mineralized samples, a point that correlates well with the high levels of visible gold recorded in drill core. The composites
averaged a reasonably high gravity gold recovery of 40 %, which is consistent with the metallurgical testwork for the other deposits.
Silver grades are consistently low compared to
the gold grades, and comparable to those recorded at Koula.
Some arsenic was found in most of the samples,
but the average level is sufficiently low to assume that it too will not present a significant problem (50 ppm to <10 ppm).
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.5.3 | Comminution Results |
A summary of various comminution test results
from the A23013 program is presented in Table 55.
| Table 55: | Sunbird comminution testwork summary |
Ore Type |
Project # |
Bond Work Indices (kWh/t) |
Ai |
*BWi |
Sunbird |
A23013 |
0.1265 |
13.8 |
*Closing screen size of 106 µm.
Comparing the Sunbird comminution parameters to
those measured for samples from the other deposits, the average values are all within similar ranges. The comminution results from the
A23013 program have no impact on the existing comminution design.
| 13.5.4 | Gravity-Cyanidation Results |
Table 56 presents a summary of the various tests
conducted on the Sunbird master composite for gold from the A23013 program.
| Table 56: | Sunbird master composite testwork results for gold |
Test # |
Comp ID |
Au Head Grade
(g/t) |
Au Extraction (%) |
Au Tail
Grade
(g/t) |
Reagents (kg/t) |
Assay |
Calc'd |
Grav |
4-hr |
8-hr |
24-hr |
48-hr |
|
NaCN |
Lime |
BK16724 |
SGRC1280 |
2.86 |
2.22 |
25.0 |
88.0 |
89.7 |
90.9 |
92.1 |
0.18 |
0.31 |
0.81 |
BK16725 |
SGRC1278 |
1.04 |
0.74 |
38.7 |
90.1 |
90.8 |
92.6 |
93.2 |
0.05 |
0.20 |
0.51 |
BK16726 |
SGRC1297 |
2.83 |
2.33 |
24.4 |
85.0 |
86.6 |
88.1 |
89.3 |
0.25 |
0.31 |
0.80 |
BK16727 |
SGDD089 |
15.9 |
14.6 |
67.4 |
94.1 |
94.9 |
96.0 |
97.4 |
0.38 |
0.22 |
0.53 |
BK16728 |
SGRC1300 |
5.63 |
5.02 |
49.2 |
90.1 |
93.7 |
94.9 |
95.8 |
0.21 |
0.26 |
0.59 |
BK16729 |
SGRC1296 |
5.78 |
3.91 |
43.1 |
93.3 |
94.5 |
95.2 |
95.6 |
0.17 |
0.29 |
0.73 |
BK16730 |
SGRC1285 |
2.27 |
1.73 |
28.7 |
86.2 |
88.1 |
89.7 |
90.7 |
0.16 |
0.26 |
0.75 |
BK16731 |
SGRC1306 |
3.32 |
3.00 |
48.4 |
94.4 |
95.0 |
96.8 |
96.8 |
0.10 |
0.22 |
0.62 |
The Sunbird variability testwork shows an average
gravity gold recovery of 40.6 %. However, one of the composites (BK16727) yielded a 67.4 % gravity gold recovery which increased the average
significantly. Without BK16727, the average would be only 36.8 %. Gravity gold recovery at full-scale tends to be about 25 % less than
the testwork results, hence, no impact to the existing gravity circuit design is expected.
The Sunbird overall gold recovery averaged 93
% at the end of 24-hour leach period. This is similar to the design recovery of 95 %, which was based on Antenna variability testwork
results only at the time. Sunbird mineralized material would likely be blended with other ore, hence, the existing 95 % gold recovery
in the plant design criteria still holds.
The average cyanide consumption was 0.26 kg/t
from the variability testwork; however, the measurement was completed after 48 hours of leaching. Since the targeted leach residence time
is only 24 hours, the cyanide consumption in full-scale should be less, hence no impact to the existing cyanide consumption in the plant
design criteria is expected.
The average lime consumption was 0.66 kg/t from
the variability testwork, however the measurement for lime consumption was completed after 48 hours of leaching. Since the targeted leach
residence time is
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
only 24 hours, the lime consumption in full-scale
should be less, hence, no impact is expected to the existing lime consumption rate in the plant design criteria.
| 13.6 | ALS Metallurgy Update Testwork Program – Sunbird (A23013) |
ALS Metallurgy conducted a defined program of
metallurgical testwork on various samples from the Sunbird deposit.
Testwork was conducted between April and
June 2023, and included the following:
| · | Composite generation and sample preparation |
| · | Comminution testwork, including: |
| · | Grind establishment testwork. |
| · | Gravity gold recovery and cyanide leach testwork. |
| 13.6.1 | Comminution Testwork Samples |
Roxgold Sango selected drill samples from twenty-five
drill holes for the A24535 metallurgical testwork program to confirm the characteristics and of the Sunbird deposit, as a follow up from
testwork program A23013 completed between November 2021 and February 2022.
A total of 32 quarter core and RC chip samples
were received and combined to generate the Master Composite.
| 13.6.3 | Variability Composite |
A total of 67 quarter core and RC chip samples
were received and combined to generate 10 variability composites.
| 13.6.4 | Unconfined Compressive Strength |
Five samples were provided for UCS determination.
The UCS results classified the Sunbird mineralized
material as weak to medium strength characteristics.
| 13.6.5 | Bond Impact Crushing Work Index |
Ten individual samples were selected and prepared
for Bond CWi determination. All samples were cut to ensure they were in the size range -76 +51 mm. The CWi was determined using an Impact
Crushability Test Unit. A summary of results is presented in Table 57.
| Table 57: | Summary of Sunbird Bond impact CWi results |
Composite ID |
No. of Specimens
Tested |
Average |
Maximum |
Minimum |
Standard
Deviation |
Sunbird |
10 |
17.0 |
22.3 |
9.25 |
4.85 |
The results are indicative of a material with
moderate hardness.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.6.6 | Bond Rod Mill Work Index |
Ten half core composites were combined and control-crushed
to 100 % passing 12.7 mm. The crushed sample was thoroughly homogenized, and sub-sample of the crushed material submitted for Bond RWi
determination at a closing screen size of 1,180 μm. A summary of results is presented in Table 58.
| Table 58: | Summary of Sunbird Bond RWi results |
Composite ID |
F80 |
P80 |
Grp (g/rev) |
Test Aperture
Pi (μm) |
Bond RWi
(kWh/t) |
Sunbird |
9,692 |
834 |
4.752 |
1180 |
20.7 |
The results are indicative of a material with
moderate to high hardness.
| 13.6.7 | Bond Ball Mill Work Index |
Twelve quarter core samples were combined and
control-crushed to -3.35 mm and tested to determine the Bond BWi. A closing screen size of 106 μm was used. A summary of results is
presented in Table 59.
| Table 59: | Summary of Sunbird Bond BWi results |
Composite ID |
F80 |
P80 |
Grp (g/rev) |
Test Aperture
Pi (μm) |
Bond RWi
(kWh/t) |
Sunbird |
2,411 |
70 |
1.326 |
106 |
13.5 |
The results are indicative of a material with
moderate to high hardness.
Results for the head assays of the composite samples
taken at Sunbird are presented in Table 60.
| Table 60: | Summary of Sunbird
head assays |
Composite
ID |
Au-1
(g/t) |
Au-2
(g/t) |
Au -3
(g/t) |
Au
(ave) |
CTOTAL
(%) |
CORGANIC
(%) |
Fe (%) |
STOTAL
(%) |
SSULPHIDE |
SiO2 (%) |
VC1 |
0.99 |
0.66 |
0.73 |
0.79 |
2.10 |
0.06 |
5.70 |
0.24 |
0.14 |
53.0 |
VC2 |
1.62 |
1.34 |
1.52 |
1.49 |
0.03 |
0.06 |
9.48 |
<0.02 |
<0.02 |
55.4 |
VC3 |
4.44 |
4.04 |
3.97 |
4.15 |
2.34 |
0.06 |
6.56 |
1.00 |
0.88 |
51.6 |
VC4 |
3.94 |
4.10 |
3.99 |
4.01 |
2.88 |
0.06 |
7.06 |
1.26 |
1.06 |
45.4 |
VC5 |
1.04 |
0.96 |
1.30 |
1.10 |
1.41 |
0.06 |
4.78 |
0.56 |
0.36 |
69.4 |
VC6 |
3.21 |
3.09 |
3.05 |
3.12 |
2.31 |
0.06 |
7.12 |
0.90 |
0.68 |
51.6 |
VC7 |
3.09 |
2.50 |
2.67 |
2.75 |
2.55 |
0.06 |
6.82 |
0.88 |
0.68 |
48.2 |
VC8 |
5.62 |
5.83 |
5.43 |
5.63 |
0.03 |
0.06 |
8.20 |
<0.02 |
<0.02 |
58.8 |
VC9 |
11.1 |
11.1 |
12.4 |
11.9 |
1.65 |
0.06 |
4.92 |
0.30 |
0.22 |
57.2 |
C10 |
4.21 |
4.65 |
4.40 |
4.42 |
1.89 |
0.06 |
5.68 |
0.84 |
0.72 |
57.4 |
Master |
3.30 |
3.92 |
3.40 |
3.54 |
2.25 |
0.06 |
6.52 |
1.02 |
0.72 |
53.6 |
Variability in the triplicate gold assays usually
indicates the presence of coarse gold, which appears to be the case for most samples. Negligible organic carbon suggests the samples are
unlikely to exhibit preg-robbing behavior during cyanide leaching. Most samples contain moderate levels of sulfides.
| 13.6.9 | Gravity/Cyanide Leach Testwork |
For the Master Composite, three different tests
were completed:
| · | Direct whole-ore cyanide leach (no gravity gold
recovery). |
| · | Gravity gold recovery, followed by cyanide leaching
(with oxygen sparging throughout). |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| · | Gravity gold recovery, followed by cyanide leaching
(with oxygen sparging for 6 hours). |
The objectives of the tests were to determine:
| · | Impact of grind size on gold extraction. |
| · | The presence of gravity-recoverable-gold, and
the impact on overall gold recovery if gravity gold is recovered prior to leaching. |
Variability composites were submitted for testing
to determine gold recovery via gravity and cyanide leaching (Table 61).
| Table 61: | Sunbird master composites gravity/cyanide leach test
results |
|
Au Head Grade (g/t) |
Au Extraction (%) |
Au Tail |
Reagents (kg/t) |
Test No
|
Assay |
Calc’d |
Grav |
2-hr |
8-hr |
24-hr |
48-hr |
Grade (g/t) |
NaCN |
Lime |
BK19274 |
3.54 |
3.39 |
- |
54.2 |
89.0 |
93.9 |
94.4 |
0.19 |
0.21 |
0.46 |
BK19277 |
3.54 |
3.64 |
40.4 |
90.1 |
94.1 |
94.9 |
95.6 |
0.16 |
0.12 |
0.35 |
BK19278 |
3.54 |
3.58 |
29.9 |
87.5 |
91.6 |
94.2 |
94.7 |
0.19 |
0.16 |
0.43 |
For all composites, gravity/leach tests were conducted
at P80 75 μm.
Results show that removal of gravity gold prior
to leaching significantly improves leach kinetics. Despite this, overall recovery after 24 hour of leaching was almost identical for all
three tests.
Results for the variability composites gravity/cyanide
leach tests at Sunbird are presented in Table 62.
| Table 62: | Sunbird variability composites gravity/cyanide leach
test results |
|
Au Head Grade (g/t) |
Au Extraction (%) |
Au Tail |
Reagents (kg/t) |
Test No
(BK-) |
Assay |
Calc’d |
Grav |
2-hr |
8-hr |
24-hr |
48-hr |
Grade (g/t) |
NaCN |
Lime |
19289 |
0.79 |
2.43 |
69.6 |
95.4 |
97.4 |
98.0 |
98.1 |
0.05 |
0.19 |
0.28 |
19290 |
1.49 |
2.17 |
35.7 |
88.3 |
94.1 |
97.0 |
97.5 |
0.06 |
0.16 |
6.41 |
19291 |
4.15 |
4.00 |
36.1 |
89.7 |
92.8 |
94.6 |
94.9 |
0.21 |
0.15 |
0.35 |
19292 |
4.01 |
3.50 |
15.8 |
87.8 |
92.4 |
92.4 |
93.7 |
0.22 |
0.26 |
0.70 |
19293 |
1.10 |
1.18 |
38.3 |
85.5 |
92.9 |
94.1 |
94.9 |
0.06 |
0.19 |
0.24 |
19294 |
3.12 |
2.59 |
39.0 |
86.1 |
92.5 |
93.9 |
95.0 |
0.13 |
0.14 |
0.36 |
19295 |
2.75 |
4.14 |
54.5 |
89.3 |
94.7 |
95.6 |
96.0 |
0.17 |
0.15 |
0.31 |
19296 |
5.63 |
5.69 |
26.6 |
85.4 |
90.0 |
94.6 |
95.3 |
0.27 |
0.14 |
4.47 |
19297 |
11.9 |
6.27 |
60.5 |
91.8 |
95.6 |
97.1 |
97.5 |
0.16 |
0.14 |
0.26 |
19298 |
4.42 |
4.87 |
19.9 |
78.7 |
87.7 |
87.9 |
89.9 |
0.49 |
0.14 |
0.25 |
Overall gold extraction was generally very high,
above 93.7 %, with only one exception at 89.9 %. Gravity gold was also high for most composites, between 27–70 %. Cyanide and lime
consumption was generally low except for two instances.
The large disparity between calculated and assayed
head grades is most likely attributed to high coarse gold content.
Test work completed for Sunbird confirmed that
the mineralized material characteristics were similar to the other deposits.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.7 | Miscellaneous Testwork – Oxygen Sparging Requirement |
A summary of the oxygen uptake rate testwork for
the master composite is presented in Table 63 for the A21707 program.
| Table 63: | Oxygen uptake rate testwork for master composite (A21707
program) |
Time (hours) |
Oxygen Uptake Rate* (mg/L/min) |
Test 1 (NaCN = Nil) |
Test 2 (NaCN = 500 ppm) |
0** |
-0.1637 |
-0.0727 |
1 |
-0.1734 |
-0.0736 |
2 |
-0.1432 |
-0.0405 |
3 |
-0.1493 |
-0.0323 |
4 |
-0.1548 |
-0.0175 |
5 |
-0.146 |
-0.0261 |
6 |
-0.1451 |
-0.0379 |
24 |
-0.0691 |
0.0065 |
*Ambient temperature
** Baseline data prior to aeration
Test 2 had a significantly lower oxygen uptake
rate than Test 1 due to the presence of cyanide. The reactive species that were being oxidized in the pre-oxidation stage were possibly
already oxidized by the cyanide, hence, their demand for oxygen could significantly be reduced.
Table 64 presents the gravity/leach testwork results
from the A21707 program.
| Table 64: | Gravity/Cyanide leach testwork for master composite
(A21707 program) |
Test ID |
Test
Description |
Au Head
Grade (g/t) |
Au Extraction (%) |
Tail Au
Grade
(g/t) |
Reagents
(kg/t) |
Assay |
Calc |
Grav |
2hr |
4hr |
8hr |
24hr |
36hr |
NaCN |
Lime |
BK14631 |
Bottle-roll, Continuous
O2 Sparging |
2.31 |
2.15 |
30.0 |
75.9 |
86.5 |
89.6 |
93.8 |
94.6 |
0.12 |
0.07 |
0.58 |
BK14632 |
Vat Leach,
15ppm DO |
2.31 |
2.11 |
30.6 |
79.9 |
83.2 |
87.4 |
91.0 |
91.0 |
0.19 |
0.26 |
0.63 |
BK14633 |
Vat Leach, 15ppm DO First 3 hrs |
2.31 |
2.16 |
29.8 |
80.3 |
88.0 |
87.6 |
92.4 |
93.3 |
0.15 |
0.24 |
0.63 |
BK14635 |
Vat Leach, 3- hr Pre-ox |
2.31 |
2.30 |
28.0 |
75.8 |
85.6 |
87.7 |
88.6 |
93.0 |
0.16 |
0.43 |
0.49 |
The lowest tail grade and cyanide consumption
were achieved for BK14631, which was the bottle-roll test with constant oxygen-sparging. Historically, bottle-roll tests have had consistently
lower cyanide consumption than vat leach tests. Out of the three vat leach tests, BK14633 performed best with just oxygen sparging during
the first three hours of leaching. Based on the results, a pre-oxidation step was not required for the Séguéla Mine.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 13.8 | Recovery Equations for Mine Modelling |
All
of the Antenna test results for both the PEA and feasibility study programs were used to derive an empirical correlation between the residue
grade and head grade, which was then used to formulate a recovery equation. Figure 53 shows the plot of the residue versus head grades.
Figure 53: Residue gold grade
versus head grade for Antenna tests (ALS, 2020)
Of the 53 tests conducted on Master Composite
and variability samples, five tests were excluded as those were performed at grinds that differed from the selected optimum to test the
effect of liberation on gold extraction. The results for VC1 and VC2 were also excluded as the residue grades for these two samples were
significantly above the expected values and they also had head grades that far exceeded the projected LOMP grade and were therefore considered
outliers. The remaining 46 test results were included in Figure 53.
The correlation coefficient was poor, but it was
similar for a linear and exponential trendline so the poor R2 is due to regular variability in the data and not due to the choice of empirical
equation. The correlation between residue and head grade is thus:
| · | Residue Grade = 0.0572 * Head Grade0.906 |
From this the recovery equation can be formulated
as:
| · | Recovery = 100-100*(0.0572*HG-0.094) |
This recovery represents extraction, through gravity
concentration followed by cyanidation, from the ground mineralization only, and does not include other losses such as the dissolved gold
loss in the CIL tails stream or gold adsorbed onto carbon fines.
This equation yields a residue grade of 0.141
g/t Au at the feasibility study LOMP head grade of 2.8 g/t Au, which equates to an extraction of 94.8 %. Deducting losses of 0.3 % (0.008
g/t), the overall forecast gold recovery decreases to 94.5 % at this grade.
| 13.9 | Process Design Criteria |
Based on the testwork completed, a flowsheet featuring
single stage semi-autogenous grinding (SAG) followed by gravity concentration and cyanidation of the gravity tailings was adopted.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The conventional six-stage CIL is preceded by
a pre-leach stage. All tanks are injected with oxygen via the agitator down shaft. The pre-leach stage allows adsorption to proceed from
a higher initial solution gold concentration, which improves adsorption efficiency and limits gold lock-up on the carbon inventory. It
also ensures that there is very little additional leaching occurring in the final CIL stage, which allows a lower dissolved gold loss
in the plant tailings stream.
Process design criteria adopted or derived from
the testwork are tabulated in Table 65.
| Table 65: | Process design criteria |
Criterion |
Units |
Average |
Design |
CWi |
kWh/t |
10.1 |
19.3 |
Axb 1 |
- |
32.3 |
30.6 |
Specific Gravity |
- |
2.82 |
Bond Ball Mill Work Index1 |
kWh/t |
19.7 |
20.7 |
Abrasion Index |
- |
0.42 |
Grind
P80 |
µm |
75 |
Bond Rod Mill Work Index |
kWh/t |
21.8 |
22.7 |
Gravity Gold Recovery (Testwork) |
% |
38.6 |
Gravity Gold Recovery (Full-Scale)2 |
% |
29.0 |
40 |
Sedimentation flux |
t/(m2.h) |
1.0 |
Flocculant Consumption |
g/t |
20 |
60 |
Cyanidation Duration |
h |
24 |
Cyanidation Density |
% w/w solids |
50 |
Leach Cyanide Strength (Initial) |
g/L |
0.5 |
Leach NaCN Consumption3 |
kg/t |
0.12 |
0.17 |
Leach CaO Consumption3 |
kg/t |
0.41 |
0.57 |
Fleming kinetic constant (k) |
1/h |
104 |
Fleming parameter (n) |
- |
0.718 |
Notes:
| · | OMC used highest of five test results due to low number of data points |
| · | Full-scale plant gravity gold recovery discounted by 25 % from test results |
| · | A 40 % design allowance applied to average consumptions to allow for peak fluctuations. Based on 76 % CaO lime used during testwork |
| 13.10 | Comments on Section 13 |
It is the opinion of the QP that metallurgical
testwork is representative of the material planned to be processed in the LOMP, including material expected to be sourced from the Antenna,
Ancien, Koula, Agouti, Boulder and Sunbird open pit mining operations. Recoveries experienced during the commissioning and ramp up stage
of the process plant fed by mineralized material extracted from the Antenna deposit supports this opinion.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 14 | Mineral Resource Estimates |
Mineral Resources were estimated for of six deposits,
Antenna, Ancien, Agouti, Boulder, Koula and Sunbird.
The resource estimation methodology included the
following procedures:
| · | Validation of the drilling database. |
| · | Modelling of mineralized wireframes that were
generated based on logged lithology and sample grade values. |
| o | At the Antenna, Koula, Ancien and Sunbird deposits, strings were generated for gold mineralization using
downhole plots of assayed grade at a nominal cut-off grade of 0.2 g/t Au. Geological logging was used to guide lode interpretation. |
| o | At the Agouti and Boulder deposits the mineralization was modelled using the ‘vein’ function
in Leapfrog Geo to create discreet domains for estimation. Mineralization was modelled at a nominal cut-off grade of 0.2 g/t Au. |
| · | Modelling of geological wireframes for host/waste
lithologies. |
| · | Validation of wireframes. |
| · | Data compositing for statistical analysis and
validation. |
| · | Application/review of top cuts based on statistical
analysis. |
| · | Construction of the block model. |
| · | Grade interpolation using ordinary kriging (OK)
and inverse distance weighted (ID) techniques. |
| · | Mineral Resource classification, validation and
reporting. |
| · | Generation of pit shells to constrain the reporting
of Mineral Resources potentially amenable to open pit mining methods. |
| · | Definition and reporting of underground Mineral
Resources based on mineable shape optimizer (MSO). |
The drilling database used to estimate the Mineral
Resources was audited internally by Roxgold Sango and Fortuna personnel. In the opinion of the QP, the current drilling information is
sufficiently reliable to interpret with confidence the boundaries of gold mineralization and that the assay data are sufficiently reliable
to support Mineral Resource estimation.
The models were prepared using all drilling information
available as of June 30, 2023. The Sunbird estimate has changed with available data and the interpretation supporting the estimate
has been updated. The Antenna, Ancien, Agouti, Boulder and Koula deposits have been the subject of limited to no additional drilling information
since the previously published estimates in 2022 and the changes to those estimates are primarily due to application of reasonable prospects
of eventual economic extraction criteria.
Drilling activities remain ongoing at the Séguéla
Mine with a focus early-stage exploration and resource definition drilling of high-priority targets.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Drill hole visualization and 3D modelling of mineralization
for the Antenna, Koula, Ancien and Sunbird deposits were undertaken using Dassault Systemes’ Surpac mining software package. 3D
modelling of host geology units was undertaken in Seequent’s Leapfrog Geo software package. Mineral Resource estimation was conducted
in Datamine’s Studio RM mining software package. Classical and geostatistical analysis of the input data for the purposes of Mineral
Resource estimation was conducted using Snowden’s Supervisor exploratory data analysis software package.
Drill hole visualization and 3D modelling of mineralization
and host geology for the Agouti and Boulder deposits was undertaken using a combination Leapfrog Geo and Micromine. Validation of both
mineralization and geology wireframes, block model creation and Mineral Resource estimation were conducted using Studio RM. Classical
and geostatistical analysis of the input data for the purposes of Mineral Resource estimation was conducted using Supervisor.
| 14.4 | Geological Interpretation |
3D wireframes of the host lithologies, including
the weathering profile and alluvial cover, were generated by Roxgold Sango for all deposits using Leapfrog Geo.
The QP imported these wireframes into Studio RM
and reviewed them against the logged geology from the drill hole database. Wireframes were validated to ensure their “solidity”
and to enable their use in subsequent Mineral Resource modelling. In all cases, the wireframes were found to be suitably representative
of the deposit stratigraphy.
Typical cross-sections showing logged and
modelled geology is provided for the Antenna (Figure 54), Ancien (Figure 55), Koula (Figure 56), Agouti (Figure 57), Boulder
(Figure 58) and Sunbird (Figure 59) deposits. These wireframes once validated, were used in Mineral Resource estimation.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 54: Geology cross-section
894550 mN, Antenna deposit (±25 m)
Figure 55: Geology cross-section
888445 mN, Ancien deposit (±12.5 m)
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 56: Geology cross-section
895395 mN, Koula deposit (±12.5 m)
Figure 57: Geology cross-section
896425 mN, Agouti deposit (±12.5 m)
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 58: Geology cross-section
893980mN, Boulder deposit (±12.5 m)
Figure 59: Geology cross-section
892880 mN, Sunbird deposit (±12.5 m)
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 14.5 | Preparation of Mineralization Wireframes |
| 14.5.1 | Antenna, Ancien, Koula and Sunbird Deposits |
Strings were generated for the Antenna, Ancien,
Koula and Sunbird deposits using downhole assay data to enclose mineralized envelopes at a nominal cut-off grade of 0.2 ppm Au. Minimum
downhole thicknesses required for inclusion were set at a nominal 2 m, with maximum internal dilution also set at 2 m. Three dimensional
solid wireframes were then constructed, imported into Studio RM, and validated to ensure that where the wireframes were intersected by
a drill hole, the solids were “snapped” to the corresponding assay intervals. Figure 60 to Figure 65 show the interpreted
mineralization wireframes.
Figure 60: Mineralization wireframes
– Antenna deposit
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 61: Mineralization wireframes
– Ancien deposit
Figure 62: Mineralization wireframes
– Koula deposit
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 63: Mineralization wireframes
– Sunbird deposit
| 14.5.2 | Agouti and Boulder Deposits |
Mineralized domains for the Agouti and Boulder
deposits were modelled using the ‘vein’ function in Leapfrog Geo. Modelling at the satellite deposits used a nominal cut-off
grade of 0.2 g/t Au to define mineralization volumes. Minimum downhole thicknesses required for inclusion were typically set at a nominal
2 m, with maximum internal dilution also set at 2 m. Modelled domains were imported into Studio RM, validated to ensure volume integrity,
and that wireframes were snapped to drilling.
Interpreted mineralization wireframes for the
Agouti and Boulder deposits are presented in Figure 64 and Figure 65.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 64: Mineralization wireframes
– Agouti deposit
Figure 65: Mineralization wireframes
– Boulder deposit
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The topographic surface used at the Antenna, Koula,
Ancien and Sunbird deposits is based collectively on LiDAR drone surveys conducted by qualified surveyors. Extracts of the complete Project
topographic survey are taken to cover each of the relevant deposits Mineral Resource estimation purposes. Topographic surfaces used for
the Agouti and Boulder deposit modelling are based upon shuttle radar topography mission (SRTM) data at full resolution.
Modelled weathering surfaces below the respective
topographic surfaces were used to flag the oxide states in the deposit block models. Modelled surfaces were based on recorded geological
logs with intersection points digitized to the base of the corresponding interval that informed the 3DM surface. The regolith profile
typically comprised transported overburden, oxide material (upper and lower saprolites), transitional material (saprolite rock) and fresh
rock. The Mineral Resources were reported inclusive of oxide material, with adjustments made for the lower densities of this material.
Prior to estimation, input data were statistically
spatial reviewed for gold distribution and continuity.
The histograms and log-probability plots modelled
did not indicate any clear evidence for mixed populations. Consequently, a nominal 0.2 g/t Au cut-off grade was used to define the mineralization
solids as described in Section 14.5, in combination with the logged and modelled lithology, using the QPs experience with similar
deposits, and a visual appraisal of the spatial continuity of the data at varying grade cut-offs.
Solid wireframes for each mineralized envelope
were used to select drill hole samples. Samples were then selected for individual mineralized envelopes and flagged for each mineralization
zone.
Drill holes were typically sampled at 1 m intervals
regardless of drilling technique. Samples were not shortened or truncated at geological boundaries. With the exception of a limited number
of end-of-hole samples that were very short, >99 % of the samples for the respective deposits were 1 m in length. Consequently, all
input data was composited to 1 m.
| 14.11 | Geostatistical Analysis |
The geometry, orientation and summary statistics
of each deposit were reviewed.
Mineralization at Antenna is primarily contained
with anastomosing, interlinked vein networks, hosted within brittle-ductile shear structures within rhyolite. Subordinate to this is shear/vein
mineralization that occurs along the hanging wall contact between the volcaniclastic units and the hanging wall basaltic lithologies.
These spatial domains were grouped together on the basis of their geometry, and the common petrogenetic framework and proposed mineralization
timing.
The mineralization at Agouti forms four mineralized
trends that are informally termed the Eastern, Central, Western and Southern (refer to Figure 64) zones. The main area of mineralization
is the eastern trend. Domains separated into three distinct zones from south to the north. Interpreted cross faults disrupt the domains.
The domain grouping is based on spatial location and orientation.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The mineralization at Boulder forms two zones
(Figure 65), which are separated along strike.
Mineralization at Ancien and Koula is primarily
hosted within network vein systems developed in shear bands in basaltic lithologies.
