false
0001844862
0001844862
2025-01-21
2025-01-21
0001844862
us-gaap:CommonStockMember
2025-01-21
2025-01-21
0001844862
us-gaap:WarrantMember
2025-01-21
2025-01-21
iso4217:USD
xbrli:shares
iso4217:USD
xbrli:shares
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d)
of the Securities Exchange Act of 1934
Date of report (Date of earliest event reported):
January 21, 2025
Solid
Power, Inc.
(Exact Name of Registrant as Specified in Charter)
Delaware |
|
001-40284 |
|
86-1888095 |
(State or other jurisdiction
of incorporation) |
|
(Commission
File Number) |
|
(I.R.S. Employer
Identification Number) |
486
S. Pierce Avenue, Suite E
Louisville, Colorado |
|
80027 |
(Address of principal executive offices) |
|
(Zip code) |
(303) 219-0720
(Registrant’s telephone number, including
area code)
Not Applicable
(Former name or former address, if changed since
last report)
Check the appropriate box below if the Form 8-K filing is intended
to simultaneously satisfy the filing obligation of the Registrant under any of the following provisions:
¨ | Written
communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425) |
¨ | Soliciting
material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12) |
¨ | Pre-commencement
communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b)) |
¨ | Pre-commencement
communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) |
Securities registered pursuant to Section 12(b) of the Act:
Title of each class |
|
Trading
Symbol(s) |
|
Name of each exchange
on which registered |
Common stock, par value $0.0001 per share |
|
SLDP |
|
The Nasdaq Stock Market LLC |
Warrants, each whole warrant exercisable for one share of common stock at an exercise price of $11.50 |
|
SLDPW |
|
The Nasdaq Stock Market LLC |
Indicate by check mark whether the registrant is an emerging growth
company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405) or Rule 12b-2 of the Securities Exchange Act
of 1934 (§ 240.12b-2).
Emerging growth company ¨
If an emerging growth company, indicate
by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial
accounting standards provided pursuant to Section 13(a) of the Exchange Act. ¨
Item 1.01 |
Entry into a Material Definitive Agreement. |
On January 21, 2025, Solid
Power Operating, Inc., a wholly owned subsidiary of Solid Power, Inc. (collectively, the “Company”), and the United States
Department of Energy (the “DOE”) entered into an Assistance Agreement (the “Assistance Agreement”), with an effective
date of January 1, 2025. The Assistance Agreement provides that the DOE will provide the Company with funding of up to $50 million for
the Company’s installation of equipment necessary for the continuous production of sulfide-based solid electrolyte material. The
Company’s cost share obligation under the Assistance Agreement is $60 million. The Company is subject to certain reporting requirements
and compliance obligations under the Assistance Agreement, as set forth in more detail in the Assistance Agreement.
The foregoing description
of the Assistance Agreement does not purport to be complete and is qualified in its entirety by reference to the full text of the agreement,
a copy of which is filed as Exhibit 10.1 to this Current Report on Form 8-K and incorporated herein by reference.
Item 9.01 |
Financial Statements and Exhibits. |
(d) Exhibits.
See the Exhibit index
below, which is incorporated herein by reference.
SIGNATURE
Pursuant to the requirements of the Securities
Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, hereunto duly authorized.
Dated: January 24, 2025
|
SOLID
POWER, INC. |
|
|
|
|
By: |
/s/
James Liebscher |
|
|
Name:
James Liebscher |
|
|
Title:
Chief Legal Officer and Secretary |
Exhibit 10.1

| 1. Award No. 2. Modification No. 3. Effective Date 4. CFDA No.
DE-MS0000122 01/01/2025 81.253
ASSISTANCE AGREEMENT
486 S Pierce Avenue, Suite E
7. Period of Performance
01/01/2025
through
12/31/2025
6. Sponsoring Office
Manufacturing &Energy Supply Chain
U.S. Department of Energy
1000 Independence Avenue, SW
Forrestal Building , MESC-1
Washington DC 20585
Louisville CO 800273123
Attn: Adam Jansons
Solid Power Operating, Inc.
5. Awarded To
Other
Cooperative Agreement
Grant See Page 2 25MS000066
8. Type of Agreement 9. Authority 10. Purchase Request or Funding Document No.
X
11. Remittance Address 12. Total Amount 13. Funds Obligated
Solid Power Operating, Inc.
Attn: Adam Jansons
LOUISVILLE CO 80027
Govt. Share: $50,000,000.00
Cost Share : $60,000,000.00
Total :
$110,000,000.00
This action:
$50,000,000.00
Total :
$50,000,000.00
486 S Pierce Avenue, Suite E
Morgantown WV 26505-2353
3610 Collins Ferry Road
NATIONAL ENERGY TECH LAB
U.S. DOE/NETL
14. Principal Investigator 15. Program Manager
Stephanie Smith
Phone: [***]
16. Administrator
by call/email 888-251-3557 or
VIPERS See Attachment 2
https://vipers.doe.gov
Any questions, please contact
payments@hq.doe.gov Payments@hq.doe.gov
by call/email 888-251-3557 or
Any questions, please contact
https://vipers.doe.gov
VIPERS
17. Submit Payment Requests To 18. Paying Office 19. Submit Reports To
20. Accounting and Appropriation Data
05461-2025-31-220960-41999-1005909-0000000-0000000-0000000
21. Research Title and/or Description of Project
Bipartisan Infrastructure Law (BIL) - Continuous Production of Sulfide-based Solid Electrolyte
Materials for Advanced All-solid-state Batteries
For the Recipient For the United States of America
22. Signature of Person Authorized to Sign 25. Signature of Grants/Agreements Officer
23. Name and Title 24. Date Signed 26. Name of Officer 27. Date Signed
Susan Miltenberger 12/30/2024
25-4269-1 C1.2 P5
/s/ John Van Scoter
President and Chief Executive Officer 1/21/2025
Susan Miltenberger |

| CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE OF
(A) (B) (C) (E) (F)
DE-MS0000122 2 3
Solid Power Operating, Inc.
(D)
UEI: P6C4J2FTTUM7
Project Period of Performance:
01/01/2025 - 12/31/2028
Budget Periods:
Budget Period 1: 01/01/2025 - 12/31/2025
Budget Period 2: 01/01/2026 - 12/31/2026
Budget Period 3: 01/01/2027 - 12/31/2027
Budget Period 4: 01/01/2028 - 12/31/2028
Block 9. Authority:
Public Law (P.L.) 102-486, Energy Policy Act
(EPAct) of 1992, amended by P.L. 109-58, EPAct
2005, Section 911, as amended (codified at 42
U.S.C. § 16191), and P.L. 110-140,
Public Law 117-58, Infrastructure Investment and
Jobs Act of 2021 (referred to as BIL), Section
40207 (codified at 42 U.S.C. § 18741.)
Block 14. Principal Investigator:
Joseph Duchaj
[***]
[***]
Recipient Business Point of Contact:
Dr. Derek C. Johnson
[***]
[***]
Block 15. DOE Program Manager:
Stephanie Smith
[***]
[***]
DOE Award Administrator:
Mary Cass
[***]
[***]
ASAP: NO: STD IMMEDIATE Extent Competed: COMPETED
Davis-Bacon Act: YES PI: Joesph Duchaj
Fund: 05461 Appr Year: 2025 Allottee: 31 Report
Entity: 220960 Object Class: 41999 Program:
1005909 Project: 0000000 WFO: 0000000 Local Use:
0000000
25-4269-1 C1.2 P6 |

| JULY 2004
25-4269-1 C1.2 P7 |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Special Terms and Conditions
Solid
Power Operating, Inc. (“recipient”), which is identified in Block 5 of the Assistance Agreement, and the
United States Department of Energy (“DOE”), enter into this award, referenced above, to achieve the project objectives and
the deliverables stated in the Attachments to this award.
This award consists of the following documents, including all terms
and conditions therein:
|
Assistance
Agreement |
|
Special
Terms and Conditions |
Attachment
1 |
Statement
of Project Objectives |
Attachment
2 |
Federal
Assistance Reporting Checklist and Instructions |
Attachment
3 |
Budget
Information SF-424A |
Attachment
4 |
Intellectual
Property Provisions |
Attachment
5 |
Community
Benefits Outcomes and Objectives |
Attachment
6 |
Data
Management Plan |
Attachment
7 |
Wage
Determination - Reserved |
The following are incorporated into this award by reference:
| · | DOE
Assistance Regulations, 2 CFR Part 200 as adopted and supplemented by 2 CFR Part 910
(subject to any deviations issued pursuant to 2 CFR 910.133) at https://www.ecfr.gov/current/title-2. |
| · | National
Policy Requirements (November 12, 2020) at https://www.nsf.gov/awards/managing/rtc.jsp. |
| · | Public
Law 117-58, also known as the Bipartisan Infrastructure Law (BIL). |
| · | The
recipient’s application/proposal as approved by DOE. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Table of Contents
Table of Contents |
2 |
|
|
Subpart A. |
General Provisions |
4 |
|
|
|
Term 1. |
Legal Authority and Effect |
4 |
Term 2. |
Flow Down Requirement |
4 |
Term 3. |
Pre-Award Information |
4 |
Term 4. |
Compliance with Federal, State, and Municipal Law |
4 |
Term 5. |
Inconsistency with Federal Law |
4 |
Term 6. |
Federal Stewardship |
4 |
Term 7. |
Whistleblower Protections |
5 |
Term 8. |
Termination |
5 |
Term 9. |
Federal Involvement |
5 |
Term 10. |
Risk-Based Review of Project Participation |
6 |
Term 11. |
Post-Award Due Diligence Reviews |
7 |
Term 12. |
NEPA Requirements |
7 |
Term 13. |
Performance of Work in United States |
7 |
Term 14. |
Notice Regarding the Purchase of American-Made Equipment
and Products – Sense of Congress |
8 |
Term 15. |
Reporting Requirements |
8 |
Term 16. |
Lobbying |
9 |
Term 17. |
Publications |
9 |
Term 18. |
One Time No-Cost Extension |
10 |
Term 19. |
Property Standards |
10 |
Term 20. |
Insurance Coverage |
10 |
Term 21. |
Intangible Property |
10 |
Term 22. |
Real Property |
10 |
Term 23. |
Equipment |
11 |
Term 24. |
Supplies |
12 |
Term 25. |
Continued Use of Real Property and Equipment |
12 |
Term 26. |
DOE’S Property Interest |
13 |
Term 27. |
Property Trust Relationship |
14 |
Term 28. |
Record Retention |
14 |
Term 29. |
Audits |
14 |
Term 30. |
Site Visits and Recipient Administrative Organizational
Reviews |
15 |
Term 31. |
Indemnity |
15 |
|
|
|
Subpart B. |
Financial Provisions |
16 |
|
|
|
Term 32. |
Maximum Obligation |
16 |
Term 33. |
Funding of Budget Periods |
16 |
Term 34. |
Continuation Application and Funding |
17 |
Term 35. |
Cost Sharing |
19 |
Term 36. |
Refund Obligation |
20 |
Term 37. |
Allowable Costs |
20 |
Term 38. |
Foreign Travel |
20 |
Term 39. |
Indirect Costs |
21 |
Term 40. |
Decontamination and/or Decommissioning (D&D)
Costs |
22 |
Term 41. |
Pre-Award Costs |
23 |
Term 42. |
Use of Program Income |
23 |
Term 43. |
Payment Procedures |
23 |
Term 44. |
Budget Changes |
25 |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Subpart C. |
Miscellaneous Provisions |
26 |
|
|
|
Term 45. |
Environmental, Safety and Health Performance of
Work at DOE Facilities |
26 |
Term 46. |
Corporate Felony Conviction and Federal Tax Liability
Assurances |
26 |
Term 47. |
Insolvency, Bankruptcy or Receivership |
27 |
Term 48. |
Reporting Subawards and Executive Compensation |
27 |
Term 49. |
System for Award Management and Universal Identifier
Requirements |
30 |
Term 50. |
Nondisclosure and Confidentiality Agreements Assurances |
31 |
Term 51. |
Subrecipient Change Notification |
32 |
Term 52. |
Conference Spending |
33 |
Term 53. |
Reporting of Matters Related to recipient Integrity
and Performance |
34 |
Term 54. |
Export Control |
35 |
Term 55. |
Current and Pending Support |
36 |
Term 56. |
Interim Conflict of Interest Policy for Financial
Assistance |
41 |
Term 57. |
Organizational Conflict of Interest |
41 |
Term 58. |
Prohibition on Certain Telecommunications and Video
Surveillance Equipment or Services |
42 |
Term 59. |
Participants and Other Collaborating Organizations |
43 |
Term 60. |
Human Subjects Research |
44 |
Term 61. |
Fraud, Waste and Abuse |
45 |
Term 62. |
Trafficking in Persons |
45 |
Term 63. |
Prohibition related to Malign Foreign Talent Recruitment
Programs |
48 |
Term 64. |
Affirmative Action and Pay Transparency Requirements |
50 |
Term 65. |
Potentially Duplicative Funding Notice |
51 |
Term 66. |
Transparency of Foreign Connections |
51 |
Term 67. |
Foreign Collaboration Considerations |
52 |
Term 68. |
Entity of Concern Prohibition |
53 |
Term 69. |
Required Risk Mitigation |
54 |
Term 70. |
Impacted Indian Tribes |
54 |
Term 71. |
Historic Preservation |
54 |
Term 72. |
Implementation of Executive Order 13798, Promoting
Free Speech and Religious Liberty |
54 |
Term 73. |
Project Labor Agreement |
55 |
Term 74. |
Offtake Partner Plan |
55 |
Term 75. |
Supply Assurance |
56 |
Term 76. |
Access Restrictions |
56 |
Term 77. |
Threat Briefing |
56 |
Term 78. |
Technology Protection Plan |
57 |
Term 79. |
Material Supply Plan |
57 |
Term 80. |
Research Technology and Economic Security Officer |
58 |
Term 81. |
Third Party Monitor |
61 |
|
|
|
Subpart D. |
Bipartisan Infrastructure Law (BIL)-Specific Requirements |
62 |
|
|
|
Term 82. |
Community Benefits Outcomes and Objectives |
62 |
Term 83. |
Reporting, Tracking, and Segregation of Incurred
Costs |
62 |
Term 84. |
Davis-Bacon Act Requirements |
62 |
Term 85. |
Cybersecurity Plan |
64 |
Term 86. |
Construction Signage |
64 |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Subpart A. |
General Provisions |
| Term
1. | Legal
Authority and Effect |
A DOE financial assistance award is valid only if it is in writing
and is signed, either in writing or electronically, by a DOE Grants Officer.
The recipient may accept or reject the award. A request to draw down
DOE funds or acknowledgement of award documents by the recipient’s authorized representative through electronic systems used by
DOE, specifically FedConnect, constitutes the recipient's acceptance of the terms and conditions of this award. Acknowledgement via FedConnect
by the recipient’s authorized representative constitutes the recipient's electronic signature.
| Term
2. | Flow Down Requirement |
The recipient agrees to apply the terms and conditions of this award,
including the Intellectual Property Provisions, to all subrecipients (and contractors, as appropriate). See, 2 CFR 200.101(b)(2) through
(b)(5), 2 CFR 200.327, and 2 CFR 200.332.
| Term
3. | Pre-Award
Information |
Prior to award, the recipient was required to provide certain information,
disclosures, representations, and certifications. Certification of the information was required by the recipient’s authorized representative
on behalf of the recipient, via the pre-award information sheet. If there are any changes to the provided information, disclosures, representations,
and/or certifications throughout the life of the award, the recipient must notify the DOE Grants Officer, in writing, within fifteen
(15) business days of the changes, unless a different notification period is specified in an applicable law or controlling term, in which
case the specific period controls.
| Term
4. | Compliance
with Federal, State, and Municipal Law |
The recipient is required to comply with applicable federal, state,
and local laws and regulations for all work performed under this award. The recipient is required to obtain all necessary federal, state,
and local permits, authorizations, and approvals for all work performed under this award.
| Term
5. | Inconsistency
with Federal Law |
Any apparent inconsistency between federal statutes and regulations
and the terms and conditions contained in this award must be referred to the DOE award Administrator for guidance.
| Term
6. | Federal
Stewardship |
DOE will exercise normal federal stewardship in overseeing the project
activities performed under this award. Stewardship activities include, but are not limited to, conducting site visits; reviewing performance
and financial reports; providing technical assistance and/or temporary intervention in unusual circumstances to address deficiencies
that develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion
to ensure that the project objectives have been accomplished.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| Term
7. | Whistleblower
Protections |
As provided in 2 CFR 200.217, an employee of a recipient or subrecipient
must not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing information that the employee reasonably
believes is evidence of gross mismanagement of a federal contract or grant, a gross waste of federal funds, an abuse of authority relating
to a federal contract or grant, a substantial and specific danger to public health or safety, or a violation of law, rule, or regulation
related to a federal contract (including the competition for or negotiation of a contract) or grant. The recipient and subrecipient must
inform their employees in writing of employee whistleblower rights and protections.
This award may be terminated in part or in its entirety in accordance
with 2 CFR 200.340.
| Term
9. | Federal
Involvement |
The recipient, including but not limited to the principal
investigator (or, if applicable, co-principal investigators), is required to participate in periodic review meetings with DOE. Review
meetings enable DOE to assess the work performed under this award and determine whether the recipient has timely achieved the technical
objectives and deliverables stated in Attachment 1 to this award.
DOE shall determine the frequency of review meetings and
select the day, time, and location of each review meeting and shall do so in a reasonable and good faith manner. DOE will provide the
recipient with reasonable notice of the review meetings.
For each review meeting, the recipient is required to provide
a comprehensive overview of the project, including:
| 1. | The recipient’s
technical progress compared to the technical objectives stated in Attachment 1 to this award. |
| 2. | The recipient’s
actual expenditures compared to the approved budget in Attachment 3 to this award. |
| 3. | Other subject
matter specified by the DOE Technology Manager/Federal Project Manager. |
The recipient is required to notify DOE in advance of scheduled
tests and internal project meetings that would entail discussion of topics that could result in major changes to the baseline project
technical scope/approach, cost, or schedule. Upon request by DOE, the recipient is required to provide DOE with reasonable access (by
telephone, webinar, or otherwise) to the tests and project meetings. The recipient is not expected to delay any work under this award
for the purpose of government insight.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
DOE's authorized representatives have the right to make
site visits at reasonable times to review project accomplishments and management control systems and to provide technical assistance,
if required. The recipient must provide, and must require subrecipients to provide, reasonable access to facilities, office space, resources,
and assistance for the safety and convenience of the government representatives in the performance of their duties. All site visits and
evaluations must be performed in a manner that does not unduly interfere with or delay the work.
Attachment 1 to this award establishes Go/No Go decision
points. For each Go/No Go decision point, DOE must determine whether the recipient has fully and satisfactorily completed the work described
in Attachment 1 to this award. As a result of a Go/No Go review, in its discretion, DOE may take one of the following actions:
| · | Authorize
federal funding for the next budget period for the project; |
| · | Recommend
redirection of work under the project; |
| · | Place
a hold on the federal funding for the project, pending further supporting data; |
| · | Discontinue
providing federal funding for the project beyond the current budget period as the result
of insufficient progress, change in strategic direction, or lack of available funding. |
The recipient must provide any information, documents,
site access, or other assistance requested by DOE for the purpose of its federal stewardship or substantial involvement.
| Term
10. | Risk-Based
Review of Project Participation |
All project participants are subject to a DOE risk review. The risk
review of covered individuals includes but is not limited to the review of resumes and disclosures, as required in the award. DOE reserves
the right to ask for disclosures on project participants not defined as covered individuals. The recipient need not submit any additional
information on non-covered individuals, unless requested by DOE. The volume and type of information collected may depend on various factors
associated with the award.
Note this review is separate and distinct from DOE Order 142.3B “Unclassified
Foreign National Access Program”.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| Term
11. | Post-Award
Due Diligence Reviews |
During the period of performance of the award, DOE may conduct ongoing
due diligence reviews, through Government resources, to identify potential risks of undue foreign influence. In the event a risk is identified,
DOE may require risk mitigation measures, including but not limited to, requiring an individual or entity not participate in the award.
As part of the research, technology, and economic security risk review, DOE may contact the recipient project team members for additional
information to inform the review.
| Term
12. | NEPA
Requirements |
DOE must comply with the National Environmental Policy Act (NEPA)
prior to authorizing the use of federal funds. Based on all information provided by the recipient, DOE has made a NEPA determination
by issuing a categorical exclusion (CX) for all activities listed in the Statement of Project Objectives (SOPO) approved by the Grants
Officer and the DOE NEPA Determination. The recipient is thereby authorized to use federal funds for the defined project activities,
except where such activity is subject to a restriction set forth elsewhere in this award.
This authorization is specific to the project activities and locations
as described in the SOPO approved by the Grants Officer and the DOE NEPA Determination.
If
the recipient later intends to add to or modify the activities or locations as described in the approved SOPO and the
DOE NEPA Determination, those new activities/locations or modified activities/locations are subject to additional NEPA review and are
not authorized for federal funding until the Grants Officer provides written authorization on those additions or modifications. Should
the recipient elect to undertake activities or change locations prior to written authorization from the Grants Officer, the recipient
does so at risk of not receiving federal funding for those activities, and such costs may not be recognized as allowable cost share.
| Term
13. | Performance
of Work in United States |
All work performed under this award must be performed in
the United States unless the Grants Officer provides a waiver. This requirement does not apply to the purchase of supplies and equipment;
however, the recipient should make every effort to purchase supplies and equipment within the United States. The recipient must flow
down this requirement to its subrecipients.
If the recipient fails to comply with the requirements
of this term, the Grants Officer may deny reimbursement for the work conducted outside the United States and such costs may not be recognized
as allowable recipient cost share regardless of if the work is performed by the recipient, subrecipients, contractors or other project
partners.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| C. | Waiver
for Work Outside the U.S. |
All work performed under this award must be performed in
the United States. However, the Grants Officer may approve the recipient to perform a portion of the work outside the United States under
limited circumstances. The recipient must obtain a waiver from the Grants Officer prior to conducting any work outside the United States.
To request a waiver, the recipient must submit a written waiver request to the Grants Officer, which includes the information as required
in the Funding Opportunity Announcement (FOA) that the award was selected under.
For the rationale, the recipient must demonstrate to the
satisfaction of the Grants Officer that the performance of work outside the United States would further the purposes of the FOA that
the award was selected under and is in the economic interests of the United States. The Grants Officer may require additional information
before considering such request.
| Term
14. | Notice
Regarding the Purchase of American-Made Equipment and Products – Sense of Congress |
It is the sense of the Congress that, to the greatest extent practicable,
all equipment and products purchased with funds made available under this award should be American-made.
| Term
15. | Reporting
Requirements |
The reporting requirements for this award are identified
on the Federal Assistance Reporting Checklist, attached to this award. Failure to comply with these reporting requirements is considered
a material noncompliance with the terms of the award. Noncompliance may result in withholding of future payments, suspension, or termination
of the current award, and withholding of future awards. A willful failure to perform, a history of failure to perform, or unsatisfactory
performance of this and/or other financial assistance awards, may also result in a debarment action to preclude future awards by federal
agencies.
| B. | Dissemination
of Scientific and Technical Information |
Scientific
and Technical Information (STI) generated under this award will be submitted to DOE via the Office of Scientific and Technical Information’s
Energy Link (E-Link) system. STI submitted under this award will be disseminated via DOE’s OSTI.gov website
subject to approved access limitations. Citations for journal articles produced under the award will appear on the DOE PAGES website.
If the award authorizes protected data for a period of time, the recipient must also submit a publicly releasable version of the final
technical report for immediate dissemination.
Scientific and Technical Information submitted to E-Link
must not contain any Protected Personal Identifiable Information (PII), limited rights data (proprietary data), classified information,
information subject to export control classification, or other information not subject to release.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
By accepting funds under this award, the recipient agrees that none
of the funds obligated on the award shall be expended, directly or indirectly, to influence congressional action on any legislation or
appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. § 1913.
This restriction is in addition to those prescribed elsewhere in statute and regulation.
The recipient is required to include the following acknowledgement
in publications arising out of, or relating to, work performed under this award, whether copyrighted or not:
| · | Acknowledgment:
“This material is based upon work supported by the U.S. Department of Energy’s
Office of Manufacturing Energy and Supply Chains under award Number DE-MS0000122.” |
| | |
| · | Full
Legal Disclaimer: “This report was prepared as an account of work sponsored by
an agency of the United States Government. Neither the United States Government nor any agency
thereof, nor any of their employees, makes any warranty, express or implied, or assumes any
legal liability or responsibility for the accuracy, completeness, or usefulness of any information,
apparatus, product, or process disclosed, or represents that its use would not infringe privately
owned rights. Reference herein to any specific commercial product, process, or service by
trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply
its endorsement, recommendation, or favoring by the United States Government or any agency
thereof. The views and opinions of authors expressed herein do not necessarily state or reflect
those of the United States Government or any agency thereof.” |
Abridged
Legal Disclaimer: “The views expressed herein do not necessarily represent the views of the U.S. Department of Energy
or the United States Government.”
The recipient should make every effort to include the full Legal Disclaimer.
However, in the event that recipients are constrained by formatting and/or page limitations set by the publisher, the abridged Legal
Disclaimer is an acceptable alternative.
The
award may be subject to a Data Management Plan as part of the Intellectual Property clause set that explains how data generated
in the course of the work performed under this award will be shared or preserved or, when justified, explains why data sharing or preservation
is not possible or scientifically appropriate.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| Term
18. | One Time No-Cost Extension |
As provided in 2 CFR 200.308(g)(2), the recipient must provide the
Grants Officer with written notice in advance if it intends to utilize a one-time, no-cost extension of this award. The notification
must include the supporting justification and a revised period of performance. The recipient must submit this notification in writing
to the Grants Officer and DOE Technology Manager/Federal Project Manager at least 10 days before the end of the current budget period.
This paragraph does not preclude the federal agency from approving further no-cost extensions to the federal award.
