Northern Graphite Announces Filing of Expansion Case NI 43-101 PEA
10 December 2013 - 12:45AM
Marketwired
Northern Graphite Announces Filing of Expansion Case NI 43-101 PEA
OTTAWA, ONTARIO--(Marketwired - Dec 9, 2013) - Northern Graphite
Corporation (TSX-VENTURE:NGC:)(OTCQX:NGPHF) announces that a
technical report prepared in accordance with National Instrument
43-101 with respect to a Preliminary Economic Assessment (the
"PEA") on an expansion case for its 100% owned Bissett Creek
graphite project has been filed on SEDAR at www.sedar.com. The
technical report is dated December 6, 2013 and was prepared by Marc
Leduc, P.Eng., and Gordon Zurowski, P.Eng. and Pierre Desautels,
P.Geo. of AGP Mining Consultants Inc. ("AGP"). There are no
material differences between the results of the technical report
filed and the disclosure provided in the Company's press release
dated October 23, 2013 announcing the PEA results.
Gregory Bowes, CEO, commented that: "The PEA builds on the
Feasibility Study completed by G Mining in August, 2012, the
expanded resource model and updated FS economics completed by AGP
and announced September 23, 2013, and the extensive body of work
done in the 1980s, all of which have substantially de-risked the
project in terms of resources, metallurgy and engineering. The PEA
was undertaken to demonstrate the ability to meet expected future
growth in graphite demand by doubling mill throughput after three
years of operation based on measured and indicated resources
only."
Northern Graphite Corporation
Northern Graphite Corporation is a Canadian company that has a
100% interest in the Bissett Creek graphite deposit located in
eastern Ontario. Graphite demand is expected to rapidly increase in
the future due to strengthening economies and the growth in new
technologies such as lithium ion batteries, particularly due to
their use in hybrid and all electric vehicles. Graphite production
is dominated by China which is modernizing and consolidating its
industry and emphasizing value added domestic manufacturing rather
than the export of cheap raw materials. Both the EU and USA have
named graphite a supply critical mineral. Northern Graphite is well
positioned to build the first new greenfields graphite development
project in the west in over 20 years. The Company's Bissett Creek
project is a high purity, large flake, scalable deposit that is
located close to infrastructure and has very competitive capital
and operating costs. It is the only graphite project to have
completed a full Feasibility Study and to have its major
environmental permit. Additional information on Northern can be
found at www.sedar.com and www.northerngraphite.com.
This press release contains forward-looking statements, which
can be identified by the use of statements that include words such
as "could", "potential", "believe", "expect", "anticipate",
"intend", "plan", "likely", "will" or other similar words or
phrases. These statements are only current predictions and are
subject to known and unknown risks, uncertainties and other factors
that may cause our or our industry's actual results, levels of
activity, performance or achievements to be materially different
from those anticipated by the forward-looking statements.
The Company does not intend, and does not assume any obligation, to
update forward-looking statements, whether as a result of new
information, future events or otherwise, unless otherwise required
by applicable securities laws. Readers should not place undue
reliance on forward-looking statements.
Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Northern Graphite CorporationGregory BowesCEO(613)
241-9959Northern Graphite CorporationStephen ThompsonCFO(613)
241-9959www.northerngraphite.com
Northern Graphite (QB) (USOTC:NGPHF)
Historical Stock Chart
From Feb 2025 to Mar 2025
Northern Graphite (QB) (USOTC:NGPHF)
Historical Stock Chart
From Mar 2024 to Mar 2025