Mineralization at Sunbird is contained within
vein networks that follow shear zones within the basaltic host lithologies. However, a secondary control over mineralization at Sunbird
is also recognized, with mineralization hosted in a unit of tholeiitic basalt. The local shear zone strike orientation transects this
tholeiitic basalt at a low angle, and gently southerly-plunging high-grade mineralized shoots are observed within Sunbird corresponding
to the intersection between the tholeiite and shear zone.
| 14.11.2 | Global Summary Statistics |
Antenna Deposit
Basic summary statistics for the gold grades at
the Antenna deposit are presented in Table 66 and shown in Figure 66.
| Table 66: | Summary statistics by estimation domain – Antenna
deposit |
Statistic |
Value |
Number |
4,614 |
Minimum |
0.00 |
Maximum |
123.50 |
Mean |
2.69 |
Median |
0.96 |
Standard deviation |
5.84 |
Coefficient of variation |
2.17 |
Figure 66: Main Domain histogram
and log-probability plot – Antenna deposit
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Ancien Deposit
Basic summary statistics for the gold grades in
each domain of the Ancien deposit are presented in Table 67 and shown in Figure 67.
| Table 67: | Summary statistics by estimation domain – Ancien
deposit |
Statistic |
Value |
Number |
1,992 |
Minimum |
0.00 |
Maximum |
216.00 |
Mean |
4.00 |
Median |
0.62 |
Standard deviation |
12.79 |
Coefficient of variation |
3.20 |
Figure 67: Histogram and log-probability
plot – Ancien deposit
Agouti Deposit
Basic summary statistics for the gold grades in
each domain of the Agouti deposit are presented in Table 68 and Figure 68.
| Table 68: | Summary statistics by estimation domain – Agouti
deposit |
Statistic |
Eastern Trend
(4-24) |
Central Trend
(25-29) |
Western Trend
(32-43) |
Combined |
Number |
1,735 |
332 |
419 |
2,486 |
Minimum |
0.00 |
0.00 |
0.00 |
0.00 |
Maximum |
173.5 |
88.00 |
38.3 |
173.50 |
Mean |
1.69 |
1.99 |
1.97 |
1.78 |
Median |
0.37 |
0.38 |
0.72 |
0.42 |
Standard deviation |
7.48 |
7.98 |
3.76 |
7.07 |
Coefficient of variation |
4.43 |
4.00 |
1.91 |
3.98 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 68: Histogram and log-probability
plot - Agouti deposit
Boulder Deposit
Basic summary statistics for the gold grades in
each domain of the Boulder deposit are presented in Table 69 and shown in Figure 69.
| Table 69: | Summary statistics by estimation domain – Boulder
deposit |
Statistic |
Boulder LG
(101-109) |
Boulder HG
(111-117) |
Bouti LG
(201-215) |
Bouti HG
(211-216) |
Combined |
Number |
4,354 |
431 |
2,165 |
339 |
7,289 |
Minimum |
0.00 |
0.01 |
0.00 |
0.08 |
0.00 |
Maximum |
61.28 |
106.10 |
10.27 |
20.10 |
106.10 |
Mean |
0.40 |
3.89 |
0.22 |
1.33 |
0.60 |
Median |
0.22 |
1.43 |
0.13 |
0.79 |
0.22 |
Standard deviation |
1.25 |
10.0 |
0.38 |
2.06 |
2.80 |
Coefficient of variation |
3.10 |
2.58 |
1.72 |
1.54 |
4.70 |
Figure 69: Histogram and log-probability
plot – Boulder deposit
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Koula Deposit
Basic summary statistics for gold grades within
each estimated domain of the Koula deposit are presented in Table 70 and shown in Figure 70.
| Table 70: | Summary statistics by estimation domain – Koula
deposit |
Statistic |
Value |
Number |
1,674 |
Minimum |
0.01 |
Maximum |
336.00 |
Mean |
7.58 |
Median |
1.24 |
Standard deviation |
22.30 |
Coefficient of variation |
2.94 |
Figure 70: Histogram and log-probability
plot – Koula deposit
Sunbird Deposit
Basic summary statistics for gold grades within
the estimation domains of the Sunbird deposit are presented in Table 71 and shown in Figure 71.
| Table 71: | Summary statistics by estimation domain – Sunbird
deposit |
Statistic |
Value |
Number |
4,524 |
Minimum |
0.00 |
Maximum |
160 |
Mean |
2.54 |
Median |
0.39 |
Standard deviation |
8.50 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 71: Histogram and log-probability
plot - Sunbird deposit
| 14.12 | Treatment of Outliers (Top-Cut Selection) |
Top-cuts were selected following statistical review
of the sample population using histograms and log-probability plots. The cutting strategy was applied based on the following:
| · | Effect on cumulative probability plot distribution |
| · | Spatial position of extreme grades. |
Grades above the selected cut were set to the
cut value. The applied top-cuts on a per-mineralization solid basis are detailed in Table 72.
| Table 72: | Top-cuts applied for the Séguéla Gold
Mine Mineral Resource estimation by mineralized domain |
Deposit |
Domain |
Top-cut (g/t Au) |
Sunbird |
101 |
56 |
102 |
24 |
103 |
82 |
104 |
5 |
105 |
100 |
106 |
6 |
107 |
1.5 |
108 |
20 |
109 |
7.5 |
110 |
2.2 |
111 |
1.2 |
112 |
2 |
113 |
6.7 |
Agouti |
1 |
4 |
2 |
1 |
3 |
1.4 |
4 |
50 |
5 |
25 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Deposit |
Domain |
Top-cut (g/t Au) |
|
6 |
3 |
7 |
0.35 |
8 |
1.15 |
9 |
2 |
10 |
27 |
11 |
1.7 |
12 |
2.5 |
13 |
1.5 |
14 |
9 |
15 |
30 |
16 |
13 |
17 |
1.7 |
18 |
1.5 |
19 |
6 |
20 |
9 |
21 |
2.9 |
22 |
3 |
23 |
0.8 |
24 |
6.5 |
25 |
45 |
26 |
1.35 |
27 |
1.05 |
28 |
1.5 |
29 |
0.75 |
32 |
7.5 |
33 |
12 |
34 |
6.7 |
35 |
6.5 |
36 |
- |
37 |
1.3 |
38 |
3.2 |
39 |
1 |
40 |
1.6 |
41 |
- |
42 |
1.25 |
|
43 |
1.09 |
Ancien |
1 |
100 |
2 |
4.6 |
3 |
4 |
Boulder |
101 |
8 |
102 |
1.7 |
103 |
7 |
104 |
6 |
105 |
2.6 |
106 |
1.4 |
107 |
2 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Deposit |
Domain |
Top-cut (g/t Au) |
|
108 |
0.9 |
109 |
2.25 |
111 |
4 |
112 |
21 |
113 |
30 |
114 |
25 |
115 |
50 |
116 |
30 |
117 |
8.5 |
201 |
3 |
202 |
0.8 |
203 |
0.5 |
204 |
0.7 |
205 |
- |
211 |
11 |
212 |
4 |
213 |
2.6 |
214 |
6 |
215 |
6 |
216 |
3.5 |
Antenna |
101 |
13.5 |
102 |
13.5 |
103 |
40 |
104 |
10 |
105 |
11 |
106 |
10 |
107 |
2.5 |
108 |
3 |
Koula |
101 |
112 |
102 |
4 |
103 |
20 |
Exploratory data analysis and assessment of spatial
continuity for the relevant the input data of each deposit was conducted using Supervisor. Spatially congruent domains in each deposit
were grouped, and experimental semi-variograms were constructed accounting for observed anisotropy in each of the three principal continuity
directions identified within the data. Model semi-variograms were fitted to the experimental results.
In general, the spatial continuity was adequately
described by a nugget component, and two spherical components for the semi-variogram models. The modelled semi-variograms were used in
subsequent quantitative kriging neighborhood analysis for search parameter optimization, and for Mineral Resource estimation. The semi-variogram
model parameters used for each deposit are presented, along with relevant estimation domains, in Table 73.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| Table 73: | Estimation and search parameters for estimation domains |
Deposit |
Domain |
Min.
Samp. |
Max.
Samp. |
Major
Dist. |
Semi Major
Dist. |
Minor
Dist. |
RM Rotations |
c0 |
c1 |
Ranges (m) |
c2 |
Ranges (m) |
Z |
X |
Z |
Sunbird |
all |
4 |
16 |
65 |
45 |
10 |
100 |
90 |
-10 |
0.432 |
0.424 |
33,16,2 |
0.145 |
74,57,11 |
Koula |
all |
4 |
24 |
42 |
24 |
4 |
115 |
95 |
-40 |
0.606 |
0.324 |
42,24,2 |
0.069 |
204,50,10 |
Ancien |
all |
4 |
24 |
60 |
24 |
7 |
105 |
65 |
-55 |
0.405 |
0.443 |
24,5,2 |
0.152 |
99,20,6 |
Antenna |
all |
4 |
20 |
70 |
33 |
13 |
100 |
75 |
-45 |
0.481 |
0.279 |
25,21,7 |
0.24 |
77,53,18 |
105 |
4 |
20 |
70 |
33 |
13 |
100 |
75 |
-45 |
0.481 |
0.279 |
25,21,7 |
0.24 |
77,53,18 |
Agouti |
1, 15, 22, 24 |
6 |
22 |
35 |
14 |
9 |
105 |
70 |
0 |
0.428 |
0.507 |
27,26,3 |
0.065 |
78,30,10 |
2, 16, 19 |
6 |
24 |
27 |
13 |
5 |
110 |
85 |
-55 |
0.627 |
0.283 |
92,30,6 |
0.09 |
124,39,16 |
3, 14, 18, 20, 21 |
6 |
24 |
22 |
8 |
4 |
85 |
70 |
-160 |
0.293 |
0.592 |
32,15,5 |
0.116 |
66,22,11 |
4 to 7 |
6 |
30 |
100 |
20 |
6 |
100 |
85 |
-150 |
0.331 |
0.378 |
107,2,6 |
0.291 |
168,16,15 |
8, 9 |
6 |
26 |
35 |
35 |
6 |
110 |
90 |
60 |
0.399 |
0.266 |
47,73,4 |
0.335 |
109,119,9 |
10 |
6 |
26 |
23 |
15 |
5 |
30 |
35 |
65 |
0.614 |
0.249 |
45,30,7 |
0.137 |
70,45,16 |
11 |
6 |
30 |
100 |
20 |
6 |
100 |
85 |
-150 |
0.331 |
0.378 |
107,2,6 |
0.291 |
168,16,15 |
12 to 13 |
6 |
26 |
35 |
35 |
6 |
110 |
90 |
60 |
0.399 |
0.266 |
47,73,4 |
0.335 |
109,119,9 |
17 |
6 |
20 |
35 |
15 |
8 |
105 |
60 |
180 |
0.405 |
0.257 |
61,27,15 |
0.338 |
79,34,18 |
23 |
2 |
4 |
30 |
30 |
30 |
100 |
110 |
0 |
0.401 |
0.599 |
20,20,20 |
- |
- |
15, 26, 27, 28, 29 |
6 |
22 |
50 |
12 |
4 |
90 |
90 |
0 |
0.428 |
0.507 |
108,35,4 |
0.065 |
145,36,7 |
30 to 31 |
4 |
8 |
60 |
12 |
5 |
100 |
85 |
-150 |
0.331 |
0.378 |
107,2,6 |
0.291 |
168,16,15 |
32 to 43 |
6 |
20 |
40 |
26 |
7 |
100 |
90 |
-115 |
0.528 |
0.268 |
67,32,10 |
0.203 |
122,78,20 |
Boulder |
101 |
4 |
20 |
35 |
31 |
11 |
140 |
45 |
-20 |
0.393 |
0.478 |
35,30,10 |
0.129 |
160,75,45 |
102 |
4 |
20 |
45 |
26 |
10 |
130 |
70 |
130 |
0.335 |
0.32 |
45,25,10 |
0.345 |
90,65,30 |
103 |
4 |
20 |
50 |
35 |
10 |
120 |
30 |
60 |
0.447 |
0.375 |
50,35,10 |
0.178 |
90,70,20 |
104 |
4 |
20 |
50 |
35 |
10 |
105 |
25 |
45 |
ID Estimation |
105 |
4 |
20 |
30 |
30 |
10 |
155 |
35 |
50 |
0.348 |
0.522 |
25,25,10 |
0.13 |
75,60,25 |
106 |
4 |
20 |
50 |
35 |
10 |
-40 |
135 |
50 |
ID Estimation |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Deposit |
Domain |
Min.
Samp. |
Max.
Samp. |
Major
Dist. |
Semi Major
Dist. |
Minor
Dist. |
RM Rotations |
c0 |
c1 |
Ranges (m) |
c2 |
Ranges (m) |
Z |
X |
Z |
|
107 |
4 |
20 |
60 |
45 |
15 |
140 |
70 |
160 |
0.333 |
0.269 |
60,45,15 |
0.398 |
160,90,30 |
108 |
Assigned average grade |
109 |
4 |
20 |
50 |
35 |
10 |
130 |
55 |
50 |
ID Estimation |
111 |
4 |
20 |
50 |
35 |
10 |
115 |
45 |
140 |
ID Estimation |
112 |
4 |
20 |
50 |
35 |
10 |
135 |
65 |
130 |
ID Estimation |
113 |
4 |
20 |
30 |
21 |
10 |
130 |
50 |
35 |
0.391 |
0.322 |
30,20,10 |
0.287 |
60,40,20 |
114 |
4 |
20 |
40 |
30 |
8 |
150 |
45 |
75 |
0.301 |
0.453 |
40,30,8 |
0.247 |
80,65,15 |
115 |
4 |
20 |
60 |
35 |
11 |
130 |
45 |
170 |
0.251 |
0.514 |
60,35,10 |
0.235 |
140,60,20 |
116 |
4 |
20 |
35 |
25 |
6 |
130 |
50 |
50 |
0.362 |
0.388 |
35,25,6 |
0.249 |
80,60,15 |
117 |
4 |
20 |
45 |
31 |
9 |
130 |
60 |
20 |
0.231 |
0.579 |
45,30,8 |
0.19 |
125,70,20 |
201 |
4 |
20 |
35 |
31 |
11 |
115 |
65 |
155 |
0.484 |
0.324 |
35,30,10 |
0.192 |
80,55,35 |
202 |
4 |
20 |
50 |
35 |
10 |
125 |
130 |
170 |
ID Estimation |
203 |
Assigned average grade |
204 |
4 |
20 |
50 |
35 |
10 |
120 |
45 |
150 |
ID Estimation |
205 |
Assigned average grade |
211 |
4 |
20 |
35 |
25 |
9 |
130 |
55 |
50 |
0.42 |
0.389 |
35,25,8 |
0.191 |
65,45,15 |
212 |
4 |
20 |
45 |
31 |
9 |
115 |
45 |
30 |
0.462 |
0.467 |
45,30,8 |
0.071 |
85,50,15 |
213 |
4 |
20 |
55 |
31 |
9 |
115 |
50 |
140 |
0.315 |
0.441 |
55,30,8 |
0.244 |
110,65,20 |
214 |
4 |
20 |
50 |
35 |
10 |
115 |
50 |
160 |
ID Estimation |
215 |
4 |
20 |
45 |
36 |
9 |
120 |
50 |
150 |
0.476 |
0.448 |
45,35,8 |
0.076 |
75,50,15 |
216 |
4 |
20 |
50 |
35 |
10 |
105 |
55 |
150 |
ID Estimation |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 14.14 | Quantitative Kriging Neighborhood Analysis |
Search parameters to be used in conjunction with
the modelled semi-variograms were quantitatively optimized for each estimation domain using Supervisor. A selection of potential block
sizes considered appropriate for modelling the individual deposits were first assessed, with the final selection being a parent block
size suitable to the dimensions of the mineralization and informing data density. Parent block sizes are provided in Table 74.
Table 74: Block
model parameters by deposit
Deposit |
Axis |
Extent (m) |
Block size (m) |
Minimum |
Maximum |
Antenna |
Easting |
741480 |
742250 |
5 |
Northing |
893850 |
895800 |
5 |
RL |
100 |
550 |
5 |
Discretization |
3 x 3 x 3 (XYZ) |
Block Model File |
ANT_REGMOD_230818v2_Sep.dm (Studio RM v1.13) |
Ancien |
Easting |
742900 |
743460 |
5 |
Northing |
888200 |
888800 |
5 |
RL |
0 |
410 |
5 |
Discretization |
3 x 3 x 3 (XYZ) |
Block Model File |
ANC_REGMOD_230818v2.dm (Studio RM v1.13) |
Agouti |
Easting |
744000 |
745000 |
2.5 |
Northing |
895700 |
897330 |
5 |
RL |
160 |
480 |
5 |
Discretization |
3 x 3 x 3 (XYZ) |
Block Model File |
AGT_REGMOD_230818v1.dm (Studio RM v1.13) |
Boulder |
Easting |
743070 |
744505 |
3.5 |
Northing |
893600 |
895150 |
5 |
RL |
150 |
550 |
5 |
Discretization |
3 x 3 x 3 (XYZ) |
Block Model File |
bdr_regmod_230820v3.dm (Studio RM v1.13) |
Koula |
Easting |
742320 |
742940 |
5 |
Northing |
894930 |
895870 |
5 |
RL |
-100 |
520 |
5 |
Discretization |
3 x 3 x 3 (XYZ) |
Block Model File |
KOU_REGMOD_230820v2.dm (Studio RM v1.13) |
Sunbird |
Easting |
742435 |
743160 |
5 |
Northing |
892360 |
893780 |
5 |
RL |
30 |
600 |
5 |
Discretization |
3 x 3 x 3 (XYZ) |
Block Model File |
SB_REGMOD_230819v2.dm (Studio RM v1.13) |
Selections for each parameter were made based
on the assessment of maximizing both kriging efficiency and estimate slope of regression statistics, while minimizing the number of negative
kriging weights encountered. Selected parameters for each estimation domain were shown in Table 73.
Block models aligned with the national UTM grid
– WGS84 datum were created to encompass the full extent of the individual deposits. Block model parameters were shown in Table 74.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The mineralized domain wireframes were used as
hard boundaries in grade interpolation. A combination of OK and ID methods (Table 73) was selected for grade interpolation in the mineralized
zones. OK was selected for domains with adequate sample data to inform a variogram. It is considered by the QP to be appropriate for this
style of deposit.
Estimates were performed on a parent block basis
with block discretization (refer to Table 74) selected to provide an equal distribution across the parent block in all directions. The
search radii used a quadrant search method to improve sample selectivity for each estimate.
An oriented “ellipsoid” search was
used to select data for interpolation. Search ellipsoid orientations were based on orientations derived from variogram analysis. Search
ellipsoid parameters were presented in Table 73.
A combination of two to three-pass expanding searches
was used to complete estimation for gold, based on the variogram ranges. Typically, estimate searches used a first pass search radii ranging
from 45–60 m, and second pass search radii ranging from 70–120 m along strike. The minimum number of samples was set to four
or six and the maximum number of samples per drill hole was set to three or five samples for both passes, ensuring data from at least
two drill holes was used to inform the interpolation. An average domain composite grade was used to inform remaining un-estimated blocks
at the Antenna, Ancien, Koula and Sunbird deposits, while a default grade of 0.01 g/t Au was assigned to unestimated blocks at the Agouti
and Boulder deposits. Typically, >85 % of the blocks were estimated consistently in the first two passes, and >99 % of blocks were
populated after three passes.
| 14.17 | Bulk Density Assignment |
Fixed bulk density values were assigned to individual
lithologies based on water immersion measurements of drill core. Density values by lithology are presented in Table 75.
Table 75: Density
values by lithology – Séguéla Gold Mineral Resource estimates
Lithology |
Density Value (g/cm3) |
Antenna |
Ancien |
Agouti |
Boulder |
Koula |
Sunbird |
Basalt (Tholeiitic) |
2.80 |
2.83 |
|
|
3.02 |
2.81 |
Basalt (Pillow) |
2.80 |
- |
2.81 |
2.81 |
3.02 |
2.90 |
Gabbro |
- |
2.94 |
|
|
|
|
Dolerite |
- |
- |
|
|
|
|
Ultramafic |
3.20 |
2.92 |
|
|
|
2.85 |
Felsic / Rhyolite |
2.75 |
2.74 |
2.69 |
2.67 |
|
2.7 |
Volcaniclastics |
- |
- |
|
|
|
|
Transitional |
1.9 |
2.5 |
2.2 |
2.2 |
2.2 |
2.5 |
Oxide |
1.9 |
1.9 |
1.8 |
1.8 |
1.8 |
2.2 |
Overburden |
1.8- |
1.8 |
1.8 |
1.8 |
1.8 |
1.8 |
Core samples varied from 0.1–1 m in length
and encompassed all coherent lithologies encountered. Mineralization was assigned the density of the relevant host lithology.
Tonnage estimates are reported on a dry basis.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Initial validation of the block models was undertaken
using a variety of methods, including: checks for un-estimated mineralization blocks, incorrect or absent assignation of density values,
and mineralized blocks or blocks with density values above topography.
Following these checks, swath plots were generated
along the three principal axes to assess the representivity of estimated grade profiles in comparison to the input composite grades. Swath
plots were generated on a per-mineralization solid basis. Swath plots indicate a suitable level of adherence of the estimated grades to
the expected values observed within the input composite data.
Examples of swath plots for the deposits are presented
in Figure 72 to Figure 77.
Figure 72: Antenna validation
plots
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 73: Ancien validation
plots
Figure 74: Koula validation
plots
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 75: Agouti validation
plots
Figure 76: Boulder validation
plots – Combined domains (101-216)
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 77: Sunbird validation
plots
| 14.19 | Mineral Resource Classification |
The Mineral Resource estimate is reported using
the confidence classifications set out in the 2014 CIM Definition Standards.
| 14.19.1 | Mineral Resource Classification Parameters |
Mineral Resource classification was applied to
each model using classification boundary strings assigned to the block model in a cookie-cutter fashion on a per mineralization lode basis.
Strings define a region of blocks that, on average, met the following criteria:
| · | The Mineral Resource was classified as Indicated
where the majority of blocks were informed in the first pass, the average distance to informing samples was <60 m, drill hole spacing
was <50 m between sections and <40 m on each section, and there were more than two drill holes on each section. |
| | |
| · | The Mineral Resource was classified as Inferred
where drilling had been completed on broader pattern (pierce points generally having a separation of >80 m) and geological continuity
was reasonable. Geological evidence is considered sufficient to imply but not verify geological and grade continuity. |
| | |
| · | No Measured Mineral Resources were classified. |
Figure 78 to Figure 83 present the Mineral Resource
classifications for each of the deposits.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 78: Antenna deposit Mineral
Resource classification
Figure 79: Ancien deposit Mineral
Resource classification
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 80: Koula deposit Mineral
Resource classification
Figure 81: Agouti deposits
Mineral Resource classification
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 82: Boulder deposits
Mineral Resource classification
Figure 83: Sunbird
deposit Mineral Resource classification
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 14.19.2 | Reasonable Prospects for Eventual Economic Extraction |
Mineral Resources were subject to an optimization
process, whereby the in-ground value of each block was calculated using nominated values for: gold price, metal recoveries, mining dilution,
mining costs, processing and selling costs. The gold price provided by Fortuna’s Corporate Finance Department is based on the average
three-year future financial institution projections and five-year trailing gold price with a 15 % upside.
Open Pit
These values were then used to generate a theoretical
open pit via the Lerchs-Grossmann algorithm within Deswik.
Parameters used for the optimization include:
| · | Assumed gold price of $1,840/oz. |
| | |
| · | Processing recovery of 94.5 %. |
| | |
| · | Overall slope angles of 36.8° for oxide material,
44.2° for transitional material and 51° for fresh material except for Sunbird that used slope angles of 36.8° for oxide material,
36.5° for transitional material and 50° for fresh material. |
| | |
| · | Average mining costs of $3.12/t mined. |
| | |
| · | Average total processing costs (including G&A)
of $24.25/t processed. |
| | |
| · | Selling costs which include: |
| | |
| o | Refining costs of $7.00/oz Au with a payability of 99%. |
Underground
Drilling has demonstrated that mineralization
continues at reasonable widths and elevated grades below the defined pits at the Ancien, Koula and Sunbird deposits.
The underground potential below these pits was
tested at these three deposits using the MSO tool within Datamine.
Parameters used for the optimization include:
| · | 2.4 g/t Au cut-off grade based on operational
cost at Fortuna’s Yaramoko Gold Mine, bench-marked against a first principal cost model exercise completed by Roxgold Sango. |
| | |
| · | 1.8 m minimum mining width. |
| | |
| · | 0.6 m dilution applied to both hanging wall and
footwall. |
| | |
| · | Total stope shape minimum mining width of 3.0
m. |
| | |
| · | 20m length stopes along strike and 20 m level
spacing. |
| | |
| · | 10 m minimum mineable stope strike length. |
| 14.20 | Mineral Resource Estimate |
The Mineral Resource estimate for the Antenna,
Ancien, Agouti, Boulder, Koula and Sunbird deposits is reported in Table 76, at varying cutoffs based upon the application of varying
costs during pit shell and stope optimization. Mineral Resources are reported assuming open pit and underground mining methods.
Mineral Resources for Antenna are depleted to
account for mining production conducted up to December 31, 2023. If artisanal mining was known to have taken place, then mineralized
material associated with
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
this activity was excluded from the Mineral Resources
using a cookie cutter approach with a buffer zone to account for potential additional areas not identified by surveys or drilling.
Mineral Resources potentially amenable to underground
mining methods are reported inside MSO shapes that account for operational dilution at the specified minimum mining width of 1.8 m with
0.6 m dilution distributed evenly across the hanging wall and footwall.
Mineral Resources are reported insitu, exclusive
of those Mineral Resources modified to produce Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated
economic viability.
Table
76: Mineral Resource estimate
Indicated Mineral Resources |
COG (g/t Au) |
Tonnes (Mt) |
Au (g/t) |
Au (koz) |
Open pit |
Antenna |
0.55 |
1.33 |
1.32 |
57 |
Agouti |
0.65 |
0.30 |
1.69 |
16 |
Ancien |
0.65 |
0.19 |
2.79 |
17 |
Koula |
0.60 |
0.05 |
5.84 |
10 |
Boulder |
0.60 |
0.43 |
1.13 |
16 |
Sunbird |
0.55 |
0.55 |
1.77 |
31 |
Total |
0.55–0.65 |
2.86 |
1.60 |
147 |
Underground |
Ancien |
2.40 |
0.19 |
3.79 |
23 |
Koula |
2.40 |
0.04 |
4.54 |
7 |
Sunbird |
2.40 |
1.56 |
4.05 |
203 |
Total |
2.40 |
1.80 |
4.03 |
233 |
Total Indicated Mineral Resources |
|
4.66 |
2.54 |
381 |
|
|
|
|
|
|
Inferred Mineral Resources |
COG (g/t Au) |
Tonnes (Mt) |
Au (g/t) |
Au (koz) |
Open pit |
Antenna |
0.55 |
1.73 |
1.61 |
90 |
Agouti |
0.65 |
0.05 |
1.53 |
2 |
Ancien |
0.65 |
0.02 |
0.89 |
0 |
Koula |
0.60 |
0.37 |
4.44 |
53 |
Boulder |
0.60 |
0 |
- |
- |
Sunbird |
0.55 |
0.02 |
2.29 |
2 |
Total |
0.55–0.65 |
2.19 |
2.09 |
147 |
Underground |
Ancien |
2.40 |
0.15 |
3.82 |
19 |
Koula |
2.40 |
0.29 |
3.24 |
30 |
Sunbird |
2.40 |
0.42 |
3.62 |
49 |
Total |
2.40 |
0.86 |
3.53 |
98 |
Total Inferred Mineral Resources |
|
|
3.05 |
2.50 |
245 |
Notes:
· | Mineral Resources are reported insitu, using the 2014 CIM Definition Standards. |
| |
· | Mr. Eric Chapman, P.Geo., is the Qualified Person responsible for Mineral Resources and is a full
time employee of Fortuna Silver Mines Inc. |
| |
· | Mineral Resources are reported as of December 31, 2023. |
| |
· | Mineral Resources are reported on a 100% basis. Fortuna holds a 90% interest in the Séguéla
Gold Mine. The remaining 10% interest is held by the State of Côte d’Ivoire. |
| |
| · | Mineral Resources are reported exclusive of those Mineral Resources modified to produce Mineral Reserves.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
· | Mineral Resources potentially amenable to open pit mining methods are reported at a gold cut-off grade of 0.55 g/t Au for Antenna
and Sunbird, 0.60 g/t Au for Koula and Boulder, and 0.65 g/t Au for Ancien and Agouti. Mineral resources are constrained within optimized
pit shells. |
| |
· | Mineral Resources potentially amenable to underground mining methods are reported inside MSO shapes at a gold cut-off grade of
2.4 g/t Au based on sublevel stoping mining method. |
| |
· | Mineral Resources are based on a gold price of US$1,840/oz. |
| |
| · | All figures have been rounded to reflect the relative accuracy of the estimates and totals may not
add due to rounding. |
Factors which may affect the Mineral Resource
estimates include:
| · | Metal price and exchange rate assumptions. |
| · | Changes to the technical inputs used to estimate
gold content (e.g. bulk density estimation, grade interpolation methodology). |
| · | Changes to the geological interpretation (e.g.
post-mineralization dykes and structural offsets such as faults and shear zones). |
| · | Additional depletion due to artisanal mining
activities beyond those already identified and excluded from the estimate. |
| · | Changes to geotechnical and mining assumptions,
including the minimum mining thickness; or the application of alternative mining methods. |
| · | Changes to process plant recovery estimates if
the metallurgical recovery in certain domains is lesser or greater than currently assumed. |
| · | Final negotiated terms of the Mining Convention. |
| · | Changes to governmental regulations. |
| · | Changes to environmental, permitting and social
license assumptions. |
| 14.21 | Previous Mineral Resource Estimates |
Mineral Resources have changed since the previous
publicly reported numbers as of December 31, 2022. Changes include:
| · | Additional
drilling, including infill drilling of the Sunbird deposit. |
| · | Changes
to reporting shell input parameters including, but not limited to, adjustments in the mining
and processing costs with updated input data. |
| · | Mining
depletion of the Antenna deposit based on production. |
| · | Inclusion
of Mineral Resources identified as potentially amenable to underground mining methods. |
| 14.22 | Comments on Section 14 |
Mineral Resources were classified using the 2014
CIM Definition standards.
Mineral Resources for the Antenna, Ancien, Agouti,
Boulder, Koula, and Sunbird deposits were estimated using data of suitable reliability and industry standard practices.
The QP is not aware of any environmental, permitting,
legal, title, taxation, socio-economic, marketing, political, or other relevant issues that could potentially affect the Mineral Resource
estimate that are not discussed in this Report.
There is upside potential for the estimates if
mineralization that is currently classified as Inferred can be upgraded to higher-confidence Mineral Resource categories.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| 15 | Mineral
Reserve Estimates |
A process was followed to convert the Mineral
Resources to Mineral Reserves that was underpinned by a design, schedule, and economic evaluation. Only Mineral Resources considered potentially
amenable to open pit mining methods have been considered for conversion to Mineral Reserves as insufficient detailed data had been collected
to apply modifying factors to Mineral Resources considered potentially amenable to underground mining methods. The process included:
| · | Pit
optimizations were run on the Mineral Resource models, using Deswik software’s Pseudoflow
algorithm. The nested pit shells resulting from the Pseudoflow algorithm were assessed, with
deposit specific pits staging shells selected as the basis for detailed designs with consideration
for economic and operational risks on the potential net present value (NPV). |
| · | Mineral
Resource block models for each deposit included gold grade, oxidation state, rock type, density
values and confidence category classification. |
| · | All
pit optimizations, designs, schedules, and cashflow estimates were completed using Indicated
Mineral Resources, with all Inferred Mineral Resources treated as non-revenue generating
waste rock. |
| · | Modifying
factors were applied to the mined physicals; including dilution and recovery factors based
on typical mining factors by regularizing the block models to a typical selective mining
unit (SMU) block size. |
| · | Open
pit mine designs were produced to align with the preferred ultimate pit shells and incorporate
appropriate geotechnical batter and berm parameters, appropriate ramp widths, and minimum
mining widths to access all Mineral Reserves. |
| · | Open
pit stage designs were designed to prioritize the lowest cash cost, highest grade, operational
constraints and to meet quantity and material type requirements for the plant mill feed. |
| · | The
open pit mine designs were scheduled using MineSched to produce a mine plan, using proposed
productivity rates, and following an appropriate mining sequence to maintain mill feed and
plant material characteristic requirements. |
| · | The
resulting mining schedule was evaluated in a financial model. Mining costs were derived from
the active mining contract with Mota-Engil and pricing submission for the Sunbird deposit
from Mota-Engil. Processing, general administration, and selling costs were based on the
life of mine financial model and compared against actual costs for August 2023, a full
production month for the Séguéla Mine. Cost estimates are described in Section 21. |
The following block model constraints were used
to convert Indicated Mineral Resources to Probable Mineral Reserves:
| · | Use
the SMU regularized block models. |
| · | Within
the ultimate pit designs. |
| · | Below
the site topography surface. |
| · | Above
the marginal cut-off grade. |
| 15.2 | Cut-off Grade Derivation |
Table 77 provides the cost and revenue parameters
used to estimate the cut-off grade for each deposit.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 77: Cut-off grade inputs
Factor |
Unit |
Assumption |
Gold Price |
$US / oz |
1,600 |
Royalty |
% |
6.0 |
Gold Payability |
% |
99.0 |
Refining and Selling Cost |
$US / oz |
7.00 |
Mill Recovery |
% |
94.5 |
Milling Cost |
$US / t ore |
15.42 |
G&A Cost |
$US / t ore |
8.83 |
Sustaining Capital Cost |
$US / t ore |
3.81 - 4.67 |
ROM Loader Cost |
$US / t ore |
0.44 |
Grade Control Cost |
$US / t ore |
0.39 – 1.67 |
Ore Differential by Deposit: |
Ore Differential - Antenna |
$US / t ore |
0.58 |
Ore Differential - Agouti |
$US / t ore |
1.65 |
Ore Differential - Ancien |
$US / t ore |
2.94 |
Ore Differential - Boulder |
$US / t ore |
1.11 |
Ore Differential - Koula |
$US / t ore |
0.58 |
Ore Differential - Sunbird |
$US / t ore |
0.44 |
The cut-off grade for each deposit was calculated
by applying the economic parameters above and using the formula below:
The resultant cut-off grade applied to each deposit
is shown in Table 78.
Table 78: Estimated cut-off
grade by deposit
Pit |
Breakeven
COG (g/t) |
Incremental
COG (g/t) |
Antenna |
1.07 |
0.65 |
Agouti |
1.33 |
0.72 |
Ancien |
1.61 |
0.73 |
Boulder |
1.24 |
0.69 |
Koula |
2.03 |
0.66 |
Sunbird |
1.95 |
0.66 |
The cut-off grades applied are the breakeven cut-off
grade and incremental cut-off grade. The breakeven cut-off grade is the grade at which all the cost is equal to the revenue (Hall, 2014)
and includes selling cost, refining cost, mining cost, processing cost, general and administration cost, capital cost and metallurgical
recovery. These cost parameters are used to complete pit optimization and define the ultimate pit shell.