Any no-cost extension will not alter the project scope, deliverables,
budget, or milestones (if applicable) of this award.
| Term
19. | Property
Standards |
The complete text of the Property Standards can be found at 2 CFR
200.310 through 200.316. Also see 2 CFR 910.360 for additional requirements for real property and equipment for for-profit recipients
| Term
20. | Insurance
Coverage |
See 2 CFR 200.310 for insurance requirements
for real property and equipment acquired or improved with federal funds. Also see 2 CFR 910.360(e) for additional requirements
for real property and equipment for for-profit recipients
| Term
21. | Intangible
Property |
Title to intangible property acquired under a federal award vests
upon acquisition in the recipient or subrecipient. Intangible property includes trademarks, copyrights, data (including data licenses),
websites, IP licenses, trade secrets, patents, patent applications, and property such as loans, notes and other debt instruments,
lease agreements, stocks and other instruments of property ownership either tangible or intangible property, such as intellectual property,
software, or software subscriptions or licenses.
See 2 CFR Part 200.315 for additional requirements pertaining
to intangible property acquired under a federal award.
Also see 2 CFR Part 910.362 and Attachment 4 for amended requirements
for Intellectual Property for for-profit requirements.
Subject to the conditions set forth in 2 CFR 200.311, title to real
property acquired or improved under the federal award will conditionally vest upon acquisition in the recipient or subrecipient. The
recipient or subrecipient cannot encumber its title or other interests and must follow the requirements of 2 CFR 200.311 before disposing
of the property.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Except as otherwise provided by federal statutes or the federal agency,
real property must be used for the originally authorized purpose as long as it is needed for that purpose. When real property is no longer
needed for the originally authorized purpose, the recipient or subrecipient must obtain disposition instructions from DOE or pass-through
entity.
See
2 CFR 200.311 for additional requirements pertaining to real property acquired or improved under a federal award. Also see 2 CFR 910.360
for additional requirements for real property for for-profit recipients.
Subject
to the conditions provided in 2 CFR 200.313, and 2 CFR 910.360 (as applicable), title to equipment (property) acquired under the
federal award will conditionally vest upon acquisition with the recipient or subrecipient. The recipient or subrecipient must not encumber
this property or permit encumbrance without prior written approval of the Grants Officer and must follow the requirements of 2 CFR 200.313
before disposing of the property, unless DOE vests unconditional title with the recipient and/or subrecipient pursuant to the Term “DOE’s
Property Interest”.
A state must use equipment acquired under a federal award by the state
in accordance with state laws and procedures.
Indian Tribes must use, manage, and dispose of equipment acquired
under a federal award in accordance with tribal laws and procedures. If such laws and procedures do not exist, Indian Tribes must
follow the guidance in 2 CFR 200.313.
The
recipient or subrecipient must use equipment for the project or program for which it was acquired and for as long as needed, whether
or not the project or program continues to be supported by the federal award. When no longer needed for the original project or program,
the equipment may be used by programs supported by DOE in the priority order specified in 2 CFR 200.313(c)(1)(i) and (ii).
Equipment with a current per unit fair market value of $10,000 or
less (per unit) may be retained, sold, or otherwise disposed of with no further responsibility to the federal awarding agency or pass-through
entity, as specified in 2 CFR 200.313(e)(1) and 2 CFR 910.360 (as applicable).
Management requirements, including inventory and control systems,
for equipment are provided in 2 CFR 200.313(d).
When
equipment acquired under a federal award is no longer needed, the recipient or subrecipient must obtain disposition instructions
from DOE or pass-through entity. However, pursuant to the FY23 Consolidation Appropriations Act (Pub. L. No. 117-328), Division
D, Title III, Section 309, the Secretary, or a designee of the Secretary may, at their discretion, vest unconditional title or other
property interests acquired under this project regardless of the fair market value of the property at the end of the award period of
performance.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Subject
to vesting of any property pursuant to Section 309 of the FY23 Consolidated Appropriations Act (Pub. L. No. 117-328), Division
D, Title III, disposition will be made as follows: (a) items of equipment with a current fair market value of $10,000 or
less (per unit) may be retained, sold, or otherwise disposed of with no further obligation to the federal agency or pass-through entity;
(b) the recipient or subrecipient may retain title or sell the equipment after compensating the federal agency as described in 2
CFR 200.313(e)(2); or (c) transfer title to the federal agency or to an eligible third Party as specified in 2 CFR 200.313(e)(3).
See
2 CFR 200.313 for additional requirements pertaining to equipment acquired under a federal award. Also see 2 CFR 910.360 for additional
requirements for for-profit recipients. See also 2 CFR 200.439 Equipment and other capital expenditures.
See 2 CFR 200.314 for requirements pertaining to supplies acquired
under a federal award. See also 2 CFR 200.453 Materials and supplies costs, including costs of computing devices.
| Term
25. | Continued
Use of Real Property and Equipment |
Real
property and equipment purchased with project funds (federal share and recipient cost share) under this award are subject to the requirements
at 2 CFR 200.311, 200.313, and 200.316 (recipient or subrecipient,
except for-profit entities) and 2 CFR 910.360 (for-profit entities). The recipient may continue to use the real property and equipment
after the conclusion of the award period of performance so long as the recipient and/or subrecipient:
| 1. | continues
to use the property for the authorized project purposes; |
| 2. | complies
with the applicable reporting requirements and regulatory property standards; |
| 3. | as applicable
to for-profit entities, UCC filing statements are maintained; and |
| 4. | submits
a written Request for Continued Use for DOE authorization, which is approved by the DOE Grants
Officer. |
The recipient must request authorization from the Grants Officer to
continue to use the property for the authorized project purposes beyond the award period of performance (“Request for Continued
Use”). The recipient’s written Request for Continued Use must identify the property and include: a summary of how the property
will be used (must align with the authorized project purposes); a proposed use period (e.g., perpetuity, until fully depreciated, or
a calendar date where the recipient expects to submit disposition instructions); acknowledgement that the recipient shall not sell or
encumber the property or permit any encumbrance without prior written DOE approval; current fair market value of the property; and an
Estimated Useful Life or depreciation schedule for equipment.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
When the property is no longer needed for authorized project purposes,
the recipient must request disposition instructions from DOE. For-profit entity disposition requirements are set forth at 2 CFR 910.360.
Property disposition requirements for other entities are set forth in 2 CFR 200.310 – 200.316.
If title to the real property and/or equipment has vested unconditionally
with the Recipient or subrecipient, as applicable, then this term shall not be applicable and the term titled “DOE’s Property
Interest” shall control.
| Term
26. | DOE’S
Property Interest |
While the Award is in effect and DOE retains its undivided reversionary
interest in real property and equipment acquired under the Award, DOE will not assert its reversionary interest in the property as long
as it: (1) is being used for the authorized purposes set forth in SOPO (the “Authorized Purpose”); (2) is not encumbered
without permission. If there is an agreement between DOE and debt and/or tax equity financing providers (“Financing Providers”),
DOE may assert its reversionary interest in the property consistent with the terms of any such agreement regardless of whether or not
the underlying encumbrance of the property was appropriately approved.
Upon
Recipient request, DOE will engage with the Recipient and/or subrecipient and potential Financing Providers seeking arrangements, such
as a Government-Creditor Agreement, relating to DOE’s undivided reversionary interest in the real property and equipment acquired
under the Award that address the reasonable requests of Financing Providers, including with respect to the exercise of remedies by Financing
Providers. Consistent with applicable regulation, DOE will consent to a pari passu position with the Financing Providers pursuant
to arrangements that will protect the federal interest and enable necessary financing for project success. These arrangements will be
set forth in a Government-Creditor Agreement or other agreement.
PROGRAM DETERMINATION TO EXERCISE 309 AUTHORITY UNDER AWARD
Upon Recipient’s request for vesting, including on behalf of
a subrecipient, DOE will exercise Section 309 authority to vest unconditional title to real property and equipment of a project
or sub-project in the Recipient and/or subrecipient when it is demonstrated to DOE’s satisfaction that the Recipient and/or subrecipient
has achieved the milestones set forth in the SOPO that correspond to the conclusion of the award period that includes mechanical completion,
commissioning and successful testing as set forth in Statement of Project Objectives Tasks 2.4 and 4.2, provided that the Recipient or
subrecipient satisfies the following conditions. Recipient or subrecipient, as applicable, agrees to:
| 1. | certify
that it will not sell or transfer the equipment or real property acquired under the
award to a Foreign Country of Risk, or to an entity owned, controlled by, incorporated in,
or located in those countries; |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| 2. | use
the equipment and real property acquired under the award during the award period for its
Authorized Purpose; and |
| 3. | continue
to comply with the award terms and conditions during the award period including all necessary
tasks, objectives, and milestones included in Attachment 1, Statement of Project Objectives
and Attachment 5, Community Benefits Outcomes and Objectives. |
Recipient
or subrecipient is required to advise DOE on its progress on the above conditions at various points throughout the life of the award,
including but not limited to, continuations, go/no-go decision points, budget periods, or phases, as determined at the start of each
budget period or phase. DOE will require a written certification satisfactory to DOE from the Recipient or subrecipient immediately prior
to the conclusion of the above award period confirming the Recipient’s or subrecipient’s satisfaction of the above conditions,
prior to DOE effecting any vesting of title under Section 309. After any disposition or vesting of DOE’s reversionary
interest, this award may remain in place to fulfill other award commitments.
| Term
27. | Property Trust Relationship |
Real property, equipment, and intangible property acquired or improved
with the federal award must be held in trust by the recipient or subrecipient as trustee for the beneficiaries of the project or program
under which the property was acquired or improved. See 2 CFR 200.316 for additional requirements pertaining to real property, equipment,
and intangible property acquired or improved under a federal award.
Consistent with 2 CFR 200.334 through 200.338, the recipient and subrecipient
must retain all federal award records.
| A. | Government-Initiated
Audits |
The recipient must provide any information, documents,
site access, or other assistance requested by DOE or federal auditing agencies (e.g., DOE Inspector General, Government Accountability
Office) for the purpose of audits and investigations. Such assistance may include, but is not limited to, reasonable access to the recipient’s
records relating to this award.
Consistent with 2 CFR part 200 as adopted and supplemented
by 2 CFR part 910, DOE may audit or review the recipient’s financial records or administrative records relating to this award at
any time. Audits or reviews may be performed to determine if the recipient has an adequate financial management system to estimate, bill,
and record federal government expenditures in accordance with the criteria in 2 CFR 200.302, Generally Accepted Accounting Principles
(GAAP), Generally Accepted Government Accounting Standards (GAGAS), and Standard Form 1408. Government-initiated audits are generally
paid for by DOE.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
DOE may conduct a final audit at the end of the period
of performance (or the termination of the award, if applicable). Upon completion of the audit, the recipient is required to refund to
DOE any payments for costs that were determined to be unallowable. If the audit has not been performed or completed prior to the closeout
of the award, DOE retains the right to recover an appropriate amount after fully considering the recommendations on disallowed costs
resulting from the final audit.
DOE will provide reasonable advance notice of audits and
will minimize interference with ongoing work, to the maximum extent practicable.
| B. | Annual
Independent Audits (Single Audit or Compliance Audit) |
The recipient must comply with the annual independent audit
requirements in 2 CFR 200.500 through .521. In the alternative, a for-profit recipient that expends $1,000,000 or more in federal awards
during that entity’s fiscal year may have a compliance audit conducted for that year in accordance with 2 CFR 910.500 through 910.521.
The annual independent audits are separate from Government-initiated
audits discussed in part A. of this Term and must be paid for by the recipient. To minimize expense, the recipient may have a Compliance
audit in conjunction with its annual audit of financial statements. The financial statement audit is not a substitute for the
Compliance audit. If the audit (Single audit or Compliance audit, depending on recipient entity type) has not been performed or completed
prior to the closeout of the award, DOE may impose one or more of the actions outlined in 2 CFR 200.339, Remedies for Noncompliance.
| Term
30. | Site
Visits and Recipient Administrative Organizational Reviews |
DOE’s authorized representatives have the right to make site
visits and conduct recipient Administrative Organizational Reviews to review the project and management control systems and to provide
technical assistance, as appropriate. The recipient must provide, and must require its subrecipients and contractors to provide, reasonable
access to facilities, office space, resources, and assistance for the safety and convenience of the government representatives in the
performance of their duties. DOE will make reasonable efforts to ensure these site visits do not interfere with or unduly delay project
work.
The recipient shall indemnify DOE and its officers, agents, or employees
for any and all liability, including litigation expenses and attorneys' fees, arising from suits, actions, or claims of any character
for death, bodily injury, or loss of or damage to property or to the environment, resulting from the project, except to the extent that
such liability results from the direct fault or negligence of DOE officers, agents or employees, or to the extent such liability may
be covered by applicable allowable costs provisions.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Subpart
B. Financial Provisions
| Term
32. | Maximum
Obligation |
The maximum obligation of DOE for this award is the total “Funds
Obligated” stated in Block 13 of the Assistance Agreement to this award.
| Term
33. | Funding
of Budget Periods |
DOE has obligated funding as shown in Block 13 of the Assistance Agreement
for completion of the Project. However, only the federal share of costs associated with the current Period of Performance is available
for work performed by the recipient. The federal share of costs is shown on Attachment 3. The current Period of Performance is shown
in Block 7 of the Assistance Agreement.
The remainder of funding is contingent upon the following:
| 1. | availability
of federal funds appropriated by Congress for the purpose of this program; |
| 2. | the
availability of future-year budget authority; |
| 3. | substantial
progress towards meeting the objectives of the recipient’s approved Milestones and
Go/No-Go’s in the Statement of Project Objectives; |
| 4. | recipient’s
progress compared to the Milestone Summary Table stated in Attachment 5, Community Benefits
Outcomes and Objectives; |
| 5. | recipient’s
submittal of required reports; |
| 6. | recipient’s
compliance with the terms and conditions of the award; |
| 7. | the recipient’s
submission of a continuation application, including delivery of the documents set forth in
Section A Table 1 and the factors described in Section B items 1-11 of the term
“Continuation Application and Funding”; |
| 8. | written
approval of the continuation application by the Grants Officer.; and |
| 9. | DOE’s
Go/No-Go decision. |
In the event that the recipient does not submit a continuation application
for subsequent Budget Periods, or DOE disapproves a continuation application for subsequent Budget Periods, the maximum DOE liability
to the recipient is the funds that are available for the current approved Budget Period(s). In such event, DOE reserves the right to
deobligate any remaining federal funds.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| Term
34. | Continuation
Application and Funding |
| A. | Continuation
Application |
A
continuation application is a non-competitive application for an additional budget period within a previously approved period of performance.
At least 90 calendar days before the end of each budget period, the recipient must submit its continuation application to the DOE as
required in Attachment 2, Federal Assistance Reporting Checklist, with written notification to the Technology
Manager/Federal Project Manager and the DOE Award Administrator that it has been submitted. The continuation application includes
the following information:
Table 1
Deliverables |
Description |
Progress
Report |
Report
on the Recipient’s progress towards meeting the project objectives, schedule, tasks, milestones, and Go/No Go decision points
set forth in the Statement of Project Objectives (SOPO) and CBOO, including any significant findings, conclusions, or developments.
|
Unobligated
Balances Report (UBR) |
Updated
estimate of any unobligated balances remaining at the end of the budget period. If the remaining unobligated balance is estimated
to exceed 20 percent of the funds available for the budget period, explain why the excess funds have not been obligated and provide
a proposal for how the funds will be used in the next budget period. |
Updated
Budget (if applicable) |
A
proposal to update the budget along with a detailed rationale for the proposed budget changes. |
Updated
SOPO (if applicable) |
A
proposal to update the SOPO along with a detailed rationale for the proposed changes. |
Updated
CBOO (if applicable) |
A
proposal to update the CBOO along with a detailed rationale for the proposed changes. |
Project
Management Plan (PMP) |
Updated
to reflect status, progress, or changes to PMP elements such as work breakdown structure
elements, schedule, spend plans, earned value metrics, technical milestones, risks, and planning
documents. Per the FARC, the PMP must include the following:
· Financing
Plan - The plan must identify an achievable path to project financing at an acceptable risk level and that there is sufficient
cost share to continue.
· Commercial
/ Economic Viability Analysis - The plan must identify an achievable path to commercial viability at an acceptable risk level
when considering the financial model and market analysis.
· Site
Plan (if applicable) - The plan must identify the rationale for current site selection, demonstrate the strength of current site
commitments, or the schedule to selection the site and gain appropriate commitments.
· Engineering
and Construction Plan (if applicable) - The plan must identify sound processes, standards, and criteria for transition of the
facility from concept to occupation and acceptance. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Deliverables |
Description |
Material
Supply Plan (MSP) |
Updated
to reflect the latest supply needs to meet current and/or projected demand, supplier sources, and quantities from each. Risks associated
with significant supply sources must be identified along with mitigation plans. TPO coordination required to determine the appropriate
location for the submission. |
Offtake
Partner Plan (OPP) |
Updated
to reflect contractual customer commitments/Offtake agreements and delivery deadlines for products to be produced resulting from
the award. |
DOE will conduct a review of the Recipient’s continuation
application and performance under the Award to date at the end of each budget period to inform its decision on whether to fund the Award
in the next budget period. Continuation funding is contingent on (1) the availability of funds appropriated by Congress for
the purpose of this program; (2) the availability of future-year budget authority; 3) Recipient’s achievement of the milestone
and “go/no-go” criteria stated in the SOPO (3a) and in the Community Benefits Outcomes and Objectives (3b); (4) the
commercial viability of the project, (5) risk of project continuation due to financing and ability to meet cost share requirements:
(6) Risk of project site selection; (7) Risk of project continuation due to construction planning: (8) Recipient’s
submittal of required reports; (9) Recipient’s compliance with the terms and conditions of the Award; (10) the Recipient’s
submission of a continuation application; and (11) written approval of the continuation application by the DOE Contracting Officer.
Select elements of the Continuation funding evaluation are detailed below for clarity:
| · | (3b)
CBP / Workforce: Reasonable likelihood that the Project will be accepted by the
community, provide good jobs and minimize negative impacts to the community. Demonstrated
by community participation, workforce engagement and community partnerships. |
| · | (4) Market
/ Commercial: Reasonable likelihood the project will be commercially viable.
Demonstrated by the business plan, market assessment, financial model, and off-take agreements. |
| · | (5) Financial:
Reasonable likelihood that the Recipient has sufficient liquidity to fund
the project through construction (total project cost and contingency) and operate the project.
Demonstrated by Cost Share commitments, financial model, and detailed cost estimate. |
| · | (7) Construction:
Reasonable likelihood that the plant can be constructed, and the technology will
be competitive in the marketplace for the foreseeable future. Demonstrated by the design,
siting, and techno-economic analysis. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
As
a result of this review, DOE, may choose to: (1) fund the Award in the next budget period; (2) fund the Award in the
next budget period with additional conditions or requirements; or (3) not fund future budget periods of the Award. DOE will communicate
its continuation decision in writing. If DOE chooses to fund the next budget period, it will update the Award to reflect the revised
funding level, budget period, milestones and go/no-go’s, deliverables, and any other changes.
| C. | Waiver
of Prior Written Approval Requirements |
DOE waives prior written approval requirements to carry
forward unobligated balances to subsequent budget periods, in accordance with 2 CFR 200.308(g)(3).
| A. | Cost
Sharing Obligations |
The recipient must provide the “Cost Share”
amount stated in Block 12 of the Assistance Agreement to this award. DOE and the recipient’s cost share for the total estimated
project costs are listed below.
Table 1
| |
DOE Cost Share | |
Recipient Cost Share | |
Total Estimated | |
Budget Period | |
$ | | |
% | | |
$ | | |
% | | |
Costs | |
1 | |
$ | 10,026,036 | | |
| 45.5 | % | |
$ | 12,031,243 | | |
| 54.5 | % | |
$ | 22,057,279 | |
2* | |
$ | 10,800,405 | | |
| 45.5 | % | |
$ | 12,960,486 | | |
| 54.5 | % | |
$ | 23,760,891 | |
3* | |
$ | 14,787,891 | | |
| 45.5 | % | |
$ | 17,745,469 | | |
| 54.5 | % | |
$ | 32,533,360 | |
4* | |
$ | 14,385,668 | | |
| 45.5 | % | |
$ | 17,262,802 | | |
| 54.5 | % | |
$ | 31,648,470 | |
| |
| | | |
| | | |
| | | |
| | | |
| | |
Total Project | |
$ | 50,000,000 | | |
| 45.5 | % | |
$ | 60,000,000 | | |
| 54.5 | % | |
$ | 110,000,000 | |
*Estimated costs subject to DOE review / approval of
submitted Continuation Application.
The recipient must provide its required “Cost Share”
amount as a percentage of the total project costs in each invoice period for the duration of the period of performance. Specifically,
the cumulative cost share percentage provided to date on each invoice received must reflect, at a minimum, the cost sharing percentage
specified in the award.
| B. | Cost
Share Obligation If Award Terminated or Discontinued |
If the award is terminated or is otherwise not funded to
completion, the recipient is not required to provide the entire “Cost Share” amount stated in Block 12 of the Assistance
Agreement to this award; however, the recipient must provide its share (i.e., percentage as shown in Table 1 above) of the total project
cost reimbursed as of the date of the termination or discontinuation.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
The recipient may not use federal funds to meet its cost
sharing obligations, unless otherwise allowed by federal law.
| D. | Inability
to Comply with Cost Sharing Obligations |
If the recipient determines that it is unable to meet its
cost sharing obligations, the recipient must notify the DOE Award Administrator in writing immediately. The notification must include
the following information: (1) whether the recipient intends to continue or phase out the project, and (2) if the recipient
intends to continue the project, how the recipient will pay (or secure replacement funding for) the recipient’s share of the total
project cost.
If the recipient fails to meet its cost sharing obligations,
DOE may recover some or all of the financial assistance provided under this award. The amount DOE would seek to recover under this Term
would be predicated on DOE’s analysis of the recipient’s compliance with their cost sharing obligation under the award (i.e.,
percentage as shown in Table 1 above of the total project cost as of the date of the termination or discontinuation).
| Term
36. | Refund
Obligation |
The recipient must refund any excess payments received from DOE, including
any costs determined unallowable by the Grants Officer. At the end of the period of performance (or the termination of the award, if
applicable), the recipient must refund to DOE the difference between (1) the total payments received from DOE, and (2) the
federal share of the costs incurred. Refund obligations under this Term do not supersede the annual reconciliation or true up process
if specified under the Indirect Cost Term.
DOE determines the allowability of costs in accordance with 2 CFR
Part 200 as adopted and supplemented by 2 CFR Part 910. All project costs must be allowable, allocable, and reasonable. The
recipient must document and maintain records of all project costs, including, but not limited to, the costs paid by federal funds, costs
claimed by its subrecipients and project costs that the recipient claims as cost sharing, including in-kind contributions. The recipient
is responsible for maintaining records adequate to demonstrate that costs claimed have been incurred, are reasonable, allowable, and
allocable, and comply with the appropriate cost principles. Upon request, the recipient is required to provide such records to DOE. Such
records are subject to audit. Failure to provide DOE adequate supporting documentation may result in a determination by the Grants Officer
that those costs are unallowable.
The recipient is required to obtain the prior written approval of
the Grants Officer for any foreign travel costs.
| · | To
initiate a foreign travel request, submit a foreign work waiver. See Performance of Work
in the United States (Foreign Work Waiver) above for details. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| · | Foreign
travel that typically isn’t subject to foreign work waivers (e.g., foreign travel to
conferences, scholarly workshops, or symposia) still requires a foreign work waiver if the
travel is to a foreign country of risk (China, Russia, North Korea, Iran). |
All international travel must comply with the International Air Transportation
Fair Competitive Practices Act of 1974 (49 USC 40118), commonly referred to as the “Fly America Act,” and implementing regulations
at 41 CFR 301-10.131 through 301-10.143. The law and regulations require air transport of people or property to, from, between, or within
a country other than the United States, the cost of which is supported under this award, to be performed by or under a cost-sharing arrangement
with a U.S. flag carrier, if service is available.
| A. | Indirect
Cost Allocation: |
The recipient has a federally approved provisional Negotiated
Indirect Cost Rate Agreement (NICRA) with a current effective period identified for billing and estimation purposes and it applies uniformly
across all federal awards. These costs shall be reconciled or trued up (actual incurred costs) on an annual basis with the recipient’s
cognizant agency. An updated rate proposal or NICRA is required if the recipient requests to bill the DOE higher billing rates than those
listed in the current NICRA.
| B. | Fringe
Cost Allocation: |
The budget for this award does not include an allocation
of segregated fringe billing rates. Therefore, fringe benefit costs shall not be charged as a separate rate allocation to this award.
DOE will not reimburse fringe benefit costs as a separate budget item. Fringe benefit costs for this award cannot be allocated as a separate
rate allocation to any other federally-sponsored project.
| C. | Subrecipient
Indirect Costs (If Applicable): |
The recipient must ensure its subrecipient’s indirect
costs are appropriately managed, have been found to be allowable, and comply with the requirements of this award and 2 CFR Part 200
as adopted and supplemented by 2 CFR Part 910.
| D. | Indirect
Cost Stipulations: |
| 1. | Modification
to Indirect Cost Billing Rates |
DOE will not modify this award solely to provide additional
funds to cover increases in the recipient’s indirect cost billing rate(s). Adjustments to the indirect cost billing rates must
be approved by the recipient’s Cognizant Agency or Cognizant Federal Agency Official.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
The recipient must provide a copy of an updated NICRA or
indirect rate proposal to the DOE Award Administrator to increase indirect cost billing rates. If the Grants Officer provides prior written
approval, the recipient may incur an increase in the indirect cost billing rates. Reimbursement will be limited by the budgeted dollar
amount for indirect costs for each budget period as shown in Attachment 3 to this award.
| 2. | Annual
Cost Reconciliation |
In accordance with Appendices III-VII of 2 CFR Part 200
or 48 CFR 42.7, governing for-profit organizations, the indirect cost billing rates shall be reconciled or trued up (actual incurred
costs) on an annual basis via the annual incurred cost proposal within six months after the recipient’s fiscal year end.
| 3. | Adjustments
to Indirect Cost Billing Rates |
Following an official audit or adequacy review of the incurred
cost proposal, one of the following shall apply:
| i. | If the recipient’s
actual and final annual indirect cost billing rate(s) reflect that recipient invoiced
at higher billing rates than actually incurred, the recipient must refund the Government
the over-recovered amounts. |
| ii. | If the
recipient’s actual and final annual indirect cost billing rate(s) reflect that
the recipient invoiced at lower billing rates than actually incurred, the recipient may not
be reimbursed for increases in its indirect cost rate, which resulted in an under-recovery.