The incremental cut-off grade does not include
mining costs where these costs are allocated to mine the higher-grade material. The incremental cut-off grade is referred to as the milling
cut-off grade and includes selling cost, refining cost, processing cost, general and administration cost, capital cost and metallurgical
recovery, used to define whether the material is sent as waste or ore.
Once the ultimate pit shell is determined the
incremental cut-off grade is used to determine classification between ore and waste, and due to all the material is required to be excavated
from the ultimate pit shell including all the cost that makes up the breakeven cut-off grade, the assumption is that the higher-grade
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
material within the ultimate pit will pay for
the mining cost to mine the lower grade material, and the remaining decision made is to whether to send the material to the waste dump
or run-of-mine (ROM) pad.
The primary difference in cut-off grade values
between each deposit is the difference in ore differential between each pit. The ore differential is the cost difference to mine and haul
ore compared to waste. The key difference between each pit being the different distances to haul ore to the ROM pad. The cut-off grade
is used to determine whether the material mined will generate a profit following associated operating and selling costs.
| 15.3 | Mineral Reserve Estimate |
The resulting Mineral Reserve estimate with an
effective date of December 31, 2023, is shown in Table 79.
Table 79: Mineral
Reserve estimate
Location |
Proven |
Probable |
Proven & Probable |
Tonnes
(Mt) |
Grade
(g/t Au) |
Metal
(000 oz) |
Tonnes
(Mt) |
Grade
(g/t Au) |
Metal
(000 oz) |
Tonnes
(Mt) |
Grade
(g/t Au) |
Metal
(000 oz) |
Stockpile |
0.44 |
2.06 |
29 |
- |
- |
- |
0.44 |
2.06 |
29 |
Antenna |
- |
- |
- |
4.35 |
2.30 |
321 |
4.35 |
2.30 |
321 |
Koula |
- |
- |
- |
1.45 |
5.77 |
268 |
1.45 |
5.77 |
268 |
Ancien |
- |
- |
- |
1.81 |
3.80 |
221 |
1.81 |
3.80 |
221 |
Agouti |
- |
- |
- |
0.90 |
2.39 |
70 |
0.90 |
2.39 |
70 |
Boulder |
- |
- |
- |
0.71 |
1.73 |
39 |
0.71 |
1.73 |
39 |
Sunbird |
- |
- |
- |
2.10 |
3.04 |
206 |
2.10 |
3.04 |
206 |
Total |
0.44 |
2.06 |
29 |
11.33 |
3.09 |
1,125 |
11.76 |
3.05 |
1,154 |
Notes:
| · | Mineral
Reserves are reported at the point of delivery to the process plant, using the 2014 CIM Definition
Standards. |
| · | Mr. Raul
Espinoza, P.Eng., is the Qualified Person responsible for Mineral Reserves and is a full
time employee of Fortuna Silver Mines Inc. |
| · | Mineral
Reserves are reported as of December 31, 2023. |
| · | Mineral
Reserves are reported on a 100% basis. Fortuna holds a 90% interest in the Séguéla
Gold Mine. The remaining 10% interest is held by the State of Côte d’Ivoire. |
| · | Mineral
Reserves are reported at an incremental gold grade cut-off of 0.65 g/t Au for Antenna, 0.72
g/t Au for Agouti, 0.69 g/t Au for Boulder, 0.66 g/t Au for Koula, 0.73 g/t Au for Ancien,
and 0.66 g/t Au for Sunbird deposit. The estimate is based on a gold price of US$1,600/oz,
metallurgical recovery of 94.5%, surface mining costs of $3.12/t, processing costs of $15.42/t
and G&A costs of 8.83/t. |
| · | Overall
slope angles applied are 36.8° for oxide material, 44.2° for transitional material
and 51° for fresh material except for Sunbird that uses slope angles of 36.8° for
oxide material, 36.5° for transitional material and 50° for fresh material. |
| · | The
Mineral Reserves are reported with modifying factors of mining dilution and mining recovery
represented by regularizing the block models to an appropriate selective mining unit (SMU)
block size. |
| · | Each
deposit has undergone pit optimization, detailed mine design, mine scheduling, and cashflow
analysis, demonstrating a technically achievable and economically viable mine plan supporting
this Mineral Reserve. |
| · | All
figures have been rounded to reflect the relative accuracy of the estimates and totals may
not add due to rounding. |
Factors which may affect the Mineral Reserve
estimates include:
| · | Metal
price and exchange rate assumptions. |
| · | Changes
to metallurgical recovery assumptions. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| · | Changes
to the input assumptions used to derive the mineable shapes applicable to the open pit mining
methods used to constrain the estimates. |
| · | Changes
to the forecast dilution and mining recovery assumptions. |
| · | Changes
to the cut-off values applied to the estimates. |
| · | Variations
in geotechnical, hydrogeological and mining method assumptions. |
| · | Final
negotiated terms of the Mining Convention. |
| · | Changes
to environmental, permitting and social license assumptions. |
| 15.4 | Comparison with Previous Mineral Reserves |
A previous Mineral Reserve estimate was announced
with an effective date of December 31, 2022. Changes in the Mineral Reserve are due to changes in the estimation methodology, with
updated parameters since the December 31, 2022, estimate, as well as additional Mineral Resource drilling occurring since this date.
The difference between the Mineral Reserve estimates
is due to the following:
| · | The
inclusion of the Sunbird deposit into the Mineral Reserve based on Mineral Resource drilling
and mining study work completed to the effective date of this Report. |
| · | The
December 31, 2022, Mineral Reserve pit designs were guided by pit optimizations which
included revenue from Inferred Mineral Resource. |
| · | Pit
optimizations in the December 31, 2022, Mineral Reserve estimate included ramp widths
in the overall slope angles by applying a negative 3˚ deduction, rather than estimating
the true total ramp width and number of ramp passes. |
| · | Changes
in pit optimization parameters and marginal cut-off grade estimation, including higher operating
and selling costs, and actual contract mining cost executed on April 1, 2022, with an
established mining contractor Mota-Engil. |
| · | Change
in mining dilution and mining recovery methodology from global factors to regularized block
models by SMU sizes. |
| · | All
pits have been re-optimized and re-designed based on the latest parameters and Mineral Resource
estimates. |
| 15.5 | Comments on Section 15 |
Mineral Reserves are reported using the 2014 CIM
Definition Standards.
Mineral Reserves assume open pit mining methods,
and in the opinion of the QP, are reported appropriately with the application of reasonable mining recovery and dilution factors and a
breakeven cut-off grade based on contractor mining costs, actual processing and smelting costs; actual metallurgical recoveries achieved
in the plant; and reasonable long-term metal prices based on market consensus.
There are no other known environmental, legal,
title, taxation, socioeconomic, marketing, political or other relevant factors that would materially affect the estimation of Mineral
Reserves that are not discussed in this Report.
There is upside potential for the estimates if
mineralization that is currently classified as Mineral Resources potentially amenable to underground mining methods can be converted to
Mineral Reserves following appropriate technical studies, or if higher gold prices support a larger open pit.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The mine plan is based on conventional open pit
mining methods and conventional equipment, utilizing the services of a mining contractor.
The overall mining and production strategy is
to maintain a mill processing throughput of 1.46 Mtpa initially and increase to 1.57 Mtpa in 2026, by sequencing pit stages and processing
feed requirements and material characteristics. The mine life based on Probable Mineral Reserves is 8.2 years.
Drilling and blasting are planned for oxide, transitional
and fresh ore and waste, followed by conventional excavator and truck operations within the pits for the movement of ore and waste. Free
digging will be conducted in the oxide zones if practical, otherwise blasting has been assumed for all the weathering horizons. Bench
heights for extraction of ore and waste material is 5 m taken in two digging flitches of 2.5 m. Where possible in high waste stripping
pit stages, 10 m bench heights will be used at an appropriate standoff distance from known mineralization.
Mining costs and equipment requirements are predominantly
based on the existing mining contract with mining contractor Mota-Engil. The mining schedule consists of a lower mining rate for 2024,
with a ramp up in total mining movement when commencing higher waste stripping pit stages, requiring additional mining equipment. The
initial mining equipment required to meet the mining schedule for 2024 is one 200 t excavator, one to two 120 t excavator, and one 80
t excavator, along with eight to ten 90 t haul trucks. The total material mined in 2024 is equivalent to 5.9 million BCM. The mining
equipment required to meet the mining schedule for 2025 onwards is an additional 200 t excavator and an additional six to eight 90 t haul
trucks. The annual rate of mining movement after 2024 peaks in 2026 at 10.0 million BCM. A common pool of equipment will be used and scheduled
across all of the active pits so that movement between the pits is minimized.
Roxgold Sango will use Mota-Engil as the mining
contractor until March 2028, after which mining is planned to transition to Owner operator.
ROM ore is trucked from the pits to the ROM pad
and tipped onto the ROM pad to be reclaimed and loaded to the crusher feed bin using front end loaders operated by the mining contractor.
Roxgold Sango commissioned Entech to undertake
a geotechnical assessment (Entech, 2021). The study evaluated the potential for slope instabilities and prepared slope design parameter
recommendations for the proposed open pit mining at the Agouti, Ancien, Antenna, Boulder, and Koula deposits.
In 2023, MineGeotech completed a geotechnical
assessment (MineGeotech, 2023) for the Sunbird pit to determine design parameters for pit optimization and design processes.
A dedicated geotechnical drilling program was
designed by Entech to investigate local ground conditions. A geotechnical material property testing program was designed to capture information
pertinent to characterizing and understanding the mechanical behavior of the different materials expected to be encountered.
For the Sunbird deposit a drilling program was
designed by MineGeotech to investigate material characteristics specific to the deposit. A geotechnical material property testing was
completed to capture information pertinent to characterizing and understanding the rock mass and was supported by
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
completion of kinematic and numerical analysis
to provide bench configuration and assessment of overall stability respectively.
A total of 35 dedicated geotechnical DD holes
and 30 historical DD holes, located in the vicinity of the Agouti, Ancien, Antenna, Boulder, Koula and Sunbird pit walls, and totaling
~9,213 m, were used for the collection of detailed geotechnical data, including rock mass and structure characterization, and oriented
structural data.
Samples were selected from the drill core of the
dedicated geotechnical drill holes for material properties testing including particle size distribution, Atterberg limits, consolidated
undrained triaxial strength, uniaxial compressive strength, uniaxial tensile strength, elastic constant (Young’s Modulus and Poisson’s
Ratio), and Hoek triaxial and direct shear tests.
The extent of drill hole and material properties
testing coverage is considered sufficient to undertake geotechnical assessments.
The depth to the base of complete oxidation wireframes
in proximity to the pit walls is on average approximately 8 m at Agouti, 28 m at Ancien, 9 m at Antenna, 8 m at Boulder, 7 m at Koula,
and 15 m at Sunbird. The drill holes used for the geotechnical assessment encountered the base of complete oxidation at an average depth
of approximately 8 m at Agouti, 15 m at Ancien, 12 m at Antenna, 15 m at Boulder, 9 m at Koula, and 15 m at Sunbird.
The depth to the top of fresh rock wireframes
in proximity to the pit walls is on average approximately 11 m at Agouti, 30 m at Ancien, 18 m at Antenna, 17 m at Boulder, 22 m
at Koula and 30 m at Sunbird. The drill holes used for the geotechnical assessment encountered the top of fresh rock at an average depth
of approximately 16 m at Agouti, 32 m at Ancien, 30 m at Antenna, 34 m at Boulder, 29 m at Koula, and 30 m at Sunbird. Entech and
MineGeotech used the top of fresh rock wireframes for deriving slope design parameter limits in fresh rock following discussions with
Roxgold Sango.
According to Bieniawski’s rock mass rating
(RMR), the major rock types encountered at each deposit can be summarized as follows in the fresh rock:
| · | Ancien: Good to very good rock. |
| 16.2.3 | Slope Design Analysis |
Slope design modelling and analysis was undertaken,
including kinematic, spill berm width, and limit equilibrium slope stability, to develop the slope design parameter recommendations.
Entech adopted the Slope Design Acceptance Criteria
outlined in Read and Stacey (2009). A pragmatic approach to slope design was adopted and implemented on a case-by-case basis, which, at
times relied on scheduling to complete mining activities at a faster rate where exposure to high risk and deep sections of the pits occurs.
Given the phased approach to the mining sequence with each phase being mined in a relatively short period of time, slope design is largely
in accordance with the Slope Design Acceptance Criteria, and tailored to the upper limits of the slope design criteria.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
The kinematic analysis indicated that batter-scale
failures (planar, wedge and toppling) are possible and ground control issues at the bench scale (including crest loss and localized slips
and failures) can be expected. However, failed material should largely be contained by the recommended spill berm widths.
The limit equilibrium slope stability analysis
indicated that slope instability at an inter-ramp or overall scale is unlikely within the design.
Geotechnical input parameters for intact rock
and rock mass strength were developed based on information gathered from the geotechnical logging and material properties testing programs,
as well as Entech’s judgement used in conjunction with experience in similar settings and review of similar geotechnical engineering
literature.
An observational design approach should be taken
where regular review of bench-scale performance is undertaken and adjusted if necessary.
| 16.2.4 | Slope Design Parameters |
The slope design elements, geometries and terminology
used for analysis and design are provided in Figure 84.
Figure 84: Pit
slope design elements, geometries, and terminology (source: Read & Stacey, 2009)
Table 80 to Table 85 detail the slope design parameter
recommendations for each deposit.
Table 80: Slope design parameter
recommendations for Agouti.
Domain |
From/To |
Material |
Bench Height (m) |
Bench Face Angle (deg) |
Spill Berm Width (m) |
Inter-Ramp Angle (deg) |
Agouti 1 – West |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 20 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
20 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Agouti 1 – East |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 20 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
20 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Domain |
From/To |
Material |
Bench Height (m) |
Bench Face Angle (deg) |
Spill Berm Width (m) |
Inter-Ramp Angle (deg) |
Agouti 2 – West |
Surface to 20 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
20 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Agouti 2 – East |
Surface to 20 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
20 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Agouti 3 – West |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 20 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
20 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Agouti 3 – East |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 20 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
20 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Notes: Transitional material may have a bench height/spill berm
width configuration of 20 m/9 m or 10 m/5 m, where required mbs = meters below surface
Table 81: Slope design parameter
recommendations for Ancien
Domain |
From/To |
Material |
Bench Height (m) |
Bench Face Angle (deg) |
Spill Berm Width (m) |
Inter-Ramp Angle (deg) |
Ancien – West |
Surface to 30 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
30 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Ancien – North |
Surface to 20 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
20 mbs to 30 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
30 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Ancien – East |
Surface to 20 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
20 mbs to 30 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
30 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Ancien – South |
Surface to 30 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
30 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Notes: Transitional material may have a bench height/spill berm
width configuration of 20 m/9 m or 10 m/5 m, where required mbs = meters below surface
Table 82: Slope design parameter
recommendations for Antenna.
Domain |
From/To |
Material |
Bench Height (m) |
Bench Face Angle (deg) |
Spill Berm Width (m) |
Inter-Ramp Angle (deg) |
Antenna – West |
Surface to 20 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
20 mbs to 30 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
30 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Antenna – East |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 30 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
30 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Antenna – South |
Surface to 20 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
20 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Notes: Transitional material may have a bench height/spill berm
width configuration of 20m/9m or 10m/5m, where required mbs = meters below surface
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 83: Slope design parameter
recommendations for Boulder
Domain |
From/To |
Material |
Bench Height (m) |
Bench Face Angle (deg) |
Spill Berm Width (m) |
Inter-Ramp Angle (deg) |
Boulder 1 – Northwest |
Surface to 15 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Boulder 1 – Northeast |
Surface to 15 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Boulder 1 – Southeast |
Surface to 15 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Boulder 1 – Southwest |
Surface to 40 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
40 mbs to 70 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
70 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Boulder 2 – Northwest |
Surface to 15 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
15 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Boulder 1 – Southeast |
Surface to 15mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
15 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Notes: Transitional material may have a bench height/spill berm
width configuration of 20m/9m or 10m/5m, where required mbs = meters below surface
Table 84: Slope design parameter
recommendations for Koula
Domain |
From/To |
Material |
Bench Height (m) |
Bench Face Angle (deg) |
Spill Berm Width (m) |
Inter-Ramp Angle (deg) |
Koula – West |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 30 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
30 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Koula – North |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 15 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
15 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Koula – East |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 40 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
40 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Koula – South |
Surface to 10 mbs |
Transported/Oxide |
10 |
50 |
5 |
36.8 |
10 mbs to 25 mbs |
Transitional |
20 |
60 |
9 |
44.2 |
25 mbs to base of pit |
Fresh |
20 |
80 |
8 |
60 |
Notes: Transitional material may have a bench height/spill berm
width configuration of 20m/9m or 10m/5m, where required mbs = meters below surface
Table 85: Slope Design parameter
recommendations for Sunbird
Geotechnical Domains |
Sector |
Azimuth From (deg) |
Azimuth to (deg) |
Bench Height (m) |
Bench Face Angle (deg) |
Berm Width (m) |
Inter-Ramp Angle (deg) |
Saprolite |
A |
0 |
360 |
10 |
50 |
5 |
36.8 |
Transitional |
B |
300 |
80 |
10 |
85 |
5 |
65 |
C |
80 |
120 |
10 |
55 |
6.5 |
37 |
D |
120 |
250 |
10 |
85 |
5 |
65 |
|
|
|
|
|
|
|
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Geotechnical Domains |
Sector |
Azimuth From (deg) |
Azimuth to (deg) |
Bench Height (m) |
Bench Face Angle (deg) |
Berm Width (m) |
Inter-Ramp Angle (deg) |
|
E |
250 |
300 |
10 |
55 |
6.5 |
37 |
Fresh |
F |
300 |
80 |
20 |
90 |
11 |
65 |
G |
80 |
120 |
20 |
80 |
12 |
52 |
H |
120 |
260 |
20 |
90 |
11 |
65 |
I |
260 |
300 |
20 |
80 |
12 |
52 |
Notes: Transitional material may have a bench height/spill berm
width configuration of 20m/9m or 10m/5m, where required mbs = meters below surface
The slope design parameter recommendations are
based on the following assumptions:
| · | Best practice management of surface water runoff. |
| · | Dewatered or dry slope conditions. |
| · | Monitoring of ground water drawdown within wall
limits through the application of monitoring bores equipped with vibrating wire piezometers. |
| · | Implementation of a thorough ground control management
plan with provision for: |
| o | Good wall blasting practices which includes pre-split blasting of final walls and achievement of spill
berm widths, limited crest loss, and clean batters. |
| o | Sound wall scaling practices. |
| o | Appropriate, fit for purpose and routine monitoring of walls. |
| o | Ongoing collection of geotechnical data (i.e. mapping) and wall performance metrics. |
| o | Regular geotechnical review. |
| · | If the slope design parameters are not being
achieved, including spill berm widths and toe checks, then drill and blast practices and/or spill berm widths must be reviewed. |
| · | The mining operation perform a detailed risk
assessment prior to implementation of the slope design parameters. |
An initial hydrogeological study was conducted
in 2019 to characterize the groundwater regime. Subsequently, a preliminary desktop assessment was undertaken in 2020 to review all available
information, assess groundwater conditions and develop a conceptual model of the site and surrounding areas. Following this a site investigation
was designed to improve knowledge regarding groundwater resources and provide estimates of potential pit dewatering estimates and impacts
across the site. This drilling and aquifer testing investigation was conducted from July to September 2020, targeting discrete
geological structures and specific lithologies at the Antenna deposit.
A total of nine bores were installed and pump
tested to gain aquifer parameter information. A number of findings were made including that depth to the static water varies from 2.95
to 6.59 meters below ground level, pit dewatering will be required at the Antenna deposit, and that groundwater flow from the south to
the north generally follows the topography at the Antenna deposit. Analyses of the aquifer test data by the Cooper and Jacob method show
transmissivities ranged from 2.2 m2/day to 384.2 m2/day, which are consistent with fractured rock permeability.
These results were used to construct a numerical model to estimate pit inflow rates, which range from 0.0 to 134.7 m3/hr for
the Antenna deposit depending on the stage of the mining schedule. Additionally, numerical modelling results show a cumulative dewatering
drawdown impact around the ore bodies may occur to about 15 km by 8 km in lateral extent. The results and aquifer parameters gained from
the program were extrapolated to inform a high-level hydrogeological evaluation across the site.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Water samples collected in March 2020, show
water quality is generally better than the directives set by the European Union/Organisation Management Service (UE/OMS) standards, except
for turbidity and total iron which exceed these standards. Fourteen water samples collected in August 2020 show elevated selenium
levels in all of the bores, with lead levels elevated in five bores. Results show elevated cadmium in two bores.
Another drilling and testing hydrogeological site
investigation was conducted from December 2020 to March 2021, in order to advance groundwater knowledge, refine and improve
numerical model simulations and predictions. This investigation was designed using information collected and evaluated from the drilling
investigation conducted earlier in 2020 to inform the groundwater assessment. Drilling and testing for this program was undertaken at
the Agouti, Ancien, Antenna and Boulder deposits, where a total of 13 pumping and monitoring bores were drilled and constructed and used
in the subsequent aquifer test program.
The data collected from this program was assessed
and analyzed for incorporation into an updated and refined groundwater numerical model and used in estimating groundwater resources and
possible environmental impacts.
The numerical model is required to be updated
from the initial steady-state calibrated model to a more refined transient-state model, based on the updated mine schedules to provide
an estimate of pit dewatering requirements as mining advances at each deposit. This information may also be used to inform the operations
water balance, anticipate dewatering volumes, as well as forecast dewatering drawdown impacts.
The Sunbird groundwater analysis is based on the
report completed by Knight Piesold (Drew, 2021). Some extrapolation has had to be made for the Sunbird deposit based on the analysis in
the report as deposits on which the report was focused are about 1–2 km from Sunbird.
MineGeotech believes that the hydraulic conductivity
values, a parameter required for slope design analysis provided by Knight Piesold are reasonable, except for the oxide/saprolite layer
where it is believed that the proposed value is too high for predominantly clay material.
To complete the slope design analysis the hydraulic
conductivity of Antenna pit was used as Sunbird is part of the east domain to the east of the Antenna pit.
For the saprolite/oxide layer, generic published
values have been used (Heath, 2004), giving the following values for each domain:
Block models were provided in Datamine format.
The Antenna, Ancien, Koula, and Sunbird block models were regularized to 5 x 5 x 5 m dimensions, the Agouti and Boulder block models were
regularized to 5 x 5 x 2.5 m dimensions. The block model regularization was used to represent mining dilution and mining recovery inherent
within the block model tonnes and grade.
Prior to conducting the pit optimization, the
block models had the following modifications:
| · | Different rock type codes were added to distinguish
ore from waste within the block model based on the cut-off grades for each deposit. |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
| · | All operating costs including mining, processing,
selling, and general and administrative costs were estimated for each block within the block model. |
| · | Revenue was estimated for each ore block within
the block model based on the estimated metallurgical recoveries and the forecast long-term gold price. |
| · | Geotechnical domains were applied based on the
material type and wall orientation as per the geotechnical recommendations. |
| 16.4.2 | Optimization Parameters |
Financial Inputs and Selling Costs
Table 86 shows the financial parameters applied
in the pit optimization. Table 87 shows the selling costs applied within the pit optimization.
Table 86: Financial parameters
applied in pit optimization
Input |
Unit |
Value |
Currency |
$ Currency |
US Dollars |
Discount rate |
% |
5.0 |
Gold price |
US$/oz |
1,600 |
Table 87: Selling costs applied
in pit optimization
Input |
Unit |
Value |
Royalty |
% Revenue |
6.0 |
Refining and selling costs |
US$/oz |
7.0 |
Payability |
% |
99.0 |
Mining Costs
Table 88 summarizes the mining costs and parameters
applied within the pit optimizations. Table 89 and Table 90 show the variable load and haul costs by bench for waste and ore respectively.
Mining dilution and recovery is represented within the block model regularization.
Table 88: Mining costs applied
in pit optimization
Input |
Unit |
Value |
Mining dilution |
% |
Included in SMU |
Mining recovery |
% |
Included in SMU |
Ore load and haul costs |
US$/bcm |
Variable by pit and bench |
Waste load and haul costs |
US$/bcm |
Variable by pit and bench |
Drilling cost |
US$/bcm |
0.54–0.86 |
Blasting cost – oxide |
US$/bcm |
1.18–1.24 |
Blasting cost – transitional |
US$/bcm |
1.57–1.63 |
Blasting cost – fresh |
US$/bcm |
1.80–2.14 |
Mining overheads |
US$/bcm |
0.24–0.25 |
Diesel cost |
US$/bcm |
1.44–2.20 |
Closure cost |
US$/bcm |
0.09 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 89: Waste
load and haul costs in US$/bcm
Elevation |
Agouti |
Ancien |
Antenna |
Boulder |
Koula |
Sunbird |
Bench 1 |
2.95 |
2.42 |
0.50 |
2.76 |
4.46 |
3.17 |
Bench 2 |
2.89 |
1.88 |
0.57 |
2.69 |
4.38 |
3.22 |
Bench 3 |
2.83 |
1.83 |
0.64 |
2.62 |
4.22 |
3.29 |
Bench 4 |
2.78 |
1.82 |
0.71 |
2.55 |
4.09 |
3.33 |
Bench 5 |
2.68 |
1.84 |
0.78 |
2.48 |
3.99 |
3.33 |
Bench 6 |
2.50 |
1.83 |
0.85 |
2.39 |
3.93 |
3.31 |
Bench 7 |
2.38 |
1.89 |
0.92 |
2.32 |
3.85 |
3.34 |
Bench 8 |
2.32 |
1.94 |
1.02 |
2.25 |
3.78 |
3.36 |
Bench 9 |
2.29 |
2.00 |
1.27 |
2.20 |
3.70 |
3.40 |
Bench 10 |
2.33 |
2.06 |
1.66 |
2.15 |
3.65 |
3.44 |
Bench 11 |
2.41 |
2.12 |
1.97 |
2.11 |
3.60 |
3.49 |
Bench 12 |
2.61 |
2.13 |
2.34 |
2.06 |
3.57 |
3.54 |
Bench 13 |
2.77 |
2.16 |
2.54 |
2.03 |
3.55 |
3.59 |
Bench 14 |
2.89 |
2.15 |
2.81 |
2.11 |
3.08 |
3.65 |
Bench 15 |
2.91 |
2.18 |
2.89 |
2.21 |
3.00 |
3.69 |
Bench 16 |
2.96 |
2.16 |
2.93 |
2.30 |
2.98 |
3.75 |
Bench 17 |
2.95 |
2.21 |
2.90 |
2.37 |
3.02 |
3.81 |
Bench 18 |
3.19 |
2.24 |
2.91 |
2.45 |
3.00 |
3.88 |
Bench 19 |
3.26 |
2.27 |
2.98 |
2.48 |
3.04 |
3.95 |
Bench 20 |
3.15 |
2.29 |
2.97 |
3.66 |
3.02 |
4.02 |
Bench 21 |
2.94 |
2.33 |
2.96 |
4.61 |
3.05 |
4.10 |
Bench 22 |
3.10 |
2.37 |
2.95 |
4.72 |
3.13 |
4.16 |
Bench 23 |
2.86 |
2.43 |
3.02 |
4.69 |
3.17 |
4.23 |
Bench 24 |
2.89 |
2.47 |
3.11 |
4.91 |
3.21 |
4.30 |
Bench 25 |
2.89 |
2.53 |
3.22 |
5.28 |
3.27 |
4.37 |
Bench 26 |
2.89 |
2.58 |
3.32 |
5.62 |
3.33 |
4.44 |
Bench 27 |
2.89 |
2.61 |
3.41 |
5.84 |
3.38 |
4.52 |
Bench 28 |
|
2.59 |
3.50 |
5.84 |
3.39 |
4.58 |
Bench 29 |
|
2.61 |
2.62 |
5.84 |
3.41 |
4.64 |
Bench 30 |
|
2.59 |
2.66 |
5.84 |
3.44 |
4.72 |
Bench 31 |
|
2.64 |
2.67 |
|
3.46 |
4.79 |
Bench 32 |
|
2.73 |
2.68 |
|
3.45 |
4.86 |
Bench 33 |
|
2.85 |
2.68 |
|
3.46 |
4.93 |
Bench 34 |
|
2.89 |
2.68 |
|
3.44 |
5.00 |
Bench 35 |
|
2.91 |
2.67 |
|
3.47 |
5.06 |
Bench 36 |
|
2.87 |
2.63 |
|
3.42 |
5.13 |
Bench 37 |
|
2.85 |
2.53 |
|
3.43 |
5.20 |
Bench 38 |
|
2.78 |
2.51 |
|
3.47 |
5.27 |
Bench 39 |
|
2.74 |
2.54 |
|
3.47 |
5.34 |
Bench 40 |
|
2.90 |
2.56 |
|
3.47 |
5.41 |
Bench 41 |
|
2.93 |
2.60 |
|
3.48 |
5.47 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Elevation |
Agouti |
Ancien |
Antenna |
Boulder |
Koula |
Sunbird |
Bench 42 |
|
2.89 |
2.64 |
|
3.51 |
5.54 |
Bench 43 |
|
2.98 |
2.68 |
|
3.52 |
5.61 |
Bench 44 |
|
2.92 |
2.81 |
|
3.56 |
5.69 |
Bench 45+ |
|
3.14 |
2.88 |
|
3.60 |
5.76 |
Table 90: Ore
load and haul costs in US$/bcm
Elevation |
Agouti |
Ancien |
Antenna |
Boulder |
Koula |
Sunbird |
Bench 1 |
7.64 |
11.85 |
2.85 |
5.57 |
5.11 |
4.69 |
Bench 2 |
7.64 |
11.85 |
2.85 |
5.57 |
5.11 |
4.69 |
Bench 3 |
7.64 |
11.85 |
2.85 |
5.57 |
5.11 |
4.69 |
Bench 4 |
7.64 |
11.85 |
2.85 |
5.57 |
5.11 |
4.69 |
Bench 5 |
7.56 |
12.17 |
2.85 |
5.57 |
5.11 |
4.69 |
Bench 6 |
7.49 |
12.17 |
2.92 |
5.57 |
5.11 |
4.69 |
Bench 7 |
7.40 |
12.40 |
2.99 |
5.57 |
5.11 |
4.69 |
Bench 8 |
7.23 |
11.59 |
3.06 |
5.57 |
5.11 |
4.69 |
Bench 9 |
7.07 |
11.87 |
3.13 |
5.57 |
5.11 |
4.76 |
Bench 10 |
7.14 |
12.05 |
3.20 |
5.44 |
5.03 |
4.77 |
Bench 11 |
7.07 |
12.21 |
3.27 |
5.38 |
4.96 |
4.62 |
Bench 12 |
7.06 |
12.01 |
3.34 |
5.30 |
4.89 |
4.68 |
Bench 13 |
7.21 |
12.11 |
3.34 |
5.21 |
4.81 |
4.76 |
Bench 14 |
7.33 |
12.18 |
3.34 |
5.19 |
4.63 |
4.81 |
Bench 15 |
7.51 |
11.68 |
5.06 |
5.27 |
4.49 |
4.84 |
Bench 16 |
7.56 |
11.33 |
4.94 |
5.35 |
4.46 |
4.89 |
Bench 17 |
7.59 |
11.54 |
4.44 |
5.43 |
4.53 |
4.97 |
Bench 18 |
7.57 |
11.69 |
4.16 |
5.50 |
4.53 |
5.06 |
Bench 19 |
7.77 |
11.40 |
4.11 |
5.51 |
4.57 |
5.13 |
Bench 20 |
7.74 |
11.42 |
4.11 |
5.58 |
4.65 |
5.21 |
Bench 21 |
7.49 |
11.17 |
4.07 |
6.20 |
4.64 |
5.28 |
Bench 22 |
7.26 |
10.89 |
4.00 |
7.54 |
4.55 |
5.35 |
Bench 23 |
7.45 |
10.80 |
3.98 |
8.51 |
4.71 |
5.42 |
Bench 24 |
7.22 |
10.24 |
3.96 |
8.19 |
4.88 |
5.49 |
Bench 25 |
7.28 |
9.68 |
4.07 |
8.58 |
4.95 |
5.55 |
Bench 26 |
6.18 |
9.26 |
4.17 |
8.73 |
5.04 |
5.62 |
Bench 27 |
6.18 |
9.28 |
4.30 |
9.49 |
5.16 |
5.68 |
Bench 28 |
|
9.30 |
4.43 |
9.97 |
5.06 |
5.75 |
Bench 29 |
|
9.08 |
4.23 |
11.02 |
5.16 |
5.81 |
Bench 30 |
|
9.06 |
4.32 |
11.02 |
5.26 |
5.89 |
Bench 31 |
|
8.85 |
4.38 |
|
5.29 |
5.95 |
Bench 32 |
|
8.94 |
4.43 |
|
5.38 |
6.01 |
Bench 33 |
|
9.14 |
4.47 |
|
5.47 |
6.07 |
Bench 34 |
|
9.43 |
4.50 |
|
5.61 |
6.13 |
Bench 35 |
|
9.44 |
4.48 |
|
5.65 |
6.21 |
Bench 36 |
|
9.62 |
4.48 |
|
5.74 |
6.29 |
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Elevation |
Agouti |
Ancien |
Antenna |
Boulder |
Koula |
Sunbird |
Bench 37 |
|
9.37 |
4.46 |
|
5.79 |
6.35 |
Bench 38 |
|
9.43 |
4.42 |
|
5.87 |
6.42 |
Bench 39 |
|
9.27 |
4.34 |
|
5.90 |
6.49 |
Bench 40 |
|
9.20 |
4.32 |
|
5.93 |
6.57 |
Bench 41 |
|
9.46 |
4.33 |
|
5.47 |
6.64 |
Bench 42 |
|
9.69 |
4.39 |
|
5.51 |
6.71 |
Bench 43 |
|
9.46 |
4.37 |
|
5.52 |
6.79 |
Bench 44 |
|
9.86 |
4.42 |
|
5.40 |
6.86 |
Bench 45+ |
|
9.56 |
4.80 |
|
5.30 |
6.94 |
ROM Costs
Table 91 shows the ROM costs applied to ore.