Increased indirect cost billing rates cannot be retroactively applied to the DOE award. |
| 4. | Cost
Sharing Indirect Costs |
Indirect costs may be used as cost share only with prior
approval from the Grants Officer.
The closeout of the DOE award does not affect (1) the
right of the DOE to disallow costs and recover funds on the basis of a later audit or other review; (2) the requirement for the
recipient to return any funds due as a result of later refunds, corrections or other transactions including final indirect cost billing
rate adjustments; and (3) the ability of the DOE to make financial adjustments to a previously closed award resolving indirect cost
payments and making final payments.
| Term
40. | Decontamination
and/or Decommissioning (D&D) Costs |
Notwithstanding any other provisions of this award, the Government
shall not be responsible for or have any obligation to the recipient for (1) Decontamination and/or Decommissioning (D&D) of
any of the recipient’s facilities, or (2) any costs which may be incurred by the recipient in connection with the D&D
of any of its facilities due to the performance of the work under this award, whether said work was performed prior to or subsequent
to the effective date of the award.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
As stated in the Grants Officer’s Pre-Award Costs Letter dated
October 11, 2024, the recipient is authorized to request reimbursement for costs incurred on or after October 11, 2024, if
(1) such costs are allowable in accordance with 2 CFR Part 200 as adopted and supplemented by 2 CFR Part 910, (2) such
costs are not otherwise restricted by Term titled “National Environmental Policy Act (NEPA) Requirements,” and (3) such
costs are not otherwise restricted by any other Term. If the recipient elects to undertake activities that are not authorized for federal
funding by the Grants Officer in advance of DOE completing the NEPA review, the recipient is doing so at risk of not receiving federal
funding and such costs may not be recognized as allowable cost share. Nothing contained in the pre-award cost reimbursement regulations
or any pre-award costs approval letter from the Grants Officer override these NEPA requirements to obtain the written authorization from
the Grants Officer prior to taking any action that may have an adverse effect on the environment or limit the choice of reasonable alternatives.
| Term
42. | Use
of Program Income |
Program income does not include rebates, credits, discounts, and interest
earned on any of them. Program income does not include tax credits, including elective pay or transferable tax credits or Environmental
Attribute Credits.
Consistent
with 2 CFR § 200.307, if the recipient earns program income during the period of performance as a result of this award, the
program income may be added to the total allowable costs, increasing the overall total amount of the federal award (see 2 CFR 200.307
(b)(2)), or the recipient may use the program income to meet its cost sharing requirement (see 2 CFR 200.307 (b)(3)). The Recipient must
notify DOE at least 30 days prior to the anticipated date of initial generation of program on income whether the Recipient is choosing
the addition or cost sharing method.
For purposes of 2 CFR § 200.307(d), “costs incidental to
the generation of program income” may include, but are not limited to, operating and maintenance costs, debt service, required
reserves and other payments or reserves required by third-party lenders, provided these costs have not been charged to the Federal Award.
| Term
43. | Payment
Procedures |
Payment will be made by reimbursement through ACH.
| B. | Requesting
Reimbursement |
Requests
for reimbursements must be made electronically through Department of Energy’s Oak Ridge Financial Service Center (ORFSC) VIPERS.
To access and use VIPERS, the recipient must enroll at https://vipers.doe.gov. Detailed instructions on how to enroll are
provided on the web site.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Submittal of the SF-270 or SF-271 should coincide with
the recipient’s normal billing pattern, but not more frequently than every two weeks. Requests for reimbursement must be limited
to the amount of disbursements made during the billing period for the federal share of direct project costs and the proportionate share
of any allowable indirect costs incurred during that billing period.
| D. | Adjusting
Payment Requests for Available Cash |
The recipient must disburse any funds that are available
from repayments to, and interest earned on a revolving fund, program income, rebates, refunds, contract settlements, audit recoveries,
credits, discounts, and interest earned on any of those funds before requesting additional cash payments from DOE.
The DOE approving official will approve the invoice as
soon as practical, but not later than 30 days after the recipient’s request is received, unless the billing is improper. Upon receipt
of an invoice payment authorization from the DOE approving official, the ORFSC will disburse payment to the recipient. The recipient
may check the status of payments at the VIPERS web site. All payments are made by electronic funds transfer to the bank account specified
on the Bank Information Form that the recipient filed with the U.S. Department of Treasury.
| F. | Supporting
Documents for Agency Approval of Payments |
For
non-construction awards, the recipient must submit a Standard Form SF-270, “Request for Advance or Reimbursement,” at
https://vipers.doe.gov and attach a file containing appropriate supporting documentation.
The following additional items are required:
| 1. | Summary
cost data, for the billing period and cumulative cost data, showing all categories listed
in the SF-424A and identifying federal, non-federal, and total amounts. |
| 2. | If there
are unauthorized phases and/or tasks for the current budget period in the NEPA Requirements
term in these Special Terms and Conditions, a statement affirming that no invoiced costs
are related to tasks or activities prohibited by the NEPA Requirements term. |
| 3. | Applicable
to for-profit recipients and subrecipients. UCC filing proof for all equipment acquired
with project funds (i.e., federal share or recipient share) and equipment offered as cost
share. In accordance with 2 CFR 910.360(b)(4), the Recipient may request reimbursement
for progress payments incurred for equipment prior to submission of the UCC financing statement
as required below: |
| i. | All progress
payment reimbursement requests must include the vendor name, vendor location, project risks
being mitigated by the progress payments, the progress payment schedule inclusive of any
final hold-back amounts required prior to final payment, a copy of the vendor agreement outlining
equipment purchase terms, and the source(s) and availability of cash for the purchase. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| ii. | Late or
missed progress payments to the vendor that do not adhere to the payment schedule must be
justified prior to DOE reimbursement and may result in a DOE determination that all Federal
funds previously reimbursed toward the purchase of the equipment shall be promptly returned
to DOE or credited back to the award. |
| iii. | If progress
payments are made toward an equipment purchase that is terminated or not fully executed,
all prior reimbursements for previously incurred progress payments shall be promptly returned
to DOE or credited back to the award. |
| iv. | Final progress
payments may only be reimbursed after the Recipient secures title and complies with the UCC
filing instructions contained 2 CFR 910.360, the Federal Assistance Reporting Checklist,
and all applicable laws and regulations. |
The DOE payment authorizing official may request additional
information from the recipient to support the payment requests prior to release of funds, as deemed necessary. The recipient is required
to comply with these requests. Supporting documents include invoices, copies of contracts, contractor quotes, and other expenditure explanations
that justify the reimbursement requests.
| G. | Unauthorized
Drawdown of Federal Funds |
For each budget period, the recipient may not spend more
than the federal share authorized to that particular budget period, without specific written approval from the Grants Officer. The recipient
must immediately refund DOE any amounts spent or drawn down in excess of the authorized amount for a budget period. The recipient and
subrecipients shall promptly, but at least quarterly, remit to DOE interest earned on advances drawn in excess of disbursement needs
and shall comply with the procedure for remitting interest earned to the federal government per 2 CFR 200.305, as applicable.
| A. | Budget
Changes Generally |
The Grants Officer has reviewed and approved the SF-424A
in Attachment 3 to this award.
Any increase in the total project cost, whether DOE share
or Cost Share, which is stated as “Total” in Block 12 to the Assistance Agreement of this award, must be approved in advance
and in writing by the Grants Officer.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Any change that alters the project scope, milestones or
deliverables requires prior written approval of the Grants Officer. DOE may deny reimbursement for any failure to comply with the requirements
in this term.
| B. | Transfers
of Funds Among Direct Cost Categories |
The recipient is required to obtain the prior written approval
of the Grants Officer for any transfer of funds among direct cost categories where the cumulative amount of such transfers exceeds or
is expected to exceed 10 percent of the total project cost, which is stated as “Total” in Block 12 to the Assistance Agreement
of this award.
The recipient is required to notify the DOE Technology
Manager/Federal Project Manager of any transfer of funds among direct cost categories where the cumulative amount of such transfers is
equal to or below 10 percent of the total project cost, which is stated as “Total” in Block 12 to the Assistance Agreement
of this award.
| C. | Transfer
of Funds Between Direct and Indirect Cost Categories |
The recipient is required to obtain the prior written approval
of the Grants Officer for any transfer of funds between direct and indirect cost categories. If the recipient’s actual allowable
indirect costs are less than those budgeted in Attachment 3 to this award, the recipient may use the difference to pay additional allowable
direct costs during the period of performance so long as the total difference is less than 10% of total project costs and the difference
is reflected in actual requests for reimbursement to DOE.
Subpart
C. Miscellaneous Provisions
| Term
45. | Environmental,
Safety and Health Performance of Work at DOE Facilities |
With respect to the performance of any portion of the work under this
award which is performed at a DOE-owned or controlled site, the recipient agrees to comply with all State and Federal Environmental,
Safety and Health (ES&H) regulations and with all other ES&H requirements of the operator of such site.
Prior to the performance on any work at a DOE-owned or controlled
site, the recipient shall contact the site facility manager for information on DOE and site-specific ES&H requirements.
The recipient is required to apply this provision to its subrecipients
and contractors.
| Term 46. | Corporate
Felony Conviction and Federal Tax Liability Assurances |
This term applies to recipients that are organized as corporations.
A corporation includes any entity that has filed articles of incorporation in any of the 50 states, the District of Columbia, or the
various territories of the United States, but not foreign corporations. It includes both for-profit and non-profit organizations.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
By entering into this award, the recipient attests that its corporation
has not been convicted of a felony criminal violation under federal law in the 24 months preceding the date of signature.
The recipient further attests that its corporation does not have any
unpaid federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed,
and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
| Term
47. | Insolvency,
Bankruptcy or Receivership |
The recipient shall immediately, but no later than five days, notify
DOE of the occurrence of any of the following events: (1) the recipient or the recipient’s parent’s filing of a voluntary
case seeking liquidation or reorganization under the Bankruptcy Act; (2) the recipient’s consent to the institution of an
involuntary case under the Bankruptcy Act against the recipient or the recipient’s parent; (3) the filing of any similar proceeding
for or against the recipient or the recipient’s parent, or the recipient’s consent to the dissolution, winding-up or readjustment
of its debts, appointment of a receiver, conservator, trustee, or other officer with similar powers over the recipient, under any other
applicable state or federal law; or (4) the recipient’s insolvency due to its inability to pay debts generally as they become
due.
Such notification shall be in writing and shall: (1) specifically
set out the details of the occurrence of an event referenced in paragraph A; (2) provide the facts surrounding that event; and (3) provide
the impact such event will have on the project being funded by this award.
Upon the occurrence of any of the four events described in paragraph
A. of this term, DOE reserves the right to conduct a review of the recipient’s award to determine the recipient’s compliance
with the required elements of the award (including such items as cost share, progress towards technical project objectives, and submission
of required reports). If the DOE review determines that there are significant deficiencies or concerns with the recipient’s performance
under the award, DOE reserves the right to impose additional requirements, as needed, including (1) change of payment method; or
(2) institute payment controls.
Failure of the recipient to comply with this term may be considered
a material noncompliance of this award by the Grants Officer.
| Term
48. | Reporting
Subawards and Executive Compensation |
| A. | Reporting
of first-tier subawards |
Unless the recipient is exempt as provided in paragraph
D. of this award term, the recipient must report each subaward that equals or exceeds $30,000 in federal funds for a subaward to an entity
or federal agency. The recipient must also report a subaward if a modification increases the federal funding to an amount that equals
or exceeds $30,000. All reported subawards should reflect the total amount of the subaward.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| 2. | Reporting
Requirements. |
| i. | The
recipient must report each subaward described in paragraph A.1. of this award term to the
Federal Funding Accountability and Transparency Act Subaward Reporting System (FSRS) at https://www.fsrs.gov. |
| ii. | For subaward
information, report no later than the end of the month following the month in which the subaward
was issued. (For example, if the subaward was made on November 7, 2025, the subaward
must be reported no later than December 31, 2025.) |
| B. | Reporting
Total Compensation of recipient Executives for Entities |
The recipient must report the total compensation for each
of the recipient’s five most highly compensated executives for the preceding completed fiscal year if:
| i. | The total
federal funding authorized to date under this award equals or exceeds $30,000; |
| ii. | In the
preceding fiscal year, the recipient received; |
| a. | 80 percent
or more of the recipient’s annual gross revenues from federal procurement contracts
(and subcontracts) and federal awards (and subawards) subject to the Transparency Act; and |
| b. | $25,000,000
or more in annual gross revenues from federal procurement contracts (and subcontracts) and
federal awards (and subawards) subject to the Transparency Act; and |
| iii. | The
public does not have access to information about the compensation of the executives through
periodic reports filed under section 13(a) or 15(d) of the Securities Exchange
Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986
after receiving this subaward. (To determine if the public has access to the compensation
information, see the U.S. Security and Exchange Commission total compensation filings at
https://www.sec.gov/answers/execomp.htm). |
| 2. | Reporting
Requirements. |
The recipient must report executive total compensation described
in paragraph B.1. of this award term:
| i. | As
part of the recipient’s registration profile at https://www.sam.gov. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| ii. | No later
than the month following the month in which this federal award is made, and annually after
that. (For example, if this federal award was made on November 7, 2025, the executive
total compensation must be reported by no later than December 31, 2025.) |
| C. | Reporting
of Total Compensation of Subrecipient Executives |
Unless a first-tier subrecipient is exempt as provided in
paragraph D. of this award term, the recipient must report the executive total compensation of each of the subrecipient's five most highly
compensated executives for the subrecipient's preceding completed fiscal year if:
| i. | The total
federal funding authorized to date under the subaward equals or exceeds $30,000; |
| ii. | In the
subrecipient’s preceding fiscal year, the subrecipient received: |
| a. | 80 percent
or more of its annual gross revenues from federal procurement contracts (and subcontracts)
and federal awards (and subawards) subject to the Transparency Act; and |
| b. | $25,000,000
or more in annual gross revenues from federal procurement contracts (and subcontracts), and
federal awards (and subawards) subject to the Transparency Act; and |
| iii. | The
public does not have access to information about the compensation of the executives through
periodic reports filed under section 13(a) or 15(d) of the Securities Exchange
Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986
after receiving this subaward. (To determine if the public has access to the compensation
information, see the U.S. Security and Exchange Commission total compensation filings at
https://www.sec.gov/answers/execomp.htm). |
| 2. | Reporting
Requirements. |
Subrecipients
must report to the recipient their executive total compensation described in paragraph C.1. of this award term. The recipient
is required to submit this information to the Federal Funding Accountability and Transparency Act Subaward Reporting System (FSRS) at
http://www.fsrs.gov no later than the end of the month following the month in which the subaward was made. (For example, if the
subaward was made on November 7, 2025, the subaward must be reported by no later than December 31, 2025).
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
A recipient with gross income under $300,000 in the previous
tax year is exempt from the requirements to report:
| 1. | Subawards;
and |
| 2. | The total
compensation of the five most highly compensated executives of any subrecipient. |
For purposes of this award term:
| i. | Whether
for profit or non-profit: |
| a. | A corporation; |
| b. | An association; |
| c. | A partnership; |
| d. | A limited
liability company; |
| e. | A limited
liability partnership; |
| f. | A sole
proprietorship |
| g. | Any other
legal business entity; |
| h. | Another
grantee or contractor that is not excluded by subparagraph 2; and |
| i. | Any State
or locality. |
| a. | An individual
recipient of federal financial assistance; or |
| b. | A federal
employee. |
| 2. | Executive
means an officer, managing partner, or any other employee holding a management position. |
| 3. | Subaward
has the meaning given in 2 CFR 200.1. |
| 4. | Subrecipient
has the meaning given in 2 CFR 200.1. |
| 5. | Total
compensation means the cash and noncash dollar value an executive earns during an entity's
preceding fiscal year. This includes all items of compensation as prescribed in 17 CFR 229.402(c)(2). |
| Term
49. | System
for Award Management and Universal Identifier Requirements |
| A. | Requirement
for System for Award Management (SAM.gov) |
Unless exempt from this requirement under 2 CFR 25.110,
the recipient must maintain a current and active registration in SAM.gov. The recipient’s registration must always be current and
active until the recipient submits all final reports required under this federal award or receives the final payment, whichever is later.
The recipient must review and update its information in SAM.gov at least annually from the date of its initial registration or any subsequent
updates to ensure it is current, accurate, and complete. If applicable, this includes identifying the recipient’s immediate and
highest-level owner and subsidiaries and providing information about the recipient’s predecessors that have received a federal
award or contract within the last three years.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| B. | Requirements
for Unique Entity Identifier (UEI) |
If the recipient is authorized to make subawards under
this award, the recipient:
| 1. | Must notify
potential subrecipients that no entity may receive a subaward until the entity has provided
its UEI to the recipient. |
| 2. | May not
make a subaward to an entity unless the entity has provided its UEI number to the recipient.
Subrecipients are not required to complete full registration in SAM.gov to obtain a UEI. |
For purposes of this award term:
| 1. | System
for Award Management (SAM.gov) means the federal repository into which a recipient must
provide the information required for the conduct of business as a recipient. Additional information
about registration procedures may be found in SAM.gov (currently at https://www.sam.gov). |
| 2. | Unique
Entity Identifier (UEI) means the universal identifier assigned by SAM.gov to uniquely
identify an entity. |
| 3. | Entity
is defined at 2 CFR Part 25.400 and includes all of the following types as define
in 2 CFR 200.1: |
| iii. | Non-federal
entity; |
| iv. | Foreign
organization; |
| v. | Foreign
public entity; |
| vi. | Domestic
for-profit organization; and |
| vii. | Federal
agency. |
| 4. | Subaward
has the meaning given in 2 CFR 200.1. |
| 5. | Subrecipient
has the meaning given in 2 CFR 200.1. |
| Term
50. | Nondisclosure
and Confidentiality Agreements Assurances |
| A. | By
entering into this agreement, the recipient attests that it does not and will not require
its employees or contractors to sign internal nondisclosure or confidentiality agreements
or statements prohibiting or otherwise restricting its employees or contractors from lawfully
reporting waste, fraud, or abuse to a designated investigative or law enforcement representative
of a federal department or agency authorized to receive such information. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| B. | The
recipient further attests that it does not and will not use any federal funds to implement
or enforce any nondisclosure and/or confidentiality policy, form, or agreement it uses unless
it contains the following provisions: |
| 1. | ‘‘These
provisions are consistent with and do not supersede, conflict with, or otherwise alter the
employee obligations, rights, or liabilities created by existing statute or Executive order
relating to (1) classified information, (2) communications to Congress, (3) the
reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement,
a gross waste of funds, an abuse of authority, or a substantial and specific danger to public
health or safety, or (4) any other whistleblower protection. The definitions, requirements,
obligations, rights, sanctions, and liabilities created by controlling Executive orders and
statutory provisions are incorporated into this agreement and are controlling.’’ |
| 2. | The limitation
above shall not contravene requirements applicable to Standard Form 312, Form 4414,
or any other form issued by a federal department or agency governing the nondisclosure of
classified information. |
| 3. | Notwithstanding
provision listed in paragraph (a), a nondisclosure or confidentiality policy form or agreement
that is to be executed by a person connected with the conduct of an intelligence or intelligence-related
activity, other than an employee or officer of the United States Government, may contain
provisions appropriate to the particular activity for which such document is to be used.
Such form or agreement shall, at a minimum, require that the person will not disclose any
classified information received in the course of such activity unless specifically authorized
to do so by the United States Government. Such nondisclosure or confidentiality forms shall
also make it clear that they do not bar disclosures to Congress, or to an authorized official
of an executive agency or the Department of Justice, that are essential to reporting a substantial
violation of law. |
| Term
51. | Subrecipient
Change Notification |
Except for subrecipients specifically proposed as part of the recipient’s
Application for award, the recipient must notify the Grants Officer and Federal Project Manager in writing 30 days prior to the execution
of new or modified subrecipient agreements, including naming any To Be Determined subrecipients. This notification does not constitute
a waiver of the prior approval requirements outlined in 2 CFR Part 200 as adopted and supplemented by 2 CFR Part 910, nor does
it relieve the recipient from its obligation to comply with applicable federal statutes, regulations, and executive orders.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
In order to satisfy this notification requirement, the recipient documentation
must, at a minimum, include the following:
| 1. | A description
of the research to be performed, the service to be provided, or the equipment to be purchased; |
| 2. | Cost share
commitment letter if the subrecipient is providing cost share to the award; |
| 3. | An assurance
that the process undertaken by the recipient to solicit the subrecipient complies with their
written procurement procedures as outlined in 2 CFR 200.317 through 200.327; |
| 4. | An assurance
that no planned, actual or apparent conflict of interest exists between the recipient and
the selected subrecipient and that the recipient’s written standards of conduct were
followed;1 |
| 5. | A completed
Environmental Questionnaire, if applicable; |
| 6. | A completed
Transparency of Foreign Connections disclosure, if applicable, which includes the information
as required in the FOA that the award was selected under; |
| 7. | An assurance
that the subrecipient is not a debarred or suspended entity; |
| 8. | An assurance
that all required award provisions will be flowed down in the resulting subrecipient agreement. |
The recipient is responsible for making a final determination to award
or modify subrecipient agreements under this agreement, but the recipient may not proceed with the subrecipient agreement until the Grants
Officer determines, and provides the recipient written notification, that the information provided is adequate.
Should the recipient not receive a written notification of adequacy
from the Grants Officer within 30 days of the submission of the subrecipient documentation stipulated above, the recipient may proceed
to award or modify the proposed subrecipient agreement.
| Term
52. | Conference
Spending |
The recipient shall not expend any funds on a conference not directly
and programmatically related to the purpose for which the grant or cooperative agreement was awarded that would defray the cost to the
United States Government of a conference held by any Executive branch department, agency, board, commission, or office for which the
cost to the United States Government would otherwise exceed $20,000, thereby circumventing the required notification by the head of any
such Executive Branch department, agency, board, commission, or office to the Inspector General (or senior ethics official for any entity
without an Inspector General), of the date, location, and number of employees attending such conference.
1 It is DOE’s position that the existence of a “covered
relationship” as defined in 5 CFR 2635.502(a)&(b) between a member of the recipient’s owners or senior management and
a member of a subrecipient’s owners or senior management creates at a minimum an apparent conflict of interest that would require
the recipient to notify the Grants Officer and provide detailed information and justification (including, for example, mitigation measures)
as to why the subrecipient agreement does not create an actual conflict of interest. The recipient must also notify the Grants Officer
of any new subrecipient agreement with: (1) an entity that is owned or otherwise controlled by the recipient; or (2) an entity that is
owned or otherwise controlled by another entity that also owns or otherwise controls the recipient, as it is DOE’s position that
these situations also create at a minimum an apparent conflict of interest.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| Term
53. | Reporting
of Matters Related to recipient Integrity and Performance |
| A. | General
Reporting Requirement |
If the total value of your active grants, cooperative agreements,
and procurement contracts from all federal agencies exceeds $10,000,000 for any period of time during the period of performance of this
federal award, then you as the recipient must ensure the information available in the responsibility/qualification records through the
System for Award Management (SAM.gov) about civil, criminal, or administrative proceedings described in paragraph B of this award term
is current and complete. This is a statutory requirement under section 872 of Public Law 110-417, as amended (41 U.S.C. 2313). As required
by section 3010 of Public Law 111-212, all information posted in responsibility/qualification records in SAM.gov on or after April 15,
2011, (except past performance reviews required for federal procurement contracts) will be publicly available.
| B. | Proceedings
About Which You Must Report |
You must submit the required information about each proceeding
that:
| 1. | Is in connection
with the award or performance of a grant, cooperative agreement, or procurement contract
from the federal government; |
| 2. | Reached
its final disposition during the most recent five-year period; and |
| 3. | Is one
of the following: |
| i. | A criminal
proceeding that resulted in a conviction, as defined in paragraph E of this award term and
condition; |
| ii. | A civil
proceeding that resulted in a finding of fault and liability and payment of a monetary fine,
penalty, reimbursement, restitution, or damages of $5,000 or more; |
| iii. | An administrative
proceeding that resulted in a finding of fault and liability and your payment of either a
monetary fine or penalty of $5,000 or more or reimbursement, restitution, or damages in excess
of $100,000; or |
| iv. | Any other
criminal, civil, or administrative proceeding if: |
| a. | It could
have led to an outcome described in paragraph B.3.i, ii, or iii; |
| b. | It had
a different disposition arrived at by consent or compromise with an acknowledgment of fault
on your part; and |
| c. | The requirement
in this award term to disclose information about the proceeding does not conflict with applicable
laws and regulations. |
Enter the required information in SAM.gov for each proceeding
described in paragraph B of this award term. You do not need to submit the information a second time under grants and cooperative agreements
that you received if you already provided the information in SAM.gov because you were required to do so under federal procurement contracts
that you were awarded.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
During any period of time when you are subject to the requirement
in paragraph A of this award term, you must report proceedings information in SAM.gov for the most recent five-year period, either to
report new information about a proceeding that you have not reported previously or affirm that there is no new information to report.
If you have federal contract, grant, and cooperative agreement awards with a cumulative total value greater than $10,000,000, you must
disclose semiannually any information about the criminal, civil, and administrative proceedings.
For purposes of this term:
| 1. | Administrative
proceeding means a non-judicial process that is adjudicatory in nature to make a determination
of fault or liability (for example, Securities and Exchange Commission Administrative proceedings,
Civilian Board of Contract Appeals proceedings, and Armed Services Board of Contract Appeals
proceedings). This includes proceedings at the federal and state level but only in connection
with the performance of a federal contract or grant. It does not include audits, site visits,
corrective plans, or inspection of deliverables. |
| 2. | Conviction
means a judgment or conviction of a criminal offense by any court of competent jurisdiction,
whether entered upon a verdict or a plea, and includes a conviction entered upon a plea of
nolo contendere. |
| 3. | Total
value of currently active grants, cooperative agreements, and procurement contracts includes
the value of the federal share already received plus any anticipated federal share under
those awards (such as continuation funding. |
The United States government regulates the transfer of information,
commodities, technology, and software considered to be strategically important to the United States to protect national security, foreign
policy, and economic interests without imposing undue regulatory burdens on legitimate international trade. There is a network of federal
agencies and regulations that govern exports that are collectively referred to as “Export Controls.” All recipients and subrecipients
are responsible for ensuring compliance with all applicable United States Export Control laws and regulations relating to any work performed
under a resulting award.
The recipient must immediately report to DOE any export control investigations,
indictments, charges, convictions, and violations upon occurrence, at the recipient or subrecipient level, and provide the corrective
action(s) to prevent future violations.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Term 55. Current
and Pending Support
For purposes of this term, the following definitions are
applicable:
| 1. | Current
and pending support – |
| i. | All resources
made available, or expected to be made available, to an individual in support of the individual’s
RD&D efforts, regardless of: |
| a. | whether
the source is foreign or domestic; |
| b. | whether
the resource is made available through the entity applying for an award or directly to the
individual; or |
| c. | whether
the resource has monetary value; and |
| ii. | Includes
in-kind contributions requiring a commitment of time and directly supporting the individual’s
RD&D efforts, such as the provision of office or laboratory space, equipment, supplies,
employees, or students. This term has the same meaning as the term Other Support as applied
to researchers in NSPM-33: For researchers, Other Support includes all resources made available
to a researcher in support of and/or related to all of their professional RD&D efforts,
including resources provided directly to the individual or through the organization, and
regardless of whether or not they have monetary value (e.g., even if the support received
is only in-kind, such as office/laboratory space, equipment, supplies, or employees). This
includes resource and/or financial support from all foreign and domestic entities, including
but not limited to, gifts provided with terms or conditions, financial support for laboratory
personnel, and participation of student and visiting researchers supported by other sources
of funding. |
| 2. | Malign
Foreign Talent Recruitment Program as defined in P.L. 117-167, Section 106384(4) – |
| i. | Any program,
position, or activity that includes compensation in the form of cash, in-kind compensation,
including research funding, promised future compensation, complimentary foreign travel, things
of non de minimis value, honorific titles, career advancement opportunities, or other types
of remuneration or consideration directly provided by a foreign country at any level (national,
provincial, or local) or their designee, or an entity based in, funded by, or affiliated
with a foreign country, whether or not directly sponsored by the foreign country, to the
targeted individual, whether directly or indirectly stated in the arrangement, contract,
or other documentation at issue, in exchange for the individual— |
| a. | engaging
in the unauthorized transfer of intellectual property, materials, data products, or other
nonpublic information owned by a United States entity or developed with a federal research
and development award to the government of a foreign country, or an entity based in, funded
by, or affiliated with a foreign country regardless of whether that government or entity
provided support for the development of the intellectual property, materials, or data products; |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| b. | being required
to recruit trainees or researchers to enroll in such program, position, or activity; |
| c. | establishing
a laboratory or company, accepting a faculty position, or undertaking any other employment
or appointment in a foreign country or with an entity based in, funded by, or affiliated
with a foreign country if such activities are in violation of the standard terms and conditions
of a federal research and development award; |
| d. | being unable
to terminate the foreign talent recruitment program contract or agreement except in extraordinary
circumstances; |
| e. | through
funding or effort related to the foreign talent recruitment program, being limited in the
capacity to carry out a research and development award or required to engage in work that
would result in substantial overlap or duplication with a federal research and development
award; |
| f. | being required
to apply for and successfully receive funding from the sponsoring foreign government's funding
agencies with the sponsoring foreign organization as the recipient; |
| g. | being required
to omit acknowledgment of the recipient institution with which the individual is affiliated,
or the federal research agency sponsoring the research and development award, contrary to
the institutional policies or standard terms and conditions of the federal research and development
award; |
| h. | being required
to not disclose to the federal research agency or employing institution the participation
of such individual in such program, position, or activity; or |
| i. | having
a conflict of interest or conflict of commitment contrary to the standard terms and conditions
of the federal research and development award; and |
| ii. | A program
that is sponsored by— |
| a. | a foreign
country of concern or an entity based in a foreign country of concern, whether or not directly
sponsored by the foreign country of concern; |
| b. | an academic
institution on the list developed under section 1286(c)(8) of the John S. McCain National
Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1 Public Law 115–232);
or |
| c. | a foreign
talent recruitment program on the list developed under section 1286(c)(9) of the John
S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1
Public Law 115–232). |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| iii. | Consistent
with applicable law, this provision does not prohibit, unless such activities are funded,
organized, or managed by an academic institution or a foreign talent recruitment program
on the lists developed under paragraphs (8) and (9) of section 1286(c) of
the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 4001
note; Public Law 115–232)— |
| a. | making
scholarly presentations and publishing written materials regarding scientific information
not otherwise controlled under current law; |
| b. | participation
in international conferences or other international exchanges, research projects or programs
that involve open and reciprocal exchange of scientific information, and which are aimed
at advancing international scientific understanding and not otherwise controlled under current
law; |
| c. | advising
a foreign student enrolled at an institution of higher education or writing a recommendation
for such a student, at such student's request; and |
| d. | other international
activities determined appropriate by the federal research agency head or designee. |
Covered Individual means an individual who (i) contributes
in a substantive, meaningful way to the development or execution of the scope of work of a project funded by DOE, and (ii) is designated
as a covered individual by DOE.
DOE designates as covered individuals any principal investigator
(PI); project director (PD); co-principal investigator (Co-PI); co-project director (Co-PD); project manager; and any individual regardless
of title that is functionally performing as a PI, PD, Co-PI, Co-PD, or project manager. Status as a consultant, graduate (master’s
or PhD) student, or postdoctoral associate does not automatically disqualify a person from being designated as a “covered individual”
if they meet the definition in (i) above.
The recipient is responsible for assessing the applicability
of (i) against each person listed on the project (i.e., listed by the recipient in the application for federal financial assistance,
approved budget, progress report, or any other report submitted to DOE by the recipient regarding the subject project). Further, the
recipient is responsible for identifying any such individual to DOE for designation as a covered individual, if not already designated
by DOE as described above.
The recipient’s submission of a current and
pending support disclosure and/or biosketch/resume for a particular person serves as an acknowledgement that DOE designates that
person as a covered individual.
DOE may further designate covered individuals during the
award period of performance.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
B. | Disclosure
Requirements |
Prior to award, the Recipient was required to provide current
and pending support disclosure statements for each covered individual, as defined by the award Terms and Conditions, at the recipient
and subrecipient level, regardless of funding source.
New Covered Individuals:
Prior
to starting work on the project, new covered individuals must submit a current and pending support disclosure and biosketch/resume
and must receive approval from DOE. R&D covered individuals are encouraged to comply with the Digital Persistent Identifier (PID)
and Research Security Training Requirements Terms. The PID and Research Training will be required for all R&D covered individuals
on May 1, 2025
Existing Covered Individuals:
Submit an updated current and pending support disclosure
within thirty (30) calendar days after the end of the quarterly reporting period in which the change occurred.
Information
Required for Each Activity |
Sponsor
of the Activity |
The
sponsor of the activity or the source of funding. |
Award
Number |
The
federal award number or any other identifying number. |
Award
Title |
The
title of the award or activity. If the title of the award or activity is not descriptive, add a brief description of the research
being performed that would identify any overlaps or synergies with the proposed research |
Total
Cost or Value |
The
total cost or value of the award or activity, including direct and indirect costs and cost share. For pending proposals, provide
the total amount of requested funding |
Award
Period |
The
"Start Date" through "End Date". |
Person-months |
The
person-months of effort per year dedicated to the award or activity. |
Description |
To
identify overlap, duplication of effort, or synergistic efforts, append a description of the other award or activity to the current
and pending support. |
Details |
Details
of any obligations, contractual or otherwise, to any program, entity, or organization sponsored by a foreign government must be provided
to DOE upon request to either the applicant institution or DOE. Supporting112 documents of any identified source of support must
be provided to DOE on request, including certified translations of any document. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Certification
Statement |
All
covered individuals must provide a separate disclosure statement listing the required information
above regarding current and pending support. Each individual must sign and date their respective
certification statement:
I, [Full Name and Title], understand that I have been
designated as a covered individual by the federal funding agency.
I certify to the best of my knowledge and belief that
the information contained in this Current and Pending Support Disclosure Statement is true, complete, and accurate. I understand
that any false, fictitious, or fraudulent information, misrepresentations, half-truths, or omissions of any material fact, may subject
me to criminal, civil, or administrative penalties for fraud, false statements, false claims, or otherwise. (18 U.S.C. §§
1001 and 287, and 31 U.S.C. §§ 3729-3733 and 3801-3812). I further understand and agree that (1) the statements and
representations made herein are material to DOE’s funding decision, and (2) I have a responsibility to update the disclosures
during the period of performance of the award should circumstances change which impact the responses provided above.
I also certify that,
at the time of submission, I am not a party in a malign foreign talent recruitment program.
The following certification is optional until May 1, 2025,
and mandatory thereafter for R&D projects:
I further certify that within the past 12 months I
have completed one of the following: (1) research security training meeting the guidelines in SEC. 10634(b) of 42 USC 19234,
or (2) all of the NSF training modules located https://new.nsf.gov/research-security/training. |
Foreign
Government Sponsorship |
Details
of any obligations, contractual or otherwise, to any program, entity, or organization sponsored by a foreign government must be provided
on request to either the applicant institution or DOE. Supporting documents of any identified source of support must be provided
to DOE on request, including certified translations of any document. |
The
information may be provided in the common disclosure format available at Common Form for Current and Pending (Other) Support
(nsf.gov) to be implemented by DOE. Regardless of the format used, the individual must still include a signature, date, and
a certification statement using the language included in the paragraph above.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Term 56. Interim Conflict of Interest
Policy for Financial Assistance
The
DOE interim Conflict of Interest Policy for Financial Assistance (COI Policy) can be found at https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance.
This policy is applicable to all recipients applying for, or that receive, DOE funding by means of a financial assistance award (e.g.,
a grant, cooperative agreement, technology investment agreement, or other transaction authority) and, through the implementation of this
policy by the recipient, to each Investigator who is planning to participate in, or is participating in, the project funded wholly or
in part under this award. The term “Investigator” means the PI and any other person, regardless of title or position, who
is responsible for the purpose, design, conduct, or reporting of a project funded by DOE or proposed for funding by DOE.
The recipient must flow down the requirements of the interim COI Policy
to any subrecipient, with the exception of DOE National Laboratories. Further, the recipient must identify all financial conflicts of
interests (FCOI), i.e., managed and unmanaged/unmanageable, in its initial and ongoing FCOI reports.
Prior to award, the recipient was required
to: 1) ensure all Investigators on this award completed their significant financial disclosures; 2) review the disclosures; 3) determine
whether a FCOI exists; 4) develop and implement a management plan for FCOIs; and 5) provide DOE with an initial FCOI report that includes
all FCOIs (i.e., managed and unmanaged/ unmanageable). Within 180 days of the date of the award, the recipient must be in full
compliance with the other requirements set forth in DOE’s interim COI Policy.
Term
57. Organizational Conflict of Interest
Organizational conflicts of interest are those where, because of relationships
with a parent company, affiliate, or subsidiary organization, the recipient is unable or appears to be unable to be impartial in conducting
procurement action involving a related organization (2 CFR 200.318(c)(2)).
The
recipient must disclose in writing any potential or actual organizational conflict of interest to the DOE Grants Officer. The recipient
must provide the disclosure prior to engaging in a procurement or transaction using project funds with a parent, affiliate, or subsidiary
organization that is not a state, local government, or Indian tribe. For a list of the information that must be included the disclosure,
see Section VI. of the DOE interim Conflict of Interest Policy for Financial Assistance at https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance.
If the effects of the potential or actual organizational conflict
of interest cannot be avoided, neutralized, or mitigated, the recipient must procure goods and services from other sources when using
project funds. Otherwise, DOE may terminate the award in accordance with 2 CFR 200.340 unless continued performance is determined to
be in the best interest of the federal government.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
The
recipient must flow down the requirements of the interim COI Policy to any subrecipient, with the exception of DOE National Laboratories,
if applicable. The recipient is responsible for ensuring subrecipient compliance with this term.
If the recipient has a parent, affiliate, or subsidiary organization
that is not a state, local government, or Indian tribe, the recipient must maintain written standards of conduct covering organizational
conflicts of interest.
Term
58. Prohibition on Certain Telecommunications and Video Surveillance Equipment or Services
As set forth in 2 CFR 200.216, recipients
and subrecipients are prohibited from obligating or expending project funds (federal and non-federal funds) to:
| 1. | Procure
or obtain covered telecommunications equipment or services; |
| 2. | Extend
or renew a contract to procure or obtain covered telecommunications equipment or services;
or |
| 3. | Enter into
a contract (or extend or renew a contract) to procure or obtain covered telecommunications
equipment or services. |
As described in section 889 of Public Law 115-232, “covered
telecommunications equipment or services” means any of the following:
| 1. | Telecommunications
equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or
affiliate of such entities); |
| 2. | For the
purpose of public safety, security of government facilities, physical security surveillance
of critical infrastructure, and other national security purposes, video surveillance and
telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision
Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of
such entities); |
| 3. | Telecommunications
or video surveillance services provided by such entities or using such equipment; |
| 4. | Telecommunications
or video surveillance equipment or services produced or provided by an entity that the Secretary
of Defense, in consultation with the Director of the National Intelligence or the Director
of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled
by, or otherwise connected to, the government of a covered foreign country. |
For the purposes of this section, “covered telecommunications
equipment or services” also include systems that use covered telecommunications equipment or services as a substantial or essential
component of any system, or as critical technology as part of any system.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
In implementing the prohibition under section 889 of Public Law 115-232,
heads of executive agencies administering loan, grant, or subsidy programs must prioritize available funding and technical support to
assist affected businesses, institutions, and organizations as is reasonably necessary for those affected entities to transition from
covered telecommunications equipment or services, to procure replacement equipment or services, and to ensure that communications service
to users and customers is sustained.
When the recipient or subrecipient accepts a loan or grant, it is
certifying that it will comply with the prohibition on covered telecommunications equipment and services in this section. The recipient
or subrecipient is not required to certify that funds will not be expended on covered telecommunications equipment or services beyond
the certification provided upon accepting the loan or grant and those provided upon submitting payment requests and financial reports.
For additional information, see section 889 of Public Law 115-232
and § 200.471.
Term
59. Participants and Other Collaborating Organizations
Prior to award, the recipient was required to provide the information
below on participants and other collaborating organizations.
Changes to Previously Submitted Information:
If there are any changes to Participants and Collaborating Organizations
information previously submitted to DOE, the recipient must submit updated information within thirty (30) calendar days after the end
of the quarterly reporting period in which the change occurred. For changes to covered individuals, please refer to the Current and Pending
Support term for additional requirements.
A. | What
individuals have worked on the project |
Provide the following information for individuals at the
prime recipient and subrecipient level:
| 1. | All covered
individuals; |
| 2. | and |
| 3. | Each person
who has worked or is expected to work at least one person month per year on the project regardless
of the source of compensation (a person month equals approximately 160 hours of effort): |
| i. | Name; |
| ii. | Organization; |
| iii. | Job Title; |
| iv. | Role in
the project; |
| v. | Start and
end date (month and year) working on the project; |
| vi. | State,
U.S. territory, and/or country of residence; |
| vii. | Whether
this person collaborated with an individual or entity located in a foreign country in connection
with the scope of this award; and |
| viii. | If yes
to vii, whether the person traveled to the foreign country as part of that collaboration,
and, if so, where and what the duration of stay was. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Identify all subrecipients, contractors, U.S. National Laboratories,
partners, and collaborating organizations. recipients must also include all foreign collaborators as outlined in the Foreign Collaboration
Considerations term of the award Terms and Conditions. For each, provide name, UEI, zip code or latitude/longitude, role in the project,
contribution to the project, and start and end date.
Term
60. Human Subjects Research
Research involving human subjects,
biospecimens, or identifiable private information conducted with Department of Energy (DOE) funding is subject to the requirements of
DOE Order 443.1C, Protection of Human Research Subjects, 45 CFR Part 46, Protection of Human Subjects (subpart
A which is referred to as the “Common Rule”), and 10 CFR Part 745, Protection of Human Subjects.
Federal regulation and the DOE Order require review by an Institutional
Review Board (IRB) of all proposed human subjects research projects. The IRB is an interdisciplinary ethics board responsible for ensuring
that the proposed research is sound and justifies the use of human subjects or their data; the potential risks to human subjects have
been minimized; participation is voluntary; and clear and accurate information about the study, the benefits and risks of participating,
and how individuals’ data/specimens will be protected/used, is provided to potential participants for their use in determining
whether or not to participate.
The
recipient shall provide the Federal Wide Assurance number identified in item 1 below and the certification identified in item 2 below
to DOE prior to initiation of any project that will involve interactions with humans in some way (e.g., through surveys);
analysis of their identifiable data (e.g., demographic data and energy use over time); asking individuals to test devices, products,
or materials developed through research; and/or testing of commercially available devices in buildings/homes in which humans will be
present. Note: This list of examples is illustrative and not all inclusive.
No DOE funded research activity involving human subjects, biospecimens,
or identifiable private information shall be conducted without:
| 1) | A registration
and a Federal Wide Assurance of compliance accepted by the Office of Human Research Protection
(OHRP) in the Department of Health and Human Services; and |
| 2) | Certification
that the research has been reviewed and approved by an Institutional Review Board (IRB) provided
for in the assurance. IRB review may be accomplished by the awardee’s institutional
IRB; by the Central DOE IRB; or if collaborating with one of the DOE national laboratories,
by the DOE national laboratory IRB. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
The
recipient is responsible for ensuring all subrecipients comply and for reporting information on the project annually to the DOE Human
Subjects Research Database (HSRD) at https://science.osti.gov/HumanSubjects/Human-Subjects-Database/home. Note:
If a DOE IRB is used, no end of year reporting will be needed.
Additional
information on the DOE Human Subjects Research Program can be found at: https://science.osti.gov/ber/human-subjects.
Term 61. Fraud,
Waste and Abuse
The mission of the DOE Office of Inspector
General (OIG) is to strengthen the integrity, economy and efficiency of DOE’s programs and operations including deterring and detecting
fraud, waste, abuse, and mismanagement. The OIG accomplishes this mission primarily through investigations, audits, and inspections
of Department of Energy activities to include grants, cooperative agreements, loans, and contracts. The OIG maintains a Hotline for reporting
allegations of fraud, waste, abuse, or mismanagement. To report such allegations, please visit https://www.energy.gov/ig/ig-hotline.
Additionally, the recipient must be cognizant of the requirements
of 2 CFR 200.113 Mandatory disclosures, which states:
An applicant, recipient, or subrecipient of a federal award
must promptly disclose whenever, in connection with the federal award (including any activities or subawards thereunder), it has credible
evidence of the commission of a violation of federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations
found in Title 18 of the United States Code or a violation of the civil False Claims Act (31 U.S.C. 3729–3733). The disclosure
must be made in writing to the federal agency, the agency’s Office of Inspector General, and pass-through entity (if applicable).
recipients and subrecipients are also required to report matters related to recipient integrity and performance in accordance with Appendix
XII of this part. Failure to make required disclosures can result in any of the remedies described in § 200.339. (See also 2 CFR
part 180, 31 U.S.C. 3321, and 41 U.S.C. 2313.)
Term
62. Trafficking in Persons
A. | Provisions
applicable to a recipient that is a private entity: |
| 1. | Under this
award, the recipient, its employees, subrecipients under this award, and subrecipient’s
employees must not engage in: |
| i. | Severe forms
of trafficking in persons; |
| ii. | The procurement
of a commercial sex act during the period of time that this award or any subaward is in effect; |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| iii. | The use
of forced labor in the performance of this award or any subaward; or |
| iv. | Acts that
directly support or advance trafficking in persons, including the following acts: |
| a. | Destroying,
concealing, removing, confiscating, or otherwise denying an employee access to that employee’s
identity or immigration documents; |
| b. | Failing
to provide return transportation or pay for return transportation costs to an employee from
a country outside the United States to the country from which the employee was recruited
upon the end of employment if requested by the employee, unless: |
| 1) | Exempted from
the requirement to provide or pay for such return transportation by the federal department
or agency providing or entering into the grant or cooperative agreement; or |
| 2) | The employee
is a victim of human trafficking seeking victim services or legal redress in the country
of employment or a witness in a human trafficking enforcement action. |
| c. | Soliciting
a person for the purpose of employment, or offering employment, by means materially false
or fraudulent pretenses, representations, or promises regarding that employment; |
| d. | Charging
recruited employees a placement recruitment fee; |
| e. | Providing
or arranging housing that fails to meet the host country’s housing and safety standards. |
| 2. | The federal
agency may unilaterally terminate this award or take any remedial actions authorized by 22
U.S.C. 7104b(c), without penalty, if any private entity under this award: |
| i. | Is
determined to have violated a prohibition in paragraph A.1 of this award term; or |
| ii. | Has an
employee that is determined to have violated a prohibition in paragraph A.1 of this award
term through conduct that is either: |
| a. | Associated
with the performance under this award; or |
| b. | Imputed
to the recipient or the subrecipient using the standards and due process for imputing the
conduct of an individual to an organization that are provided in 2 CFR part 180, “OMB
Guidelines to Agencies on Government-wide Debarment and Suspension (Nonprocurement).” |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
B. | Provision
applicable to a recipient other than a private entity. |
The federal agency may unilaterally terminate this award or take any
remedial action authorized by 22 U.S.C. 7104b(c), without penalty, if a subrecipient that is a private entity under this award:
| 1. | Is
determined to have violated a prohibition in paragraph A.1; or |
| 2. | Has an
employee that is determined to have violated a prohibition in paragraph A.1 through conduct
that is either: |
| i. | Associated
with the performance under this award; or |
| ii. | Imputed
to the subrecipient using the standards and due process for imputing the conduct of an individual
to an organization that are provided in 2 CFR part 180, “OMB Guidelines to Agencies
on Government-wide Debarment and Suspension (Nonprocurement).” |
C. | Provisions
applicable to any recipient. |
| 1. | The recipient
must inform the federal agency and the Inspector General of the federal agency immediately
of any information the recipient receives from any source alleging a violation of a prohibition
in paragraph A.1 of this award term. |
| 2. | The federal
agency’s right to unilaterally terminate this award as described in paragraphs A.2
or B of this award term: |
| i. | Implements
the requirements of 22 U.S.C. 78; and |
| ii. | Is in addition
to all other remedies for noncompliance that are available to the federal agency under this
award. |
| 3. | The recipient
must include the requirements of paragraph A.1 of this award term in any subaward it makes
to a private entity. |
| 4. | If applicable,
the recipient must also comply with the compliance plan and certification requirements in
2 CFR 175.105(b). |
For purposes of this award term:
| i. | An individual
employed by the recipient or a subrecipient who is engaged in the performance of the project
or program under this award; or |
| ii. | Another
person engaged in the performance of this project or program under this award and not compensated
by the recipient including, but not limited to, a volunteer or individual whose services
are contributed by a third party as an in-kind contribution toward cost sharing requirements. |
| 2. | Private
Entity means any entity, including for-profit organizations, nonprofit organizations,
institutions of higher education, and hospitals. The term does not include foreign public
entities, Indian Tribes, local governments, or states as defined in 2 CFR 200.1. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| 3. | The
terms “severe forms of trafficking in persons,” “commercial sex act,”
“sex trafficking,” “Abuse or threatened abuse of law or legal process,”
“coercion,” “debt bondage,” and “involuntary servitude,”
have the meanings given at Section 103 of the TVPA, as amended (22 U.S.C. 7102). |
Term
63. Prohibition related to Malign Foreign Talent Recruitment Programs
As required by law2, covered individuals participating
in a Malign Foreign Talent Recruitment Program are prohibited from participating in this award.
The
recipient must exercise ongoing due diligence to reasonably ensure that no such covered individuals participating on the DOE-funded project
are participating in a Malign Foreign Talent Recruitment Program. Consequences for violations of this prohibition will be determined
according to applicable law, regulations, and policy. Further, the recipient must notify DOE within five (5) business days upon
learning that an owner of the recipient or subrecipient or individual on the project team is or is believed to be participating in a
Malign Foreign Talent Recruitment Program. DOE may modify and add requirements related to this prohibition to the extent
required by law.
Covered
Individuals and the recipient must provide certifications regarding no participation in Malign Foreign Talent Recruitment
Programs (see the Current and Pending Support section and Transparency of Foreign Connections section).
DOE will ensure that the Malign Foreign Talent Recruitment
Program Prohibition is carried out in a manner that does not target, stigmatize, or discriminate against individuals on the basis of
race, ethnicity, or national origin, consistent with title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq.).
| C. | Definitions
– Malign Foreign Talent Recruitment Program has the definition included
in section 10638(4) of P.L. 117-167. |
| 1. | any program,
position, or activity that includes compensation in the form of cash, in-kind compensation,
including research funding, promised future compensation, complimentary foreign travel, things
of non de minimis value, honorific titles, career advancement opportunities, or other types
of remuneration or consideration directly provided by a foreign country at any level (national,
provincial, or local) or their designee, or an entity based in, funded by, or affiliated
with a foreign country, whether or not directly sponsored by the foreign country, to the
targeted individual, whether directly or indirectly stated in the arrangement, contract,
or other documentation at issue, in exchange for the individual— |
| i. | engaging
in the unauthorized transfer of intellectual property, materials, data products, or other
nonpublic information owned by a United States entity or developed with a federal research
and development award to the government of a foreign country, or an entity based in, funded
by, or affiliated with a foreign country regardless of whether that government or entity
provided support for the development of the intellectual property, materials, or data products; |
2 See sections 10631-10632 of P.L. 117-167 (42 USC 19231-19232);
OSTP-Foreign-Talent-Recruitment-Program-Guidelines.pdf (whitehouse.gov).