Table 91: ROM
costs applied in pit optimization
Input |
Unit |
Value |
Processing cost |
US$/t ROM |
15.42 |
Sustaining capital costs |
US$/t ROM |
3.81–4.67 |
General and administrative costs |
US$/t ROM |
8.83 |
Grade control costs |
US$/t ROM |
0.39–1.67 |
Crusher feed costs |
US$/t ROM |
0.44 |
Processing Recoveries
A processing recovery of 94.5% was applied.
Overall Slope Angles
The overall slope angles applied incorporate the
following:
| · | Geotechnical batter and berm parameters for each
weathering and pit wall orientation domain, as outlined in Section 16.2 of this Report. |
| · | Vertical depth of geotechnical domain. |
| · | Ramp width and number of ramp passes within each
geotechnical domain. |
Table 92 shows the overall slope angles applied
in the pit optimization for each deposit.
Table 92: Overall slope angles
applied in the pit optimizations
Weathering |
Agouti |
Ancien |
Antenna |
Boulder |
Koula |
Sunbird |
Oxide |
36.8 |
36.8 |
36.8 |
36.8 |
36.8 |
36.8 |
Transitional |
44.2 |
44.2 |
44.2 |
44.2 |
44.2 |
36.5 |
Fresh |
50.2 |
49.6 |
46.6 – 48.3 |
53.3 |
51.0 |
50.0 |
| 16.4.3 | Optimization Outcomes |
A set of nested pit shells were produced by the
Deswik pseudoflow function. The nested shells were used to determine trends in mineralization and higher-grade areas that would offer
opportunities to stage pits to increase discounted cashflow.
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Table 93 shows the selected pit shells used to
guide the ultimate pit designs for each deposit.
Table 93: Optimization results
Final Pit Shell
Deposit |
Revenue Factor |
Total Mined
Mt |
Waste
Mined
Mt |
Strip Ratio
t:t |
ROM
Feed Mt |
Grade Au
g/t |
Au
Produced
Moz |
Antenna |
1.00 |
34.2 |
28.9 |
5.45 |
5.3 |
2.41 |
0.39 |
Agouti |
1.00 |
8.6 |
7.6 |
7.69 |
1.0 |
2.40 |
0.07 |
Ancien |
1.00 |
26.2 |
24.3 |
13.06 |
1.9 |
3.85 |
0.22 |
Boulder |
1.00 |
5.8 |
5.1 |
7.29 |
0.7 |
1.83 |
0.04 |
Koula |
1.00 |
31.8 |
30.3 |
20.28 |
1.5 |
5.83 |
0.26 |
Sunbird |
1.00 |
34.1 |
31.8 |
14.36 |
2.2 |
3.05 |
0.21 |
Revenue factor 1 pit shells were chosen for the
ultimate pit extents due to the relatively short mine life of each individual pit. Figure 85 to Figure 90 show total tonnes and indicative
undiscounted discounted cashflow for each nested pit shell within each deposit. Each set of nested pit shells informed pit stage designs.
Trends in stripping ratio and cash costs were used to prioritize and sequence lowest stripping ratio and lowest cash cost ounces, while
maintaining appropriate minimum mining widths.
Figure 85: Antenna pit optimization
results – selected ultimate pit shell
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 86: Agouti pit optimization
results – selected ultimate pit shell
Figure 87: Ancien pit optimization
results – selected ultimate pit shell
Fortuna Silver Mines Inc. Technical Report for the Séguéla Gold Mine, Côte d’Ivoire | |
| |
Figure 88: Boulder pit optimization
results – selected ultimate pit shell
Figure 89: Koula pit optimization
results – selected ultimate pit shell
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Figure 90: Sunbird pit optimization
results – selected ultimate pit shell
Detailed pit stage designs were prepared based
on the results of the pit optimizations and incorporating appropriate wall angles, geotechnical berms, minimum mining widths, and access
ramps with sufficient width for the equipment selected.
Pit Design Parameters
The geotechnical parameters applied to the pit
designs include batter face angles, berm widths, and overall slope angles (Figure 91).
Figure 91: Pit wall design terminology
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Pit ramps were designed with the following characteristics:
| · | Dual lane ramps are a total of 24.8 m wide, including
19.5 m distance for safe passing of two of the selected CAT 777E haul truck, a 4.8 m wide bund, and a 0.5 m drain width. |
| | |
| · | Single lane ramps are a total of 15.0 m wide,
including 9.7 m distance for sufficient room for a single CAT 777E haul truck, a 4.8 m wide bund, and a 0.5 m drain width. |
| | |
| · | Gradient of 1:10 for all dual lane ramps. |
| | |
| · | Gradient of 1:9 for single lane ramps for the
final 40 vertical meters of each ultimate pit. |
| | |
| · | Single lane ramps have an overtaking lane every
20 vertical meters. |
| | |
| · | Ramps exit the pit in the direction of the waste
rock dumps. |
| | |
| · | All pits include a goodbye cut at a maximum depth
of 5 m. |
Pits were designed to have a minimum mining width
of 20 m and a minimum cutback width of 25 m.
Antenna
The
Antenna Mineral Reserves will be mined in three pit stages, prioritizing the highest grade, lowest waste stripping ore. Figure 92 shows
the Antenna pit stage designs.
Figure 92: Antenna pit stage
designs
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Pit optimizations that include revenue from Inferred
Mineral Resource show the potential for a stage 4 pit design, so the Antenna stage 3 design has been planned such that if further Mineral
Resource drilling increases the confidence of the Mineral Resource estimate at depth, a final pit cutback on the south-western pit wall
is possible.
The Antenna pit is located within 1 km of the
Séguéla processing plant and ROM pad. Ore from the Antenna pit is hauled to the ROM pad and waste rock is hauled to the
Antenna waste rock dump located north of the TSF. Antenna waste rock will be used for all future lifts of the TSF, as well as to form
a buttress for the tailings at the end of the mine life.
Agouti
The Agouti Mineral Reserves will be mined in three
pit stages prioritizing the production output and lowest waste stripping ore. Figure 93 shows the three Agouti pit stages.
Figure 93: Agouti pit stage
designs
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
The Agouti deposit is located approximately 3.4
km to the northeast of the Séguéla processing plant and ROM pad. Ore from the Agouti pits will be hauled to the ROM pad
and waste rock will be hauled to the Agouti waste rock dump located to the east of the Agouti pits.
Ancien
The Ancien Mineral Reserves will be mined in three
pit stages prioritizing the highest grade, lowest waste stripping ore. Figure 94 shows the Ancien pit stage designs.
Figure 94: Ancien pit stage
designs
The Ancien mineralization remains open at depth
and after additional drilling occurs, a trade-off study will be completed to establish the open pit to underground transition depth that
results in the highest discounted cashflow.
The Ancien deposit is located approximately 6
km to the south of the Séguéla processing plant and ROM pad. Ore from the Ancien pit will be hauled to the ROM pad and waste
rock will be hauled to the Ancien waste rock dump located to the north-west of the Ancien pit.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Boulder
The Boulder Mineral Reserves will be mined in
two pit stages prioritizing the highest production output and lowest waste stripping ore. Figure 95 shows the Boulder pit stages.
Figure 95: Boulder pit stage
designs
The Boulder pit is sensitive to economics, with
gold price having the largest impact on the ultimate pit size. There is potential for a final cutback on the Boulder deposit if the gold
price increases and/or other Séguéla Project cost parameters reduce sufficiently.
The Boulder deposit is located approximately 2.5
km to the southeast of the Séguéla processing plant and ROM pad. Ore from the Boulder pit will be hauled to the ROM pad
and waste rock will be hauled to the Boulder waste rock dump and Sunbird–Boulder waste rock dump located north-west and south-east
respectively.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Koula
The Koula Mineral Reserves will be mined in two
pit stages prioritizing the highest grade, lowest waste stripping ore. Figure 96 shows the Koula pit stages.
Figure 96: Koula pit stage designs
Koula has an adjacent lens of Inferred Mineral
Resource below the pit and mineralization remains open at depth. After additional drilling, both the pit staging, and ultimate pit dimensions
will be subject to change. Like Ancien, after additional drilling occurs, a trade-off study will be completed to establish the open pit
to underground transition depth that results in the highest discounted cashflow.
The Koula deposit is located approximately 1.5
km to the east of the Séguéla processing plant and ROM pad. Ore from Koula will be hauled to the ROM pad and waste rock
will be hauled to the Koula waste rock dump located to the north-west of the Koula pit.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Sunbird
The Sunbird Mineral Reserves will be mined in
two pit stages prioritizing the highest grade, lowest waste stripping ore. Figure 97 shows the Sunbird pit stage designs.
Figure 97: Sunbird pit stage
designs
The Sunbird deposit has Inferred Mineral Resources
both along strike to the south of the Sunbird pit, as well as at depth which is sensitive to cost. Additional drilling may support another
pushback for the pit but at current costs and estimated tonnages and grades, Sunbird has the potential to support underground operations
during or following the open pit mining.
The Sunbird deposit is located approximately 2.5
km to the south of the Séguéla processing plant and ROM pad. Mineralized material from Sunbird will be hauled to the ROM
pad and waste rock will be hauled
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
to the Sunbird–Boulder waste rock dump located
to the northeast of the Sunbird pit and southeast of the Boulder pit.
| 16.5.2 | Summary of Mineral Reserves and Waste by Pit |
Table 94 summarizes the Mineral Reserves estimated
for each pit, showing waste stripping ratio and waste tonnes, as well as ROM tonnes, grade, and ounces.
Table 94: Pit Mineral Reserve
and waste characteristics
Pit |
Stripping Ratio (Wt:Ot) |
Waste Tonnes
(Mt) |
ROM Tonnes
(Mt) |
Au Grade
(g/t) |
Ounces
(koz) |
Antenna |
5.3 |
24.5 |
4.4 |
2.34 |
321 |
Ancien |
14.4 |
26.2 |
1.8 |
3.80 |
221 |
Agouti |
10.5 |
9.6 |
0.9 |
2.39 |
70 |
Boulder |
11.1 |
7.9 |
0.7 |
1.73 |
39 |
Koula |
25.9 |
38.3 |
1.4 |
5.77 |
268 |
Sunbird |
20.3 |
40.1 |
2.1 |
4.04 |
206 |
Total |
12.7 |
146.6 |
11.8 |
3.05 |
1,154 |
Note: Total Mineral Reserves includes stockpile
material totaling 0.44 Mt averaging 2.06 g/t Au containing 29 koz of gold.
Waste dumps were designed for each deposit, with
the intention of minimizing haulage distance for the movement of waste material from the open pit to the adjacent surface waste dump.
Designs included consideration of surface water drainage, and existing and planned infrastructure locations. The dumps were designed using
a 37º rill, using a 15 m berm every 10 vertical meters to achieve a footprint consistent with the requirements of rehabilitated waste
dumps at closure. Figure 98 shows the location of each of the waste rock dump designs within the mining area layout.
Table 95 shows the waste rock dump capacities
in loose cubic meters (LCM) for each of the waste rock dump designs.
Table 95: Waste rock dump capacities
Waste Rock Dump |
Capacity (Million LCM) |
Antenna |
11.7 |
Koula |
25.9 |
Ancien |
18.9 |
Agouti |
9.1 |
Sunbird-Boulder |
18.2 |
Total |
83.8 |
There is sufficient waste rock dump volume capacity
within the existing waste rock dump designs to support the Mineral Reserve estimates. Total waste volume produced by the life of mine
schedule is 55.8 million BCM and given a 25 % swell factor and 5 % compaction factor, the total waste rock dump capacity required for
the life of mine is 66.3 million LCM. There is sufficient contingency within the waste rock dump designs for any future additional cutbacks
of the Antenna, Koula, and Sunbird pits.
The mine design and schedule does not include
any pit backfilling using waste rock.
There is no known potentially acid forming waste
rock at the Séguéla Mine.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
The Séguéla Gold Mine mining area
layout is shown in Figure 98.
Figure 98: Mining area layout
showing pits, waste rock dumps, haul roads, explosives magazine and bulk storage facility, mining services area, and ROM pad
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Conventional drill and blast, load and haul open
pit mining is being used to extract mineralized material from the Antenna pit. ROM ore is defined by grade control procedures in the pit
and delivered by truck to the ROM pad, located adjacent to the Séguéla processing facility. Waste rock is hauled to the
closest waste rock dump.
A mining contractor will be used for the initial
5.5 years of operations. Afterward, and depending on the extension of the life of mine, mining operations will transition to an owner-operation
model, or the contractor will be retained as the operator.
A common pool of equipment will be used and scheduled
across all active pits, so that movement of equipment between the pits is minimized and consumable and spare parts are shared within the
fleet.
Mining activities operate 24 hours per day, seven
days a week with work occurring on morning, afternoon and night shifts. The scope of work for the mining contractor consists of the following:
| · | ROM crusher feed using loaders on the ROM stockpile. |
| | |
| · | Topsoil removal and stockpiling |
| | |
| · | Haul road construction and maintenance. |
| | |
| · | Maintaining the heavy vehicle maintenance workshop. |
| | |
| · | Maintaining the mining contractor’s offices. |
| | |
| · | Maintaining the washdown facility |
| | |
| · | Maintaining an oil and lubricant storage and
dispensing capability. |
| | |
| · | Maintaining surface stores facilities. |
| | |
| · | Maintaining a surface laydown area. |
16.7.1 | Drill and Blast, Excavate, Load and Haul |
The Séguéla Gold Mine is mined by
conventional truck and excavator operation for the mining of ore and waste. Drill and blasting are planned for oxide, transitional and
fresh ore and waste material. Some free digging of oxide material is planned for weathering zones when feasible. Table 96 summarizes the
drill and blast parameters used. To minimize dilution and ore loss, all mineralized material is drilled and blasted with 5 m bench heights
and be mined in 2.5 m flitch heights. To minimize costs and increase productivity, in high waste stripping pit stages, waste not directly
adjacent to mineralized material will be drilled and blasted with 10 m bench heights where possible. All mining equipment are supplied
by the contractor and all equipment costs are fully considered in the contractor’s schedule of rates.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Table 96: Drill and blast assumptions
Material Type |
Bench
Height (m) |
Diameter
(mm) |
Powder Factor |
Burden (m) |
Spacing (m) |
Subdrill (m) |
Oxide |
5.0 |
127 |
0.30 |
5.00 |
5.80 |
0.50 |
Transitional |
5.0 |
127 |
0.50 |
3.90 |
4.50 |
0.50 |
Fresh Other Pits |
5.0 |
127 |
0.70 |
3.30 |
3.80 |
0.50 |
Fresh Antenna Pit |
5.0 |
127 |
0.90 |
2.90 |
3.40 |
0.50 |
Oxide |
10.0 |
127 |
0.30 |
5.75 |
6.60 |
1.73 |
Transitional |
10.0 |
127 |
0.50 |
4.35 |
5.00 |
1.31 |
Fresh Other Pits |
10.0 |
127 |
0.70 |
3.75 |
4.30 |
1.13 |
Fresh Antenna Pit |
10.0 |
127 |
0.90 |
3.20 |
3.70 |
0.96 |
Two 200 t excavators are the primary excavators
for most material movement over the LOMP; one has been in operation since start-up in February 2023, with mobilization of the second
unit planned in late 2024. The 200 t excavators are complemented by 120 t and 80 t excavators for supplementary mining and wall scaling.
The combined excavator fleet has sufficient capacity to meet the production requirements of the mine plan at 1.46 Mtpa initially and then
ramping up to 1.57 Mtpa from 2025 onwards. It is expected that the fleet of excavators and trucks will be adjusted over the mine life
to meet production requirements. As detailed in Table 97, the excavator fleet has an average of five excavators over the life of the mine.
A total of 18 trucks are planned for in-pit mining
activities over the LOMP, to accommodate hauling from the operating benches to the ROM pad and waste rock dumps. A fleet of eight CAT
777E trucks (90 t) is currently being used for production activities. A further eight CAT 777E trucks will be mobilized in during 2024
with additional units added as required from 2025.
The Cat 777E truck fleet is used to haul waste
material to the waste dump adjacent to each pit and ore to the ROM pad. The furthest ore haulage route is from Ancien to Antenna being
approximately 12 km. The long-haul scenario from Ancien will be conducted using the fleet of CAT 777E trucks without the requirement of
double handling or a dedicated overland haulage fleet.
The combination of fleet sizes for the excavators
and trucks will provide sufficient capacity and flexibility to fulfill the LOMP production schedule in the most cost-effective manner.
16.7.2 | Ancillary and Support Fleet |
The ancillary and support mining fleet includes
dozers, graders, water trucks and service trucks.
The ancillary fleet is required to construct roads,
strip and clear vegetation and topsoil, complete rehabilitation works, maintain dumps and stockpiles and carry out general clean-up operations
around mining faces and provide support to the primary excavation equipment.
Front-end loaders are used on the ROM pad to feed
the ore crusher with a blend from ROM ore stockpiles, removal of oversized boulders, road construction and rehabilitation work.
16.7.3 | Other Mining Infrastructure |
A workshop that maintains the mine fleet has been
constructed for the mining contractor, along with the required offices and storage facilities for the contractor to conduct their operations.
16.7.4 | Equipment and Personnel Requirements |
The estimate of equipment requirements over the
mine life are described in Table 97, which will be shared across the various deposits. The estimated personnel requirements over the mine
life are described in Table 98.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Table 97: LOMP mining equipment requirements
Mining Fleet Load & Haul |
Max LOM |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
2031 |
Excavator 200t |
2 |
1 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
Excavator 120t |
3 |
2 |
2 |
3 |
3 |
3 |
3 |
2 |
1 |
Excavator 80t |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Trucks Cat 777E |
18 |
10 |
16 |
18 |
18 |
18 |
18 |
14 |
14 |
Ancillary |
|
|
|
|
|
|
|
|
|
Dozer |
7 |
6 |
7 |
7 |
7 |
7 |
7 |
6 |
6 |
Grader Cat |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
2 |
2 |
Watercart |
3 |
2 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
ROM Loader |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
Rock Breaker |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Compactor |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Drill & Blast |
|
|
|
|
|
|
|
|
|
Blast Hole Drill Rig |
6 |
4 |
6 |
6 |
6 |
6 |
6 |
4 |
4 |
Grade Control Drill Rig |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
MPU (Bulk Explosive Truck) |
2 |
1 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
The mining personnel levels required over the
life of mine is shown in Table 98.
Table 98: LOMP mining personnel
requirements
Personnel |
Max LOM |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
2031 |
Roxgold Sango Mine Department |
|
|
|
|
|
|
|
|
|
Mine Manager |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Geologists |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
Mining Engineers |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
Geotechnical Engineers & Assistants |
5 |
5 |
5 |
5 |
5 |
5 |
5 |
5 |
5 |
Surveyors & Assistants |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Personnel |
Max LOM |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
2031 |
Admin & Technicians |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
Contractor Management & Support |
|
|
|
|
|
|
|
|
|
Project Manager |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Site Engineers |
6 |
6 |
6 |
6 |
6 |
6 |
6 |
6 |
6 |
SHEQ Manager |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
H&S and Training Coordinator |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
HS&E Training Officer |
12 |
8 |
12 |
12 |
12 |
12 |
12 |
12 |
12 |
Administrative & HR Manager |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Admin / Clerks / Assistants |
15 |
15 |
15 |
15 |
15 |
15 |
15 |
15 |
15 |
Surveyor & Assistants |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
Stores Supervisor |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Stores |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
Watchmen |
15 |
12 |
15 |
15 |
15 |
15 |
15 |
15 |
15 |
Contractor Mining Personnel |
|
|
|
|
|
|
|
|
|
Production Manager |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Mine Superintendent |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
Shift Supervisor |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
Shotfirer |
6 |
3 |
4 |
6 |
6 |
6 |
6 |
4 |
4 |
Blast crew |
16 |
12 |
14 |
16 |
16 |
16 |
16 |
12 |
12 |
Excavator Operator |
34 |
12 |
24 |
34 |
34 |
34 |
34 |
24 |
12 |
Dump Truck Operator |
72 |
32 |
60 |
72 |
72 |
72 |
72 |
56 |
32 |
Dozer Operator |
20 |
12 |
20 |
20 |
20 |
20 |
20 |
20 |
12 |
ROM Loader Operator |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
8 |
All Round Operator |
54 |
30 |
46 |
54 |
54 |
54 |
54 |
46 |
30 |
Driller |
30 |
16 |
24 |
30 |
30 |
30 |
30 |
24 |
16 |
Driller assistant |
30 |
16 |
24 |
30 |
30 |
30 |
30 |
24 |
16 |
Dewatering crew |
12 |
6 |
12 |
12 |
12 |
12 |
12 |
12 |
6 |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Personnel |
Max LOM |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
2031 |
Contractor Maintenance Personnel |
|
|
|
|
|
|
|
|
|
Maintenance Manager |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Workshop Supervisor |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Mechanical Planning Engineer |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
Workshop Supervisor |
4 |
3 |
4 |
4 |
4 |
4 |
4 |
4 |
4 |
Inspector and Conditions Monitoring |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
Heavy Duty Fitter |
42 |
12 |
34 |
42 |
42 |
42 |
42 |
34 |
34 |
Service Person |
24 |
10 |
18 |
24 |
24 |
24 |
24 |
14 |
14 |
Auto Electrician |
7 |
5 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
Boilermaker |
8 |
4 |
6 |
8 |
8 |
8 |
8 |
6 |
4 |
Tire Crew |
12 |
6 |
8 |
12 |
12 |
12 |
12 |
8 |
8 |
Diesel Truck Operator & Assistants |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
Service Truck Operator & Assistants |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
10 |
Workshop Operators |
10 |
6 |
8 |
10 |
10 |
10 |
10 |
8 |
8 |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
16.8 Mining and Production Schedule
16.8.1 | Scheduling Parameters |
A mining and production schedule was prepared
based on the following scheduling parameters:
| · | Monthly scheduling periods. |
| | |
| · | Processing throughput ramp up from 1.46 Mtpa
and increasing to 1.57 Mtpa by 2026. |
| | |
| · | Mined tonnage as required to ensure sufficient
ore stocks are available at the grades required to meet gold production expectations |
| | |
| · | Pit stage sequencing is determined by several
criteria. Whenever feasible, the schedule prioritizes higher-grade and lower strip ratio pit stages early on to facilitate higher gold
production and delay the costs associated with waste mining. |
| | |
| · | Slower mining rate in low waste stripping and
deeper benches where grade control, drill and blast, pit dewatering, and small work areas will reduce mining productivity. |
| | |
| · | Higher mining rate in high waste stripping and
higher benches where 10 m bench heights are blasted, and there are reduced requirements for dewatering and grade control drilling. |
| | |
| · | Maximum vertical rate of advance of 75 m/year. |
| | |
| · | Mining delays due to inclement weather from August through
to October each year. |
| | |
| · | All Inferred Mineral Resources are treated as
waste rock with zero grade. |
Geovia MineSched was used to produce the mining
and production schedule using the scheduling parameters outlined in Section 16.8.1 of this Report. Table 99 summarizes the mining
and production schedule outcomes.
Table 99: Mining and production
schedule results
Schedule Item |
Units |
Value |
Total ROM Ore Processed |
Mt |
11.8 |
Total ROM Ore Grade |
g/t |
3.04 |
Total Waste Mined |
Mt |
146.6 |
Stripping Ratio |
Waste (t): Ore (t) |
12.7 |
Mining Life |
Months |
90 |
Total Mine Life |
Years |
7.5 |
The life of mine production schedule shown in
Table 99 includes planned production for the fourth quarter of 2023 and 2024 through to 2031.
The resulting schedule has a mine life of 7.5
years. Figure 99 and Figure 100 shows the mined volume and tonnes by deposit. Figure 101 shows both the crusher feed tonnes and grade.
Figure 102 shows the stockpile tonnes over the life of mine.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Figure 99: Volume mined by deposit
Figure 100: Tonnes mined by
deposit
Figure 101: Crusher feed tonnes
and grade
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Figure 102: Stockpile tonnes
The mining and production schedule demonstrates
a technically achievable operation for the life of mine. A relativity lower mining movement is maintained until late 2024 and then increases
in line with mobilization of additional mining fleet in 2025 and 2026 when the total mining movement increases with the higher waste stripping
pit stages in two distinct steps up. The key risk to achieving the mine plan is being ahead in mine development, waste stripping and grade
control activities to access deposits and increased confidence in the mineralization to be able to mine in sequence. The schedule is generally
de-risked by the ability to substitute pit stages with similar waste stripping ratios, as well as maintaining sufficient ROM stockpiles.
16.9 | Comments on Section 16 |
The QP is of the opinion that:
| · | The mining method being used is appropriate for
the Antenna deposit and is regarded as appropriate for each of the Ancien, Koula, Boulder, Agouti and Sunbird deposits. The open pit mine
design, TSF design, and equipment fleet selection are appropriate to reach production targets. |
| · | The mine life is estimated as 7.5-years for the
open pit operation. |
| · | The mine plan is based on a successful mining
philosophy and planning is considered low risk. |
| · | All mine infrastructure and supporting facilities
meet the needs of the current mine plan and production rate. |
There is upside potential if the Inferred Mineral
Resources can be upgraded to higher confidence categories with additional work and subsequently converted to Mineral Reserves. There is
also upside potential if those Mineral Resources considered potentially amenable to underground mining methods can be converted to Mineral
Reserves with additional study.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
In late April 2023, Roxgold Sango commenced
commissioning of the Séguéla processing plant with the first gold pour occurring in May 2023.
The process plant design is based on a metallurgical
flowsheet envisioned to produce gold doré at optimum recovery while minimizing initial capital expenditure and operating costs.
The flowsheet consists of crushing, milling, gravity recovery, a carbon-in-leach (CIL) circuit, carbon elution and a gold recovery circuit.
CIL tails are disposed of as tails in the HDPE-lined TSF.
The key criteria for equipment selection are suitability
for duty, reliability, and ease of maintenance. The plant layout is conceived to provide ease of access to all equipment for operating
and maintenance requirements whilst, in turn, maintaining a layout that will facilitate construction progress in multiple areas concurrently.
Provision has been made for expansion should future Mineral Reserves warrant an increase in throughput while maintaining grind size (75
µm) and recovery (94.5 %). Specifically, ensuring there is sufficient space in the plant layout to facilitate the conversion of
the single-stage semi-autogenous grinding circuit (SS SAG) into a semi-autogenous grinding (SAG) and ball milling circuit (SABC). Alternatively,
with minimal capital cost, the throughput could be increased to 1.57 Mtpa by maintaining the SS SAG circuit but coarsening the grind to
106 µm.
The key project design criteria for the plant
are:
| · | Nominal throughput of 1.25 Mtpa. |
| | |
| · | Crushing plant availability of 75%. |
| | |
| · | Plant availability of 91.3% for grinding, gravity
concentration, leach plant and gold recovery operations. |
| 17.2 | Process Plant Performance |
The plant commenced commissioning in late April 2023
and has ramped up steadily whereby in September 2023, regular plant throughputs of 180 dry tonnes per hour were achieved. Gold production
has been increasing with improvements in head grade, recovery and mill availability.
Performance testing
was carried out from August 15 to 26, 2023, as set out in the agreement between Roxgold and its EPCM contractor. The main key performance
indicators for the crusher and mill throughput were exceeded and the gold recovery parameters met. The SAG mill availability of 96.2 %
was achieved. All gold recovery centers such as the gravity circuit, CIL, elution and electrowinning performed as designed. Table 100
outlines the process plant performance summary to December 31, 2023.
Table 100: Process plant performance
summary
Parameter |
Unit |
Q2 2023 |
Q3 2023 |
Q4 2023 |
Total 2023 |
Ore Processed |
(dmt) |
109,605 |
310,387 |
387,624 |
807,617 |
Plant Runtime |
(%) |
48.1 |
86.6 |
95.7 |
86.3 |
Throughput |
dtph |
103 |
162 |
186 |
159 |
Grade Processed |
(g/t) |
1.56 |
3.83 |
3.62 |
3.42 |
Gold Recovery - Total |
(%) |
89.6 |
93.4 |
94.9 |
93.9 |
Gold Recovered |
(oz) |
4,917 |
35,695 |
42,824 |
83,435 |
*Totals may not
add due to rounding
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Deposition of
tailings into the TSF commenced with first ore through the SAG mill and has continued according to the TSF Operating Manual’s beaching
schedule. The decant return water provides the bulk of the process water with the raw water being used to top up as required and in accordance
with the design.
| 17.3 | Process Plant Design Criteria |
The process plant consists of the following circuits:
| · | Primary crushing of ROM material. |
| | |
| · | A surge bin with overflow stockpile to provide
buffer capacity ahead of the grinding circuit. |
| | |
| · | Grinding circuit: SS SAG mill with cyclones. |
| | |
| · | Gravity recovery of cyclone underflow by a semi-batch
centrifugal gravity concentrator, followed by intensive cyanidation of the gravity concentrate and electrowinning of the pregnant leach
solution in a dedicated cell located in the gold room. |
| | |
| · | Trash screening and thickening of cyclone overflow
prior to leaching. |
| | |
| · | Gold leaching in a CIL circuit. |
| | |
| · | Acid washing of loaded carbon and split AARL-type
elution followed by electrowinning and smelting to produce doré. Carbon regeneration by rotary kiln. |
| | |
| · | Disposal of tailings to the TSF. |
The most pertinent design criteria to the plant
are summarized in Table 101.
Table 101: Summary of the plant
design criteria
Parameter |
Units |
Value |
Plant Throughput |
Mtpa |
1.25 |
Gold Head Grade (LOMP) |
g/t Au |
2.8 |
Crushing Plant Availability |
% |
75 |
Leach and Refinery Availability |
% |
91.3 |
Bond Crusher Work Index (CWi) – Design |
kWh/t |
19.3 |
SMC Axb |
|
30.6 |
Ore Specific Gravity |
t/m3 |
2.82 |
Angle of Repose |
degrees |
37 |
Material Moisture Content |
% |
5.0 |
Feed Size |
F100 |
800 |
Crushing Plant Product Size, P80 |
mm |
150 |
Cyclone Overflow Size, P80 |
µm |
75 |
Design Gravity Gold Recovery - Design |
% |
40 |
Overall Gold Recovery – Design (Without Gravity) |
% |
95.0 |
Leach Time – Target |
h |
24 |
Leach Tails Solution Grade |
g/m3 Au |
0.01 |
Sodium Cyanide Addition (NaCN) |
kg/t ore |
0.22 |
Lime Addition (at 93% CaO purity) |
kg/t ore |
0.33 |
Elution Column Size |
tonnes |
4.0 |
Number of Carbon Strip Per Week |
# |
6 |
Leach Tails CNWAD |
ppm |
50 to 100 |
An overall process flow diagram depicting the
unit operations incorporated in the selected process flowsheet is presented in Figure 103.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Figure 103: Séguéla
Gold Mine process flow (Source: Roxgold Sango, 2023)
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 17.4 | Process Plant Description |
17.4.1 | Materials Handling and Crushing Circuit |
ROM material is trucked from the pit to the ROM
pad and dumped on the ROM pad to be reclaimed by a Cat 988 front end loader and loaded to the ROM bin. A mobile rock breaker is utilized
to break oversize rocks at the top of the feed bin.