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| ii. | being required
to recruit trainees or researchers to enroll in such program, position, or activity; |
| iii. | establishing
a laboratory or company, accepting a faculty position, or undertaking any other employment
or appointment in a foreign country or with an entity based in, funded by, or affiliated
with a foreign country if such activities are in violation of the standard terms and conditions
of a federal research and development award; |
| iv. | being unable
to terminate the foreign talent recruitment program contract or agreement except in extraordinary
circumstances; |
| v. | through
funding or effort related to the foreign talent recruitment program, being limited in the
capacity to carry out a research and development award or required to engage in work that
would result in substantial overlap or duplication with a federal research and development
award; |
| vi. | being required
to apply for and successfully receive funding from the sponsoring foreign government's funding
agencies with the sponsoring foreign organization as the recipient; |
| vii. | being
required to omit acknowledgment of the recipient institution with which the individual is
affiliated, or the federal research agency sponsoring the research and development award,
contrary to the institutional policies or standard terms and conditions of the federal research
and development award; |
| viii. | being
required to not disclose to the federal research agency or employing institution the participation
of such individual in such program, position, or activity; or |
| ix. | having
a conflict of interest or conflict of commitment contrary to the standard terms and conditions
of the federal research and development award; and |
| 2. | A program
that is sponsored by— |
| i. | a foreign
country of concern or an entity based in a foreign country of concern, whether or not directly
sponsored by the foreign country of concern; |
| ii. | an academic
institution on the list developed under section 1286(c)(8) of the John S. McCain National
Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1 Public Law 115–232);
or |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| iii. | a foreign
talent recruitment program on the list developed under section 1286(c)(9) of the John
S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1
Public Law 115–232). |
| 3. | Consistent
with applicable law, this provision does not prohibit, unless such activities are funded,
organized, or managed by an academic institution or a foreign talent recruitment program
on the lists developed under paragraphs (8) and (9) of section 1286(c) of
the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 4001
note; Public Law 115–232)— |
| i. | making scholarly
presentations and publishing written materials regarding scientific information not otherwise
controlled under current law; |
| ii. | participation
in international conferences or other international exchanges, research projects or programs
that involve open and reciprocal exchange of scientific information, and which are aimed
at advancing international scientific understanding and not otherwise controlled under current
law; |
| iii. | advising
a foreign student enrolled at an institution of higher education or writing a recommendation
for such a student, at such student's request; and |
| iv. | other international
activities determined appropriate by the federal research agency head or designee. |
Term
64. Affirmative Action and Pay Transparency Requirements
All federally assisted construction contracts exceeding $10,000 annually
will be subject to the requirements of Executive Order 11246:
| 1. | Recipients,
subrecipients, and contractors are prohibited from discriminating in employment decisions
on the basis of race, color, religion, sex, sexual orientation, gender identity or national
origin. |
| 2. | Recipients
and Contractors are required to take affirmative action to ensure that equal opportunity
is provided in all aspects of their employment. This includes flowing down the appropriate
language to all subrecipients, contractors and subcontractors. |
| 3. | Recipients,
subrecipients, contractors and subcontractors are prohibited from taking adverse employment
actions against applicants and employees for asking about, discussing, or sharing information
about their pay or, under certain circumstances, the pay of
their co-workers. |
The
Department of Labor’s (DOL) Office of federal Contractor Compliance Programs (OFCCP) uses a neutral process to schedule contractors
for compliance evaluations. OFCCP’s Technical Assistance Guide should be consulted to gain an understanding of the requirements
and possible actions the recipients, subrecipients, contractors, and subcontractors must take. See OFCCP’s Technical Assistance
Guide at:
https://www.dol.gov/sites/dolgov/files/ofccp/Construction/files/ConstructionTAG.pdf?msclkid=9e397d68c4b111ec9d8e6fecb6c710ec.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Additionally,
for construction projects valued at $35 million or more and lasting more than one year, recipients, subrecipients, contractors, and subcontractors
may be selected by OFCCP to participate in the Mega Construction Project Program. DOE, under relevant legal authorities including
Sections 205 and 303(a) of Executive Order 11246, will require participation as a condition of the award. This program offers
extensive compliance assistance with Executive Order 11246. For more information regarding this program, see https://www.dol.gov/agencies/ofccp/construction/mega-program.
Term
65. Potentially Duplicative Funding Notice
If the recipient or subrecipients have or receive any other award
of federal funds for activities that potentially overlap with the activities funded under this award, the recipient must promptly notify
DOE in writing of the potential overlap and state whether project funds (i.e., recipient cost share and federal funds) from any of those
other federal awards have been, are being, or are to be used (in whole or in part) for one or more of the identical cost items under
this award. If there are identical cost items, the recipient must promptly notify the DOE Grants Officer in writing of the potential
duplication and eliminate any inappropriate duplication of funding.
Term
66. Transparency of Foreign Connections
The recipient must notify the DOE Grants Officer within fifteen (15)
business days of learning of the circumstances listed below in relation to the recipient and subrecipients.
Disclosure exceptions by entity type:
| · | U.S.
National Laboratories and domestic government entities are not required to respond to the
Transparency of Foreign Connections disclosure. |
| · | Institutions
of higher education are only required to report on items 5 and 7. |
For subrecipient reporting requirements, applicability is determined
by the subrecipient entity type, regardless of whether the prime recipient was exempt.
Disclosure Information:
| 1. | Any current
or pending subsidiary, foreign business entity, or offshore entity that is based in or funded
by any foreign country of risk or foreign entity based in a country of risk; |
| 2. | Any current
or pending contractual or financial obligation or other agreement specific to a business
arrangement, or joint venture-like arrangement with an entity owned by a country of risk
or foreign entity based in a country of risk; |
| 3. | Any current
or pending change in ownership structure of the recipient or subrecipients that increases
foreign ownership related to a country of risk. Each notification shall be accompanied by
a complete and up-to-date capitalization table showing all equity interests held including
limited liability company (LLC) and partnership interests, as well as derivative securities.
Include both the number of shares issued to each equity holder, as well as the percentage
of that series and of all equity on fully diluted basis. For each equity holder, provide
the place of incorporation and the principal place of business, as applicable. If the equity
holder is a natural person, identify the citizenship(s); |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| 4. | Any current
or pending venture capital or institutional investment by an entity that has a general partner
or individual holding a leadership role in such entity who has a foreign affiliation with
any foreign country of risk; |
| 5. | Any current
or pending technology licensing, transfer or intellectual property sales to a foreign country
of risk within the same technology area as the award (e.g., biotechnology, energy generation
and storage, advanced computing; |
| 6. | Any changes
to the recipient or the subrecipients’ board of directors, including additions to the
number of directors, the identity of new directors, as well as each new director’s
citizenship, shareholder affiliation (if applicable); each notification shall include a complete
up-to-date list of all directors (and board observers), including their full name, citizenship
and shareholder affiliation, date of appointment, duration of term, as well as a description
of observer rights as applicable; and |
| 7. | Any of
the following changes to the equipment proposed for use on the project: |
| i. | Unmanned
aircraft, control, and communication components originally made or manufactured in a foreign
country of risk (including relabeled or rebranded equipment). |
| ii. | Coded equipment
where the source code is written in a foreign country of risk. |
| iii. | Equipment
from a foreign country of risk that will be connected to the internet or other remote communication
system. |
| iv. | Any
entity from a foreign country of risk that will have physical or remote access to any part
of the equipment used on the project after delivery. |
Should DOE determine the connection poses a risk to economic or national
security, DOE will require measures to mitigate or eliminate the risk.
DOE has designated the following countries as foreign countries of
risk: Iran, North Korea, Russia, and China. This list is subject to change.
Recognizing the disclosures may contain business confidential information,
subrecipients may submit their disclosures directly to DOE.
Term
67. Foreign Collaboration Considerations
A. | Consideration
of new collaborations with foreign entities, organizations, and governments. The recipient
must provide DOE with advanced written notification of any potential collaboration with foreign
entities, organizations, or governments in connection with its DOE-funded award scope. The
recipient must await further guidance from DOE prior to contacting the proposed foreign entity,
organization or government regarding the potential collaboration or negotiating the terms
of any potential agreement. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
B. | Existing
collaborations with foreign entities, organizations, and governments. The recipient must
provide DOE with a written list of all existing foreign collaborations, organizations, and
governments in which has entered in connection with its DOE-funded award scope. |
C. | In
general, a collaboration will involve some provision of a thing of value to, or from, the
recipient. A thing of value includes but may not be limited to all resources made available
to, or from, the recipient in support of and/or related to the award, regardless of whether
or not they have monetary value. Things of value also may include in-kind contributions (such
as office/laboratory space, data, equipment, supplies, employees, students). In-kind contributions
not intended for direct use on the award but resulting in provision of a thing of value from
or to the award must also be reported. Collaborations do not include routine workshops, conferences,
use of the recipient’s services and facilities by foreign investigators resulting from
its standard published process for evaluating requests for access, or the routine use of
foreign facilities by awardee staff in accordance with the recipient’s standard policies
and procedures. |
Term
68. Entity of Concern Prohibition
No Entity of Concern, as defined in
section 10114 of Public Law 117-167 (42 USC 18912), may receive any grant, contract, cooperative agreement, or loan
of $10 million or more in Departmental funds including funds made available by the Consolidated Appropriations Act, 2024 (Public Law
118-42). In addition, for all awards involving Departmental activities authorized under Public
Law 117-167, no Entity of Concern (including an individual that owns or controls, is owned or controlled by, or is under common ownership
or control with an Entity of Concern) may receive DOE funds or perform work under the award, subject to certain penalties. See section
10114 of Public Law 117-167 and section 310 of Public Law 118-42 for additional information.
Congress has given DOE authority to require the submission of documentation
necessary to implement the requirements of this term.
The recipient shall include this term, suitably modified to identify
the parties, in all subawards/contracts, regardless of tier, under this award.
If, at any time, the recipient becomes aware that any participant
on the award is an Entity of Concern and therefore is unable to fully comply with this term, the recipient shall promptly stop all work
on this award, notify the Contracting Officer, and not proceed with the award work without further authorization.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Term
69. Required Risk Mitigation
This award is subject to the recipient’s compliance with required
DOE Office of Research, Technology, and Economic Security (RTES) mitigation measures that are specific to the recipient, if any. Failure
to comply with a required RTES mitigation measure is grounds for an immediate termination of the award. This term must be flowed down
to the subrecipients. If a subrecipient fails to comply with required RTES mitigation measures, if any, that are specific to that subrecipient,
it is grounds for immediate termination of the subaward.
Term
70. Impacted Indian Tribes
If any activities anticipated to take place under this agreement could
potentially impact the resources or reserved rights of Indian Tribe(s), as defined in 25 U.S.C. § 5304 (e), then the recipient/awardee
agrees to develop and maintain active and open communications with the potentially impacted Indian Tribe(s), during the period of performance
of the agreement, and, if necessary, after the end of the agreement. If the recipient proposes any activities that could impact Tribal
resources or reserved rights, including but not limited to lands, cultural sites, sacred sites, water rights, mineral rights, fishing
rights, and hunting rights, the recipient must notify DOE. The recipient/awardee must coordinate with DOE on all Tribal interactions.
DOE will determine if formal government-to-government consultation is needed, and DOE will conduct that consultation accordingly.
| · | Tribal
lands is as defined in 25 U.S.C. §§ 3501(2), (3), (4)(A) and (13). |
| · | Indian
Tribe is as defined in 25 U.S.C. § 5304 (e). |
Term
71. Historic Preservation
DOE must comply with the National Historic Preservation Act ("NHPA"),
54 USC § 306108 et seq., which requires federal agencies to consider the effects of undertaking (federally funded or assisted projects
and activities) on historic properties that are listed in or eligible for listing in the National Register of Historic places prior to
the expenditures of federal funds. The recipient is required to cooperate with DOE in its compliance with the requirements of Section 106
of the NHPA. The recipient may not alter any structure or site, including any groundbreaking for any purpose, prior to the resolution
of the NHPA process without DOE approval. The requirements of this part are applicable to activities funded under the award and shall
be coordinated in conjunction with DOE and, as appropriate, other federal agencies, the State Historic Preservation Officer or Tribal
Historic Preservation Officer, Tribal representatives, and consulting parties.
Term
72. Implementation of Executive Order 13798, Promoting Free Speech and Religious Liberty
States, local governments, or other public entities may not condition
sub-awards in a manner that would discriminate, or disadvantage sub-recipients based on their religious character.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Term 73. Project
Labor Agreement
The
recipient must meet the stated objectives and milestones set forth in its Community Benefits Outcomes and Objectives, including any Project
Labor Agreement described in your application submission or a subsequent
award modification. The Community Benefits Outcomes and Objectives is incorporated into the award as Attachment 5.
The Project Labor Agreement (meaning a pre-hire collective bargaining
agreement consistent with section 8(f) of the National Labor Relations Act (29 U.S.C. 158(f) must:
| 1. | bind all
contractors and subcontractors on the construction project through the inclusion of appropriate
specifications in all relevant solicitation provisions and contract documents; |
| 2. | allow all
contractors and subcontractors on the construction project to compete for contracts and subcontracts
without regard to whether they are otherwise parties to collective bargaining agreements; |
| 3. | contain
guarantees against strikes, lockouts, and similar disruptions; |
| 4. | set forth
effective, prompt, and mutually binding procedures for resolving labor disputes arising during
the term of the PLA; |
| 5. | provide
other mechanisms for labor-management cooperation on matters of mutual interest and concern,
including productivity, quality of work, safety, and health; and |
| 6. | fully conform
to all statutes, regulations, Executive Orders, and any other DOE requirements contained
in this agreement. |
Termination
of the PLA or removal of any of the above referenced provisions ((1)-(6)) may result in additional reporting and will be
reassessed over the period of performance.
Term 74. Offtake
Partner Plan
The Recipient must submit an Offtake Partner Plan to DOE within 180
days of the award Period of Performance start date, listed in Block 7 of the Assistance Agreement.
The Offtake Partner Plan must include the following:
| (a) | The proposed
offtake partners, the intended use of the offtake, and a proposed level of commitment from
the Recipient and the offtake partner(s) for domestic offtake use (if prohibited by
a prior confidentiality agreement, information may be disclosed verbally to DOE’s Office
of Research Technology and Economic Security); |
| (b) | Recipient’s
strategy and approach for material offtake; |
| (c) | In support
of the purposes of section 40207 of the Bipartisan Infrastructure Law, preference should
be given to non-FEOC (foreign entity of concern) offtake partners; |
| (d) | How the
Recipient will incorporate U.S. economic security considerations in its strategy and approach
for material offtake; |
| (e) | Milestones
to measure progress and success of the Offtake Partner Plan. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
The Recipient must meet the stated objectives and milestones set forth
in its Offtake Partner Plan. DOE will evaluate the Recipient’s progress during the award period of performance, including as part
of the Go/No-Go review process. A report on the Recipient’s progress towards meeting the objectives and milestones set forth in
the Offtake Partner Plan must be included in any continuation application. The Recipient must provide DOE advance written notice of proposed
changes to its offtake partners. The Offtake Partner Plan and any revisions to the plan and all related deliverables must be emailed
securely to the point of contact designated by DOE.
The Recipient shall provide written notification within fifteen (15)
business days to the DOE Contracting Officer during the award period of performance of any project event(s) that may result in a:
| 1. | change
to the Offtake Supply at the Project manufacturing facility that significantly deviates from
(greater than a 10% reduction) the Offtake Supply proposed in the application. |
| 2. | change
to the location of the Project manufacturing facility. |
| 3. | change
to the approved Material Supply Plan. |
| 4. | change
to the approved Offtake Partner Plan. |
For purposes of this term, “Offtake Supply” shall mean
amount of material generated by Recipient’s activities under the Project; specifically, material that is available for sale under
the Offtake Agreement(s).
Term 76. | Access Restrictions |
The Recipient (including its employees, directors, officers, managers,
agents, contractors, or other representatives, and includes the respective successors or assigns of the foregoing) shall not disclose
any information that is not publicly available (including technical data, subject inventions, or any other information that is not publicly
available or required to be made public under applicable law or regulation) developed under the DOE-funded project with any Recipient
subsidiary, affiliate, investor, supplier, licensee at any tier, battery manufacturer for Recipient end customers, or joint development
partner that: (1) has a place of incorporation or a principal place of business in a Foreign Country of Risk (for entities) or (2) is
a national of a Foreign Country of Risk (for individuals). The Recipient shall also ensure that its subsidiaries or affiliates
under its control adhere to this same restriction.
The Recipient shall provide on an annual basis and upon request of
the DOE Contracting Officer (CO), a certificate of compliance with this term to the CO or designee.
The Recipient and DOE shall meet, at a mutually
agreeable time, no later than six (6) months after the effective date of this award, to discuss, at an unclassified level, the current
threat environment related to economic espionage, intellectual property theft, insider threats, and other relevant topics. DOE, in its
sole discretion, may invite other U.S. Government representatives, to participate in these briefings and discussions. The parties may
also meet additionally during the period of performance, at DOE’s discretion, to continue these briefings and discussions.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Term 78. | Technology Protection
Plan |
The Recipient must submit a Technology Protection
Plan within 60 days of award setting out the Recipient’s policies and procedures for identifying, accessing, handling, controlling,
and releasing the following under this Award: (1) Recipient’s proprietary information, including non-public technical information,
trade secrets and other confidential business information, including but not limited to information, know-how, methods or processes that
give the Recipient a competitive advantage in the marketplace; (2) information that is subject to U.S. export control laws or regulations;
(3) information that has been designated as classified or controlled unclassified information (CUI) by DOE; (4) any other information
designated by DOE as sensitive throughout the period of performance. The Recipient must meet the stated objectives set forth in its Technology
Protection Plan. The Recipient must notify the Department of any revisions to the Technology Protection Plan or the proposed security
approach. A report on the Recipient’s progress toward meeting the objectives and milestones set forth in the Technology Protection
Plan must be included in any continuation application. The Technology Protection Plan and any revisions to the plan and all related deliverables
must be emailed securely to the point of contact designated by DOE.
Any DOE and/or National Laboratory review
comments or feedback provided to the Recipient does not constitute an endorsement or approval of any specific elements within the Technology
Protection Plan or the proposed security approach. Therefore, such feedback should not be referenced or used in marketing or promotional
materials.
Term 79. | Material Supply Plan |
The Recipient must submit a Material Supply Plan to DOE within 60
days of award setting out the Recipient’s strategy and approach for materials supply, including a new supply chain without reliance
on Foreign Entities of Concern (FEOC). The Material Supply Plan is subject to DOE’s review and approval.
The Material Supply Plan must include the following:
| (a) | The proposed
material suppliers; |
| (b) | The specific
steps the Recipient will take to encourage suppliers in Europe, North America, and countries
with which the United States has a free trade agreement – the latter as defined in
89 FR 37706 (the IRS 30D regulations published May 6, 2024); |
| (c) | How the
Recipient will incorporate U.S. economic security considerations in its strategy and approach
for material suppliers; |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| (d) | Specific
steps the Recipient will to take to give preference to non-FEOC material suppliers; |
| (e) | Milestones
to measure progress and success of the Material Supply Plan. |
The Recipient must meet the stated objectives set forth in its Material
Supply Plan. The Recipient must provide DOE advance written notice of proposed changes to its material suppliers and of any revisions
to the Material Supply Plan, including relevant economic, competitiveness, or foreign policy rationales for the proposed change. A report
on the Recipient’s progress towards meeting the objectives and milestones set forth in the Material Supply Plan must be included
in any continuation application. The Material Supply Plan and any revisions to the plan and all related deliverables must be emailed
securely to the point of contact designated by DOE.
Term 80. | Research Technology and
Economic Security Officer |
| A. | Within thirty
(30) calendar days following the award date, the Recipient shall nominate in writing to DOE
an employee of the Recipient as a Security Officer (the “Security Officer”) who
will be responsible for ensuring the Recipient’s compliance the terms and conditions
related to research, technology and economic security (RTES)3. The appointment
of the Security Officer shall be subject to prior written consent by DOE. If DOE does not
object within twenty (20) calendar days following receipt of a proposed nomination and of
the information pursuant to paragraph D, to ensure that the nominee can effectively perform
the functions of the position, the lack of action shall constitute a non-objection. If DOE
objects to a nominated Security Officer, the Recipient shall nominate an alternate nominee
within ten (10) calendar days of its receipt of any such objection, subject to the same
consent and objection procedures as the initial nomination. The Recipient shall appoint the
nominated Security Officer within three (3) days following consent or non-objection
by DOE. |
| B. | The Recipient
shall notify DOE of the any of following changes to the appointed Security Officer: |
| a. | At least fifteen
(15) calendar days before the proposed removal or replacement of the Security Officer unless
removed for cause. In the event of a removal for cause, the Recipient shall notify DOE of
the removal within (5) calendar days of the removal. To prevent a vacancy from taking
place, the Recipient should, to the greatest extent possible, nominate a new candidate for
the position in conjunction with a notice of proposed removal or notice of removal for cause,
subject to the same consent and objection procedures as the initial nomination. |
3
Terms and Conditions related to research, technology and economic security (RTES) are as follows: Foreign Collaboration
Considerations, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment, Prohibition Related to Malign
Foreign Talent Recruitment, Current and Pending Support, Export Control, Potentially Duplicative Funding, Cybersecurity Plan, Technology
Protection Plan, Material Supply Plan, Performance of Work in United States, Threat Briefing, Post Award Due Diligence Reviews, Participants
and Other Collaborating Organizations, Transparency of Foreign Connections, Access Restrictions, Research Technology and Economic Security
Officer, Third-Party Monitor.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| b. | Within forty-eight
(48) hours upon learning of (1) an actual or planned resignation of the Security Officer,
(2) the incapacitation of the Security Officer, or (3) the death of the Security
Officer. |
| C. | The Recipient
shall provide DOE with a written nomination for each Security Officer. The Recipient shall
provide a curriculum vitae or similar professional synopsis of each nominee, as well as the
following information of the nominee: |
| 1. | Full name
(first, middle, last name); |
| 3. | Education:
Include all academic institutions attended, major/area, degree; |
| 5. | Professional
Experience: Beginning with the current position, list professional/academic positions in
chronological order with a brief description; and |
| 6. | All current
academic, professional, or institutional appointments, foreign or domestic, at the applicant
institution or elsewhere, whether or not remuneration is received, and, whether full-time,
part-time, or voluntary. |
The curriculum vitae or similar professional synopsis should
have no lapses in time over the past ten years or since age 18, which ever time period is shorter.
| D. | The Recipient
shall ensure that the Security Officer: |
| 1. | is a non-dual
U.S. citizen who is eligible to hold a security clearance at least at the Secret level, and
physically resides in the United States (the position may require obtaining and maintaining
at least Secret level security clearance); |
| 2. | has the appropriate
senior-level authority and necessary skills and resources across the Recipient’s corporate
structure to fulfill the responsibilities of his or her position and to ensure compliance
with the RTES requirements of this Award; |
| 3. | has physical
and logical access to the records, information, networks, and resources necessary to ensure,
monitor, document, and report on compliance with the RTES requirements of this Award; |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| 4. | provides written
responses to inquiries from DOE within five (5) days after receiving any inquiry and
is available upon reasonable notice for discussions with DOE on matters relating to the enforcement
of and compliance with the RTES requirements of this Award or any other RTES matter with
respect to this Award; |
| 5. | reports any
actual or suspected violation of the RTES requirements of this Award to DOE as soon as practicable,
but in any event within three (3) calendar days of learning of the actual or suspected
violation; |
| 6. | continuously
monitors the Recipient’s compliance with the RTES requirements of this Award and ensures
the Recipient’s day-to-day compliance with the RTES requirements of this Award; |
| 7. | serves as
primary point of contact for DOEs regarding the Recipient’s compliance with the RTES
requirements of this Award; |
| 8. | serves as
liaison between the Recipient and third-party monitor put in place to assess the Recipient’s
compliance with the RTES requirements of this Award; |
| 9. | instructs
all personnel of the Recipient as to the RTES requirements of this Award, and provides training
as necessary to ensure compliance; |
| 10. | takes all
reasonable steps to rectify promptly any actual or potential violation immediately upon learning
of such actual or potential violation; |
| 11. | develops,
maintains, and provides oversight of any RTES requirements of this Award; |
| 12. | ensures that
compliance and other periodic reports related to RTES requirements are submitted to the DOE
as required by this Award; and |
| 13. | maintains
control over information concerning matters relating to the enforcement of and compliance
with the RTES requirements of this Award. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Term 81. | Third Party Monitor |
| A. | DOE may require
a Third-Party Monitor at any point during the Award to assess the Recipient’s compliance
with the research technology and economic security (RTES) requirements of this Award, but
not more often than once every year. The engagement of the Third-Party Monitor and the scope
and terms of the monitoring (the “Monitoring Plan”) shall be subject to the prior
non-objection of DOE. If DOE notifies the Recipient that monitoring is required, within thirty
(30) days, the Recipient shall propose a Third-Party Monitor and the Monitoring Plan for
their non-objection. If DOE does not provide written objection within thirty (30) days, the
lack of action shall constitute a non-objection. If DOE objects to the proposed Third-Party
Monitor, the Recipient shall propose an alternative candidate within fifteen (15) days, subject
to the same non-objection procedure as the initial proposal. If DOE objects to the Monitoring
Plan, the Recipient shall address the objections and submit a revised Monitoring Plan within
fifteen (15) days, subject to the same non-objection procedure as the initial proposal. The
Recipient shall engage the Third-Party Monitor within ten (10) days after receiving
DOE’s non-objection, and shall ensure that the monitoring is completed, in accordance
with the Monitoring Plan, within ninety (90) days thereafter. |
| B. | The Recipient
shall require the Third-Party Monitor to produce a written final Monitoring Report, which
shall be provided to the Security Officer and DOE upon completion. The DOE may request supplemental
reports if a final Monitoring Report is not consistent with the DOE’s expectations
as it relates to the details of the analysis and conclusions presented. The Recipient shall
ensure that the Third-Party Monitor promptly delivers all reports and related information
generated or gathered during its review to DOE. DOE shall have the right to meet and confer
with the Third-Party Monitor independently of the Recipient. |
| C. | The Recipient
shall ensure that the Third-Party Monitor: |
| 1. | is a U.S.
business and uses only U.S. citizens to monitor compliance with this Award; |
| 2. | has
qualifications appropriate for monitoring compliance with this Award, including, at a minimum,
demonstrated experience in physical security, logical access security, and battery technology
in the automobile, defense, and aerospace industries with the ability to access and deploy
resources as necessary to discharge the duties described herein; |
| 3. | has
no current or prior contractual, financial, or fiduciary relationship with either the Recipient,
Subrecipient(s), or personnel thereof; and |
| 4. | has
access to all information in the possession of the Recipient reasonably deemed necessary
by the Third-Party Monitor to monitor and verify compliance with this Award, including non-public
information and any records of communications or other documents. |
| D. | The Recipient
shall cooperate with the Third-Party Monitor and provide all information requested by the
Third-Party Monitor to monitor and verify compliance with RTES requirements of this Award,
including any records of communications or other documents. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Subpart D. Bipartisan Infrastructure Law (BIL)-Specific Requirements
Term 82. | Community
Benefits Outcomes and Objectives |
The recipient must meet the stated objectives and milestones set forth
in its Community Benefits Outcomes and Objectives, which is incorporated into the award as Attachment 5. A report on the recipient’s
progress toward meeting the objectives and milestones set forth in the Community Benefits Outcomes and Objectives must be included in
the continuation application.