Mineralized material is drawn from the ROM bin
via an apron feeder, scalped via a vibrating grizzly with the undersize reporting directly to the discharge conveyor and the oversize
reporting to a primary jaw crusher for further size reduction. All crushed and scalped mineralized material will by conveyed to a surge
bin, which provides approximately 30 minutes of surge capacity.
The crushing circuit is designed for 75 % availability,
whereas the milling operation is designed for 91.3 % availability, resulting in excess crushed mineralized material while the crusher
is operational. The excess crushed ore allows for routine crusher maintenance without interrupting feed to the mill.
The crushed ore bin is equipped with an apron
feeder to regulate feed into the SAG mill. Crushed ore drawn from the surge bin feeds the SAG mill circuit via the mill feed conveyor.
Lime is added via a storage bin for pH control as required.
The material handling and crushing circuit includes
the following key equipment:
17.4.2 | Reclaim, Grinding and Classification Circuit |
The primary grinding circuit consists of a SAG
mill that operates in closed circuit with a classifying cyclone pack. Oversize from the SAG mill trommel is directed to a scats bunker
and returned to the mill feed via a front-end loader, while the undersize gravitates to the cyclone feed pump box where it is pumped to
the classifying cyclones. The cyclone overflow gravitates to a trash screen prior to the pre- leach thickener, while the underflow gravitates
to the SAG mill feed chute for further grinding. A portion of the cyclone underflow feeds the gravity concentration circuit.
The grinding circuit includes the following key
pieces of equipment:
| · | Classification cyclones. |
| 17.4.3 | Gravity Recovery Circuit |
The gravity circuit comprises of a centrifugal
concentrator complete with a feed scalping screen. Feed to the circuit is extracted from the cyclone underflow discharge launder and flows
by gravity to the scalping screen. Gravity scalping screen oversize at +2 mm reports by gravity to the mill feed. Scalping screen undersize
is fed to the centrifugal concentrator. Gravity tails gravitate to the mill discharge hopper.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Operation of the gravity concentrator is semi-batch
and the gravity concentrate is collected in the concentrate storage cone and subsequently leached by the intensive cyanidation reactor
circuit (ICR).
The gravity recovery circuit includes the following
key pieces of equipment:
| · | Gravity feed scalping screen. |
| | |
17.4.4 | Intensive Cyanidation Reactor |
Concentrate from the gravity concentrator is sent
to the intensive cyanidation reactor to recover the contained gold by cyanide leaching.
The concentrate from the gravity concentrator
is discharged to the intensive cyanidation reactor gravity concentrate storage cone and de-slimed before transfer to the intensive cyanidation
reactor.
ICR leach solution (2% NaCN and 2 % NaOH) is made
up within the heated intensive cyanidation reactor vessel feed tank. Oxygen is sparged into the reactor vessel. From the feed tank, the
leach solution is circulated through the reaction vessel for approximately 16 hours, then drained back into the feed tank. The leached
residue within the reaction vessel is washed, with wash water recovered to the solution tank, and then the solids are pumped to the mill
discharge hopper.
Intensive cyanidation reactor pregnant solution
is pumped to the intensive cyanidation reactor pregnant solution tank and recovered as gold sludge using a dedicated electrowinning cell.
The sludge is combined with the sludge from the carbon elution electrowinning cells and smelted or separately smelted for metallurgical
accounting purposes.
The intensive cyanidation reactor circuit includes
the following key pieces of equipment:
| · | Gravity concentrate storage cone. |
| | |
| · | Intensive cyanidation reactor. |
| | |
| · | Reactor vessel feed tank heater. |
| | |
| · | Intensive cyanidation reactor pregnant solution
tank. |
| | |
| · | Intensive cyanidation reactor electrowinning
cell. |
17.4.5 | Pre-Leach Thickening |
Cyclone overflow gravitates over the trash screen,
to remove foreign material prior to leaching. Trash reports to the trash bin and is periodically removed for emptying. Screen undersize
gravitates to the pre-leach thickener where the solids concentration is increased prior to the leach feed. Thickener overflow gravitates
to the process water tank and the underflow is pumped to the CIL circuit.
The pre-leach circuit includes the following key
pieces of equipment:
| 17.4.6 | Leaching and Adsorption Circuit |
The leach circuit consists of one pre-leach tank
and six CIL tanks. Oxygen can be sparged to each of the tanks to maintain adequate dissolved oxygen levels for leaching.
Cyanide solution is added into the pre-leach tank
and the first three CIL tanks as required.
Fresh/regenerated carbon from the carbon regeneration
circuit is returned to the last tank of the CIL circuit and is advanced counter-currently to the slurry flow by airlifts. The inter-tank
screen in each CIL tank retains the carbon
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
whilst allowing the slurry to flow by gravity
to the downstream tank. This counter-current process is repeated until the carbon, by then loaded with gold, reaches the first CIL tank
via an air lift system. A recessed impeller pump is used to transfer slurry from the first CIL tank to the loaded carbon recovery screen
mounted above the acid wash column in the elution circuit.
Slurry from the last CIL tank gravitates to the
vibrating carbon safety screen to recover any carbon leaking from worn screens or overflowing tanks. Screen underflow gravitates to the
tailings hopper before being pumped to the HDPE lined TSF. Screen oversize (recovered carbon) is collected in the fine carbon bin for
potential return to the circuit.
The leach and carbon adsorption circuit includes
the following key pieces of equipment:
| · | Loaded carbon recovery screen. |
| | |
| 17.4.7 | Carbon Acid Wash, Elution and Regeneration Circuit |
Prior to carbon stripping (elution), loaded carbon
is treated with a 3 % hydrochloric acid solution to remove calcium, magnesium and other salt deposits that would otherwise render the
carbon less active leading to less efficient subsequent elutions.
Loaded carbon from the loaded carbon recovery
screen flows by gravity to the acid wash column.
Entrained water is drained from the column and
the column is then refilled with a 3 % hydrochloric acid solution, from the bottom up. Once the column is filled with the carbon, it is
left to soak in the acid solution for 30 mins after which the spent acid solution is rinsed from the carbon and discarded to the TSF via
the tails hopper.
The acid washed carbon is then transferred to
the elution column for carbon stripping. The acid wash circuit includes the following key equipment:
Carbon stripping (elution) uses the split AARL
process. The elution sequence commences with pre-soaking the carbon at a temperature of 95°C with a 2 % w/w NaOH and 2% w/w NaCN solution.
Upon completion of the pre-soak, the elution is performed under pressure at a temperature of 125°C.
Four bed volumes of low-grade (lean) eluate from
the previous elution are passed through the column at a rate of 2 BV/h. The pregnant eluate from this initial 4 BV cycle is discharged
into a pregnant solution tank, which serves to decouple the elution process from the subsequent electrowinning unit operation. Once the
lean eluate is exhausted, new incoming strip solution (6 BV) is sourced from the strip solution tank. Only 2 BV of this strip solution
reports to the pregnant eluate tank, with the last 4 BV used for cooling down the carbon before being directed to the lean eluate tank
for re-use in the next elution cycle.
Upon completion of the cool down sequence, the
carbon is hydraulically transferred to the carbon regeneration kiln feed hopper via a de-watering screen.
The stripping circuit includes the following key
pieces of equipment:
| · | Strip solution heater with heat exchangers. |
| | |
| · | Pregnant solution tanks. |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Carbon is reactivated in a diesel fired rotary
kiln. Dewatered barren carbon from the stripping circuit is held in the kiln feed hopper. A screw feeder feeds the carbon into the reactivation
kiln, where it is heated to 700°C – 750°C in an atmosphere of superheated steam to restore the activity of the carbon. Re-activated
carbon exiting the kiln is quenched with water and flows onto the carbon sizing screen. Sizing screen oversize is transferred to the last
CIL tank to replenish the CIL carbon inventory. Sizing screen undersize reports to the carbon safety screen.
Fresh carbon, to make up for attrition losses,
is added to the last CIL tanks by opening a new bag and dumping it directly above the tank from the leach area upper level.
The carbon reactivation circuit includes the following
key pieces of equipment:
| · | Carbon dewatering screen. |
| | |
| · | Regeneration kiln including feed hopper and screw
feeder. |
| | |
17.4.8 | Electrowinning and Gold Room |
Gold is recovered from the pregnant eluate by
electrowinning and smelted to produce doré bars.
The pregnant eluate is pumped through two electrowinning
cells with stainless steel mesh cathodes. Gold is deposited on the cathodes and the resulting barren solution gravitates back to the pregnant
solution tank until a targeted low gold concentration is achieved. One additional electrowinning cell is dedicated for processing ICR
pregnant solution. Barren solution from all electrowinning is discharged to CIL Tank 1.
Upon completion of one or more cycles of electrowinning,
the cathodes are removed, and gold sludge is washed off the cathodes at a dedicated wash box with a high-pressure water cleaner. The gold
bearing sludge is recovered from the wash water by decantation. The sludge is dried in an oven, mixed with fluxes, and smelted in a diesel
fired furnace to produce gold doré.
The electrowinning and smelting process take place
within a secure and supervised gold room equipped with access control, intruder detection and closed-circuit television surveillance.
The electrowinning circuit and gold room includes
the following key pieces of equipment:
| · | Electrowinning cells with rectifiers. |
| | |
| · | Induction smelting furnace with bullion moulds
and slag handling system. |
| | |
| · | Dust and fume collection system. |
| | |
| · | Gold room security system. |
17.5 | Reagent Handling and Storage |
For the management of unexpected reagent spills,
the reagent preparation and storage facilities are located within containment areas designed to accommodate 110 % of the volume of the
largest tank. Where required, each reagent system is located within its own containment area to facilitate its return to its respective
storage vessel and to avoid the mixing of incompatible reagents. Storage tanks are equipped with level indicators, instrumentation, and
alarms to ensure spills do not occur during normal operation. Appropriate fire and safety
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
protection, eyewash stations, and Safety Datasheet
(SDS) stations are located throughout the facilities. Sumps and sump pumps are provided for spillage control.
The following reagent systems are installed: quicklime,
sodium cyanide, sodium hydroxide, hydrochloric acid, flocculant, activated carbon, anti-scalant and smelting fluxes.
17.6 | Control Systems and Instrumentation |
The plant control system is a network of programmable
logic controllers (PLCs) sitting beneath a supervisory control and data acquisition (SCADA) network layer. The programmable logic controllers
perform the necessary controls and interlocking while the SCADA terminals monitor the PLCs and provide an interface for operator interaction.
Communication of the programmable logic controllers
and SCADA terminals is achieved via a plant wide Ethernet network, the backbone of which consists of dedicated, single mode, fiber optic
cables.
Field instrumentation and drive status signals
are interfaced to the plant control system by fiber optic communications installed as optical fiber ground wire onto the high-voltage
power lines. Vendor packages are connected to the SCADA network via a communications link, where appropriate.
17.7 | Electrical Reticulation |
Power distribution within the plant area and vicinity
is three-phase, 50 hertz at 11 kV and 415 v. The accommodation camp is connected and powered by the nearby existing 33 kV power line.
Power consumption for each general plant area
is metered.
The 11 kV power distribution cables are generally
underground within the plant area, while all other plant cabling is in above-ground cable racks attached to buildings and structural steelwork.
Overhead power lines have been installed where
no interference may be caused to mobile equipment, e.g. cranes. Overhead power lines are installed to the following remote locations outside
the plant area:
| · | Tailings storage facility. |
| | |
Power supply to the bores is provided by either
diesel generators, solar photovoltaics (PV), or the site’s power distribution network.
17.8 | Services and Utilities |
17.8.1 | High- and Low-Pressure Air |
High pressure air at 700 kPa is produced by compressors.
The entire high-pressure air supply is dried and used to satisfy both plant air and instrument air demand. Dried air is distributed via
the air receivers located throughout the plant.
Low pressure air for the leach tanks is supplied
by air blowers.
A vendor supplied pressure swing adsorption oxygen
plant has been installed to provide oxygen to the CIL circuit, and intensive leach reactors.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
17.8.3 | Raw Water Supply System |
Raw water is stored in a raw water storage tank
and supplied to all users requiring clean water with low dissolved solids, such as:
| · | Fire water for use in the sprinkler and hydrant
system. |
| | |
| · | Feed to the water filtration system. |
| | |
17.8.4 | Process Water Supply System |
Water, which will be used in a wide range of services,
is sourced primarily from the TSF decant return steam or where the presence of cyanide and other contaminants is not desired, from the
water storage dam. Potable water is sourced from local bores and treated in a reverse osmosis plant, located at the accommodation camp.
Mine dewatering is directed to the water storage dam.
Pre-leach thickener overflow and TSF decant water
meet the main process water requirements. Raw water provides any additional make-up water requirements.
Bore water is treated to provide potable water.
Potable water is stored in the camp potable water tank and pumped to the camp buildings and the potable water tank at the process plant
site. To prevent back contamination of the drinking water supply, no potable service points, or direct connection of this water to process
equipment.
Raw water is treated to provide water to a two-stage
filter system. Filtered water is stored in a tank and pumped to the elution circuit and to various slurry pumps as gland water.
Sewage from the process plant is forwarded by
a sewage pumping system to the camp sewage treatment plant where it is treated along with the camp site sewage. The treated water is used
as irrigation water for the camp’s vegetation and gardens.
17.9 | Comments on Section 17 |
The QP considers process requirements to be well
understood with commissioning and ramp up operating data confirming design assumptions. There is no indication that the characteristics
of the material being mined will change and therefore the processing and recovery assumptions applied for future mining, including that
mined from the other deposits, are considered as reasonable for the LOMP. The plant is of a conventional design and uses readily available
consumables.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
The general layout of the Séguéla
Mine is illustrated in Figure 104.
Figure 104: Layout of the Séguéla
Gold Mine
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Ore is currently transported from the Antenna
open pit deposit via haul truck and placed in stockpiles on the ROM pad located adjacent to the process plant. As the other pits are accessed,
ore will be transported in the same manner. Ore is fed by a front-end loader from the ROM stockpiles, or directly tipped into the primary
crusher. Ore is drawn from the ROM bin via an apron feeder and scalped via a vibrating grizzly with the undersize reporting directly to
the discharge conveyor and the oversize reporting to a primary jaw crusher for further size reduction. All crushed and scalped material
is conveyed to a surge bin.
A single stage SAG milling circuit is in operation.
Crushed ore and water are fed to the mill and discharged via a trommel. Trommel oversize is collected in a scats bunker.
The tailings system comprises a pipeline and associated
tailings pumps. The TSF consists of an HDPE lined side-valley storage formed by two multi-zoned earth-fill embankments.
The water storage dam is the primary collection
and storage pond for clean raw and process water.
The process plant and specific infrastructure
is located within a high security area. General site infrastructure buildings are situated outside the high security area bounded by a
single perimeter security fence. The camp, TSF, and water storage facility are located outside the process plant security fence but are
contained within their own fences. Entry to the main administration area is via the main access security building with access to the process
plant high security area via an additional security building that incorporates turnstiles, change room and laundry.
The mine services area is located within the general
security perimeter fence. In this area, the following contractor functions/items are included:
18.3 | Tailings Storage Facility |
Roxgold Sango engaged Knight Piésold Pty
Ltd (KP) to conduct the design of the TSF and surface water management.
The TSF consists of a zoned side-valley earth
fill embankment, forming a total footprint area of approximately 34.3 ha for the Stage 1 TSF and 84.2 ha for the final TSF.
A conceptual study is recommended to determine
the maximum practical capacity of the TSF. For the TSF to be GISTM (Global Industry Standard of Tailings Management) compliant, it will
be necessary to buttress the entire TSF. The current design includes a large waste dump buttress for the north dam. The east and west
dams will also require buttressing to lower the consequence classification. To buttress the west dam, the tailings delivery and return
pipeline trench, power line and property fence will need to be moved westward from the current design location. The tailings delivery
and return pipeline trench is currently partially filled with sediment that must be removed to provide sufficient capacity in case there
is a rupture in the tailings pipeline.
Various GISTM related work is planned for 2024
such as: site visits from the Independent Tailings Review Board; Dam Safety Review; revised dam breach study to update the Operation Monitoring
Surveillance manual; Trigger Action Response Plan and Emergency Preparedness Response Plan. Once these key documents are updated, GISTM
related community work should commence.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
The TSF embankment will be constructed via annual
raises to suit storage requirements and the availability of suitable mine waste. The Stage 1 TSF is designed to provide 16 months of storage
capacity, to allow Stage 2 construction to be carried out during the subsequent dry season. Downstream raise construction methods will
be used throughout operation and the embankments will generally be buttressed using mine waste to form an integrated waste landform. A
seepage collection system was installed within and downstream of the TSF embankment.
The entire TSF basin area has been cleared, grubbed
and topsoil stripped. A compacted soil liner has been constructed over the entire TSF basin area, comprising either reworked in-situ material
or imported low permeability material. A 1.5 mm HDPE geomembrane liner has been installed over the entire TSF basin area (overlying the
compacted soil liner) and on the upstream embankment face.
The TSF design incorporates an underdrainage system
to reduce pressure head acting on the soil liner, reduce seepage losses, increase tailings densities, and improve the geotechnical
stability of the embankments. It comprises an upstream toe drain and a network of finger drains and collector drains. The underdrainage
system drains by gravity to a collection tower located at the lowest point in the TSF. In addition, a groundwater collection system has
been installed beneath the low permeability soil liner that also serves to detect any potential leaks in the liner system. Solution recovered
from the underdrainage and groundwater systems is released to the top of the tailings mass via submersible pump, reporting to the supernatant
pond.
Supernatant water is removed from the TSF via
submersible pumps located within decant towers, constructed at start-up, and raised during operation. Solution recovered from the decant
system is pumped back to the plant for re-use in the process circuit.
An operational emergency spillway will always
be available during TSF operation. The closure spillway will be located at the final supernatant pond location and will be constructed
to ensure all rainfall runoff from the TSF will safely discharge after operations cease.
Tailings are discharged by sub-aerial deposition,
using a combination of spigots at regularly spaced intervals from the embankments. A soil lined pipeline containment trench has been constructed
during Stage 1 to contain both the tailings delivery pipeline and decant return pipeline to the plant site.
The stability and seepage performance of
the facility has been designed to international guidelines and standards. Monitoring instrumentation has been incorporated into the design
to facilitate detection of any potential issues which may arise during operations.
The monitoring includes:
| · | Monitoring bores and surface water sampling stations
downstream of the TSF. |
| | |
| · | Standpipe piezometers within each embankment
to monitor the phreatic surface. |
| | |
| · | Settlement pins on embankment crests to monitor
embankment movement. |
The piezometers and monitoring bores are checked
monthly for water levels and quarterly for water quality.
At the end of the TSF operation, the downstream
faces of the embankments will have an overall slope profile of 3H:1V with 5 m wide benches located at 10 m height intervals. The downstream
profile will be inherently stable under both normal and seismic loading conditions. The embankment downstream faces will be re-vegetated
once the final downstream profile is achieved.
At closure, the TSF should be fully water-shedding.
After the water in the TSF has been proven to be benign, runoff can be allowed to discharge via the closure spillway. The TSF closure
spillway will be excavated through the eastern ridge line, discharging into the adjacent drainage course downstream of the TSF. Rehabilitation
of the tailings surface will commence upon termination of deposition into the TSF. The closure spillway will be constructed in
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
such a manner as to allow rainfall runoff
from the surface of the rehabilitated TSF to flow into the surrounding natural drainage system.
It is anticipated
that a low permeability layer, overlying a capillary break layer comprising mine waste rock material, will be required on the final tailings
surface to reduce rainfall infiltration into the tailings mass.
The finished surface
will be shallow ripped and seeded with shrubs and grasses.
Sediment control
structures include sediment dams that have been constructed in the downstream reaches of catchments impacted by site infrastructure.
the sediment control structures are designed to limit maximum water depth as much as practicable for safety reasons. Further source control
is used to reduce the amount of sediment generated.
Preliminary water
balance modelling indicates that the volume of the water storage dam will be cyclical. Additional key water management findings from
the water balance modelling include the following:
| · | The
TSF is designed to hold the tailings plus the design rainfall conditions, and thus has sufficient
storm water storage capacity for all design storm events and rainfall sequences. |
| · | The
supernatant pond should be removed (and treated if necessary) as soon as practicable after
decommissioning. |
| · | Process
water shortfall is expected to occur under average and design dry climatic conditions. Peak
shortfalls occur in the initial stages of operation, primarily due to the lower runoff volumes
into the TSF. |
| · | A
water storage dam storage capacity of 500,000 m3 is required to provide sufficient
make-up water, supplemented by pit dewatering. The water storage dam has been constructed
early to allow a full wet season for filling prior to commissioning. |
| · | Under
design dry conditions, with a pit dewatering rate of 16.5 L/s or greater (which is expected
based on the groundwater assessment), there is sufficient make up water available to the
plant from the water storage dam. The water balance needs to be updated with data from the
wet and dry season cycle to verify if more diversions can be put in place such as above the
TSF catchment. |
| · | Rip
rap armoring was not completed during construction since no waste rock was available. Rip
rap armoring as per design is required for the TSF spillway, water storage dam spillway,
and diversion ditch to prevent downstream sedimentation and improve dam safety (limit erosion
of water retaining structures). |
| · | The
diversion ditch crossing the main public road is currently undersized. Two additional 2m
x 2m culverts are required to be installed to reduce the risk of breaching the public road. |
| 18.6 | Water
Storage Facility |
The water storage
dam is the main collection and storage pond for clean process water on site and is designed to be able to store up to 500,000 m3
of water at the maximum operating level. The water storage dam has a catchment area of 183 ha (expanding to a total of 687 ha with
the Antenna pit diversion channel catchment). The water collected in the water storage dam is pumped back to the plant to supply plant
raw water requirements, and process make-up water requirements.
Upon decommissioning,
the water storage dam will remain in place. Water balance modelling indicates that the water storage dam stored volume will be cyclical.
If the pit diversion is not decommissioned, the water storage dam will continue to discharge each wet season.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
As at the effective date of this Report,
the water storage dam capacity is sufficient for plant and site requirements.
| 18.7 | Water
Supply and Sewage |
Process water is
decant water returned from the TSF and water containing reagents and other contaminants circulating within the process plant system.
The site process water tank provides surge capacity in the event of an interruption to the supply of TSF return water. Provision has
also been made to top-up the process water from the raw water system should this be required. Process water is delivered to a process
water pond or tank adjacent to the process plant via the following sources:
| · | Overflow
from the raw water tank. |
| · | Tailings
storage facility decant return water. |
| · | Pre-leach
thickener overflow. |
From the process
water tank, process water is distributed by duty and standby single stage process water pumps. The main uses for process water include:
| · | Slurrying
of new feed in the SAG mill. |
| · | Dilution
of mill discharge for classification. |
The plant’s
raw water is supplied from the water storage dam to a tank located adjacent to the process plant.
Water drawn from
an elevated suction nozzle part way up the tank is distributed for use as raw water, process water make-up and, after treatment, as filtered
water.
A second suction
nozzle at the base of the raw water tank supplies the fire water pumps. The difference in elevation between the two nozzles ensures that
in the event of an interruption to the raw water supply there is always a reserved quantity of water available for firefighting.
Raw water is reticulated
through the plant by dedicated raw water pumps and used for:
| · | Flushing
water in the acid wash. |
| · | Raw
water will be made available to the mine services area. |
The fire water
system comprises:
| · | An
electrical jockey pump. |
| · | An
electrical fire water pump. |
| · | A
diesel standby fire water pump. |
| · | Fire
water main including standpipes, hydrants and hose reels. |
| · | Fire
water will be distributed to the mine services area including the diesel storage facility. |
The fire water
distribution header pressure is maintained by the electric jockey water pump. An electric fire water pump automatically starts on a drop
in line pressure. The diesel fire water pump automatically starts if the line pressure continues to drop below the target supply pressure
or during a power failure.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 18.7.3 | Filtered
(Including Gland Seal) Water |
Some raw water
uses require water with a low suspended solids content (mill cooling water, elution circuit and pump gland seals). To satisfy this need,
a portion of the raw water is subjected to water treatment by filtration. Filtered water is stored within a dedicated filtered water
storage tank from where it is pumped to the various end users by dedicated duty and standby pumps. The pressure of a portion of the filtered
water is boosted through a second stage booster pump to render it suitable for the higher-pressure duties (gland seals).
Potable water is
sourced from the accommodation camp potable water system. A satellite storage tank is provided at the process plant and water distributed
from that tank goes through a further stage of ultraviolet sterilization to ensure its suitability. Potable water is distributed to site
buildings and safety shower/eyewash stations.
| 18.7.5 | Raw
Water Supply Pipeline |
The main water
supply pipeline is from the water storage facility to the process plant and camp water treatment plant. The pipe route from the water
storage facility is adjacent to the access road to the processing plant. The water storage dam pipeline is connected to the raw water
tank within the process plant and the accommodation camp.
| 18.7.6 | Water
Supply Development |
The water storage
dam was constructed prior to the 2022 wet season to ensure sufficient water was stored before the plant went into production. Production
bores have been developed to supplement the mine dewatering and water storage facility flows.
Pumping stations
are located in the following areas:
| · | Floating
pump from the water harvesting and storage facilities to supply raw water to the process
plant. |
| · | Decant
pump station from the TSF to pump water back to the processing plant. |
| · | Open
pit dewatering pumping station to dewater the mine and supply water to the processing plant
via settling pond. |
| · | Treated
sewage to the TSF or sewage facility. |
| · | Potable
water pump from camp to plant. |
The process plant
operators at the wet plant control room control the water delivery from the water storage facility to the plant raw water tank.
A sewage treatment
system, located at the camp site, has been installed to service the administration and plant buildings and the 170-person accommodation
camp. Sewage from the plant is pumped to the treatment facility at the camp via a pump station fitted with macerating sewage pumps.
All sewage water
is treated before the treated effluent is pumped to the tailings storage or sewage facility.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 18.8 | Mine
Access and Haulage Roads |
An existing public
road has been diverted around the plant site and various mining infrastructure. The public road has been re-routed to the east of the
Boulder pit, continuing north-west around the Koula pit, and reconnects to the existing public road near the process plant site and water
storage dam.
The plant site
is accessed by a new section of road that is connected to the existing public road. The plant access road continues beyond the plant
main entrance to provide access to the 90 kV switchyard and the fuel depot adjacent to the mine services area.
The design basis
for the diversion roads is as follows:
| · | Formation
width 8 m (2 x 3.5 m traffic lanes plus 2 x 0.5 m shoulders). |
| · | Design
speed 40 km/h on the process plant (30 km/h posted limit) and camp access road and on the
approach curves to the junction. |
| · | Maximum
10 % vertical grade. |
| · | Unsealed
wearing surface. |
| · | Intersections
designed to accommodate semi-trailer type vehicles (19 m semi-trailer). |
| · | LIDAR
topography contour data. |
A network of haul
roads has been developed based on the location of the Antenna, Koula, Ancien, Boulder, Sunbird and Agouti pits. Adjacent to the open
pits are storage areas for mine waste that may be hauled and used as structural fill for TSF embankment construction and raises.
The design basis
for the haul roads are as follows:
| · | Design
vehicle: CAT 777 haul truck. |
| · | LIDAR
topography contour data. |
| · | Maximum
8 % vertical grade, 40 km/h design speed (20 km/h inside facilities). |
| · | Pavement
width 24.4 m (excluding safety berms, including side ditches, >3.5 x width of widest haulage
vehicle). |
| · | 2
x 10.7 m wide traffic lanes. |
| · | Unsealed
wearing surface. |
| 18.9 | Mining
Contractor’s Infrastructure |
An area adjacent
to the process plant has been demarcated as the mining services area. The mining contractor has provided its own workshop, store facilities,
offices, washdown area and waste oil management facility, which are located within the mining contractor’s area. The washdown slab
incorporates a silt and oil trap, and an oil separator removes any contaminant oil from the wastewater before it is recycled into the
wash bay facility, with excess water used for dust suppression. The mining contractor manages the safe removal of waste oil by using
approved suppliers of waste oils as required by law.
Treatment and disposal
of sewage from the contractor’s area is through the sewage treatment facility located at the camp.
Explosive materials
are stored in a magazine and bulk emulsion plant segregated 500 m from each other and located in a remote area, well away from people
and major infrastructure, adhering to the separation distance requirements. The magazine and bulk emulsion plant is secured within a
fenced compound and surrounded by embankments. The magazine is always manned with security.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 18.10 | Administration
and Plant Buildings |
The following buildings are located
within the low security area:
| · | Main
entrance guardhouse. |
| · | Emergency
response building. |
| · | Security
building with clinic and change room (access control to the process plant). |
The administration
building provides a meeting room, male and female ablutions, kitchen, and offices for management, mine and process plant technical services
and administrative personnel.
The administration
office is fitted throughout with split-system air-conditioners and reticulated power from an uninterruptible power supply to service
computers and peripherals. A parking lot is located at the front of the administration building.
The security and
first aid building are located at the mine entrance. The security office houses a security reception area and the security manager’s
office. The first aid area houses the nurse and the doctor within the low security area. A parking lot is also located at this building
for site visitors.
The following buildings
are located within the high security area:
| · | Motor
control center building. |
The high security,
laundry and change room building are located at the entrance to the high security area. This building has a guard house, in/out one-way
turnstiles, a laundry room, and male and female change rooms. This building also includes an ablution section that is only accessible
from the high security area.
The plant workshop
is a single steel framed building arranged in three separate areas for mechanical, electrical, and welding workshops.
The warehouse and
reagent stores are single steel framed buildings with eaves height that are at least 6 m to allow for good crane and forklift access.
The warehouse has an outdoor fenced enclosure for laydown storage. Delivery vehicles for both the warehouse and reagent stores report
to the security office in the high security area for inspection before and after deliveries are made.
The laboratory
and sample preparation buildings comprise:
| · | Unloading
and drying area. |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| · | Atomic
absorption equipment room. |
| · | Metallurgical
laboratory. |
| · | Environmental
laboratory. |
| · | Grade
control preparation area. |
| · | Exploration
and sample preparation area. |
| · | Male
and female ablutions. |
Electrical medium
voltage and low voltage switch rooms are located near the processing facility.
A process control
room is located above the CIL tanks and able to view the mill on one side and the CIL circuits on the other. The control room includes
a titration room.
The plant office
includes a kitchenette, male and female toilets, a meeting room, and office areas for the maintenance superintendent, plant foreman (electrical,
mechanical, and mill), maintenance planner, and plant metallurgists.
The gold room is
a steel-clad building. The building houses the leach reactor, calcine oven, electrowinning cells, smelting furnace, safe (enclosed within
a concrete vault), and associated equipment. A supervisor workstation is installed in the gold room; this workstation is equipped with
a telephone and data connection. A secure area with inner and outer doors ensures that the gold room remains sealed during bullion transfer
to the transport vehicle. All operations within the gold room will be subject to full-time closed-circuit television (CCTV) surveillance
with security alarms provided to the security coordinator.
Two mess halls
are incorporated in the plant and administration building areas. Both buildings have verandas attached to them. All meals are prepared
at the village or accommodation camp outside the high security area and transported into the high security mess at mealtimes.
The accommodation
camp houses the senior level construction and operations personnel. The remaining personnel are accommodated in the nearby town of Séguéla
(house rentals, hotels, etc.).