Term 83. | Reporting,
Tracking, and Segregation of Incurred Costs |
BIL funds can be used in conjunction with other funding, as necessary
to complete projects, but tracking and reporting must be separate to meet the reporting requirements of the BIL and related Office of
Management and Budget (OMB) Guidance. The recipient must keep separate records for BIL funds and must ensure those records comply with
the requirements of the BIL.
Term 84. | Davis-Bacon
Act Requirements |
This award is funded under Division D of the Bipartisan Infrastructure
Law (BIL). All laborers and mechanics employed by the recipient, subrecipients, contractors or subcontractors in the performance of construction,
alteration, or repair work in excess of $2,000 on an award funded directly by or assisted in whole or in part by funds made available
under this award shall be paid wages at rates not less than those prevailing on similar projects in the locality, as determined by the
Secretary of Labor in accordance with Subchapter IV of Chapter 31 of Title 40, United States Code commonly referred to as the “Davis-Bacon
Act” (DBA).
Recipients shall provide written assurance acknowledging the DBA requirements
for the award or project and confirming that all of the laborers and mechanics performing construction, alteration, or repair work in
excess of $2,000 on projects funded directly by or assisted in whole or in part by and through funding under the award are paid or will
be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by Subchapter
IV of Chapter 31 of Title 40, United States Code (Davis-Bacon Act).
The recipient must comply with all Davis-Bacon Act requirements, including
but not limited to:
| 1. | Ensuring
that the wage determination(s) and appropriate Davis-Bacon clauses and requirements
are flowed down to and incorporated into any applicable subrecipient or contract awards.
See Attachment 7 for Wage Determinations applicable to this award. |
| 2. | Being
responsible for compliance by any subrecipient or contractor with the Davis-Bacon
labor standards. |
| 3. | Receiving
and reviewing certified weekly payrolls submitted by all subrecipients or contractors for
accuracy and to identify potential compliance issues. |
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
| 4. | Maintaining
original certified weekly payrolls for 3 years after the completion of the project and must
make those payrolls available to the DOE or the Department of Labor upon request, as required
by 29 CFR 5.6(a)(2). |
| 5. | Conducting
payroll and job-site reviews for construction work, including interviews with employees,
with such frequency as may be necessary to assure compliance by its subrecipients and contractors
and as requested or directed by the DOE. |
| 6. | Cooperating
with any authorized representative of the Department of Labor in their inspection of records,
interviews with employees, and other actions undertaken as part of a Department of Labor
investigation. |
| 7. | Posting
in a prominent and accessible place the wage determination(s) and Department of Labor
Publication: WH-1321, Notice to Employees Working on Federal or Federally Assisted Construction
Projects. |
| 8. | Notifying
the Grants Officer of all labor standards issues, including all complaints regarding incorrect
payment of prevailing wages and/or fringe benefits, received from recipient, subrecipient,
contractor, or subcontractor employees; significant labor standards violations, as defined
in 29 CFR 5.7; disputes concerning labor standards pursuant to 29 CFR parts 4, 6, and 8 and
as defined in FAR 52.222-14; disputed labor standards determinations; Department of Labor
investigations; or legal or judicial proceedings related to the labor standards under this
award, subrecipient award, contract or subcontract. |
| 9. | Preparing
and submitting to the Grants Officer, the Office of Management and Budget Control Number
1910-5165, Davis Bacon Semi-Annual Labor Compliance Report, by April 21 and October 21
of each year, in accordance
with the reporting instructions in Attachment 2, Federal Assistance Reporting Checklist. |
The
recipient must undergo Davis-Bacon Act compliance training and must maintain competency in Davis-Bacon Act compliance. The Grants Officer
will notify the recipient of any DOE sponsored Davis-Bacon Act compliance trainings. The Department of Labor offers free Prevailing Wage
Seminars several times a year that meet this requirement, at https://www.dol.gov/agencies/whd/government-contracts/construction/seminars/events.
The recipient must ensure the timely submission of weekly certified
payrolls as part of its compliance with the Davis-Bacon Act.
The Department of Energy has contracted with LCPtracker, a third-party
DBA electronic payroll compliance software application, and the use of LCP tracker is mandatory absent a waiver. A waiver for the use
of LCPtracker may be granted to a particular recipient if they are unable or limited in their ability to use or access the software.
 |
DOE
Special Terms and Conditions
Award No. DE-MS0000122.0000 With Solid
Power Operating, Inc. |
|
|
Davis-Bacon Act Electronic Certified Payroll Submission Waiver
A waiver must be granted before the start of work subject to Davis-Bacon
Act requirements (e.g., construction, alteration, or repair work). The recipient does not have the right to appeal DOE’s decision
concerning a waiver request.
For
additional guidance on how to comply with the Davis-Bacon provisions and clauses, see https://www.dol.gov/agencies/whd/government-contracts/construction and https://www.dol.gov/agencies/whd/government-contracts/protections-for-workers-in-construction.
Term 85. | Cybersecurity
Plan |
The Secretary of Energy, per BIL Section 40126, designated the
DOE’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER) as responsible for coordinating cybersecurity project
plans for IIJA provisions the Secretary deemed to have a cyber risk. CESER coordinates with DOE National Laboratory Subject Matter Experts
(SMEs) to provide project lifecycle support activities that maintain or improve the project cybersecurity over its lifecycle.
The
recipient is responsible for maintaining and improving project cybersecurity throughout the period of performance, including responding
to DOE feedback on the plans and the associated milestones, deliverables, and attending associated cybersecurity plan lifecycle support
meeting dates with CESER and DOE SMEs. Any revisions to the cybersecurity plans and all related deliverables shall be emailed securely
to CR-IIJACybersecurityplans@hq.doe.gov.
Any DOE and/or National Laboratory review comments or feedback provided
to recipients does not constitute an endorsement or approval of any specific elements within the cybersecurity plan or the proposed security
approach. Therefore, such feedback should not be referenced or used in marketing or promotional materials.
All cybersecurity plans and deliverables are exempt from disclosure
under the Freedom of Information Act (5 U.S.C. § 552) pursuant to Section 40126(e). This exemption is limited to information
provided to or collected by the federal government described in Pub. L. 117-58 § 41026, 42 U.S.C. § 18725.
Term 86. | Construction Signage |
The recipient is encouraged to display
DOE Investing in America signage during and after construction. Guidance can be found at: (https://www.energy.gov/design).
Proposed signage costs that meet these specifications are an allowable cost and may be included in the proposed project budget.

ATTACHMENT 1 - STATEMENT OF PROJECT OBJECTIVES
Bipartisan Infrastructure Law (BIL) - Continuous
Production of Sulfide-based Solid Electrolyte Materials for Advanced All-Solid-State Batteries
The objective of the project is to advance US
battery supply chain competitiveness in the All-solid-state battery technologies. The recipient will increase the solid-state electrolyte
(SSE) production capacity of their manufacturing facility by 1) installing one new continuous production line, and 2) by removing their
current batch process and installing two additional continuous production lines. At the end of the project, the recipient’s facility
will have a nameplate production capacity of 140 metric tons per year, the cost of SSE production will be significantly decreased, and
a scalable SSE manufacturing process will be established.
The recipient will place orders for equipment, complete detailed design,
begin pre-process installation construction, complete the process installation, and commission and validate the new continuous production
line. After verification of the first line, work will continue for the next two production lines; Orders will be placed for major equipment,
the existing batch lines will be removed, pre-process installation construction will be completed, process installation will be completed,
and the new continuous production lines will be commissioned and validated.
The project will be conducted in 4 budget periods:
Budget Period 1: Detailed Design: The purpose of this budget
period is to begin procurement of major equipment and to complete detailed design in preparation for construction. The tasks completed
in this budget period regarding major process equipment include purchase order placement, drawing approval, and the beginning of fabrication.
Regarding detailed design, the recipient will proceed from conceptual design (FEL 2) to beginning project execution (FEL 4). During this
design process, regular reviews and iteration will occur at 30%, 60%, and 90% design completion. The output of the detailed engineering
phase will be utilized for construction drawings, a construction schedule, and a Guaranteed Maximum Price (GMP) proposal from the selected
Engineering, Procurement, and Construction (EPC) contractor.
Budget Period 2: Line #1 Installation: The purpose of budget
period 2 is to complete the base and process builds, install process equipment, and to begin continuous operation of the new line. This
includes the installation of all process and utility equipment, site acceptance testing, commissioning, and the demonstration of 50%
output on the new continuous production process line.
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 1 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Budget Period 3: Remove Batch Lines & Prepare for Lines
#2 and #3: The purpose of this budget period is to use data from the new continuous line to procure major equipment, engineer the
additional continuous lines, install a new dry room, and decommission existing batch production lines. In this budget period, the recipient
will procure long lead equipment and complete process and facility engineering. Once engineering is completed, construction of a new
dry room will be completed to relocate packaging equipment to maintain operation of the continuous line from budget period 2. With use
of the new dry room and relocated packing equipment, the existing batch processing lines will be decommissioned.
Budget Period 4: Line #2 & #3 Installation: The purpose
of this budget period is to complete the base and process builds, install process equipment, and begin continuous operation of the new
lines. This includes the installation of all process and utility equipment, site acceptance testing, commissioning, and the demonstration
of 50% output on the new continuous production process line.
The following tasks will be conducted:
ALL BUDGET PERIODS: Overall
Project Management and Planning
The recipient will perform project management activities to include
project planning and control, subcontractor control, financial management, data management, management of supplies and/or equipment,
risk management, and reporting as required to successfully achieve the overall objectives of the project. The recipient will monitor
the project Schedule Performance Index (SPI) and Cost Performance Index (CPI) based upon the baseline total project value, scope, and
schedule and provide an assessment of variations from baseline and the recommended mitigations.
Task 0.0 – Project Management and Planning:
The recipient shall develop and maintain the Project Management Plan
(PMP). The content, organization, and requirements for revision of the PMP are identified in the Federal Assistance Reporting Checklist
and Instructions, which can be found in the award attachments. The recipient must add an Earned Value Management Plan (EVMP) as an appendix
to the PMP. The recipient shall manage and implement the project in accordance with the PMP.
Task 0.1 – Kick-Off Meeting:
The recipient will participate in a project kickoff meeting with the
Department of Energy (DOE) within 30 days of project initiation.
Task 0.2 – Community Benefits Plan:
The recipient will execute activities with the community as defined
in the Community Benefits Outcomes and Objectives attached to the award.
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 2 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Task 0.3 – Cybersecurity Plan:
The recipient will execute cybersecurity related activities in accordance
with the cybersecurity plan developed for the award.
BUDGET PERIOD 1: Detailed Design
Task 1.1 – Internal Review of Project:
Subtask 1.1.1 – The recipient will develop
a project execution plan to include team definition, scope definition, cost targets, a baseline schedule, material requirements, identification
of long lead process equipment, a risk register, and communication plan.
Subtask 1.1.2 – Recipient review and approval
of project execution plan during the quality gate review meeting at Quality Gate 0 of 5.
Task 1.2 – Long-lead Time Equipment Procurement:
Subtask 1.2.1 – Previous testing and pre-engineering
for major capital equipment will be reviewed against the throughput requirements for the continuous production line and approved by the
technical team.
Subtask 1.2.2 – The recipient will generate
requests for quote documents and user requirement specifications as necessary and issue these documents to vendor(s) for long lead
equipment for them to generate proposals.
Subtask 1.2.3 – Proposals from vendors will
be reviewed by the technical and procurement teams to select vendors and negotiate payment terms for major equipment.
Subtask 1.2.4 – Purchase orders will be issued
to selected vendors for long lead equipment by the procurement team.
Subtask 1.2.5 – The recipient’s technical
team will review and approve fabrication drawings and set up reoccurring meetings with vendors to track fabrication of long lead equipment
against agreed upon schedules and deliverables for long lead equipment vendors.
Subtask 1.2.6 – The recipient’s technical
team will schedule factory acceptance testing, Factory Acceptance Test (FAT), as required for long lead equipment. During FAT, the equipment
will be tested against approved drawings to ensure proper operation prior to shipping.
Task 1.3 – Completion of Detailed Design:
Subtask 1.3.1 – The recipient, General Contractor,
and Design Engineering firms will hold a kickoff meeting to agree on project deliverables and schedule. The output of this meeting will
be an updated proposal for detailed design.
Subtask 1.3.2 – The General Contractor and
Design Engineering firm will submit a drawing package at a 30% design completion for review and comment by the recipient. After all comments
are answered, the contractor will be approved, either through email or in a meeting, by the technical team to proceed with further detailed
design.
Subtask 1.3.3 – The General Contractor and
Design Engineering firm will submit a drawing package at a 60% design completion and a class 3 estimate for construction. This will be
reviewed and commented on by the recipient. After all comments are answered, the contractor will be approved, either through email or
in a meeting, by the technical team to proceed with further detailed design.
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 3 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Subtask 1.3.4 – The General Contractor and
Design Engineering firm will submit a drawing package at a 90% design completion for review and comment by the recipient. This will be
reviewed and commented on by the recipient. After all comments are answered, the contractor will be approved, either through email or
in a meeting, by the technical team to proceed to issued for construction drawing sets, Issued for Construction (IFC).
Subtask 1.3.5 – The General Contractor and
Design Engineering firm will produce issued for construction drawings and a permit set for the fully detailed design. This package will
be issued to subcontractors by the general contractor to generate proposals.
Subtask 1.3.6 – The technical core team will
review and approve the permit set. This approval will be documented internally to achieve Quality Gate 1 of 5.
Subtask 1.3.7 – The General Contractor and
Design Engineering firm will produce a class 2 estimate based on the IFC drawings for construction, bid tabulations for the proposals
generated by the subcontractors per division, and a schedule for the project scope. This will consist of a submission to the recipient
of a document showing the breakdown of the received bids and a schedule.
Task 1.4 – Guaranteed Maximum Price and Finalized Gantt:
Subtask 1.4.1 – The recipient will hold a
meeting with the General Contractor to review bid tabulations for each division of the project and work to select subcontractors. The
output of this will be selected subcontractors for each division of the IFC package.
Subtask 1.4.2 – The General Contractor will
incorporate the proposals of the selected subcontractor into a Guaranteed Maximum Price proposal to the recipient for review and approval.
Subtask 1.4.3 – The General Contractor will
work with the selected subcontractors to update the project schedule as necessary based on the anticipated durations of each subcontractor’s
work. The general contractor will submit a finalized Project Gantt to the recipient for review and approval.
Subtask 1.4.4 – The recipient will conduct
a meeting with the core team and its management reviewing the GMP and schedule for a Go/No-Go decision. The approval to proceed will
be documented and achieve Quality Gate 2 of 5.
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 4 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Milestone |
Type |
Description |
Complete
Quality Gate 0 of 5 |
Technical |
Complete
QG 0 of 5 for the project, including reviewing major deliverables such as: team definition, scope, cost targets, schedule, material
requirements, capital equipment requirements, risks, and team communication norms. |
Completion
of Basic and Detailed Design: Quality Gate 1 of 5 |
Technical |
Work
with the General Contractor firm to deliver basic and detailed design, and procure deliverables such as: air permitting study, utility
tables, HVAC redesign, emission control study, mass balance and process flow diagrams. Approval of the detailed design by the core
team will complete Quality Gate 1 of 5. |
Full
GMP Complete with Project Gantt Published |
Technical |
All
subcontractors selected, and costs and schedule finalized. |
Order
Major Equipment |
Technical |
Place
Purchase Order (PO) for all long-lead and major equipment. |
Go/No-Go
Decision: Move to Construction and installation Phase. Quality Gate 2 of 5 |
Go/No-Go
Technical |
Issued
for construction drawings, schedule, and guaranteed maximum price will be reviewed and approved by the core team; Confirm DOE and
Solid Power Leadership concurrence, Quality Gate 2 of 5. |
Go/No-Go
Decision: Financial Model |
Financial |
Provide
updated financial model. |
Continuation: The recipient is NOT authorized to initiate
any scope in the next budget period without the DOE Contracting Officer’s prior written approval in accordance with the award terms
and conditions. Remaining Budget Period tasks are subject to DOE review/approval of submitted Continuation Application.
BUDGET PERIOD 2: Line #1 Installation
Task 2.1 – Base Building:
Subtask 2.1.1 – The recipient will hold Owner,
Architect, Contractor (OAC) meetings with the contractors to track daily activities, schedule, change orders, and cost. The output of
this meeting will be meeting minutes and agreed upon daily project scopes.
Subtask 2.1.2 – The recipient will work with
general contractors to execute construction activities until all divisions reach completion. Execution will be tracked by reviewing earned
value against the baseline schedule.
Subtask 2.1.3 – The recipient will work with
general contractors to execute process utility commissioning plans in preparation for process equipment site acceptance testing.
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 5 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Task 2.2 – Process Installation:
Subtask 2.2.1 –The recipient technical team
will review the installation of the process equipment to ensure it was installed as engineered and ready to begin commissioning.
Task 2.3 – Complete Quality Gate 3 of 5:
Subtask 2.3.1 – The recipient technical, operations,
and quality teams will review and approve standard operating procedures (SOP’s) to confirm systems are ready for commissioning.
Subtask 2.3.2 – The recipient technical, operations,
and quality teams will review and approve SAT and commissioning plans for each piece of process equipment to ensure systems are ready
for commissioning.
Subtask 2.3.3 – The recipient technical, operations,
and quality teams will review and approve sampling plans and quality validation checks in preparation for commissioning.
Subtask 2.3.4 – The recipient technical, operations,
and quality teams will conduct a material review and approve materials prior to commissioning.
Subtask 2.3.5 – The recipient technical, operations,
quality, and safety teams will meet to review PHA items for approval to begin initial production.
Subtask 2.3.6 – The recipient technical, operations,
quality, and safety teams will meet for initial production approval.
Task 2.4 – Line #1 Startup & Commissioning:
Subtask 2.4.1 – The recipient technical team
and equipment vendors will execute the commissioning plans for site acceptance testing.
Subtask 2.4.2 – Once all equipment site acceptance
testing has been completed site acceptance testing the operations team will begin initial production.
Subtask 2.4.3 – The recipient will complete
approved sampling plans and quality validation checks. With quality and technical data the technical, quality, and operation teams will
hold a meeting to approve proceeding with additional production. This approval will be documented and will achieve quality gate 4 of
5.
Subtask 2.4.4 – The recipient will demonstrate
50% output.
Subtask 2.4.5 – The recipient operations and
technical team will work to achieve 50% throughput capability.
Milestone |
Type |
Description |
Base
Building Complete |
Technical |
Complete
construction and utility installation up until the point of connection. |
Complete
Process Equipment Validation |
Technical |
Ensure
building has been completed to design. |
Complete
Quality Gate 3 of 5. |
Technical |
Ensure
team alignment by completing the quality gate. |
Complete
Site Acceptance Testing |
Technical |
Confirm
mechanical integrity of equipment and complete commissioning. |
Go/No-Go
Decision: Demonstrate 50% Output & Product Quality |
Technical |
Confirm
the quality of the product coming off the line quality gate 4 of 5 and demonstrate 50% throughput capability. |
Go/No-Go
Decision: Financial Model |
Financial |
Provide
updated financial model. |
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 6 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Continuation: The recipient is NOT authorized to initiate
any scope in the next budget period without the DOE Contracting Officer’s prior written approval in accordance with the award terms
and conditions. Remaining Budget Period tasks are subject to DOE review/approval of submitted Continuation Application.
BUDGET PERIOD 3: Remove Batch Lines & Prepare for Lines
#2 and #3
Task 3.1 – Batch Line Removal:
Subtask 3.1.1 – The recipient will review
equipment performance and outputs with feedback from Line #1. Based on the data from this review, major equipment request for proposals
and User Requirement Specification (URS) documents will be updated and finalized.
Subtask 3.1.2 – The recipient will submit
request for proposal and URS documents as necessary to major equipment vendors.
Subtask 3.1.3 – The proposals from vendors
will be reviewed by the technical and procurement teams to select vendors and negotiate payment terms for major equipment.
Subtask 3.1.4 – Purchase orders will be issued
to selected vendors for long lead equipment by the procurement team.
Subtask 3.1.5 – The recipient’s technical
team will review and approve fabrication drawings and set up reoccurring meetings with vendors to track fabrication of long lead equipment
against agreed upon schedules and deliverables for long lead equipment vendors.
Subtask 3.1.6 – The recipient’s technical
team will schedule factory acceptance testing, FAT, as required for long lead equipment. During FAT, the equipment will be tested against
approved drawings to ensure proper operation prior to shipping.
Subtask 3.1.7 – The recipient will order all
order all construction materials and confirm project schedule.
Subtask 3.1.8 – The receipt will begin construction
of the new dry room for packaging.
Subtask 3.1.9 – The recipient will decommission
existing batch lines.
Task 3.2 – Begin Line #2 and #3 Construction:
Subtask 3.2.1 – The recipient will complete
base building and utility installation up to points of connection.
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 7 |
STATEMENT OF PROJECT OBJECTIVES |
 |
Milestone |
Type |
Description |
Update
Install Plans for Line #2 And #3 |
Technical |
Update
learnings from Line #1 installation and update plan. |
Order
All Major Equipment |
Technical |
Place
PO for all long-lead and major equipment. |
Confirm
Project Schedule |
Technical |
Complete
ordering of all construction materials and confirm schedule. |
Installation
of new dry room |
Technical |
Complete
installation of new dry room. |
Decommission
Existing Batch Lines |
Technical |
Begin
teardown and decommissioning of existing batch lines. |
Go/No-Go
Decision: Begin Process Installation for Lines #2 and #3 |
Technical |
Confirm
remaining project cost, scope, and schedule; Confirm DOE and Solid Power Leadership concurrence. |
Go/No-Go
Decision: Financial Model |
Financial |
Provide
updated financial model. |
Continuation: The recipient is NOT authorized to initiate
any scope in the next budget period without the DOE Contracting Officer’s prior written approval in accordance with the award terms
and conditions. Remaining Budget Period tasks are subject to DOE review/approval of submitted Continuation Application.
BUDGET PERIOD 4: Lines #2 and #3 Installation
Task 4.1 – Process Installation:
Subtask 4.1.1 – The recipient will complete
process equipment validation.
Subtask 4.1.2 – The recipient will complete
Quality Gate 4.
Task 4.2 – Line #2 and #3 Startup & Commissioning:
Subtask 4.2.1 – The recipient will complete
site acceptance testing (SAT) and commissioning.
Subtask 4.2.2 – The recipient will complete
product quality validation and demonstrate 50% output.