The accommodation
camp and facilities are for 170 staff not residing in the local area. The camp is located east of the process plant and consists of the
following major components:
| · | 3
x 4-person manager style self-contained units complete with bedroom, ensuite bathroom and
toilet. |
| · | 14
x 12-person single room units complete with bedroom, ensuite bathroom and toilet. |
| · | Kitchen,
dining, and wet mess facility. |
| · | Security
fencing/gates and security office. |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Power supply to
the site is via a grid connection to the 90 kV powerline from the Laboa to the Séguéla substation. The transmission line
terminates at a substation/switchyard located adjacent to the process plant site. The substation has a 90/11 kV step-down transformer
and provides an 11 kV supply to the plant substation.
A grid supply from
Côte d’Ivoire is, by world standards, economically priced and much more financially favorable than other options including
self-generation as the tariff is based on a mix of hydro and thermal generation with a large portion of hydro.
The company La
Société des Energies de Côte d’Ivoire (CI-ENERGIES) own the National Interconnected Transmission System in
Côte d’Ivoire, and Compagnie Ivoiriennne d’Electricite (CIE) manages the electricity generation and transmission network
for the Government.
In the event of
a power outage, there is a generator at the plant and one at the accommodation camp. The plant emergency generator is sized to operate
drives that are deemed critical, such as agitators and pumping stations.
The electrical
loading figure estimates are shown in Table 102.
| Table 102: | Electrical
load estimates for the Séguéla Gold Mine |
Connected
load |
12
MW |
Maximum
demand |
9.5
MW |
Average
annual demand |
7.6
MW* |
Energy
consumption |
66.6
GWhr/yr |
*At a load power factor of 0.95 lagging.
The maximum demand
is defined as the maximum average load over any 30-minute period. The load factor is relatively constant except for the crushing circuit
which is assumed to operate 75 % of the time. The plant is assumed to operate 91.3 % of the time. Power factor correction equipment has
been provided to ensure a load power factor of 0.95 lagging. The average load is defined as the average load if averaged across any one
year.
There is an existing
33 kV powerline that runs within proximity to the Antenna and Boulder pits. As a result, 6.7 km of these powerlines were relocated.
Bulk fuel supply
is provided by a fuel storage facility constructed north of the mine services area and stores diesel for the mine trucks, light vehicles,
and users at the process plant. Day storage tanks are provided in the process plant. Diesel fuel dispensing is provided for mine trucks
and light vehicles. The fuel supply and facilities are under a contract arrangement with an independent fuel provider.
Mobile phone coverage
exists at the mine site. Telecommunications have been expanded to include voice, email, and internet traffic for the process plant, camp,
and main office.
From a security
perspective the Séguéla Project footprint has been configured as small as possible so that security personnel and systems
have to cover as minimal an area as possible. The security provision consists of:
| · | Access
control to the mine lease at several locations (including mine, plant and camp). |
| · | Read
in/read out access control. |
| · | Two-stage
gates for vehicle access. |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| · | Electronic
surveillance including CCTV within the plant area and at several key locations around the
property. |
| · | Physical
and visual barriers. |
| · | Fencing
(double, single and cattle). |
| · | Double
security fencing encloses the process plant. This is demarcated as the high security area.
A single security fence encloses the mining contractor’s area, main administration
building area, laboratory, camp, magazine, and tailings storage facility. The security fence
consists of a 1.8 m high fence with razor wire at the top of the support posts. |
| · | Electronic
security has been provided by a reputable security system provider and will be audited by
an independent security consultant experienced in security installations in Africa. It will
be monitored by the security contractor. |
| · | Installation
of and integrated security solution consists of a combination of various access control points,
coupled with intruder detection devices, supported by CCTV cameras located across the site.
Some of the remote cameras and access control locations are interlinked via the installation
of a line- of-sight wireless network connection with a common receiver located appropriately
to operate within “line of site” protocols. |
| 18.16 | Comments
on Section 18 |
The QPs are of
the opinion that the infrastructure required to support the open pit LOMP is in place.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 19 | Market
Studies and Contracts |
Gold is a freely
traded commodity on the world market for which there is a steady demand from numerous buyers.
The Fortuna financial
department provides Roxgold Sango with gold price projections for inclusion in budget and business plan preparations. Pricing is based
on long-term analyst and bank forecasts, with a gold price of $ 1,600/oz used for estimating Mineral Reserves and cash flow analysis,
and $ 1,840/oz for estimating Mineral Resources.
As part of Fortuna’s
socio-economic commitment to the region and other local stakeholders, Fortuna’s preference is to award contracts to local businesses
to the extent possible. Fortuna’s objective is to focus on opportunities for the residents and businesses of the region to participate
in the Séguéla Mine, thereby establishing a role as an active member of the community and participant in the sustainable
development of the region.
Numerous contracts
are in place to conduct services on behalf of Roxgold Sango and are managed by Roxgold Sango, with major contracts including:
| · | Receipt
of gold doré from Roxgold Sango with METALOR Technologies S.A. to process/refine and
either to buy or transfer the precious metal to a metal account designated by Roxgold Sango |
| · | Provision
of mining services with Mota-Engil Cote d'Ivoire including ROM feed, mine development, grade
control drilling, drill & blast, and load & haul activities to be conducted
safely and efficiently within the production requirements range in accordance with the specifications,
plans and schedules. |
| · | Provision
for Séguéla Gold Mine catering and facilities services with Tseebo Solutions
Group Proprietary Limited (ATS). |
| · | Power
supply for Séguéla Gold Mine facilities and infrastructure including camp facilities,
processing plant and administration facilities provided by Cote d’Ivoire Energies. |
| · | Fuel
supply for Séguéla Gold Mine equipment and infrastructure including the Mining
Services Contractors equipment, a free issue item by Roxgold Sango provided by Total Energies. |
| · | Séguéla
Gold Mine site security for all areas within Roxgold Sango’s tenement provided Group
4 Securities (G4S). |
| · | Processing
plant and grade control metallurgical assaying and testing provided by SGS laboratory. |
| 19.4 | Comments
on Section 19 |
The QP has reviewed
the information provided by Fortuna on metal price projections and exchange rate forecasts and notes that the information provided is
consistent with what is publicly available for industry norms.
Long-term metal
price assumptions used in this Report are based on a consensus of price forecasts for those metals estimated by numerous analysts and
major banks. Over several years, the actual metal prices can change, either positively or negatively, from what was earlier predicted.
If the assumed long term metal prices are not realized, this could have a negative impact on the operation’s financial outcome.
At the same time, higher than predicted metal prices could have a positive impact.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
The doré
produced by the mine is readily marketable.
The QP has reviewed the marketing assumptions
and the current major contract areas, and considers the information acceptable for use in estimating Mineral Reserves and in the economic
analysis that supports the Mineral Reserves.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 20 | Environmental
Studies, Permitting and Social or Community Impact |
| 20.1 | Environmental
Studies |
Following environmental
and social studies, public consultations and examination by the applicable Governmental Authorities, on September 22, 2020, the
Ministry of Environment and Sustainable Development in Côte d’Ivoire approved an environmental and social impact assessment
(ESIA) for the Séguéla Mine (Decree No.00261) for the construction and operation of the Séguéla Mine in the
Séguéla department. The ESIA allowed the Séguéla Mine to be built and to operate in accordance with the conditions
listed in the environmental permit application and the decree.
The ESIA also included
a conceptual resettlement action plan (RAP) for any physical or economic displacement of people or communities as a result of the Séguéla
Project, and a conceptual mine closure plan. Roxgold Sango finalized and validated the operational RAP with key stakeholders including
concerned communities, local authorities, and government technical services in December 2022, along with a Stakeholder Engagement
Plan, Livelihood Restauration Plan and Cultural Heritage Management Plan. These documents were prepared following International Finance
Corporation Performance Standards guidelines.
Any significant
changes to the future operations at the Séguéla Project that may impact the environment, the community and social relations
may require Roxgold Sango to inform of any material changes and/or submit an application to update the ESIA to the relevant authorities
for approval. In 2024, Roxgold Sango intends to file such an application to the National Environmental Agency (ANDE), which will advise
on the steps for updating the ESIA according to the proposed development and exploitation of the Sunbird deposit.
The potential to
conduct underground mining has been identified at the Ancien, Koula and Sunbird deposits. Appropriate underground mining, geotechnical
and economic studies remain to be completed. In the event that underground mining is determined to be feasible, Roxgold Sango will be
required to submit an application to the relevant authorities for approval Roxgold Sango to submit an application to update the ESIA
to the relevant authorities for approval to update the ESIA.
Beyond those requirements
explicitly stipulated in Ivorian Law No. 2014-138 of March 24, 2014 containing the Mining Code, the Mineral Exploration class
of permit within Côte d’Ivoire is not subject to environmental legislation (which applies only to Exploitation Permits).
To the best of Fortuna’s knowledge, there are no other known encumbrances or permitting requirements for the Séguéla
Mine permit.
The primary environmental
approval required to develop the Séguéla Project was decreed by the Ivorian Environment Minister which was necessary for
the issuance of the mining license. Roxgold Sango contracted the consulting firm CECAF to undertake the project baseline studies and
compile the ESIA required to obtain the environmental decree. The ESIA identifies the potential social and environmental impacts of the
development of the project and proposed mitigation measures. Part of the ESIA, which includes a conceptual Resettlement Action Plan,
was developed for any physical or economic displacement of people or communities as a result of the development of the mine. The ESIA
also included a conceptual mine closure plan.
Following environmental
and social studies, public consultations and governmental examination, the ESIA for the Séguéla Mine was approved by the
Ministry of Environment and Sustainable Development by decree signed on September 22, 2020 (Decree No.00261 dated September 22,
2020, on ESIA approbation for the exploitation of a
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
gold mine in Séguéla department).
This environmental decree allowed the mine to be built and requires it to operate in accordance with the conditions listed in the environmental
permit application file and the decree.
Following the environmental
decree, an exploitation permit is granted by right, by decree taken in Council of Ministers, to the holder of the exploration permit
which proved by way of a feasibility study that there is a deposit within its exploration permit.
The holder of an
exploitation permit has an exclusive right to exploit the deposits within the limits of its perimeter, and the right to transport or
to arrange the transport of the extracted ore, the right to trade with the ore on the internal or external markets and to export it.
It is also allowed to establish the necessary facilities to condition, treat, refine and transform the ore.
Unlike exploration
permits, exploitation permits are indivisible, immovable rights that may be mortgaged subject to approval by the Minister of Mines and
Industry.
The Mining Code
requires the exploitation permit holder to establish a company under Ivorian law, the sole purpose of which is to exploit the deposit
located within the perimeter. The permit will then be transferred to this exploitation company.
The exploitation
permit was granted by the Council of Ministers on December 9, 2020. This permit covers an area of 353.6 km2 and is valid
for 10 years.
A mining convention
is then negotiated between the state and the holder of the Exploitation Permit. The negotiation of the mining convention remains in progress
as of the effective date of this Report.
The convention's
main purpose is to stabilize the tax and customs regime applicable to the exploitation operations; however, the mining code does not
limit its purpose, and other essential rights, obligations and conditions may be incorporated into the convention. The decree implementing
the mining code further provides for the main obligations to be included in the mining convention, the rights and obligations of the
titleholder and the undertakings of the State. In any case, the convention cannot derogate from the provisions of the mining code and
the decree implementing the mining code.
In exchange for
the exploitation permit, the State obtains a 10 % free-carried and non-dilutable participation in the share capital of the operating
company.
Other permits and
approvals required for mine activities (e.g. fuel and explosives) have been obtained prior to the commencement of the relevant works.
Roxgold Sango has initiated the process of obtaining its classification under the Installations Classified for Environmental Protection
scheme from the Ivorian Anti-Pollution Centre). This process is statutorily required to start after the beginning of production at the
Séguéla Project and is scheduled for completion in the first quarter of 2024.
| 20.3 | Environmental
Monitoring |
Operations comply
with national environmental requirements. Roxgold Sango monitors the environmental aspects of its operations following the monitoring
requirements of the ESIA as detailed in the Environment and Social Monitoring Plan. Additional requirements may arise through the Installations
Classified for Environmental Protection process, which is to be finalized in the first quarter of 2024 with the Ivorian Anti-Pollution
Centre . If additional programs are required, they will be added to the existing monitoring programs.
Regular monitoring
reports must be communicated at least annually to the regulators ANDE and CIAPOL. The following subsections summarize the key components
of the environmental monitoring programs.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Air, Noise and Vibration Monitoring
Major sources of
air emissions in the Séguéla Mine area include dust from road traffic and rock crushing, as well as gas emissions from
the plant. The air quality monitoring plan includes measurement of total particles, PM10 and PM2.5, in addition to nitrogen and sulfur
oxide levels. Dust monitoring includes potential exposure of neighboring communities. The noise monitoring program includes LAeq
noise measurement for day and at night periods at different locations to take into account the diversity of activities that are
sources of noise, as well as the different noise receptors, including potential community receptors. Ground vibration and acoustic overpressure
are measured by the blasting contractor for each blast and reported to the site Environmental team for compilation and monitoring.
Water Monitoring
The water monitoring
program includes surface, ground, waste and potable water monitoring at multiple locations on the mine site, worker accommodation camp,
and neighboring communities, as defined by the impact assessment, based on type and magnitude of emissions, sources, effects, and receptors.
Monitoring parameters and periodicity depend on water types analyzed, and are also based on impact assessment, with periodicity ranging
from daily to quarterly. Monitoring parameters include physical, chemical and biological indicators. It is important to note that the
mine site is designed to have no industrial water discharge into the environment as the water from the tailings facility is recycled
into the process plan.
Biodiversity Monitoring
Prior to mine construction,
floristic inventories were undertaken with the national Water and Forestry services, which resulted in tree nurseries and planting to
compensate for the disruption caused due to the new infrastructure. These nurseries and planting initiatives are monitored in terms of
growth and yield. As part of the work permit system for the mine site, the Environmental department is notified before any physical work
is performed to authorize and monitor any additional impacts on biodiversity. Visual inspections of the TSF include observations of any
deceased fauna in the TSF area, with no occurrences reported as of the effective date of this Report.
Waste Management Monitoring
The Séguéla
Project has a dedicated waste sorting and management center. The waste management plan includes waste stream quantification, treatment,
and reporting as appropriate for the different types of waste generated by operations, including industrial, domestic, inert, hazardous,
and non-hazardous waste streams. Relevant waste streams are treated by specialized external waste management contractors that are certified
by national regulators CIAPOL and the National Waste Management Agency (ANAGED). Mining waste, including waste rock and tailings, are
quantified, treated and controlled by the respective mining and process departments, according to the prescriptions indicated in the
ESIA and the project design. Monitoring of acid rock drainage as well as multi-element leaching, and enrichment potential is performed
monthly.
Energy and GHG Monitoring
The quantification
of greenhouse gas emissions is carried according to the Fortuna Scope 1 and 2 Carbon Footprint Calculation Handbook. This includes the
monitoring of total fuel consumption per mine unit, broken down by non-renewable sources (e.g., diesel, gasoline, liquified petroleum
gas) and renewable sources (e.g., biofuels, biomass), total electricity consumption, total heating consumption, total cooling consumption,
total steam consumption. The data are reported on a monthly basis.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Artisanal Mining Monitoring
Artisanal and small-scale
mining (ASM) activities in the Séguéla area and its surroundings can be characterized as unauthorized, dispersed, intermittent
and not mechanized. As of the effective date of this Report, there is no permanent illegal or authorized ASM settlements on the identified
deposits of the Séguéla Mine or nearby, with only a few hundred ASM miners present from time to time in the Project area
outside of the mining operation areas. The implementation of a stakeholder management plan has ensured a good relationship between Roxgold
Sango and the local authorities, village leaders and landowners. In addition, regular monitoring of the occupancy of the land around
the deposits, exploration prospects and targets and the intervention of the authorities to avoid the establishment of organized ASM lead
to an effective control of the ASM activities in the Séguéla Mine area.
Tailings Storage Facility Monitoring
There are routine
dam safety inspections to monitor dam performance during operations. The stability and seepage performance of the TSF has been designed
to meet international guidelines and standards. Monitoring instrumentation has been incorporated into the design to facilitate detection
of any potential issues which may arise during operations. The monitoring program includes monitoring bores, downstream surface water
sampling, standpipe piezometers within TSF embankments to monitor the phreatic surface, settlement pins on embankments to monitor movement.
Piezometers and monitoring bores are checked monthly for water levels and quarterly for water quality.
| 20.4 | Social
and Community Impact |
| 20.4.1 | Stakeholder
Engagement |
In Côte d’Ivoire,
a consultative and participative approach is in many ways part of the culture of the society and adopted by governmental authorities.
This is evident for example, through the numerous decentralized structures and multi-stakeholders’ committees from the central
government to villages. In the case of large scale projects like a mine, there are rules and regulations to ensure the implementation
of standard engagement processes, such as Law No. 96-766 of October 3, 1996 on the Environment Code which mentions that everyone
has the right to be informed about the state of the environment and to participate in pre-decision-making processes that may have an
adverse effect on the environment or the environmental permitting process that includes mandatory public consultations (Articles 35).
Roxgold Sango recognizes
stakeholder engagement as a prerequisite for acquiring and maintaining the sustainable Social License to Operate and as a core element
for good social risk management. Roxgold therefore sees stakeholder engagement as a broader, more inclusive, and continuous process that
should span the entire life of mine.
Since the implementation
of a Roxgold stakeholder engagement framework in 2019, regular consultations have been held with the national Government and local authorities,
both traditional (village chiefs and notabilities) and governmental (administration and technical services), as well as local organizations
such as village-level women’s, youth, religious or artisanal mining associations. A Mining Project Community Monitoring Committee
was created in November 2020 including stakeholders from the local authorities, villages’ leaders, youth women and persons
directly affected by the Séguéla Project (e.g., landowners and farmers). Since 2022 stakeholder engagement activities have
been recorded as part of Community Relations performance tracking, including with communities and local authorities.
By the end of the
first quarter of 2021, a first training program for the neighboring communities was organized with 42 young people trained as masons,
carpenters, plumbers, and electricians. All were hired by the Séguéla Project. In 2022, a total of 25 local youth were
trained as process operators and junior metallurgists at a dedicated
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
mining training
center including an internship at Fortuna’s Yaramoko Mine, with 23 hired in 2023 to work at the Séguéla Mine (21
at the process plant and 2 with contractors). Also in 2023, a further 20 youths were trained in machinery driving.
The formal Stakeholder Engagement Plan
was presented and validated by the Mining Project Community Monitoring Committee on December 21, 2022.
| 20.4.2 | Social
Investment and the Local Development Fund |
An operating mining
company in Côte d’Ivoire, must contribute to community development via a Local Development Fund according to Decree No. 2014-397.
Roxgold Sango’s local development program aims to contribute to the sustainable development of its host communities. It is organized
in two main components:
| (a) | Statutory
Contribution to the Local Development Mining Fund: this commenced when production began in
May 2023, and amounts to 0.5 % of gross revenues of the mine per year over the life
of mine. The amount will vary depending on productions and the price of gold. |
| (b) | Voluntary
Contributions to Local Development through investments in: |
| · | Water
and sanitation – assistance in road and village allotment clearing and creation of
sanitation committee in Kouégo which provides waste management support. |
| · | Education
– construction of school classrooms in the villages of Bangana and Kouégo. |
| · | Food
security – development of a market gardening project in support of women reconverting
from traditional ASM, and development of casava fields with the women of the impacted villages. |
| · | Community
health and safety – safety driving awareness in conjunction with a fuel supply partner. |
The development
of the Séguéla Project involved the deployment and operation of physical assets including mining pits, waste rock dumps,
process plant, a TSF and assorted infrastructure. This development resulted in economic and physical displacement in the Séguéla
Project area and was managed by Roxgold Sango in accordance with Ivorian law and International Finance Corporation Performance Standard
5.
A Resettlement
Plan was prepared and validated by the Mining Project Community Monitoring Committee in December 2022 and presents the commitments
agreed by all parties to cover eligibility, entitlements, implementation schedules and accompanying measures such as cultural heritage
management and livelihood restoration programs.
As of December 2022,
resettlement covered 1,161 ha of land, including 377 ha of crops owned by seven landowners and 193 farmers, as well as 68 households
with 109 dormitories and 98 ancillary structures requiring physical relocation. In addition, six sacred sites were affected, with mitigation
measures described in the Cultural Heritage Management plan. Financial resources allocated for Resettlement Action Plan implementation
include 460 million West African Francs (FCFA) in compensation for land, 850 million FCFA for crops, and 230 million FCFA for buildings,
as well as human resources to carry out activities through the Roxgold Sango Sustainable Development team, assisted by specialized consultants
and partners.
Impacted households
are eligible for the Livelihood Restoration Program, which outlines measures taken to replace income impacted by project activities beyond
compensation. The Séguéla Project also pays special attention to vulnerable households and women in terms of consultation
and programming. The Livelihood Restoration Program is articulated around the following programs:
| · | Production
for production programs. |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| · | Financial
education programs. |
| · | Livestock
support programs. |
| · | Vulnerable
persons support programs. |
Roxgold Sango is
committed to conducting its mineral exploration, development and operating activities in a manner consistent with internationally recognized
guidelines and principles for Sustainable Development and Corporate Social Responsibility. Applicants for exploitation permits are obliged
to provide, at the same time as the ESIA, a plan for the closure and rehabilitation of the mine. Roxgold Sango included a conceptual
mine closure plan in its ESIA which will be continually updated through the life of the Séguéla Mine. The conceptual mine
closure plan assumes that mined areas will be reclaimed to a safe and environmentally sound condition consistent with closure commitments
developed in compliance with the Mining Code (Law No. 2014-138 dated 24 March 2014) of Côte d’Ivoire, applicable
regulations, and consistent with International Finance Corporation Performance Standards and other guidelines.
In accordance with
the Mining Code of Côte d’Ivoire, holders of exploitation permits are required to open an escrow account for the rehabilitation
of the environment domiciled in a financial institution of first rank in Côte d’Ivoire. This account is used to cover the
costs related to the environmental rehabilitation plan at the end of operation. Amounts are paid into this account according to a scale
established by the relevant administrative structures and are recorded as expenses in the context of the determination of the tax base
on industrial and commercial profits. The holder of an exploitation permit or the beneficiary of an industrial or semi-industrial exploitation
permit is obliged to supply this account. The methods of supplying and operating the escrow accounts are defined by decree.
At this stage of
the Séguéla Mine operations, Roxgold Sango has assumed the preferred final post-closure land use will be a natural landscape
commensurate with the surrounding land uses where possible, which are currently mainly small-scale agriculture, fallow land and forest.
Specific closure objectives may be tied to the final land use for the Séguéla Mine area, which should be determined in
collaboration with local authorities and other project stakeholders.
It is expected
that mine closure works are likely to span a period of approximately 12–24 months after closure. This will be followed by a period
of post-closure monitoring and maintenance, which is envisaged as the statutory duration of a total of five years after the cessation
of operations but may extend longer depending on monitoring results against closure criteria.
As at the effective
date of this Report and in compliance with national regulations, the projected total cost required to close present and future infrastructure
at the Séguéla Gold Mine is $11.9 million (Table 103) as developed from the conceptual mine closure plan prepared by Roxgold
Sango with the assistance of specialized consultants CECAF International and Trajectory, and assuming the exploitation of the Sunbird
deposit, based on the prevailing geophysical and social context as well as benchmarking against existing mining projects in Côte
d’Ivoire.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| Table 103: | Summary
of closure and post-closure costs |
Area |
Cost
(US$) |
Open
pits - 6 pit complexes including 10 individual pits with total surface area of 134 ha |
387,000 |
Waste
rock dumps - 6 dumps with total surface area of 300 ha |
2,913,000 |
Process
plant and infrastructures - total surface area of 35 ha |
464,000 |
Water
Storage Dam - total surface area of 39 ha |
60,000 |
Internal
and external roads - total surface area of 71 ha |
180,000 |
Mobilization
and demobilization |
80,000 |
Closure
management |
400,000 |
Tailings
storage facility - total surface area of 84 ha |
6,727,000 |
Maintenance
and repairs |
469,000 |
Monitoring
and control - applied over the statutorily required 5 years |
250,000 |
Total
mine rehabilitation and closure costs |
11,900,000 |
| 20.6 | Comments
on Section 20 |
It is the opinion
of the QP that the appropriate environmental, social and community impact studies have been conducted to date for the Séguéla
Gold Mine, and that Roxgold Sango has maintained all necessary environmental permits that are required for open pit mining operations
at the Ancien, Antenna, Agouti, Boulder, Koula and Sunbird deposits and the maintenance of mining activities.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 21 | Capital
and Operating Costs |
The Séguéla
Mine is a producing operation managed by Roxgold Sango, having mined an open pit operation since April 2023. Capital and operating
cost estimates are based on the established cost experience gained from the operation, projected budgets, and quotes from manufacturers
and suppliers. Overall, the cost estimation is of sufficient detail that, with the current experience of operating at the Séguéla
Mine, Mineral Reserves can be declared.
| 21.1 | Sustaining
Capital Costs |
Sustaining capital
costs were estimated as part of the life of mine plan completed annually by Roxgold Sango.
The capital costs
include all investments in ongoing mine development access for various open pits, brownfield exploration, waste capitalization (stripping)
minor mine equipment, plant equipment, permits and others to maintain the mine and plant facilities to sustain the continuity of the
operation. These capital costs are divided into four main areas: mine development, capitalized stripping, brownfields exploration, and
equipment and infrastructure. Brownfield exploration involves the investigation of areas to increase the confidence in currently defined
Mineral Resources with infill delineation drilling included in these costs.
Waste capitalization
(stripping) refers to the cost of removing the overburden or waste rock that overlays a mineral deposit in order to access and extract
the mineralized material.
Equipment and infrastructure
costs are attributed to all departments of the operation including mine, plant, permits, information technology, security, environmental,
tailings, management fees to support the capital projects management and closure costs.
Table 104 provides
a summary of the sustaining capital cost estimate for the project.
| Table 104: | Estimated
annual sustaining capital costs |
Year |
Units |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
2031 |
Total |
Mine development |
$M |
1.1 |
1.3 |
1.5 |
0.6 |
0.4 |
0.8 |
0 |
0 |
5.7 |
Capitalized stripping |
$M |
17.1 |
27 |
23.4 |
18.8 |
22.1 |
10.2 |
0.6 |
0 |
119.2 |
Brownfields Exploration |
$M |
7.3 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
7.3 |
Equipment and Infrastructure |
$M |
13.4 |
2.5 |
5.8 |
5.9 |
5.9 |
5.9 |
4.8 |
11.8 |
56.3 |
Mine |
|
1.7 |
0.6 |
0.8 |
0.6 |
0.6 |
0.6 |
0.2 |
0 |
|
Plant |
|
1.2 |
1.5 |
0.4 |
0.7 |
0.7 |
0.7 |
0 |
0 |
|
Permits, IT, sec., env. |
|
5.7 |
0.1 |
0.1 |
0.1 |
0.1 |
0.1 |
0 |
0 |
|
TSF |
|
4.8 |
0 |
4.2 |
4.2 |
4.2 |
4.2 |
4.2 |
0 |
|
Manag. Fees - capex |
|
0 |
0.3 |
0.3 |
0.3 |
0.3 |
0.3 |
0.3 |
0 |
|
Closure
Cost |
|
|
|
|
|
|
|
0.1 |
11.8 |
|
Total |
$M |
38.9 |
30.8 |
30.7 |
25.3 |
28.4 |
16.9 |
5.4 |
11.8 |
188.5 |
TSF sustaining
capital was estimated by Knight Piésold as part of the annual embankment lift schedule. Reclamation costs for the mine are estimated
based on the areas of impacted zones and unit rates for activities to reclaim these areas to their natural state.
| 21.2 | Operating
Cost Estimate |
Total estimated
cash costs averaging US$80/t processed are estimated for the life of mine and are presented in Table 105 and Table 106 in US dollars.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| Table 105: | Life
of mine operating cash costs |
Cash
Costs |
Value
(US$/t milled) |
Mining |
46.6 |
Processing |
20.8 |
General
and Administrative |
12.4 |
Total |
80.0 |
Note: Costs are
based on average estimated costs from the fourth quarter 2023 to the end of mine life. Totals may not add due to rounding
| Table 106: | Life
of mine operating cost estimate - cash cost |
|
Units |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
2031 |
Mining |
US$/t
ore mined |
31.3 |
48.0 |
48.4 |
47.4 |
50.2 |
49.1 |
46.0 |
13.4 |
Operating
lease |
US$/t
ore mined |
5.1 |
4.8 |
4.4 |
4.4 |
4.7 |
4.7 |
5.8 |
14.5 |
Plant |
US$/t
processed ore |
20.9 |
17.5 |
17.8 |
19 |
20.3 |
21.7 |
23.2 |
33.0 |
Indirect |
US$/t
processed ore |
10.5 |
7.3 |
4.9 |
4.9 |
4.9 |
4.9 |
4.9 |
7.8 |
SG&A
cash cost |
US$/t
processed ore |
3.0 |
3.0 |
2.8 |
2.8 |
2.8 |
2.8 |
2.8 |
4.4 |
Distribution |
US$/t
processed ore |
0.5 |
0.5 |
0.5 |
0.4 |
0.4 |
0.5 |
0.5 |
0.6 |
Community
relations |
US$/t
processed ore |
1.9 |
1.9 |
1.7 |
1.7 |
1.7 |
1.7 |
1.7 |
2.7 |
Management
Fee |
US$/t
processed ore |
1.0 |
0.7 |
0.6 |
0.6 |
0.6 |
0.6 |
0.6 |
1.0 |
Total
OPEX |
US$/t |
74.2 |
83.7 |
81.1 |
81.2 |
85.6 |
86.1 |
85.6 |
77.3 |
|
US$/oz |
678.9 |
622.2 |
700.4 |
778.8 |
835.0 |
774.7 |
842.9 |
669.3 |
Note: Totals may
not add due to rounding
Long-term projected
operating costs are based on the LOM mining and processing requirements, as well as the executed contract between Roxgold Sango and Mota-Engil
Cote d’Ivoire. Operating costs include site costs and operating expenses to maintain the operation and are analyzed based on a
cost structure that may not correspond to the operating costs reported by financial statements of Fortuna. Site costs relate to activities
performed on the property including mine, plant and indirect costs (related to general services and administrative on site). Other operating
expenses include costs associated with gold transportation (distribution), community support activities and management fee from Fortuna
corporate.
| 21.3 | Comments
on Section 21 |
The capital and
operating cost provisions for the LOMP that supports the declaration of Mineral Reserves have been reviewed and are considered as reasonable
by the QP based on industry practices and actual costs observed in 2023.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Fortuna is using
the provision for producing issuers, whereby producing issuers may exclude the information required under Item 22 of Form 43-101
– Technical Report, for technical reports on properties currently in production and where no material production expansion
is planned.
| 22.1 | Comments
on Section 22 |
The Mineral Reserve
estimate is supported by a positive cashflow for the period set out in the LOMP using the assumptions detailed in this Report.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
This section is not relevant to this
Report.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 24 | Other
Relevant Data and Information |
This section is not relevant to this
Report.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| 25 | Interpretation
and Conclusions |
This Report provides
a summary of the results and findings from each major area of investigation including exploration, geological modelling, geotechnical
and hydrology, Mineral Resource and Mineral Reserve estimation, mine design, metallurgical and process design, infrastructure design,
environmental management, capital and operating costs. The level of investigation for each of these areas is consistent with that normally
expected for an operating mine.
The QPs present
an interpretation of that body of work along with the opportunities and risks associated with each area of investigation in the following
sub-sections.
| 25.2 | Mineral
Tenure, Surface Rights, Royalties and Agreements |
Fortuna was provided
with a legal opinion that supports that the mining tenure held by Roxgold Sango for the Séguéla Mine is valid and that
Fortuna has a legal right to mine the deposit.
Roxgold Sango holds
an exploration permit and an exploitation permit.
The exploration
permit, which surrounds the exploitation permit, is a three-year permit that Roxgold Sango has exercised for a second renewal, having
submitted the application on July 20, 2023, and awaiting Ministerial signature. The permit covers an area of 270.1 km2.
Provided minimum
expenditure requirements are met, exploration permits in Côte d’Ivoire are subject to automatic grants of renewal applications
for two terms of three years each, and a special third term of no more than two years.