Milestone |
Type |
Description |
Complete
Process Equipment Validation |
Technical |
Ensure
building has been completed to design. |
Complete
Quality Gate 4 |
Technical |
Ensure
team alignment by completing the quality gate. |
Complete
Site Acceptance Testing |
Technical |
Confirm
mechanical integrity of equipment and complete commissioning. |
Offtake |
Commercial |
Show
evidence of commercial offtake agreements to DOE. |
Demonstrate
50% Output & Product Quality |
Technical |
Confirm
the quality of the product coming off the line and demonstrate 50% throughput capability. |
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 8 |
STATEMENT OF PROJECT OBJECTIVES |
 |
In addition to the reports specified in the “Federal Assistance
Reporting Checklist,” the recipient will provide the following to the DOE Project Officer (identified in Block 15 of the Assistance
Agreement as the Program Manager):
· | Material
specification sheet which lists relevant properties of the material or product to be manufactured
within the first six months of the award period. |
· | Updated letters
of commitment for product purchase or offtake agreements within 30 days of finalization. |
· | Updates to
project capacity and utilization achievements and end of project projections as part of quarterly
project reporting. |
· | Updated earned
value CPI and SPI, rationale for deviations, and plans to address deviations as part of quarterly
project reporting. |
· | Annual Progress
Report of Project Accomplishments with a publicly releasable abstract, provided by October 31
of each year. |
· | Updated product
breakeven analysis provided as part of the budget period continuation application. |
· | Updated market
share projections for near term (5 years), mid-term (5 to 10 years), and long term (greater
than 10 years) provided as part of the budget period continuation application. |
E. | BRIEFINGS
AND TECHNICAL PRESENTATIONS |
· | Detailed
project status update briefings at Washington, D.C., or via communication/conferencing media
approximately twice per year. Briefings will explain the plans, progress, and results of
the technical effort. |
· | Technical
paper(s) and presentations as appropriate at technical society meetings or at technical
exchange meetings. |
SOLID POWER OPERATING INC.: DE-MS0000122.0000 | 9 |
 | Federal Assistance
Reporting Checklist
Attachment 2 |
1. |
Award Number: |
2. Program/Project Title: |
|
DE- MS0000122.0000 |
Bipartisan Infrastructure Law (BIL) - Continuous Production of Sulfide-based Solid Electrolyte Materials for Advanced All-solid-state Batteries |
3. |
Recipient: |
|
Solid Power Operating, Inc. |
|
|
|
4. Reporting Requirements (see also the Special Instructions) |
Frequency |
Addresses |
|
|
|
I. |
PROJECT MANAGEMENT REPORTING |
|
|
x A. |
Performance Report – Narrative |
Q |
A. |
EERE
PMC |
x B. |
Performance Report – Quantitative |
Q |
B. |
EERE
PMC |
x C. |
Financial Report (SF-425) |
F, Q |
C. |
EERE
PMC |
x D. |
Scientific and Technical Reporting |
|
|
|
|
x 1. |
Accepted Manuscript of Journal Article(s) |
A5, P |
D.1. |
OSTI
E-Link |
|
x 2. |
Conference Product(s) |
A5, P |
D.2. |
OSTI
E-Link |
|
x 3. |
Technical Report(s) |
A5, P |
D.3. |
OSTI
E-Link |
|
x 4. |
Software & Manual(s) |
A5, P |
D.4. |
DOE
CODE |
|
x 5. |
Dataset(s) |
A5, P |
D.5. |
OSTI
E-Link Datasets |
|
x 6. |
Other STI (Dissertation / Thesis, etc.) |
A5, P |
D.6. |
OSTI
E-Link |
x E. |
Intellectual Property Reporting |
|
|
|
|
x 1. |
Intellectual Property Reporting |
A5, P |
E.1. |
iEdison |
|
x 2. |
Invention Utilization Report |
A5, P |
E.2. |
iEdison |
x F. |
Project Management Plan (PMP) |
A5 |
F. |
EERE
PMC |
x G. |
Special Status Report |
A5 |
G. |
See
section I.G for instructions and due dates |
x H. |
Continuation Application |
A5 |
H. |
EERE
PMC |
x I. |
Other Project Management Reporting (see Special Instructions) |
A5 |
I. |
See
Special Instructions |
|
|
|
|
II. |
AWARD MANAGEMENT REPORTING |
|
|
|
x A. |
Current and Pending Support |
A5 |
A. |
EERE
PMC |
x B. |
Demographic Reporting |
A5 |
B. |
EERE
PMC |
x C. |
Financial Conflict of Interest Report |
A5 |
C. |
EERE
PMC |
¨ D. |
Tangible Personal Property Report – Annual Property Report
(SF-428 & SF-428A) |
Y |
D. |
EERE
PMC |
x E. |
Tangible Personal Property Report – Disposition Request/Report
(SF-428 & SF-428C) |
A5 |
E. |
EERE
PMC |
x F. |
Uniform Commercial Code (UCC) Financing Statements |
A5 |
F. |
See
section II. F. for instructions and due dates |
x G. |
Federal Subaward Reporting System (FSRS) |
A5 |
G. |
FSRS |
x H. |
Annual Incurred Cost Proposal (AICP) |
|
|
|
|
x 1. |
AICP -NETL Cognizant |
Y180 |
H. |
See
section II.H. for instructions and due dates |
|
¨ 2. |
AICP – Other Agency Cognizant |
Y180 |
H. |
See
section II.H. for instructions and due dates |
¨ I. |
Fringe Reconciliation Form |
Y180 |
I. |
See
Section II. I. for instructions and due dates |
x J. |
DOE For-Profit Compliance Audit |
O |
J. |
See
section II. J. for instructions and due dates |
¨ K. |
Single Audit: States, Locals, Tribal Governments, and Non-Profits |
O |
K. |
See
section II. K. for instructions and due dates |
x L. |
Other Award Management Reporting (see Special Instructions) |
A5 |
L. |
See
Special Instructions |
|
|
|
|
III. |
CLOSEOUT REPORTING |
|
|
|
x A. |
Final Scientific/Technical Report |
|
|
|
|
¨ A.1. |
Final Scientific/Technical Report – Unlimited |
F |
A.1. |
OSTI
E-Link |
|
x A.2. |
Final Scientific/Technical Report – Data Protection |
F |
A.2. |
OSTI
E-Link |
x B. |
Invention Certification (DOE F 2050.11) |
F |
B. |
EERE
PMC |
x C. |
Tangible Personal Property Report – Final Report
(SF-428 & SF-428B) |
F |
C. |
EERE
PMC |
x D. |
Verification of Receipt of Accepted Manuscripts |
F |
D. |
See
section III. D. for instructions and due dates |
x E. |
Other Closeout Reporting (see Special Instructions) |
F |
E. |
See
Special Instructions |
 | Federal Assistance
Reporting Checklist
Attachment 2 |
IV. |
POST-PROJECT REPORTING |
|
|
x A. |
Scientific and Technical Reporting |
P |
A. |
OSTI E-Link |
x B. |
Intellectual Property Reporting |
P |
B. |
iEdison |
4. Reporting Requirements (see also the Special Instructions) |
Frequency |
Addresses |
|
|
|
V. |
Bipartisan Infrastructure Law/inflation reduction act Reporting |
|
|
x A. |
Community Benefits Report |
Y |
A. |
EERE PMC |
x B. |
Boosting Domestic Manufacturing |
A5, Y, F |
B. |
EERE PMC |
x C. |
Quality Job Creation |
|
|
|
x 1. |
Direct Jobs |
A5 |
C.1. |
LCPtracker |
|
x 2. |
Training Outcomes |
A5, Y, F |
C.2. |
EERE PMC |
|
x 3. |
Good Jobs Outcomes |
A5,
Y, F |
C.3. |
EERE PMC |
|
x 4. |
Permanent Jobs |
Q |
C.4. |
EERE PMC |
x D. |
Equity and Justice |
|
|
|
x 1.Community
Engagement Process |
Q |
D.1. |
EERE PMC |
|
¨ 2.Engagement
Events and Technical Assistance |
Q |
D.2. |
EERE PMC |
|
¨ 3.Community
Ownership |
Q |
D.3. |
EERE PMC |
¨ E. |
Pathway to Net-Zero |
|
|
|
¨ 1.Infrastructure
Supported |
A5, Y, F |
E.1. |
EERE PMC |
|
¨ 2.Hydrogen
Production |
A5, Y, F |
E.2. |
EERE PMC |
|
¨ 3.Carbon
Capture, Removal, and Storage |
A5, Y, F |
E.3. |
EERE PMC |
|
¨ 4.Energy
Saved |
A5, Y, F |
E.4. |
EERE PMC |
x F. |
Davis Bacon Act Semi-Annual Labor Compliance Report |
A5 |
F. |
EERE
PMC |
FREQUENCY CODES AND DUE DATES: |
|
A5 – As Specified or within five (5) calendar days after the event. |
|
F – Final; within 120 calendar days after expiration or termination of the award. |
|
O – Other: See instructions for further details. |
|
P – Post-project (after the period of performance); within five (5) calendar days after the event, or as specified. |
|
Q – Quarterly; within 30 calendar days after the end of the federal fiscal year quarter. |
|
S – Semiannually; within 30 days after end of the reporting period. |
|
Y – Yearly; within 90 calendar days after the end of the federal fiscal year or termination of the award. |
|
Y180 – Yearly; within 180 calendar days after the close of the recipient’s fiscal year. |
|
FULL URLS: |
|
OSTI
E-Link: https://www.osti.gov/elink/2413-submission.jsp |
OSTI
E-Link Datasets: https://www.osti.gov/elink/2416-submission.jsp |
DOE
CODE: https://www.osti.gov/doecode/ iEdison: https://www.nist.gov/iedison |
EERE
PMC: https://www.eere-pmc.energy.gov/SubmitReports.aspx |
FSRS:
https://www.fsrs.gov |
LCPtracker:
https://www.lcptracker.com |
5. Special Instructions:
Recipient’s fiscal year end date: 12/31
¨ No
indirect costs proposed
¨ De
minimis rate used and No fringe proposed
|
 | Federal Assistance
Reporting Checklist
Attachment 2 |
I. Project
Management Reporting:
I. Other
If deliverables are identified in the Statement of Project
Objectives, Award Attachment 1, the Recipient will submit the deliverables in accordance with the instructions contained therein.
The following deliverables outlined in the Special Terms
and Conditions shall be transmitted securely after coordinating with the DOE Contracting Officer, Award Administrator/Specialist, and
Program Manager:
· Technology
Protection Plan – due 60 days after award effective date
· Material
Supply Plan – due 60 days after award effective date
· Participants
and Other Collaborating Organizations – due 30 days after end of quarter in which the change occurred
· Access
Restrictions Certificate of Compliance – due annually and upon DOE request
· RTES
Security Officer Nomination – due 30 days after award effective date
· Offtake
Partner Plan – due within 180 days after award effective date.
In addition, the Project Management Plan shall be transmitted
securely after coordinating with the DOE Contracting Officer, Award Administrator/Specialist, and Program Manager.
II. Award
Management Reporting
L. Trafficking in Persons
If the estimated value of services required to be performed
under the grant or cooperative agreement outside the United States exceeds $500,000, private entities and State, local, government, Indian
Tribe, or foreign public entities when a private entity could be a subrecipient must submit an annual certification to the cognizant Grants
Officer that states:
· The
recipient has implemented a plan meeting the requirements of 2 CFR 175.105(b)(3)-(5) to prevent the activities described in 2 CFR
175(a) and is in compliance with this plan;
· The
recipient has implemented procedures to prevent activities described in 2 CFR 175(a) and to monitor, detect, and terminate any subrecipient,
contractor, subcontractor, or employee of the recipient engaging in any activities described in 2 CFR 175.105(a); and
· To
the best of the recipient’s knowledge, neither the recipient, nor any subrecipient, contractor, or subcontractor of the selectee
or any agent of the selectee or of such a subrecipient, contractor, or subcontractor, is engaged in any activities described in 2 CFR
175.105(a).
DOE may ask selectees to provide a copy of their Trafficking
in Persons compliance plan.
III. Closeout Reporting:
E. Other:
The Recipient must submit a Scientific
and Technical Information (STI) Certification to the cognizant Grants Management Specialist. The STI Certification can be found here:
STI Form. The purpose of this certification is to ensure that the STI resulting from the DOE-funded research and development
is properly submitted in accordance with the terms and conditions of the award. STI includes, but is not limited to, technical reports,
scientific/technical conference papers and presentations, theses and dissertations, journal citations, manuscripts and published
articles, videos, software, patents, and datasets. |
 | Federal Assistance
Reporting Checklist
Attachment 2 |
Table of Contents
I. |
Project Management Reporting |
7 |
A. |
Performance Report Narrative (PRN) |
7 |
1. |
Cover Page |
8 |
2. |
Summary |
8 |
3. |
Special Reporting |
11 |
B. |
Performance Report Quantitative (PRQ) |
11 |
1. |
Organizations |
11 |
2. |
Tasks and Milestones |
11 |
3. |
Contractual Cost
Summary |
11 |
4. |
Cost Summary |
11 |
5. |
Spend Plan |
11 |
6. |
Earned Value Management |
12 |
7. |
Products |
12 |
8. |
Participants |
14 |
9. |
Special Reporting Requirements |
14 |
C. |
Financial Report SF-425 Federal Financial Report |
14 |
D. |
Scientific and Technical Reporting |
14 |
1. |
Accepted Manuscript of Journal
Article |
15 |
2. |
Conference Product(s) |
16 |
3. |
Technical Report(s) |
17 |
4. |
Software & Manual(s) |
17 |
5. |
Dataset(s) |
18 |
6. |
Other STI (Dissertation /
Thesis, etc.) |
18 |
E. |
Intellectual Property Reporting |
19 |
1. |
Intellectual Property Reporting |
19 |
2. |
Invention Utilization Report |
20 |
F. |
Project Management Plan (PMP) |
20 |
1. |
Revised Plan(s) |
21 |
2. |
Content of revised PMP |
21 |
G. |
Special Status Reports |
26 |
H. |
Continuation Application |
29 |
I. |
Other Project Management Reporting (see Special Instructions) |
29 |
 | Federal Assistance
Reporting Checklist
Attachment 2 |
II. |
Award Management Reporting |
29 |
A. |
Current and Pending Support |
29 |
B. |
Demographic Reporting |
32 |
C. |
Financial Conflict of Interest Report |
33 |
D. |
Tangible Personal Property Report – Annual Property Report (SF-428 & SF-428A) |
34 |
E. |
Tangible Personal Property Report – Disposition Request/Report (SF-428 & SF-428C) |
34 |
F. |
Uniform Commercial Code (UCC) Financing Statements |
35 |
G. |
Federal Subaward Reporting System (FSRS) |
36 |
H. |
Annual Incurred Cost Proposals |
36 |
I. |
Fringe Reconciliation Form |
37 |
J. |
DOE For-Profit Compliance Audit |
38 |
K. |
Single Audit: States, Local Government, Tribal Governments, Institution of Higher Education (IHE), or Non-Profit Organization |
38 |
L. |
Other Award Management Reporting (see Special Instructions) |
39 |
III. |
Closeout Reporting |
39 |
A. |
Final Scientific/Technical Report |
39 |
1. |
Final Technical Reports – Unlimited |
41 |
2. |
Final Technical Reports – Protected Data. |
41 |
B. |
Invention Certification (DOE F 2050.11) |
42 |
C. |
Tangible Personal Property Report – Final Report (SF-428 & SF-428B) |
42 |
D. |
Verification of Receipt of Accepted Manuscripts |
43 |
E. |
Other Closeout Reporting (see Special Instructions) |
43 |
IV. |
Post-Project Reporting |
43 |
A. |
Scientific and Technical Reporting |
43 |
B. |
Intellectual Property Reporting |
44 |
V. |
Bipartisan Infrastructure Law/Inflation Reduction Act Reporting |
44 |
A. |
Community Benefits Report |
44 |
B. |
Boosting Domestic Manufacturing |
44 |
1. |
Domestic Manufacturing & Critical Materials and Rare Earth Element Mining, Processing, Production & Recycling Capacity |
45 |
2. |
GHG Emissions & Air Pollutants |
45 |
3. |
Equipment |
45 |
C. |
Quality Job Creation |
45 |
 | Federal Assistance
Reporting Checklist
Attachment 2 |
1. |
Direct Jobs |
45 |
2. |
Training Outcomes |
46 |
3. |
Good Jobs Outcomes |
46 |
4. |
Permanent Jobs |
47 |
D. |
Equity and Justice |
47 |
1. |
Community Engagement Process |
47 |
2. |
Engagement Events and Technical Assistance |
47 |
3. |
Community Ownership |
48 |
E. |
Pathways to Net Zero |
48 |
1. |
Infrastructure Supported |
48 |
2. |
Hydrogen Production |
49 |
3. |
Carbon Capture, Removal, Storage |
49 |
4. |
Energy Saved |
49 |
F. |
Davis Bacon Act Semi-Annual Labor Compliance Report |
49 |
VI. |
Appendix A: Notice To Recipients (Prime Recipients And Subrecipients) Regarding Protected Data, Limited Rights Data And Protected Personally
Identifiable Information |
51 |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
|
Reporting Instructions (11/2024) |
|
|
|
|
*** |
Throughout the performance of the project, it is important that you
mark Protected Data/Limited Rights Data as described in Appendix A. It is equally important that you not submit Protected Personally
Identifiable Information (Protected PII) to DOE. See Appendix A for guidance on Protected PII. |
*** |
| I. | Project Management Reporting |
| A. | Performance Report Narrative (PRN) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
30 calendar days after the end of the quarterly reporting period (January 30, April 30, July 30, October 30) |
Every quarter, the prime
recipient is required to submit a Performance Report - Narrative (PRN) and a Performance Report Quantitative (PRQ) for the project.
Together these two documents summarize the entirety of work performed by the prime recipient, subrecipients, and contractors. The Performance
Report - Narrative contains qualitative information on the project progress. The Performance Report - Quantitative captures quantitative
information on the project progress. The PRN must include the following information. A PRN template is available at: https://www.energy.gov/infrastructure/reporting-checklists
with the intent to reduce the administrative burden by promoting the use of common formats.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| a. | Federal Agency and Organization Element
to Which Report is Submitted |
| b. | Federal Grant or Other Identifying Number
Assigned by Agency |
| c. | Project Title |
| d. | Program Director/Principal Investigator/Lead
Project Manager (PD/PI) Name, Title, and Contact Information (e-mail address and phone number) |
| e. | Business Contact Name, Title, and Contact
Information (e-mail address and phone number) |
| f. | Submission Date |
| g. | Recipient Organization (Name and Address) |
| h. | Period of Performance (Start Date, End
Date) |
| i. | Budget Period (Start Date, End Date) |
| j. | Reporting Period (Start Date, End Date) |
| k. | Certification by the Submitting Official
that includes: Signature of Submitting Official (electronic signatures (i.e., Adobe Acrobat)
are acceptable); date of signature; and the following certification statement: |
By signing this report, I
certify to the best of my knowledge and belief that the report is true, complete, and accurate. I am aware that any false, fictitious,
or fraudulent information, misrepresentations, half-truths, or the omission of any material fact, may subject me to criminal, civil or
administrative penalties for fraud, false statements, false claims or otherwise. (U.S. Code Title 18, Section 1001, Section 287
and Title 31, Sections 3729-3730). I further understand and agree that the information contained in this report are material to Federal
agency’s funding decisions and I have an ongoing responsibility to promptly update the report within the time frames stated in
the terms and conditions of the above referenced Award, to ensure that my responses remain accurate and complete.
The purpose of the Summary
is to describe a high-level status on the items listed below. This section should be a mix of short paragraphs and bullet points.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Major Goals and Objectives
Provide a summary of the major
project goals and objectives. This should be the same from quarter to quarter and align with the Statement of Project Objectives (SOPO)/Statement
of Work (SOW).
Technical Achievement(s)
Provide a summary of all significant
technical progress of the project in achieving objective and programmatic goals during the life of the project. This should include key
outcomes or other achievements, such as major findings, developments, or conclusions (both positive and negative), information dissemination, etc.
This section should be a cumulative summary of technical achievements with newly added comments for the current reporting period highlighted.
Impact
State how the findings, results,
or techniques developed in this project will continue to make an impact on the specific fields of research in this project and in other
disciplines, which may include training and educational experiences; human resource development in science, engineering, and technology;
technology transfer; and societal impacts.
Project Schedule Status
Provide a narrative summary
of the status of tasks with respect to the plan for the quarter and budget period. If deviations from the schedule are noted, describe
the impacts and mitigation alternatives that are in place or planned in the Changes/Problems section below.
Project Budget Status
Provide a summary of the project
expenditures and costs with respect to the plan for the quarter and budget period. If applicable, describe the variance, associated impacts,
and mitigation alternatives that are in place or planned in the Changes/Problems section below.
Changes/Problems
Include any planned or anticipated
changes to scope, schedule, or budget. Proposed award modifications noted solely within a Performance Report do not constitute a proposed
award modification. Significant changes to the award scope, schedule, and budget must be submitted to the Grants Management Specialist
and the Project Officer and must be approved by the Grants Officer. If there is nothing significant to report during this reporting period,
state “Nothing to Report.”
Key Personnel Changes
Describe planned or actual changes
in principal investigator, business contacts, or senior/key personnel and the impact to achieving project objectives.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Scope Issues
Describe issues with completing
the required project scope identified in the SOPO/SOW, the impacts to achieving project objectives and program goals if applicable, and
proposed mitigation alternatives. The quantitative impact to achievement of Technical Milestones and Go/No Go decision points and key
deliverables should also be addressed.
Schedule Issues
Describe issues with achieving
the planned activities identified in the project schedule and the impact to the award budget period end dates and the overall award period
of performance. The quantitative impact to the timing of Technical Milestones and Go/No Go decision points, and key deliverables should
also be addressed.
Budget Issues
Describe changes during the
reporting period that may have a significant positive or negative impact on expenditures or the overall budget.
Respond to any special reporting
requirements specified in the award Terms and Conditions, as well as any award specific reporting requirements outlined in the FARC Special
Instructions.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| B. | Performance Report Quantitative
(PRQ) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
30 calendar days after the end of the quarterly reporting period (January 30, April 30, July 30, October 30) |
Every quarter, the prime
recipient is required to submit a Performance Report Narrative (PRN) and a Performance Report - Quantitative (PRQ) for the project.
Together these two documents summarize the entirety of work performed by the prime recipient, subrecipients, and contractors. The Performance
Report - Narrative contains qualitative information on the project progress. The Performance Report - Quantitative captures quantitative
information on the project progress. The PRQ must include the following information. A template is available at: https://www.energy.gov/infrastructure/reporting-checklists
with the intent to reduce the administrative burden by promoting the use of common formats.
Identify all subrecipients,
contractors, U.S. National Laboratories, partners, and collaborating organizations. Recipients must also include all foreign collaborators
as outlined in the Foreign Collaboration Considerations term of the award Terms and Conditions. For each, provide name, UEI, zip code
or latitude/longitude, role in the project, contribution to the project, and start and end date.
Enter all tasks and milestones
identified in your Statement of Project Objectives (SOPO), Project Management Plan (PMP), or other document which outlines your project
scope, schedule and budget, Community Benefits Plan (CBP), and Cybersecurity Plan (if directed by your DOE Project Team). Each quarter,
update the status of the task/milestone, the physical percent complete, and, when applicable, the actual month complete.
| 3. | Contractual Cost Summary |
For each subrecipient and
contractor working on the project (excluding FFRDCs), provide a summary of the work, approved budget, and actual expenses.
Using your approved budget,
enter the project costs by budget category and report actual expenses each quarter. Also include budgeted and actual recipient cost share.
For both federal and recipient
cost share, enter the planned spending for the entire project period. Planned spend means when the project team anticipates incurring
costs. Each quarter, update with actual federal and recipient spend.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 6. | Earned Value Management |
When required by your DOE
project team, complete the table for Earned Value Management.
What has the project produced?
List any products resulting
from the project during the reporting period. Specific product submission instructions can be found in Scientific and Technical Reporting.
Examples of products include: publications, conference papers, and presentations; website(s); technologies or techniques; inventions,
patent applications, and/or licenses; and other products, such as data or databases, physical collections, audio or video products, software
or NetWare, models, educational aids or curricula, instruments or equipment, research material, interventions (e.g., clinical or educational),
new business creation or any other public release of information related to the project.
| a. | Publications, conference papers,
and presentations |
Report the publication(s) resulting
from the work under this award.
Please note: Recipients must
use the DOE acknowledgement and legal disclaimer language as described in the Special Terms and Conditions.
The recipient is reminded
that all data produced under the award should comply with the award’s data management plan (DMP), if applicable. The DMP provides
a plan for making all research data displayed in publications resulting from the proposed work digitally accessible at the time of publication.
At a minimum, the DMP (1) describes how data sharing and preservation will enable validation of the results from the proposed work,
how the results could be validated if data are not shared or preserved and (2) has a plan for making all research data displayed
in publications resulting from the proposed work digitally accessible at the time of publications.
| i. | Accepted Manuscript(s) of
Journal Article |
List peer-reviewed articles
or papers that have been submitted for publication in scientific, technical, or professional journals. Include any paper submitted for
peer-reviewed publication in the periodically published proceedings of a scientific society, a conference, or the like. A publication
in the proceedings of a one-time conference, not part of a series, should be reported under “Books or other non-periodical, one-time
publications.”
Identify for each publication:
Author(s); title; journal; volume: year; page numbers; status of publication (published; accepted, awaiting publication; submitted,
under review; other); acknowledgement of federal support (yes/no); legal disclaimer language (yes/no). Also see instructions under II.
Scientific/Technical Reporting regarding the submission of accepted manuscripts and other STI as appropriate.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| ii. | Books or other non-periodical,
one-time publications |
Report any book, monograph,
dissertation, abstract, or the like published as or in a separate publication, rather than a periodical or series. Include any significant
publication in the proceedings of a one-time conference or in the report of a one-time study, commission, or the like.
Identify for each one-time publication:
author(s); title; editor; title of collection, if applicable; bibliographic information; year; type of publication (book, thesis or dissertation,
other); status of publication (published; accepted, awaiting publication; submitted, under review; other); acknowledgement of federal
support (yes/no); legal disclaimer language (yes/no).
| iii. | Other publications, conference
papers and presentations |
Identify any other publications,
conference papers and/or presentations not reported above. Specify the status of the publication as noted above.
List the URL for any Internet
site(s) that disseminates the results of the research activities. A short description of each site should be provided. It is not
necessary to include the publications already specified above in this section.
| c. | Technologies or techniques |
Identify technologies or
techniques that have resulted from the research activities. Describe the technologies or techniques and how they are being shared.
| d. | Inventions, patent applications,
and/or licenses |
Identify inventions, patent
applications with date, and/or licenses that have resulted from the research. Submission of this information as part of an interim report
or Final Technical Report is not a substitute for any other invention reporting required under the terms and conditions of an award.