In addition to
the Environmental Permit obtained on September 22, 2020, the exploitation permit was granted by the Council of Ministers on December 9,
2020, and signed as a decree by the President of Côte d’Ivoire. This permit covers an area of 353.6 km2 and is
valid for 10 years. The permit is thereafter renewable for successive 10-year periods. All the deposits are located on this permit.
Franco-Nevada Corporation
holds a 1.2 % net smelter return (NSR) royalty for gold produced from the Séguéla Mine. Roxgold Sango has the right to
repurchase up to 50 % of the Franco-Nevada Corporation royalty on a pro rata basis based on the sale price of A$10 million for a period
of up to three years from March 30, 2021.
The State of Côte
d’Ivoire is entitled to production royalties based on the gross revenue from gold produced, after deduction of transportation and
refining costs.
| 25.3 | Geology
and Mineralization |
The Séguéla
Project is situated within the Paleoproterozoic (Birimian) Baoule-Mossi Domain of the West African Craton. Two cycles of volcanism/sedimentation
are recognized within the Birimian rocks of the Baoule-Mossi Domain; each followed by a period of orogenesis, and together described
as the Eburnian Orogeny which is dated c. 2.19–2.08 Ga. Rocks of the Baoule-Mossi Domain are primarily polyphase granitoids, and
volcano-sedimentary sequences forming granite-greenstone terranes. The first cycle of sedimentation and orogenesis (Eburnian 1) is described
by the accumulation of volcanic and volcaniclastic rocks; then subsequently intruded by early stage granitoids. Following a period of
uplift and erosion, the Eburnian 2 cycle is described by the filling of intra-montaine basins with predominantly arenaceous sediments
of the Tarkwaian Series.
The Antenna deposit is considered to
be an example of an orogenic lode-style gold system, hosted by a brittle-ductile quartz-albite vein stockwork predominantly contained
within flow banded rhyolite units. The stockwork
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
lode varies in width roughly in proportion with
the widths of the rhyolitic units that host it (approximately 3–40 m) and extends over a strike length of approximately 1,350 m.
Stockwork veins that host mineralization show two principal orientations: steep east-dipping and steep west-dipping. Veins in the steep
west-dipping orientation range from ptygmatically folded to undeformed, while veins in the east-dipping direction may be variably boudinaged
to undeformed. This evidence suggests syn-deformational emplacement of the vein sets during west and east movement along the main fault
structures within the region. Mineralization occurs as free gold, associated with pyrite and pyrrhotite. Alteration assemblages associated
with this mineralization assemblage vary from proximal intense silica–albite ± biotite ± chlorite alteration, through
medial silica–albite-sericite ± chlorite assemblages, to more distal sericite-carbonate (ankerite/calcite) and carbonate-magnetite
assemblages. Pyrite is the dominant sulfide associated with higher-grade mineralization within proximal alteration zones, while sulfide
mineralogy is pyrrhotite-dominated in medial and distal assemblages and is associated with lower-grade gold mineralization.
The Ancien deposit
is associated with an interpreted D2 sinistral shear zone, informally referred to as the Ancien shear, within the east domain. The host
lithologies comprise (from west to east) a chloritic pillow basalt footwall overlain by a foliated/sheared tholeiitic basalt unit, which
is in turn overlain by a second chloritic pillow basalt hanging wall unit that is gradational into a coarser grained porphyritic basalt
unit. Generally narrow quartz-feldspar–biotite porphyries crosscut and intrude all other lithologies and are interpreted as late-stage
intrusions.
Both the Koula
and Sunbird deposits are situated within the same package of mafic rocks as the Ancien deposit, which is informally referred to as the
Ancien–Koula corridor. Similar to Ancien, both Koula and Sunbird are hosted within a strongly foliated/sheared thoeliitic basalt
unit within a broader sequence of pillow basalt.
At the Ancien,
Koula, and Sunbird deposits, significant mineralization is restricted to the more reactive and competent tholeiitic basalt unit and is
best developed in zones of strong brittle–ductile brecciation and shearing, with selective sericite ± silica alteration
and intense quartz and quartz–carbonate veining. Mineralization occurs as free gold, predominantly as small grains within microfractured
milky-white quartz veins and associated with pyrite and lesser pyrrhotite at Ancien, that trends to being more pyrrhotite dominant at
Koula. Generally lower-grade mineralization is also developed at the margins of felsic porphyries that intrude the tholeiitic basalt,
and in zones of increased brecciation and veining within these porphyries.
Gold mineralization
at the Boulder and Agouti prospects is associated with strongly foliated or mylonitized, quartz/quartz–carbonate veined basalt
and the margins of the felsic intrusions. Generally lower-grade mineralization occurs internal to the felsic intrusions where they are
brecciated or extensively veined. The highest gold grades generally correlate with the intersection of north–northeast- and northwest-trending
structures. Mineralization occurs as free gold within a network of milky white quartz veins and associated with foliation or quartz/quartz–carbonate
vein-controlled pyrite and minor pyrrhotite.
| 25.4 | Exploration,
Drilling and Analytical Data Collection in Support of Mineral Resource Estimation |
Drill holes drilled
under Newcrest and Roxgold Sango management in the period 2016 to 2023 have data collected using industry-standard practices. Drill orientations
are appropriate to the orientation of the mineralization and core logging meets industry standards for exploration of an orogenic lode-style
gold deposit.
Geotechnical logging
is sufficient to support Mineral Resource estimation with the data used to support the definition of pit slope angles and designs for
each of the six open pits.
Collar and downhole
surveys have been performed using industry-standard instrumentation. Any uncertainties in survey information have been incorporated into
subsequent resource confidence category classification.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
All collection,
splitting, and bagging of channel and core samples were carried out by Newcrest or Roxgold Sango personnel since 2016 representing 100
% of all information used in the estimation of Mineral Resources and Mineral Reserves. No material factors were identified with the drilling
programs that could affect Mineral Resource or Mineral Reserve estimation.
Sample preparation
and assaying for samples that support Mineral Resource estimation has followed approximately similar procedures for most drill programs
since 2016. The preparation and assay procedures are adequate for the type of deposit, and follow industry standard practices.
Sample security
procedures met industry standards at the time the samples were collected. Current core and pulp sample storage procedures and storage
areas are consistent with industry standards.
Assay data are
electronically reported from the laboratory in Microsoft Excel and pdf format and imported into the database after validation, along
with the corresponding assay certificates.
The quality assurance/quality
control (QAQC) program involves establishing appropriate procedures and the routine insertion of certified reference material (CRMs),
blanks, and duplicates to monitor the sampling, sample preparation and analytical process. Evaluation of the QAQC data indicates that
the analytical data are sufficiently accurate and precise to support the Mineral Resource and Mineral Reserve estimation.
Paul Weedon
Mr. Weedon
visited the Séguéla Project on multiple occasions and during these visits reviewed the geological interpretations and drill
core. He is of the opinion that the data verification programs performed on the data collected from exploration are adequate to support
the geological interpretations, the analytical and database quality, and Mineral Resource estimation at the Séguéla.
Eric Chapman
Mr. Chapman
has personally verified data used in the Mineral Resource estimates, including the supporting database, collars and downhole surveys,
geological logs and assays, estimation parameters, and mine reconciliation.
Mr. Chapman
is of the opinion that the geological and assay data stored in the database is representative of that reported from the laboratories
and is suitable for usage in Mineral Resource estimation.
Monthly and quarterly
QC reports detailing results for exploration drilling, infill drilling and channel sampling is received and reviewed by Mr. Chapman
on an ongoing basis. Any discrepancies identified are immediately followed up with site staff for further investigation.
To further verify
the assay data, Mr. Chapman has randomly selected assay data from the database and compared the assay results stored to that of
the original assay certificates. Mr. Chapman is of the opinion that the geological and assay data stored in the database is representative
of that reported from the laboratories and is suitable for usage in Mineral Resource estimation.
Raul Espinoza
Mr. Espinoza
has reviewed on site the current mining methods, road access, and verified the Mineral Reserve estimation methodology including documents
and discussions with relevant Roxgold personnel regarding permitting, metallurgical testwork and processing, environmental monitoring,
operating and capital expenditure requirements with Roxgold Sango personnel.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Mr. Espinoza
is of the opinion that the parameters used for the estimation of Mineral Reserves based on the proposed mining method, geotechnical studies,
operational, processing and cost estimates are reasonable and representative for the Project.
Mathieu Veillette
Mr. Veillette
has been providing technical support to Séguéla since October 2022. Mr. Veillette helps coordinate and manage
the Engineer of Record for the TSF and water management and provides support with respect to geotechnical and hydrogeological aspects
for the open pits and waste dumps. Mr. Veillette has reviewed all technical documents related to geotechnical, tailings and water
for the operation. During Mr. Veillette’s most recent site visit from Sep 30 to Oct 4, 2023, he performed an internal audit
on the TSF, water management, waste dump and open pit geotechnical/hydrological aspects. Most of the recommendations for further work
are based on water management related tasks and the mine has created a plan to follow through on all of these recommendations. Mr. Veillette
had numerous discussions with the Mine Manager, Responsible Tailings Facility Engineer, Environmental Superintendent for water management,
project personnel and geotechnical engineers.
Paul Criddle
Mr. Criddle
has reviewed the extensive body of metallurgical investigation comprising several phases of testwork and, in addition, has been personally
involved in the development and construction of the Séguéla Project. In the opinion of Mr. Criddle, the Séguéla
metallurgical samples tested, and the ore that is presently treated in the plant is representative of the orebody as a whole in respect
to grade and metallurgical response. Differences between deposits are minimal with regard to recovery.
| 25.6 | Metallurgical
Testwork |
Previous owner,
Newcrest, conducted a round of Leachwell assay test work on 61 samples from drill hole SGDD001 in 2018. Comparison of the Leachwell tests
to fire assays for the samples set (four-hour bottle roll used for leach testing of a nominal 1 kg sample) demonstrated a near 1:1 correlation
of results. This was used to conclude that the material is non-refractory, and therefore amenable to standard carbon-in-leach (CIL) treatment
for extraction.
Roxgold supervised
the metallurgical testing work completed by the ALS Metallurgy assay lab in Perth, Australia on representative samples from the Antenna,
Agouti, Boulder, Ancien, Koula and Sunbird deposits between 2019 to 2023. Seven test work programs were performed.
As the Antenna
deposit hosts the majority of the estimated Mineral Reserves and this ore will be the majority of mill feed ore projected for the life-of-mine
plan (LOMP). As a result, this mineralization was examined more comprehensively and represents the basis for the mineral processing design
criteria. Satellite deposits in the form of the Agouti, Boulder, Ancien, Koula and Sunbird were also tested throughout the seven programs
for confirmation purposes and in support of Mineral Resource and Mineral Reserve estimation. Test work included comminution test work,
head assays, mineralogical analysis, grind establishment test work, gravity gold recovery and cyanide leach test work, flotation test
work, carbon adsorption test work, oxygen uptake test work, preg-robbing test work, cyanide detox test work, sedimentation and rheology
test work, and acid mine drainage test work.
Samples tested
were reasonably competent with average Bond rod and ball mill work indices of 21.8kWh/t and 19.7 kWh/t respectively. The results showed
the mineralization was amenable to a simple comminution circuit design.
The test work showed
that leaching is substantially complete within 24 hours and there is no apparent preg-robbing or refractory characteristics in the ores
tested. Furthermore, it showed a fast-initial leaching rate with more than 80% of the stage extraction completed within the first two
hours of cyanidation. The highest gold
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
recovery was achieved for tests incorporating
gravity recovery and elevated dissolved oxygen levels for the duration of the leach.
The ore tested across all deposits exhibited
a degree of grind sensitivity with an optimal grind size of 75 µm selected for all extraction test work. The results of that program
were very encouraging, indicating free milling of the ore with good leach kinetics and overall recoveries averaging 94.5 %.
| 25.7 | Mineral
Resource Estimation |
The Séguéla
Project is located in a geological setting that is known to host significant gold deposits.
The Mineral Resource
estimate incorporates data RC and DD drilling as of June 30, 2023, that targeted the Antenna, Ancien, Agouti, Boulder, Koula and
Sunbird deposits. Based on the analysis of quality control results available for the relevant drilling, the received data is considered
acceptable for use in the Mineral Resource estimates.
Geological modelling
was based on radial basis function interpretation of lithological logging data. Mineralization modelling was based on sectional interpretations,
which were “snapped” to drill holes during digitization, based on fire assays and lithological logging; as well as use of
the ‘vein’ modelling tool in Leapfrog to delineate discreet stationary mineralized domains. Wireframes were generated for
the mineralization, host lithologies, weathering profile, and transported overburden.
A 3D block model
was built to cover the entire deposit area, and coded to define a mineralized volume, using Studio RM software. Assay results were used
to interpolate gold grades into the relevant mineralization block using a combination of OK and ID techniques. The estimated block model
was validated both visually and statistically.
Mineral Resources
potentially amenable to open pit mining methods were constrained within pit shells and Mineral Resources potentially amenable to underground
methods were constrained within MSO shapes.
The QP considers
the data collection techniques to be consistent with industry good practice, and suitable for use in the preparation of the combined
Séguéla Mineral Resource estimate and reported using the 2014 CIM Definition Standards.
Environmental,
permitting, legal, title, taxation, socio-economic, marketing, and political or other relevant issues could potentially materially affect
access, title, or the right or ability to perform the work recommended in this Report on the Séguéla Project. However,
as at the effective date of this Report, the QP is unaware of any such potential issues affecting the Séguéla Project and
work programs recommended in this Report.
The Mineral Resource
estimates could be affected by:
| · | Metal
price and exchange rate assumptions. |
| · | Changes
to the technical inputs used to estimate gold content (e.g. bulk density estimation, grade
interpolation methodology). |
| · | Changes
to the geological interpretation (e.g. post-mineralization dykes and structural offsets such
as faults and shear zones). |
| · | Additional
depletion due to artisanal mining activities beyond those already identified and excluded
from the estimate. |
| · | Changes
to geotechnical and mining assumptions, including the minimum mining thickness; or the application
of alternative mining methods. |
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| · | Changes
to process plant recovery estimates if the metallurgical recovery in certain domains is lesser
or greater than currently assumed. |
| · | Final
negotiated terms of the Mining Convention. |
| · | Changes
to governmental regulations. |
| · | Changes
to environmental, permitting and social license assumptions. |
The Séguéla
Project covers the entire greenstone belt exposure which hosts the Antenna, Ancien, Agouti, Boulder, Koula and Sunbird deposits, which
is considered to be a strike continuation of the Senoufo greenstone belt which also hosts the Sissingue, Syama and Tongon gold deposits
(held by third parties). Exploration over the Séguéla Project has the potential to expand known mineralization, advance
known prospects to drill stage, and discover new prospects.
A process has been
followed to convert the Mineral Resources to Mineral Reserves which is underpinned by a design, schedule, and economic evaluation. Mineral
Reserves are only estimated for open pit material. Inferred Mineral Resources were set to waste.
Factors that may
affect the Mineral Reserve estimates include: changes to long-term gold price assumptions; fluctuations in commodity price and exchange
rate; changes to the current regulatory regime; fluctuations in operating cost assumptions; changes to environmental, permitting and
social license assumptions; changes in local interpretations of mineralization geometry and continuity of mineralized zones; changes
to geological shape and continuity assumptions; changes to metallurgical recovery assumptions; geotechnical and design parameter changes
impacting dilution and mining recovery factors.
The mining strategy
for the Séguéla Mine is for a mining contractor to execute an agreed mining schedule for the first 5.5 years, after which
mining will transition to Owner-operations. The mining schedule sequence pit stages such that material within the Mineral Reserve areas
is prioritized by sequencing the mining by the highest grade, lowest waste stripping ore, and meets the throughput and material characteristic
type for the plant. A common pool of equipment will be used and scheduled across all of the active pits, so that movement of equipment
between the pits is minimized and consumable and spare parts are shared within the fleet.
Two 200 t excavators
are scheduled for most material movement over the LOMP, the first unit is already in operation with mobilization of the second unit planned
in late 2024. The 200 t excavators are complemented by 120 t, and 80 t excavators for supplementary mining and wall scaling. The
combined excavator fleet has sufficient capacity to meet the production requirements of the mine plan at 1.46 Mtpa initially and then
ramping up to 1.57 Mtpa from 2025 onwards. It is expected that the fleet of excavators and trucks will be adjusted over the mine life
to meet production requirements. A fleet of eight CAT 777E trucks (90 t) is currently being used for production activities at the Séguéla
Mine, with mobilization of further eight CAT 777E trucks planned during 2024 with additional units in 2025. Up to 18 trucks are planned
for in-pit mining activities, to accommodate hauling from the operating bench to the ROM and waste rock dumps.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Life of Mine Planning
Change to the projects
revenue and cost assumptions could result in smaller final pit designs, a shorter mine life, less ROM tonnes fed into the crusher, and
less ounces produced. The operation is most sensitive to gold price, and a significant drop in gold price will likely result in a revised
LOMP.
The LOMP assumes
that all requisite approvals and permits for the relocation of the communications antenna adjacent to the Sunbird deposit and those required
for the plant expansion in 2026 will be obtained. While it is believed that such approvals and permits can be obtained on a timely basis
and on acceptable terms, there is no certainty that this will be the case. A delay in permitting would require adjustments to the LOMP.
Wet Season Mining
The contractor’s
rates take into consideration standard wet seasons as a component of the mining services contract. Extended periods of wet season are
a risk for the contractor’s ability to deliver the mine plan. An adequate stockpile of mineralized material will be maintained
on the ROM pad and in low grade stockpiles to enable plant operations to continue during wet periods.
The risk of pit
flooding is de-risked by the muti-pit nature of the Séguéla Mine. In the event of a flooded pit, mining will commence in
next priority pit stage with a similar waste stripping ratio.
Geotechnical
The geotechnical
parameters applied to pit wall designs are being confirmed in practice. All deposits have at least one starter pit, prior to a cutback
to the final pit wall. Earlier pit stages will be used to complete the recommended additional work set out in Section 26.2, as well
as assess the geotechnical performance of pit walls prior to committing to the final pit wall design. It is possible that during mining
of initial pit stages that a decision is made to adjust the final pit wall designs. This could result in an increased waste stripping
ratio, a shallower truck floor, a reduction in ROM tonnes and ounces.
Hydrogeology
Comprehensive hydrogeological
data are not available for all pits within the LOMP. Additional pit dewatering design and costs may be incurred once better data is available.
Mining Costs
Cost inflations
of labor, diesel, explosives, and mining equipment are possible over the LOMP.
Geotechnical
Further optimization
of the geotechnical assumptions as set out in Section 16.4.2 for mine design could result in updated pit designs that contemplates
mining less waste by reducing the strip ratio. Further geotechnical work will be completed to assess where there are opportunities to
increase batter angles to 90˚and increase berm widths to 10 m to achieve a steeper inter-ramp angle in fresh rock pit walls.
Fortuna
Silver Mines Inc.
Technical Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Mining Strategy
Further optimizations
of the mining strategy may result in operating cost savings applied across a larger scope as well as optimized mine designs and scheduling.
Open Pit/Underground Optimization
The selection of
the most appropriate transition point from open pit to underground mining for the Koula, Ancien and Sunbird deposits may lead to a decrease
in waste movement, strip ratio and mining cost.
| 25.10 | Processing
and Infrastructure |
The comminution
circuit consists of a single stage primary crush/SAG milling comminution circuit where ore is drawn from the ROM bin via an apron feeder,
scalped via a vibrating grizzly with the undersize reporting directly to the discharge conveyor and the oversize reporting to a primary
jaw crusher for further size reduction. All crushed and scalped material is conveyed to a surge bin. Crushed ore and water is fed to
the mill.
The mill is operated
in closed circuit with hydrocyclones, with cyclone underflow reporting to the mill feed. A portion of the cyclone underflow slurry is
fed to the gravity circuit for recovery of gravity gold. The gravity concentrator tailings flow to the cyclone feed hopper, while the
gravity concentrate reports to an intensive leach circuit. Gold in solution is recovered in a dedicated electrowinning system.
Screened cyclone
overflow is thickened prior to the CIL circuit. Loaded carbon drawn from the CIL circuit is stripped by the split AARL method. The resultant
gold in solution is be recovered by electrowinning. Recovered gold from the cathodes is be decanted, dried and smelted in a furnace to
doré bars.
The forecast gold
recovery rate is 94.5% for the LOMP.
The tailings system
consists of a tailings pipeline and associated tailings pumps. The TSF comprises of a side-valley storage formed by two multi-zoned earth-fill
embankments, designed to accommodate 13.0 Mt of tailings, and built using the downstream construction methodology, in accordance with
industry best practices and standards on tailings management. A 1.5 mm HDPE geomembrane liner is installed over the entire TSF basin
area (overlying the compacted soil liner) and on the upstream embankment face. The TSF has an under-drainage system, designed to assist
the consolidation of tailings and leakage removal system, comprised of drains underneath the HDPE liner.
A water storage
dam is the main collection and storage pond for clean raw and process water.
The power supply
is through a connection to the Côte d’Ivoire electricity grid by a 2,400 m tee into the 90 kV powerline from the Laboa to
Séguéla substation. The Séguéla substation is fed via an existing 90 kV transmission line from the 225/90
kV Laboa substation. The Laboa substation is part of a 225 kV ring main system around the country where various sources of generation
are connected and, being a large ring main, offers a great deal of redundancy at 225 kV. The grid supply from Côte d’Ivoire
is, by world standards, economically priced and much more financially favorable than other options including self-generation as the tariff
is based on a mix of hydro and thermal generation with a large portion of hydro.
TSF Design
Future Stages of
embankment raises in conjunction with changes in plant production profiles need to be forecast well ahead of schedule. This is necessary
due to the method of constructing the downstream embankment and buttress using waste rock. Volumes required need to be sourced via the
mining schedule. Future raises also need to take into account geotechnical and environment changes that may occur.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
For future embankment raises embankment slopes can be revised as the
design progresses. It is envisaged that a potentially steeper downstream slope could be adopted for earlier stages of the facility. The
current upstream slope of 3H:1V is common for safe and practical HDPE liner installation can also be considered for minor steepening.
Any changes to the LOMP or throughput may impact
upon the tailings management requirements for the site. Any significant increases in total throughput may require an expansion review
of the current TSF LOMP design and reconsideration of the closure plan.
Beach Slope
The as-built TSF is based on an average tailings
beach slope of 0.8 % (125H:1V). However, the beach slope is heavily dependent on the grind size and the ore blend. Thus, small changes
in plant performance or design, ore type, or the ore blend have the potential to change the tailings beach slope and have a positive
or negative effect on TSF capacity. Regular monitoring is required.
There are a number of approaches which can be
used in response to measured beach slopes that are consistently different to the beach slope used for design. One advantage of staging
construction on an annual basis is the ability to modify the design each year based on measured data obtained from the TSF. In these
cases, the timing and height of the subsequent embankment raises can be modified to bring the schedule back into line with the design.
Should the measured beach slope be steeper than
the design slope, the tailings rate of rise against the TSF embankments is to be faster than expected, and the Stage 1 TSF would reach
capacity earlier than the design. It should be noted Stage 1 capacity is 16 months to August 2024. The construction of Stage 2 commenced
in July 2023 and is due for completion in June 2024. The extension of the HDPE liner is expected to occur at the end of the
dry season.
Tailings Solid and Supernatant Geochemistry
Geochemical testing of the tailings should be
continued at points throughout the life of the facility to ensure that initial testing remains valid. Measurements need to continue as
part of ongoing operations to ensure information is available on the geochemical behavior of the tailings.
Achieved Densities
The staged TSF embankment crest elevations are
based on assumed tailings characteristics and throughput. Changes in these characteristics and/or throughput is result in changes in
the achieved densities in the TSF. Similar to the variations in tailings beach slope, this may result in an adjusted construction schedule
for the first raise, either earlier or later than the design timing. It is recommended that monitoring of throughput, ore blend, rate
of rise and achieved densities be undertaken so that suitable planning and staging of the future embankment construction can occur.
Wet Season Construction
The current wet season has proved to be disruptive
causing some delays to deliveries and personnel to site. The road to the Séguéla Project requires upgrading to an all-weather
road including culverts, crowing and erosion protection.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Water Management
The diversion ditch crossing the main public
road is currently undersized. Two additional 2 x 2m culverts are required to be installed to reduce the risk of breaching the public
road.
Rip rap armoring was not completed during original
Capex since no waste rock was available. Rip rap armoring as per design is required for the TSF spillway, water storage dam spillway,
and diversion ditch to prevent downstream sedimentation and improve dam safety (limit erosion of water retaining structures).
Groundwater Contamination from TSF
There is a low risk that water seepage from
the tailings storage facility may contaminate ground water. This risk is mitigated with the use of the HDPE liner underlain by a compacted
low permeability subgrade “soil” layer.
Power Supply
The availability and reliability of grid power
supply presents a risk; however since the Roxgold Sango commissioned the process plant there has been few power outages of significant
duration.
Solar Farm
Investigations into installing a solar farm are
ongoing. Should it pass the economic study a solar facility could result in lower electricity prices. It may also provide some level
of security around continuous supply to essential services should the main grid fail for extended periods of time.
Decant Barge
The implementation of the TSF Stage 1 design
is based on a series of decant towers progressively constructed up the south slope following the path of the supernatant pond as it increases
in elevation. Typical design involves a submersible pump located at the base of precast concrete towers surrounded by select porous rockfill
and accessed by causeways constructed of general fill. This method is also to be used in Stage 2.
There is potential to implement a system whereby
the supernatant pond is decanted via a barge equipped with submersible pump, which moves with the pond as it rises up the south slope
during operation of the facility. This system is reliant on numerous factors, including the resultant beach slope (discussed above),
and the level of control required over the supernatant pond location.
The viability of a decant barge in lieu of towers
is a cost-effective solution which can be investigated further in a later phase of the TSF development, when the operating data is available.
Water Management
It is recommended that a lower design criterion
be used than the current plan of 1:100 year, 24-hour storm where the diversion ditch crosses haul roads. This is currently being investigated
where operations will take a risk-based approach to minimizing large culvert crossings.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Plant Throughput
The feasibility study identified opportunities
to cost effectively increase plant throughput or allow for future expansion to increase nominal throughput to 1.75 Mtpa (i.e. 40 %
increase). As a result, allowance in the design is made for inclusion of a secondary ball mill, additional cyclone space in the initial
cyclone cluster, and space for additional CIL tanks and a pebble crushing circuit. to allow for expansion via inclusion of additional
cyclones.
Currently the plant is running at 180 dtph which
is 15 % above design with plans to increase this further with additional de-bottleneck programs and minor capital expenditure.
25.11 | Health, Safety, Environmental and Social |
The primary environmental approval required to
develop the Séguéla Project was obtained on 22nd September 2020 (Decree No.00261 dated 22 September 2020 on ESIA
approval for the exploitation of a gold mine in Séguéla department).
Currently, there is no permanent ASM settlement
on the identified deposits or nearby, with the presence of only a few hundred of ASM miners from time to time in the project area. The
implementation of a stakeholder management plan has ensured a good relationship between Roxgold Sango and the local authorities, village
leaders and landowners.
The conceptual closure plan assumes the mine
areas will be reclaimed to a safe and environmentally sound condition consistent with closure commitments developed during the life of
the project in compliance with the national regulations and IFC standards and other best practices.
Road Travel
Serious road accidents are a risk throughout
most of West Africa. This is contributed to poorly maintained roads, poor lighting after sunset, poorly maintained and operated vehicles,
and poor separation between vehicles and pedestrians. Strictly enforced procedures have been put in place to reduce this risk, including
mandating the use of professional drivers and restrictions to driving at night. The risk of road accidents will always be present.
Dangerous Goods Transport
Dangerous goods transport, and particularly the
transport of cyanide, is managed carefully. Cyanide is transported in accordance with International Cyanide Management Code guidelines
with vehicles escorted between the port and site.
Disease/Epidemics
Endemic diseases will be monitored, with a malaria
management plan in place to control standing water and mosquito populations.
Unmet Community Expectations
The nearby communities have expectations relating
to job creation, community development and improvement in services and infrastructure. Meeting these expectations and minimizing impacts
to regional infrastructure and community livelihood is a challenge resulting in possible dissatisfaction with Roxgold Sango and the associated
risks of community action against the mining operation and loss of social license to operate. Roxgold Sango is
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
attempting to minimize
this risk with its well-established social management plans relating to community development and stakeholder engagement. Roxgold Sango’s
local training and recruitment plans will optimize the benefits associated with the operation. Furthermore, the government’s mining
community development fund ensures a direct investment in the development of the communities.
Community Benefits
There is the opportunity to maximize the benefit
of the Séguéla Project for local communities as an opportunity for social and economic development including social infrastructures,
professional skills and all the other aspects of the Sustainability Development Goals.
Stakeholder Engagement
A good working relationship with local government,
state services, traditional authorities, communities and other stakeholders such as the artisanal miners, is in place due to the quality
of the early stakeholder’s engagement at the project. The opportunity to strengthen these existing relationships will help mitigate
the risks to the mining operation due to unmet expectations amongst the community and other stakeholders.
Closure Costs
Although a standard conceptual closure plan has
been developed, there is an opportunity to revise it by undertaking additional studies to examine reclamation assumptions and techniques,
including progressive reclamation, with the goal of reducing the cost and duration of reclamation at the end of the mine's life.
25.12 | Capital and Operating Costs |
Capital and operating cost estimates are based
on established cost experience gained from current operations, projected budget data and quotes from contractors, manufacturers and suppliers.
The capital costs include all investments in
ongoing mine development access for various open pits, brownfield exploration, waste capitalization (stripping) minor mine equipment,
plant equipment, permits and others to maintain the mine and plant facilities to sustain the continuity of the operation.
The operating cost provisions for the LOMP that
supports Mineral Reserves have been reviewed and includes site costs and operating expenses to maintain the operation and are related
to activities performed on the property including mine, plant and indirect costs (related to general services and administrative on site).
Other operating expenses include costs associated with gold transportation (distribution), community support activities, management fee
from Fortuna corporate and Closure costs.
The QP considers the capital and operating costs
estimated for the Séguéla Mine as reasonable based on industry-standard practices and actual costs observed for 2023.
The capital cost estimate consists of sustaining
capital, which, for the remaining LOMP totals US$ 188.5 million.
Operating costs for the LOMP are forecasted at
US$80/t.
Fortuna is using the provision for producing
issuers, whereby producing issuers may exclude the information required under Item 22 for technical reports on properties currently in
production and where no material production expansion is planned. The Mineral Reserves declaration is supported by positive cashflow.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Recommendations for the next phases of work have
been broken down into those related to ongoing exploration activities at the Séguéla Mine; surface mining activities and
studies related to operational improvements and underground potential; processing improvements; hydrogeology studies and environmental,
permitting and social activities.
Each recommendation is not contingent on the
results of other recommendations and can be completed concurrently. Where appropriate a cost for the recommended work is included, otherwise
the cost is included in the capital and/or operating cost for the mine. The budget estimates for the work programs are presented in US$.
It is recommended that the following actions
be completed in order to support the ongoing exploration and development:
| • | Additional
definition drilling (infill and extension) where applicable, in order to support potential
upgrade of some or all of the Inferred Mineral Resources and extend the known mineralization
at an estimated drill cost of $2,000,000 for a total of 11,000 meters of RC and diamond drilling.
Drill cost includes all assays, site clearing, work- and standby times as well as drilling
costs. |
| • | Routine
collection of density measurements should be maintained for core and included for in pit
sampling to better establish densities in the block model. This recommendation will be completed
in-house with existing personnel and will not incur an additional cost above regular mine
operating costs. |
| • | Target
down-dip underground potential at each deposit, in particular Ancien, Koula and Sunbird at
an estimated drilling cost of $2,000,000 for a total of 8,250 meters of diamond drilling.
Drill cost includes all assays, site clearing, work- and standby times as well as drilling
cost. |
| • | Review
and re-rank existing regional exploration results and prospects followed by selective drill
testing of those proximal to the defined Mineral Resource estimates with a drill program
estimated at $2,000,000 for a total of 22,500 meters of aircore, RC and diamond drilling.
Drill cost includes all assays, site clearing, work- and standby times as well as drilling
cost. |
| • | Detailed
structural analysis of all deposits, based on high-quality oriented drill core, with a view
to developing exploration models for analogue or related systems elsewhere within the Séguéla
Project. This recommendation will be completed in-house with existing personnel and will
not incur an additional cost above regular mine operating costs. |
Recommendations for the mining components of
the Séguéla Mine should include:
| • | Revising
pit optimization parameters, cost estimates, scheduling, and cashflow forecasts with actual
operational data as it is collected. This recommendation will be completed in-house annually
with existing personnel and will not incur an additional cost above regular company operating
costs. |
| • | Conducting
a geotechnical investigation into steeper batter angles of 90˚ and wider berm widths
of 10 m in fresh rock. This recommendation will cost approximately $30,000. |
| • | Ongoing
collection of geotechnical data is required to further refine the geotechnical model, to
confirm assumptions made as inputs in this assessment, and to review performance of slopes,
batters, and spill berm widths during operations. This recommendation will be completed in-house
annually with existing personnel and will not incur an additional cost above regular mine
operating costs. |
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| • | Ongoing
assessment of slope, batter and spill berm width performance. This recommendation will be
completed in-house annually with existing personnel and will not incur an additional cost
above regular mine operating costs. |
| • | Conducting
detailed waste rock dump sequencing to increase discounted cashflow. This recommendation
will be completed in-house with existing personnel and will not incur an additional cost
above regular mine operating costs. |
| • | Reviewing
drill and blast parameters in consultation with the mining contractor to identify potential
areas of improvement. This recommendation will be completed in-house with existing personnel
and will not incur an additional cost above regular mine operating costs. |
| • | Preparing
drill and blast designs and procedures to achieve acceptable blasting impacts when blasting
close to the TSF. This recommendation will cost approximately $30,000. |
| • | Further
optimizations of the mining strategy as well as optimized mine designs and scheduling resulting
in a reduction in stripping ratio and overall project waste movement requirements to improve
mine economics. This recommendation will be completed in-house with existing personnel and
will not incur an additional cost above regular mine operating costs. |
| • | Optimization
on the open pit and potential underground mining transition of the Koula, Ancien and Sunbird
deposits. Review the optimal transition point from open pit to underground. This recommendation
will be completed in-house with existing personnel with the assistance of outside consultants
to complete the study. This recommendation will cost approximately $150,000. |
| • | Study
the modifying factors applicable to underground mining at the Ancien, Koula, and Sunbird
deposits to investigate the potential for converting underground Mineral Resources to Mineral
Reserves, including metallurgical test work, geotechnical drilling and study and hydrogeology
study. Activities will be completed in-house with existing personnel with assistance from
outside consultants to complete the study. This recommendation will cost approximately $700,000. |
| • | Operations
should improve pit slope monitoring systems (2 x TM50, prisms and monitoring platform), by
providing one system for Antenna and another portable system for the other pits as required
at an estimated cost of $150,000. |
| • | Perform
a cost analysis and obtain the necessary permits for relocating the telecommunication antenna
currently situated at the edge of the Sunbird pit design. It is recommended the relocation
study is performed in 2024 to ensure appropriate capital expenditure and time is assigned
to the activity to prevent potential delays in mining the Sunbird deposit, planned to commence
in the fourth quarter of 2025. This study will be completed using the internal resources
and will be part of normal operating costs. |
Additional recommendations to enhance the confidence
in the selected process design and mitigate risks to the operational costs and/or improve mine economics are highlighted below:
| • | Installation
of a substantial filter system to improve the raw water quality. This recommendation will
cost approximately $100,000. |
| • | Installation
of a reverse osmosis plant to improve elution performance by utilizing potable water rather
than filtered raw water, at an estimated budget of approximately $200,000. |
| • | Install
a rock breaker at the jaw crusher to improve throughput at an approximate cost of $1.0 M. |
| • | A
TSF conceptual study should be completed to investigate the maximum capacity of the current
TSF location and any other new potential locations such as open pit co-disposal if no additional
area is available for some pits to accommodate future growth This will require a budget of
about $50,000. |
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
| • | Determine
the required TSF buttress size for the West and East dams to decrease the consequence classification
as per Global Industry Standard of Tailings Management guidelines. This will require moving
the tailings delivery and return pipeline trench, powerline and fence alignments along the
western area of the TSF. An estimated cost of $1 M will be required during LOMP to execute
these activities. |
| • | Further
Global Industry Standard of Tailings Management work is recommended, such as revising the
dam break analysis once the TSF design is updated as per above and updating of the Operation,
Monitoring and Surveillance manual, Trigger Action Response Plan and Emergency Preparedness
Response Plan documents is required at an estimated cost of $100,000. |
| • | As
per Global Industry Standard of Tailings Management requirements, ongoing visits by the Independent
Tailings Review Board and Dam Safety Review are recommended at an estimated cost of $80,000. |
The numerical model currently being updated should
be finalized from the initial steady-state calibrated model to a more refined transient-state model. This will provide a refined estimate
of pit dewatering requirements as mining advances at each resource. This information may also be used to inform the operations water
balance, anticipate dewatering volumes and provide information for potential additional resources if required, as well as forecasting
dewatering drawdown impacts. The estimated cost of updating this model is approximately $50,000.
In addition, it is recommended that a site-wide
water balance model be created and updated at an estimated cost of approximately $75,000.
The diversion ditch crossing the main public
road is currently undersized, with two additional 2 x 2m culverts required to be installed to reduce the risk of breaching. This work
has an estimated cost of $100,000.
Rip rap armoring was not completed during initial
construction since no waste rock was available. Rip rap armoring as per design is required for the TSF spillway, water storage dam spillway,
and diversion ditch to prevent downstream sedimentation and improve dam safety (limit erosion of water retaining structures). The work
has an estimated cost of $600,000.
26.5 | Environmental and Social |
Continue the environmental and social monitoring
focusing on biodiversity, water management and air quality.
26.5.2 | Stakeholder Engagement |
Continue to engage effectively with all the stakeholders
as the mine matures. Pay particular attention to local authorities and communities, persons directly affected by the mine (landowners
and farmers) and the ASM.
Ensure that the land access and Resettlement
Action Plan are executed according to the agreements signed with all the concerned stakeholders.
Continue to perform periodic geochemical testing
of the plant tailings and mine waste rock to assess their acid rock drainage and metals leaching potential to confirm initial Project
assessments.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Commission a study to evaluate the environmental,
social and financial benefits of doing progressive rehabilitation during the life of mine, including the usage of the pits as waste rock
dumps. This can reduce the footprint of the infrastructures and their impacts especially on the biodiversity and community land usage,
while saving capital and closure costs.
Ensure the closure plan is regularly updated
using field data.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Allibone, A.H.,
Campbell Mccuaig, Harris, D., Etheridge, M., Munroe, S., Byrne, D., Amanor, J., Gyapong, W. 2002. Structural Controls on Gold Mineralization
at the Ashanti Deposit, Obuasi, Ghana. Special Publication 9: Integrated Methods for Discovery: Global Exploration in the 21st Century,
pp. 65-93.
ALS Metallurgy
Services. 2020. Metallurgical Testwork Conducted Upon Samples from the Séguéla Gold Mine. Report No. A19864/A20661,
February 2020.
ALS Metallurgy
Services. 2020. Metallurgical Testwork Conducted Upon Samples of Antenna, Boulder, Agouti & Ancien Ore. Report No. A20721,
August 2020.
ALS Metallurgy
Services. 2021. Metallurgical Testwork Conducted Upon Composite of Antenna, Boulder, Agouti & Ancien Ore. Report No. A21707,
January 2021.
ALS Metallurgy
Services. 2021. Metallurgical Testwork Conducted Upon Koula Samples. Report No. A21926, March 2021.
ALS Metallurgy
Services. 2023. Metallurgical Testwork Conducted Upon Sunbird Ore Composites. Report No.A23013, February 2022.
ALS Metallurgy
Services. 2023. Metallurgical Testwork Conducted Upon Sunbird ore samples from the Séguéla Gold Project. Report No. A2453,
July 2023.
Apollo Consolidated
Ltd. 2013. Significant Trench Program Commences, Séguéla Project, Côte d’Ivoire. News Release dated 19 November 2013.
http://www.apolloconsolidated.com.au/wp-content/sharelink/20131119-significant-trench-program----seguela-project-cote-divoire- 87775468843696995.pdf
Australian Institute
of Mining and Metallurgy (AusIMM). 2001. Monograph 9: Field Geologists Manual (4th ed.). RossCo Print, Victoria, Australia.
Australian Institute
of Mining and Metallurgy (AusIMM). 2014. Cut-off Grade and Optimising the Strategic Mine Plan. Brian Hall. 2014.
Bessoles B. 1977.
Géologie de l’Afrique. Le Craton Ouest Africain. Memorandum, Bur. Geol. Min. Paris, p. 88. Blekinsop, B., Cahen, L., Snelling,
N.J., Delhal, J., and Vail, J.R. 1984. The Geochronology and Evolution of Africa. Oxford University Press, Toronto.
CECAF International,
PAH Consulting. 2020. Etude d’Impact Environnemental et Social. Rapport Final, Août 2020.
CIM. 2014. CIM
Definition Standards on Mineral Resources and Mineral Reserves. Prepared by the CIM Standing Committee on Reserve Definitions. Adopted
by the CIM Council, May 10, 2014.
Climate Séguéla.
2019. Séguéla Climate (Côte D'ivoire). Data.org. https://en.climate-data.org/africa/cote-divoire/woroba/seguela-883191/#climate-graph
Criddle, P., Andersen,
H., Weedon, P., Morgan, D., Bailey, G., McLeay, S., Morrison, N. 2021. NI 43-101 Technical Report. Séguéla Project, Feasibility
Study, Worodougou Region, Côte d’Ivoire. Prepared on behalf of Roxgold Inc. 19 April 2021.
CSA Global. 2019.
NI 43-101 Technical Report, Séguéla Project, Worodougou Region, Côte d’Ivoire. Prepared on behalf of Roxgold
Inc. 19 March 2019.
ECG. 2021. Séguéla
Power Supply. SEG-0001-G-FS-001, Revision F.
Eisenlohr, B.N.
1989. The Structural Geology of Birimian and Tarkwaian Rocks of Southwest Ghana. BGR Report No. 106448, p. 66.
Eisenlohr, B.N.,
and Hirdes, W. 1992. The Structural Development of the Early Proterozoic Birimian and Tarkwaiain Rocks of Southwest Ghana. Journal of
African Earth Sciences and the Middle East, pp. 313-325.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Entech Pty Ltd.
2021. Séguéla Project – Mining Cost Estimation Report, Roxgold Incorporated. Entech Report Number: ENT_719_ROX.
Entech Pty Ltd.
2021. Séguéla Project – Request for Quotation Evaluation, Roxgold Incorporated. Entech Report Number: ENT_720_ROX.
Entech Pty Ltd.
2021. Séguéla Gold Mine – Geotechnical Definitive Feasibility Study, Roxgold Incorporated.
Entech Report
Number: ENT_720_ROX.
Equator Principles.
2013. The Equator Principles III: A Financial Industry Benchmark for Determining, Assessing and Managing Environmental and Social Risk
in Projects. https://equator-principles.com/wp- content/uploads/2017/03/equator_principles_III.pdf
Feybesse, J.L.,
Billa M., Guerrot, C., Duguey, E., Lescuyer, J.L., Milési, J.P., Bouchot, V. 2006.The Paleoproterozoic Ghanaian province: geodynamic
model and ore controls, including regional stress modelling. Precambrian Research, 149, pp. 149-196
Fortuna. 2022.
Press Release Titled “Fortuna increases Sunbird Resource and identifies new regional prospects at Séguéla, Côte
d´Ivoire”. Vancouver, Canada. December 5, 2022.
Fortuna. 2023.
Press Release Titled “Fortuna updates Mineral Reserves and Mineral Resources”. Vancouver, Canada. March 21, 2023.
Fortuna. 2023a.
Press Release Titled “Fortuna pours first gold at its Séguéla Mine in Côte d’Ivoire”. Vancouver,
Canada. May 25, 2023.
Fortuna. 2024.
Press Release Titled “Fortuna reports record 2023 production of 452 koz Au Eq and 2024 annual guidance of 457 to 497 koz Au Eq”.
Vancouver, Canada. January 18, 2024.
Goldfarb, R.J.
and Groves, D.I. 2015. Orogenic gold: common or evolving fluid and metal sources through time. Lithos 233, 2-26.
Groves, D.I. and
Santosh, M. 2016. The giant Jiadong gold province: The key to a unified model for orogenic gold deposits. Geoscience Frontiers 7, 409-417.
Heath R. 2004.
Basic Ground Water Hydrology USGS. 91pp.
ICMM (International
Council on Mining and Metals). 2019. Integrated Mine Closure: Good Practice Guide. ICMM, London, England.
ICMM (International
Council on Mining and Metals). 2018. Working Together: How Large-Scale Mining Can Engage with Artisanal and Small-Scale Miners. ICMM,
London, England.
IFC (International
Finance Corporation). 2007. Environmental, Health, and Safety General Guidelines. IFC, Washington, DC.
IFC (International
Finance Corporation). 2007. Environmental, Health and Safety Guidelines for Mining. IFC, Washington, DC.
IFC (International
Finance Corporation). 2006. Performance Standards on Social and Environmental Sustainability. IFC, Washington, DC.
Jessell, M.W.,
Begg, G.C., and Miller, M.S. 2016. The Geophysical Signatures of the West African Craton. Precambrian Research, Volume 274, pp. 3-24.
Knight Piésold.
2021. Feasibility Study Groundwater Assessment. PE301-00836/3, Revision 0. Knight Piésold. 2021. Feasibility Study Report. PE301-0836/06,
Revision 1.
Knight Piésold.
2021. Feasibility Study, Geotechnical Interpretative Report. PE301-0836/04, Revision 1.
Knight Piésold.
2021. Séguéla Gold Mine – Feasibility Study Water Balance Modelling Summary. PE301- 00836/06-A djtm M21010, Revision
2.
Lycopodium. 2021.
Séguéla Project Feasibility Study Report. 5141-GREP-001, Revision 0.
MineGeotech Pty
Ltd. 2023. Séguéla Sunbird Geotechnical Study. J22095, October, 2023.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
PAH Consulting.
2021. Séguéla Gold Mine Mine Rehabilitation and Closure Plan. Final Version, May 2021. Peucat, J.J., Capdevila, R.,
Drareni, A., Mahdjoub, Y., and Kahoui, M. 2005. The Eglab massif in the West African Craton (Algeria), an original segment of the Eburnean
orogenic belt: petrology, geochemistry and geochronology. Precambrian Research, Volume 136, Issues 3-4, pp. 309-352.
Prizma LLC. 2021.
Estimated HG Footprint of Roxgold’s Séguéla Gold Mine, Côte d’Ivoire. Final Report, 18 March 2021.
Peucat, J.-J.,
Capdevila, R., Drareni,A. ,Mahdjoub,Y. & Kahoui, M. 2005. The Eglab massif in theWest African Craton (Algeria), an original
segment ofthe Eburnean orogenic belt: petrology, geochemistry and geochronology. Precambrian Research 136, 309–52.
Read, J. and Stacey
P. 2009. Guidelines for open pit slope design.
Rocscience Incorporated.,
2023a. RS3 V4.020 3D finite elemental analysis program for modelling slopes, tunnel and support design, surface and underground excavations.
Rocscience, Ont, Canada.
Rocscience Incorporated.
2023b. Dips v.8.0, program for plotting, analysis and presentation of structural data using spherical projection techniques, Rocscience,
Ont., Canada
Rocscience Incorporated.,
2023c. RS2 v11.021 2D finite element analysis program for modelling slopes, tunnel and support design, surface and underground excavations.
Rocscience, Ont, Canada.
27.2 |
Abbreviations and Units of Measurement |
$ |
US dollars |
% |
percent |
° |
degrees |
°C |
degrees Celsius |
AAS |
atomic absorption spectroscopy |
AC |
air-core |
Apollo |
Apollo Consolidated Ltd |
CIM |
Canadian Institute of Mining, Metallurgy and Petroleum |
cm |
centimeter(s) |
CRM |
certified reference material |
CSA Global |
CSA Global Pty Ltd |
DD |
diamond drill core |
FS |
feasibility study |
g |
gram(s) |
g/cm3 |
grams per cubic centimeter |
g/t |
grams per tonne |
kg |
kilogram(s) |
km |
kilometer(s) |
m |
meter(s) |
mm |
millimeter(s) |
Mt |
million tonnes |
Mtpa |
million tonnes per annum |
Newcrest |
Newcrest Mining Ltd |
NI 43-101 |
National Instrument 43 101 – Standards for Disclosure for Mineral Projects |
OK |
ordinary kriging |
oz |
troy ounces |
PEA |
preliminary economic assessment |
QA |
quality assurance |
QC |
quality control |
Randgold |
Randgold Resources |
RC |
reverse circulation |
RCD |
reverse circulation with diamond core tail |
RPEEE |
reasonable prospects for eventual economic extraction |
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
ROM |
run of mine |
t |
tonne(s) |
t/m3 |
tonnes per cubic meter |
TSF |
tailings storage facility |
UTM |
Universal Transverse Mercator |
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Certificate of Qualified Person – Paul
Weedon
I, Paul Weedon, Senior Vice President, Exploration
of Fortuna Silver Mines Inc. (Fortuna), 200 Burrard Street, Suite 650, Vancouver, BC V6C 3L6, Canada, do hereby certify that:
1. | I am a co-author of the technical report entitled “Technical Report
for the Séguéla Gold Mine, Côte d’Ivoire” which has an effective date
of December 31, 2023 (the “Technical Report”). |
2. | I graduated from Curtin University, Western Australia, in December 1991
with a Bachelor of Science degree in Geology, and a Post Graduate Diploma of Economic Geology (Distinction).
I have practiced my profession continuously since 1991. I have worked across all roles of exploration
and mining geology, covering open-pit and underground gold mining in production roles up to Technical
Services Manager for large-scale, complex operations. My exploration experience extends from project
generation through to project development and corporate roles, in addition to roles in corporate development.
These roles have been conducted across Australasia, Africa and Latin America. From 2018 to 2021 I was
involved with Roxgold Inc. (Roxgold) as Vice President Exploration, closely involved with the Séguéla
Project. I have held my current position of Senior Vice President – Exploration for Fortuna since
October 2021. |
3. | I am a professional Geologist and a Member of the Australian Institute
of Geoscientists (MAIG #6001). |
4. | I have read the definition of Qualified Person set out in National Instrument
43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) and certify that by virtue of
my education, affiliation to a professional association, and past relevant work experience, I fulfill
the requirements to be a Qualified Person for the purposes of NI 43-101. |
5. | I have visited the Séguéla Project on multiple occasions
since October 2018, with my most recent personal inspection taking place from April 21 to
24, 2023, a duration of four days. |
6. | I am responsible for Sections 1.1 to 1.5, 1.18 and 1.19.1; Sections
2 to 10; Sections 12.3, 12.4.1, 12.4.2 and 12.9; Sections 25.1 to 25.5; Section 26.1, and Section 27
of the Technical Report. |
7. | I am not independent of Fortuna as independence is defined in Section 1.5
of NI 43-101. |
8. | I have been involved with the Séguéla Project since 2018. |
9. | I have read NI 43-101, and the sections of the technical report for
which I am responsible for have been prepared in compliance with that Instrument. |
10. | As of the effective date of the Technical Report, to the best
of my knowledge, information and belief, the sections of the Technical Report for which I am responsible
contain all scientific and technical information that is required to be disclosed to make the Technical
Report not misleading. |
Dated at Perth, Australia, February 16, 2024.
[“Signed”]
Mr. Paul Weedon, MAIG
Senior Vice President – Exploration
Fortuna Silver Mines Inc.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Certificate of Qualified Person – Eric
Chapman
I, Eric Chapman, Senior Vice President, Technical
Services of Fortuna Silver Mines Inc. (Fortuna), 200 Burrard Street, Suite 650, Vancouver, BC V6C 3L6, Canada, do hereby certify
that:
1. | I am a co-author of the technical report entitled “Technical Report
for the Séguéla Gold Mine, Côte d’Ivoire” which has an effective date
of December 31, 2023 (the “Technical Report”). |
2. | I graduated with a Bachelor of Science (Honors) degree in Geology from
the University of Southampton (UK) in 1996 and a Master of Science (Distinction) degree in Mining Geology
from the Camborne School of Mines (UK) in 2003. I have been practicing as a geoscientist and preparing
resource estimates for approximately 20 yearsm and have completed more than 30 resource estimates for
a variety of deposit types such as epithermal gold/silver veins, porphyry gold deposits, and volcanogenic
massive sulfide deposits. I have completed at least 15 Mineral Resource estimates for precious metal
projects over the past five years. |
3. | I am a Professional Geologist of the Engineers and Geoscientists of
British Columbia (Registration No. 36328) and a Chartered Geologist of the Geological Society of
London (Membership No. 1007330). |
4. | I have read the definition of Qualified Person set out in National Instrument
43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) and certify that by virtue of
my education, affiliation to a professional association, and past relevant work experience, I fulfill
the requirements to be a Qualified Person for the purposes of NI 43-101. |
5. | I have visited the Séguéla Project on multiple occasions
with my most recent personal inspection taking place from October 10 to 15, 2023, a duration of
six days. |
6. | I am responsible for Sections 1.6, 1.8, 1.18; Section 2.4; Section 11;
Sections 12.1, 12.2, 12.7, 12.9; Section 14; Sections 25.5 and 25.7; the introductory paragraph
to Section 26; and Section 27 of the Technical Report. |
7. | I am not independent of Fortuna as independence is described by Section 1.5
of NI 43–101. |
8. | I have been involved with the Séguéla Project since August 2021. |
9. | I have read NI 43-101, and the sections of the technical report for
which I am responsible for have been prepared in compliance with that Instrument. |
10. | As of the effective date of the Technical Report, to the best
of my knowledge, information and belief, the sections of the Technical Report for which I am responsible
contain all scientific and technical information that is required to be disclosed to make the Technical
Report not misleading. |
Dated at Vancouver, Canada, February 16, 2024.
[“Signed”]
Mr. Eric Chapman, P.Geo.
Senior Vice President – Technical Services
Fortuna Silver Mines Inc.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Certificate of Qualified Person – Raul
Espinoza
I, Raul Espinoza, Director of Technical Services
for Fortuna Silver Mines Inc. (Fortuna), 200 Burrard Street, Suite 650, Vancouver, BC V6C 3L6, Canada, do hereby certify that:
1. | I am a co-author of the technical report entitled “Technical Report
for the Séguéla Gold Mine, Côte d’Ivoire” which has an effective date
of December 31, 2023 (the “Technical Report”). |
2. | I graduated with a Bachelor of Science degree in Mining Engineering
from Pontificia Universidad Catolica del Peru in 2001 and a Master of Engineering Science in Mining
from Curtin University, Australia, in 2014. I have practiced my profession for 22 years and been preparing
Mineral Reserve estimates for approximately 11 years. My experience has covered operational, technical,
managerial and consultancy functions for open pit mines, from early-stage projects through to producing
mines in Argentina, Peru, Chile, Australia, and Canada. |
3. | I am a Fellow of the Australasian Institute of Mining and Metallurgy
and registered as a Chartered Professional in Mining – FAusIMM (CP) with Membership No. 309581. |
4. | I have read the definition of Qualified Person set out in National Instrument
43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) and certify that by virtue of
my education, affiliation to a professional association, and past relevant work experience, I fulfill
the requirements to be a Qualified Person for the purposes of NI 43-101. |
5. | I have visited the Séguéla Project on multiple occasions
with my most recent personal inspection taking place from June 17 to 23, 2023, a duration of seven
days. |
6. | I am responsible for Sections 1.9, 1.10, 1.12 to 1.18, 1.19.2 and 1.19.5 and the introductory
paragraph to Section 1.19; Section 2.4; Sections 12.8 and 12.9; Section 15; Sections 16.1, 16.4 to 16.9;
Sections 18.1, 18.2, 18.8 to 18.16, and the introductory paragraph to Section 18; Section 19; Section 20;
Section 21; Section 22; Section 23; Section 24; Sections 25.5, 25.8 to 25.13; Sections 26.2 and 26.5; and
Section 27 of the Technical Report |
7. | I am not independent of Fortuna as independence is described by Section 1.5
of NI 43–101. |
8. | I have been involved with the Séguéla Project since June 2022. |
9. | I have read NI 43-101, and the sections of the technical report for
which I am responsible for have been prepared in compliance with that Instrument. |
10. | As of the effective date of the Technical Report, to the best
of my knowledge, information and belief, the sections of the Technical Report for which I am responsible
contain all scientific and technical information that is required to be disclosed to make the Technical
Report not misleading. |
Dated at Vancouver, Canada, February 16, 2024.
[“Signed”]
Mr. Raul Espinoza, FAusIMM (CP)
Director of Technical Services
Fortuna Silver Mines Inc.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Certificate of Qualified Person – Mathieu
Veillette
I, Mathieu F. Veillette, Director, Geotechnical,
Tailings and Water for Fortuna Silver Mines Inc. (Fortuna), 200 Burrard Street, Suite 650, Vancouver, BC V6C 3L6, Canada, do hereby
certify that:
1. | I am a co-author of the technical report entitled
“Technical Report for the Séguéla Gold Mine, Côte d’Ivoire”
which has an effective date of December 31, 2023 (the “Technical Report”). |
2. | I graduated with a Bachelor of Science degree
in Civil Engineering in 1997 from Queen’s University and a Graduate Diploma Business
Administration from Simon Fraser University in 2018. I have practiced my profession continuously
for 25 years in geotechnical and water management related fields. The majority of my experience
has been in the mining industry including international projects on all stages of the mining
process from advanced exploration through decommissioning and reclamation. My relevant work
experience includes analysis, site investigations, design, construction, dewatering and operation
of open pits, waste dumps, heap leach pads, tailings storage facilities, process ponds, water
dams, diversion structures and other mining facilities in Canada (BC, QC), USA (CO, UT, NM,
AZ, MT, AK, SC), México, Panamá, Venezuela, Guyana, Peru, Chile, Argentina,
Bolivia, Australia, New Zealand and New Caledonia. |
3. | I am a Professional Engineer of the Association
of Professional Engineers and Geoscientists of the Province of British Columbia (Registration
No. 28397), also a Professional Engineer in Colorado (Registration No. 36639) and
Alaska (Registration No. 10914). |
4. | I have read the definition of Qualified Person
set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects
(NI 43-101) and certify that by virtue of my education, affiliation to a professional association,
and past relevant work experience, I fulfill the requirements to be a Qualified Person
for the purposes of NI 43-101. |
5. | I have visited the Séguéla Project
on multiple occasions with my most recent personal inspection taking place from September 30
to October 4, 2023, a duration of five days. |
6. | I am responsible for Sections 1.18, 1.19;
Section 2.4; Sections 12.5, 12.8 and 12.9; Sections 16.2, 16.3 and 16.9; Sections 18.3
to 18.7 and 18.16; Sections 25.5, 25.9 and 25.10; Sections 26.2 to 26.4; and Section 27
of the Technical Report. |
7. | I am not independent of Fortuna as independence
is described by Section 1.5 of NI 43–101. I am a Fortuna employee. |
8. | I have been involved with the Séguéla
Project since August 2022. |
9. | I have read NI 43-101, and the sections of
the technical report for which I am responsible for have been prepared in compliance with
that Instrument. |
10. | As of the effective date of the Technical
Report, to the best of my knowledge, information and belief, the sections of the Technical
Report for which I am responsible contain all scientific and technical information that is
required to be disclosed to make the Technical Report not misleading. |
Dated at Vancouver, Canada, February 16, 2024.
[“Signed”]
Mr. Mathieu F. Veillette, P.Eng.
Director, Geotechnical, Tailings and Water
Fortuna Silver Mines Inc.
Fortuna
Silver Mines Inc.
Technical
Report for the Séguéla Gold Mine, Côte d’Ivoire |
|
Certificate of Qualified Person – Paul
Criddle
I, Paul Criddle, Technical Consultant for Fortuna
Silver Mines Inc. (Fortuna), 33/2 Doepel Street, North Fremantle, Western Australia do hereby certify that:
1. | I am a co-author of the technical report entitled
“Technical Report for the Séguéla Gold Mine, Côte d’Ivoire”
which has an effective date of December 31, 2023 (the “Technical Report”). |
2. | I graduated from Murdoch University, Western
Australia in January 2001 with a Bachelor of Science (Extractive Metallurgy). I have
practiced my profession continuously since 1998, working full time as an undergraduate, prior
to graduating in 2001. In the first stage of my career, I worked in gold projects for
Placer Dome in Australia, Papua New Guinea and Tanzania. Initially my experience was focussed
on operating and optimizing processing plants and mines in these jurisdictions. In the last
20 years of my career, I have been focused on development projects in Senegal, Ghana,
Burkina Faso and Cote dÍvoire. From 2013 to October 2022, I was the Chief
Operating Officer of Roxgold Inc. (Roxgold) and was responsible for the development of the
Séguéla Project through the Preliminary Economic Assessment and Feasibility
Studies, and subsequent permitting and construction. I was based in Roxgold’s Toronto
and Perth headquarters where I was part of the corporate executive team. From October 2022, I
have been consulting to Fortuna on a technical basis. |
3. | I am a Fellow of the Australasian Institute
of Mining and Metallurgy (FAusIMM #309804). |
4. | I have read the definition of Qualified Person
set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects
(NI 43-101) and certify that by virtue of my education, affiliation to a professional association,
and past relevant work experience, I fulfill the requirements to be a Qualified Person
for the purposes of NI 43-101. |
5. | I have visited the Séguéla Project
on multiple occasions with my most recent personal inspection taking place from July 27
to 29, 2022, a duration of three days. |
6. | I am responsible for Sections 1.7, 1.11, 1.18
and 1.19.3; Section 2.4; Sections 12.6 and 12.9; Section 13; Section 17; and
Sections 25.5, 25.6 and 25.10; Section 26.3; and Section 27 of the Technical Report. |
7. | I am not independent of Fortuna as defined
in Section 1.5 of NI 43-101. |
8. | I have been involved with the Séguéla
Project since April 2019. |
9. | I have read NI 43-101, and the sections of
the technical report for which I am responsible for have been prepared in compliance with
that Instrument. |
10. | As of the effective date of the Technical
Report, to the best of my knowledge, information and belief, the sections of the Technical
Report for which I am responsible contain all scientific and technical information that is
required to be disclosed to make the Technical Report not misleading. |
Dated at Perth, Australia, February 16, 2024.
[“Signed”]
Mr. Paul Criddle, FAusIMM
Technical Consultant
Exhibit 99.2
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba
Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Séguéla Gold Mine, Côte d’Ivoire” with an effective date of December 31, 2023,
prepared for Fortuna Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Paul
Weedon” |
|
Paul Weedon, MAIG |
|
Exhibit 99.3
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Séguéla Gold Mine, Côte d’Ivoire” with an effective date of December 31, 2023,
prepared for Fortuna Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Eric Chapman” |
|
Eric Chapman, P. Geo. |
|
Exhibit 99.4
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Séguéla Gold Mine, Côte d’Ivoire” with an effective date of December 31, 2023,
prepared for Fortuna Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Raul Espinoza” |
|
Raul Espinoza, FAusIMM (CP) |
|
Exhibit 99.5
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities
Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba Securities Commission
Ontario Securities Commission
Nova Scotia Securities
Commission
Securities, Financial and Consumer Services Commission
(New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service
Newfoundland and Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Séguéla Gold Mine, Côte d’Ivoire” with an effective date of December 31, 2023,
prepared for Fortuna Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National
Instrument 43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the
Company.
“Mathieu F. Veillette” |
|
Mathieu F. Veillette, P.Eng. |
|
Exhibit 99.6
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities
Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba Securities Commission
Ontario Securities Commission
Nova Scotia Securities
Commission
Securities, Financial and Consumer Services Commission
(New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service
Newfoundland and Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Séguéla Gold Mine, Côte d’Ivoire” with an effective date of December 31, 2023,
prepared for Fortuna Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National
Instrument 43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the
Company.
“Paul Criddle” |
|
Paul Criddle, FAusIMM |
|
Fortuna Mining (NYSE:FSM)
Historical Stock Chart
From Dec 2024 to Jan 2025
Fortuna Mining (NYSE:FSM)
Historical Stock Chart
From Jan 2024 to Jan 2025