Identify any other significant
products that were developed under this project. Describe the product and how it is being shared. Examples of other products are: Data
or databases; Physical collections; Audio or video products; Software or NetWare; Models; Educational aids or curricula; Instruments
or equipment; Research material (e.g., germplasm, cell lines, DNA probes, animal models); Interventions (e.g. clinical, educational);
new business creation; and Other.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
The following information
on participants (individuals) was provided during award negotiations. On a quarterly basis, provide updates as needed. For changes to
covered individuals, please refer to the Current and Pending Support reporting for additional requirements.
| a. | What individuals have worked
on the project? |
Provide the following information
for individuals at the prime recipient and subrecipient level: (1) all senior and key personnel; and (2) each person who has
worked or is expected to work at least one person month per year on the project regardless of the source of compensation (a person month
equals approximately 160 hours of effort).
| i. | Name |
| ii. | Organization |
| iii. | Job Title |
| iv. | Role in the project |
| v. | Start and end date (month and year) working on the project |
| vi. | State, U.S. territory, and/or country of residence |
| vii. | Whether this person collaborated with an individual or entity located in a foreign
country in connection with the scope of this Award, and |
| viii. | If yes to a.vii, whether the person traveled to the foreign country as part
of that collaboration, and, if so, where and what the duration of stay was. |
| 9. | Special Reporting Requirements |
Respond to any special reporting
requirements specified in the award terms and conditions, as well as any award specific reporting requirements.
| C. | Financial Report SF-425 Federal
Financial Report |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
30 calendar days after the end of the quarterly reporting period (January 30, April 30, July 30, October 30)
and within 120 calendar days after expiration or termination of the award |
Every quarter, the prime
recipient is required to submit a completed SF-425 for the project to DOE, covering the entirety of work performed by the prime recipient,
subrecipients, and contractors – to DOE. A fillable version of the SF-425 is available at Post-Award Reporting Forms | Grants.gov.
| D. | Scientific and Technical Reporting |
The dissemination of scientific
and technical information (STI) ensures public access to the results of federally funded research. STI refers to information products
in any medium or format used to convey results, findings, or technical innovations from research and development or other scientific
and technological work that are prepared with the intention of being preserved and disseminated in the broadest sense applicable (i.e.,
to the public or, in the case of controlled unclassified information or classified information, disseminated among authorized individuals).
By properly submitting STI to DOE Energy Link System (E-Link), the information will be made available to the public through OSTI.GOV.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
NOTE: SCIENTIFIC/TECHNICAL
PRODUCTS INTENDED FOR PUBLIC RELEASE MUST NOT CONTAIN PROTECTED PERSONALLY IDENTIFIABLE INFORMATION (PII). Please refer to Appendix
A for more information.
NOTE: For awards made
after August 8, 2024, the digital persistent identifier (e.g., ORCID iD) for individuals must be used when publishing products (when
that is an option). The digital persistent identifier for individuals must be provided when reporting outputs to the Department of Energy
Office of Scientific and Technical Information (DOE OSTI).
| 1. | Accepted Manuscript of Journal
Article |
Submit to: |
DOE
Energy Link System (E-Link) available at https://www.osti.gov/elink/2413-submission.jsp |
Submission
deadline: |
No
later than the published online date of the article |
Public access to scholarly
publications is enabled by providing the Accepted Manuscript (AM) of the Journal Article to DOE OSTI and is consistent with the
U.S. Government's retained license to published results of federally-funded research. If the recipient has a journal article accepted
for publication which includes information/data produced under the award, then the recipient must submit an AN 241.3, as described below,
no later than the published online date of the article.
Content. The recipient
is to provide the final peer-reviewed AM, i.e., the version of a journal article that has been peer reviewed and accepted for publication
in a journal. Do NOT submit the journal’s published version of the article, i.e., do NOT submit a copyrighted reprint.
DOE will make no additional
review of the content of the AM because the AM is the version of the journal article with the content to be published (i.e., publicly
released) by the journal publisher.
The recipient must self-certify
at the time of submission to DOE via E-Link that the content is appropriate and that it is not a copyrighted reprint, i.e., the final
version of the published article. Recipients are reminded that the article is to include an acknowledgement of federal support and a
legal disclaimer as required in the “Publications” Term in the award Special Terms and Conditions.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
The recipient is also reminded
that all data produced under the award should comply with the award’s data management plan (DMP). The DMP provides a plan for making
all research data displayed in publications resulting from the proposed work digitally accessible at the time of publication. At a minimum,
the DMP (1) describes how data sharing and preservation will enable validation of the results from the proposed work, how the results
could be validated if data are not shared or preserved and (2) has a plan for making all research data displayed in publications
resulting from the proposed work digitally accessible at the time of publications.
Electronic Submission Process.
The AM of the Journal Article must be provided electronically via the DOE Energy Link System (E-Link) and must be accompanied
by a completed DOE Announcement Notice (AN) 241.3 (https://www.osti.gov/elink/2413-submission.jsp).
Submit to: |
DOE
Energy Link System (E-Link) available at https://www.osti.gov/elink/2413-submission.jsp |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
The recipient must submit
a copy of any scientific/technical conference papers, proceedings, or presentations.
Content: The content
should include a copy of the paper, presentation, or proceeding and: (1) name of conference; (2) location of conference; (3) date
of conference; and (4) conference sponsor. Also include an acknowledgement of federal support and a legal disclaimer as described
in the Special Terms and Conditions.
Electronic Submission Process:
Scientific/technical conference proceedings, papers/presentations or must be submitted via the DOE Energy Link System (E-Link) with a
completed DOE Announcement Notice (AN) 241.3 (https://www.osti.gov/elink/2413-submission.jsp).
The recipient is responsible
for ensuring the suitability of the content for public release. The terms and conditions of award provide that submissions must not contain
any Protected Personally Identifiable Information (PII), limited rights data (proprietary data), classified information, information
subject to export control classification, or other information not subject to release.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Submit to: |
DOE
Energy Link System (E-Link) available at https://www.osti.gov/elink/2413-submission.jsp |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
The recipient must submit
a copy of any scientific/technical reports.
Content: The content
should include a copy of the report as well as an acknowledgement of federal support and a legal disclaimer as described in the Special
Terms and Conditions.
Electronic Submission Process:
Scientific/technical reports must be submitted via the DOE Energy Link System (E-Link) with a completed DOE Announcement Notice (AN)
241.3 (https://www.osti.gov/elink/2413-submission.jsp).
The recipient is responsible
for ensuring the suitability of the content for public release. The terms and conditions of award provide that submissions must not contain
any Protected Personally Identifiable Information (PII), limited rights data (proprietary data), classified information, information
subject to export control classification, or other information not subject to release.
Submit to: |
DOE
CODE: https://www.osti.gov/doecode/
|
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
The recipient must submit
all software deliverables created under the award, as well as any accompanying documentation or manuals.
DOE CODE is DOE’s software
services platform for submitting and searching for software resulting from DOE-funded research. Through submission to DOE CODE, users
have the option to obtain a Digital Object Identifier (DOI) for the code, making it more easily discoverable, citable, and shared.
Content. When a recipient
submits software to OSTI through DOE CODE, a set of required metadata elements and a link to the software repository must be provided.
Submission Process.
Recipients will submit software by going to https://www.osti.gov/doecode/. Before submissions can be made, the recipient will
be required to create an account. The recipient may create an account by visiting the top right of the DOE CODE homepage. Once the account
is created, submissions may be made through the submit software/code link on the homepage. For more information about DOE CODE please
visit https://www.osti.gov/doecode/faq.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Submit to: |
DOE
Energy Link System (E-Link) available at https://www.osti.gov/elink/241-6-submission.jsp |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
Scientific/technical datasets
(data-streams, data files, etc.) support the technical reports and published literature resulting from DOE-funded research. They
are also recognized as valuable information entities in their own right that, now and in the future, need to be available for citation,
discovery, retrieval, and reuse. The assignment and registration of a Digital Object Identifier (DOI) is a free service for DOE-funded
researchers which is provided by OSTI to enhance access to this important resource. In order to obtain a DOI, provide to OSTI the specific
data elements relevant to the dataset, as specified in DOE AN 241.6.
Content. If the recipient
generates publicly available datasets resulting from work funded by DOE, they may announce these datasets to OSTI and have them registered
with DataCite to obtain a DOI, which ensures long-term linkage between the DOI and the dataset’s location. To register and publicly
announce a dataset, the recipient must provide an AN 241.6, including the required data elements needed for describing the dataset. Note:
Do NOT submit the dataset itself, only the metadata for registering the dataset, obtaining a DOI, and announcing its availability.
Electronic Submission Process.
Notification of scientific datasets must be submitted electronically via the DOE Energy Link System (E-Link) and must be accompanied
by a completed DOE Announcement Notice (AN) 241.6 (https://www.osti.gov/elink/241-6-submission.jsp). Within the AN 241.6, provide
relevant information about the dataset as well as the URL where the dataset can be accessed.
| 6. | Other STI (Dissertation /
Thesis, etc.) |
Submit to: |
https://www.osti.gov/elink/2413-submission.jsp |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
Recipients are encouraged
to announce other forms of STI especially if they are the primary means by which certain research results are disseminated or if they
contain research results not already announced to DOE by the recipient in technical reports, accepted journal articles, conference products,
software, and datasets.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Other types of scientific
and technical information produced which may be used for public dissemination of project results include: dissertation/thesis, patent,
book, or other similar products. These types of STI may also be announced using DOE AN 241.3 by following instructions on the E-Link
website (https://www.osti.gov/elink/2413-submission.jsp).
| E. | Intellectual Property Reporting |
| 1. | Intellectual Property Reporting |
Submit to: |
https://www.nist.gov/iedison |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
iEdison requires a login and
password. If the recipient’s organization does not already have an iEdison administrator account, the recipient may register for
one at: iEdison Registration.
In accordance with the patent
rights clause of the award, the recipient and subrecipient(s), if any, must complete the following intellectual property reports in iEdison
when applicable:
Disclosing a subject invention,
including anticipated uses and sales (use iEdison’s Invention Report);
Reporting publications, manuscript
submissions, or other public disclosures concerning a subject invention (add documents to the Invention Report);
If authorized by the award
agreement, electing (or declining) to retain title to a subject invention (modify the Invention Report and input “Title Election
Date” or “Not Elect Title Reason”);
Disclosing the filing or termination
of patent applications on a subject invention (i.e., patent applications disclosing or claiming a subject invention). Patent disclosures
must be made (using iEdison’s Patent Report) for filing the following patent applications:
| · | An
initial domestic patent application (including provisional or non-provisional); |
| · | A
domestic divisional or continuation patent application; |
| · | A
domestic continuation-in-part application; and |
| · | A
foreign patent application. |
Discontinuing prosecution
of a patent application, maintenance of a patent, or defense in a patent reexamination or opposition proceeding, regardless of jurisdiction
(modify the Patent Report); and,
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Requesting an extension
of time to:
| · | Elect
(or decline) to retain title to a subject invention (modify the Invention Report); and |
| · | File
an initial domestic or foreign patent application (modify the Invention Report). |
Failure to submit Intellectual
Property Reporting Forms in a timely manner may result in forfeiture of the recipient’s or subrecipient’s rights in the subject
inventions and related patent applications.
| 2. | Invention Utilization Report |
Submit to: |
https://www.nist.gov/iedison |
Submission
deadline: |
For
each subject invention, reports are due annually once the recipient or subrecipient elects to retain title to the subject invention
and must continue to be provided for 10 years thereafter |
The recipient and subrecipient(s) must
provide Invention Utilization Reports for each subject invention that the recipient or subrecipient retains ownership. Reports are due
annually starting one year after the recipient or subrecipient elects to take title and must continue to be provided for 10 years thereafter
or until the recipient or subrecipient informs DOE in writing that it no longer wants to retain title in the subject invention. Failure
to submit Invention Utilization Reports in a timely manner may result in forfeiture of the recipient’s or subrecipient’s
rights in the subject inventions.
| F. | Project Management Plan (PMP) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
six (6) weeks of the effective date of the award and updates at each continuation application |
Iterations and Maintenance
The recipient is required
to develop, update, and adhere to a project management plan. The purpose of the plan is to establish cost, schedule, and technical performance
baselines, and to formalize the processes by which the project will be managed. These processes include considerations such as risk management,
change management, and communications management. While it is primarily the project recipient’s responsibility to maintain the
plan, federal staff may request changes. The plan is intended to be a living document, modified as necessary, and comprising the following
iterations:
Application Draft
The recipient must submit
a draft of the project management plan with the initial application for financial assistance.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Negotiation Draft
The selected recipient may
be required by the selecting Office to revise its project management plan during the negotiation phase.
Active Plan
Following formal award of
the financial assistance agreement, the recipient must submit an updated project management plan, to include any changes requested during
negotiation and a timeline based upon the actual award date.
During the life of the project
the recipient must submit a revised project management plan based on the following circumstances:
| a. | Developments that have a significant
favorable impact on the project. |
| b. | Problems, delays, or adverse
conditions which materially impair the recipient’s ability to meet the objectives of
the award, or which may require the program office to respond to questions relating to such
events from the public. Specifically, the recipient must update the plan when any of the
following incidents occur: |
| i. | Any event which is anticipated to cause
significant schedule or cost changes, such as changes to the funding and costing profile
or changes to the project timeline. |
| ii. | Any change to Technology Readiness Level. |
| iii. | Any significant change to risk events (including both potential and realized
events) or to risk management strategies. |
| iv. | Failure to meet a milestone or milestones; any dependencies should be adjusted. |
| v. | Any changes to partnerships. |
| vi. | Any significant change to facilities or other project resources. |
| vii. | Any other incident that has the potential for high visibility in the media. |
| viii. | At every continuation application. |
Project Title: The
DOE award number and project title
Recipient Organization:
Official name of the recipient organization
Principal Investigator:
The name and title of the project director/ principal investigator
Date of Plan: The date
the plan or plan revision was completed
The revised PMP must describe
changes to any of the following sections of the PMP as well as provide updated versions of any logs, tables, charts, or timelines.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Provide a description of
the project that includes the objective, project goals, and expected results. The description should include a high-level description
of the technology, potential use or benefit of the technology, location of work sites and a brief discussion of work performed at each
site, along with a description of project phases (if the project includes phases).
| b. | Technology Readiness Levels
(TRLs): |
Identify the readiness level
of the technology associated with the project as well as the planned progression during project execution. A detailed explanation of
the rationale for the estimated technology readiness level should be provided. Specific entry criteria for the next higher technology
readiness level should be identified.
Provide a summary description
of the proposed approach to identify, analyze, and respond to potential risks associated with the proposed project. Project risk events
are uncertain future events that, if realized, impact the success of the project. At a minimum, include the initial identification of
significant technical, resource, and management issues that have the potential to impede project progress and strategies to minimize
impacts from those issues. The risk management approach should be tailored to the TRL. If a project or task is expected to progress to
a higher TRL, then the risk plan should address the retirement of any risks associated with the first TRL and identify new risks related
to moving to the next TRL. Additionally, the risk management approach should include risk opportunities that if realized, could benefit
the project.
Provide milestones for each
budget period (or phase) of the project. Each milestone should include a title and planned completion date. Milestones should be quantitative
(e.g., a date, a decision to be made, a key event) and show progress toward budget period and/or project goals. Milestones should also
be important and few. Higher TRL projects (Demonstration and Deployment) typically have the most detailed milestone logs compared to
lower TRL level projects (Research and Development). If applicable, milestones chosen should clearly reflect progress through various
TRL stages.
Note: The Milestone Status
must present actual performance in comparison with the Milestone Log, and include:
| · | The
actual status and progress of the project, |
| · | Specific
progress made toward achieving the project's milestones, and |
| · | Any
proposed changes in the project's schedule required to complete milestones. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| e. | Funding and Costing Profile: |
Provide a table (the Project
Funding Profile) that shows, by budget period, the amount of government funding going to each project team member. Also, a table (the
Project Costing Profile) which projects, by month, the expenditure of both government and recipient funds for the first budget period,
at a minimum. The Funding and Costing Profile should show the relationships with the Milestone Log (Item d above) and Project Timeline
(Item f below); for example, Funding and Costing information could be shown as an overlay on milestone or timeline charts.
Provide a timeline of the
project (similar to a Gantt chart) broken down by each task and subtask, as described in the Statement of Project Objectives. The timeline
should include a start date and end date for each task, as well as interim milestones. The timeline should also show interdependencies
between tasks and include the milestones that are identified in the Milestone Log (Item d above). The timeline should also show the relationship
to the Project Costing Profile (Item e above). If applicable, the timeline should include activities and milestones related to achieving
succeeding TRLs.
| g. | Success Criteria at Decision
Points: |
Provide well-defined success
criteria for each decision point in the project, including go/no-go decision points and the conclusions of budget periods and the entire
project. The success criteria should be objective and stated in terms of specific, measurable, and repeatable data. Usually, the success
criteria pertain to desirable outcomes, results, and observations from the project. Key milestones can be associated with success criteria.
If applicable, the success criteria should include exit criteria for progressing from one TRL to the next.
| h. | Key Partnerships, Teaming
Arrangements and Team Members: |
Provide a list of key team
members in the project as well as the role and contact information of each. A hierarchical project organization and structure chart should
be provided along with a description of the role and responsibilities of each team member in terms of contribution to project scope.
The section should also include key team members who fulfill single or multiple roles within a project as well as the contact information
for each.
| i. | Facilities and Resources: |
Provide a list of project
locations along with a discussion of capabilities and activities performed at each site in terms of contribution to project scope. The
address of each work site should be provided.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| j. | Communications Management: |
Describe the communications
needs and expectations for the project team members. The communications plan may be simple or detailed, depending on the complexity of
the project. At a minimum, the plan should include contact information, methods of communicating and anticipated frequency.
Provide a description of
the process for managing change on the project. Describe how change will be monitored, controlled and documented within the project.
This includes, but is not limited to, changes to the Scope, Schedule, and Budget. If applicable, Change Management should include assessing
how changes impact TRLs.
| l. | Commercial/Economic
Viability: |
Describe the commercial viability
of the project. The analysis must include an updated financial model as further defined in the PMP Guide. The analysis must also
include a description of qualification status and timeline; and an updated assessment of offtake agreements, including status of agreements,
volume, tenor, price, whether or not it is currently binding, and counterparty; an updated assessment of commercial agreements (including
feedstock, utilities, etc); and analysis that considers the project’s returns versus corporate hurdle rates.
In addition, if the company
uses other commercial analysis to make Final Investment Decision, those should also be included. The inherent commercial viability
risks must be assessed to include likelihood, consequence, and risk mitigation plans. The plan must identify an achievable path to commercial
viability at an acceptable risk level. Identification of commercial risks to be included in the risk register, assessment and have
mitigation plans.
Provide a plan for demonstrating
market capture for this project. The market analysis discussion must succinctly describe the current and projected target market(s) for
manufactured product(s) end items and should address the sufficiency of the existing target market(s); the stability of the target
market – that the product(s) will be competitive based on a data-based market assessment, plans for and results of product
qualification, including consideration of average selling prices, strength of current and potential competitors, and forward-looking
market trend; the market entry strategy (e.g. product differentiation, barriers to entry, intellectual property rights, first mover advantage, etc.);
channels to market and any partners (e.g. distribution) and the plan for marketing the product(s). Specific risks associated with the
planned markets must be assessed to include likelihood, consequence, and risk mitigation plans. The plan must identify reasonable, and
data driven market capture projections.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Describe the plan for financing
of the project. This section should describe the existing capital commitments as well as the plan and timeline for raising the
funding required to support the proposed budget and spend plan described in the covering the Budget Justification Workbook. The Plan
must specifically identify funds for the next Budget Period as well as (i) the approach to securing the proposed cost share sources
and initial capital stack for the project; including the availability, credibility, and risk/terms of non-federal cost share sources;
(ii) the plan and financial model describing the schedule and approach to achieve long-term financial growth and financial viability
for 15 years beyond the start of the project, to include plans beyond federal funding; and (iii) the ability to provide contingency
funding to meet unexpected project cost overruns, including the source of such funding. Specific need dates for investments, and
follow on investments, to achieve project objectives and sustainment/growth beyond the project period must also be addressed. Specific
risks associated with the project financing must be assessed to include likelihood, consequence, and risk mitigation plans.
Describe the considerations
for selection of the project site to include items such as financial incentives, environmental impact, transportation infrastructure,
existing utilities, logistics, local labor availability, local codes and regulations (permitting), and local community involvement.
If a site has been selected,
identify the level of commitment to the project site in terms of items such as a signed lease agreement, purchase agreement, etc.
If a site has not yet been
selected or there is a plan to change project sites, identify potential sites and the rationale for each as well as the schedule to commit
to a project site.
| p. | Engineering and Construction
Management Plan (only for projects involving construction activities): |
Describe strategies for reaching
final engineering design and construction and/or equipment installation at the project’s facilities, as applicable, estimate times
for different Phases of procurement, construction, and commissioning. Note interdependencies with Community Benefits Plan activities.
The construction plan must
succinctly address the company’s existing processes or those developed for the project for items such as the following:
| · | Strategy
for contracting for the Engineering, Construction and operation phase of the project. |
| · | Engineering
design (activities included pre-FEED and FEED studies, siting, inter- connections and rights
of way or other land rights which may be required. |
| · | Pre-Construction
(Activities such as Design development and finalization, permits and approvals, and site
preparation) |
| · | Procurement
(Activities such as competitions, vendor selection, contractor selection, etc.) |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| · | Construction
and Monitoring (Activities such as construction initiation, plans for Quality Control, checks
for compliance with state and local inspections, Davis Bacon compliance (if applicable),
construction milestones achievement milestones, construction updates, decision points, earned
value) |
| · | Final
Inspection plans and success criteria |
| · | Start
up and Handover plans including acceptance criteria worker training, procedure validation,
testing, and commissioning of key project components and systems. |
The plan must identify the
standards or codes used, strategy for design review, construction oversight by qualified and experienced engineers, and any existing
tools such as checklists or review criteria that may be implemented. The design/constructability reviews held by the Recipient are expected
to include such items as review of system descriptions and design criteria documents, calculations to include assumptions and methods,
drawings/diagrams that ensure the design is fully considered, and specification reviews to ensure comprehensive coverage.
The plan must also describe
the approach to development and continuous evolution of the construction budget throughout all EPC stages, quality of the cost estimates,
the change control process and use/approval of contingency.
Submit to: |
See
instructions below, submit either by email to the Federal Project Manager or to https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
specified, see instructions below, submit either in 48 hours or within five (5) business days after the event |
Problems, delays, or adverse
conditions which materially impair the recipient’s ability to meet the objectives of the award, or which may require DOE to respond
to questions relating to such events from the public. The recipient must report any of the following incidents and include the anticipated
impact and remedial action to be taken to correct or resolve the problem/condition.
Within forty-eight (48)
hours, provide notification to the DOE Federal Project Manager by email, with a copy to the DOE cognizant Grants Officer, the following
events:
| 1. | Any fatality, injury, or illness that
results in loss of consciousness or requires medical treatment beyond first aid involving
an employee, or member of the public. |
| 2. | An imminent or actual environmental
contamination or the need for environmental cleanup (including, but not limited to, contamination
or cleanup resulting from an accident connected to or arising from the presence, leakage
or spill of hazardous materials) in accordance with National Environmental Policy Act 42
USC §§4321, et seq. Examples of due care may include, but are not limited to, visual
site inspection of any portions of the property where environmental contamination is likely
or suspected, or other reasonable measures. Such notice must be made to DOE following any
immediate mitigation efforts, as appropriate, and contacts made to requisite agencies. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 3. | Actual physical property damage in excess
of $50,000. |
Within 48 hours, the recipient
is responsible for reporting cybersecurity incident(s) as follows:
| 4. | The recipient is responsible for identifying
a cybersecurity incident. In general, a cybersecurity incident is identified as any incident
that may cause financial harm or loss of intellectual property created or supported in performance
of the award, including malware and ransomware attacks; affecting operations or the security
of, or access to, data, including disruption of both physical operations and business operations
for a duration greater than one (1) hour or any Cybersecurity incidents that have national
security implications. |
Once identified, the Recipient
is responsible for reporting Cybersecurity incidents to the Cyber Incident mailbox within 48 hours of the incident. The recipient
sends a password protected document via email attachment that includes the date and time of the incident, a high-level description of
the incident, a summary of the known impacts, and current and planned mitigation activities. The recipient sends a second email to the
Cyber Incident mailbox including the password to the protected document.
Within 5 business days,
submit to https://www.eere-pmc.energy.gov/SubmitReports.aspx:
| 5. | If the recipient or project team member
receives any other award of federal funds for activities that potentially overlap with the
activities funded under the DOE award, the recipient must promptly notify DOE in writing
of the potential overlap and state whether project funds from any of those other federal
awards have been, are being, or are to be used (in whole or in part) for one or more of the
identical cost items under the DOE award; |
| 6. | If an individual on the project team
is or is believed to be participating in a foreign government-sponsored talent recruitment
program of a foreign country of risk. |
| 7. | If the recipient is considering new
collaborations with foreign entities and governments, the recipient must provide written
notification to DOE and await further guidance from DOE prior to contacting the proposed
foreign entity or government regarding the potential collaboration or negotiating the terms
of any potential agreement. In general, a collaboration will involve some provision of a
thing of value to, or from, the recipient. A thing of value includes but may not be limited
to all resources made available to, or from, the recipient in support of and/or related to
the DOE award, regardless of whether or not they have monetary value. Things of value also
may include in-kind contributions (such as office/laboratory space, data, equipment, supplies,
employees, students). In-kind contributions not intended for direct use on the DOE award
but resulting in provision of a thing of value from or to the DOE award must also be reported. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 8. | Any current or pending subsidiary, foreign
business entity, or offshore entity that is based in or funded by any foreign country of
risk or foreign entity based in a country of risk; |
| 9. | Any current or pending contractual or
financial obligation or other agreement specific to a business arrangement, or joint venture-like
arrangement with an entity owned by a country of risk or foreign entity based in a country
of risk; |
| 10. | Any current or pending change in ownership
structure of the recipient or subrecipients that increases foreign ownership related to a
country of risk. Each notification shall be accompanied by a complete and up-to-date capitalization
table showing all equity interests, held including limited liability company (LLC) and partnership
interests, as well as derivative securities. Include both the number of shares issued to
each equity holder, as well as the percentage of that series and of all equity on fully diluted
basis. For each equity holder, provide the place of incorporation and the principal place
of business, as applicable. If the equity holder is a natural person, identify the citizenship(s); |
| 11. | Any current or pending venture capital
or institutional investment by an entity that has a general partner or individual holding
a leadership role in such entity who has a foreign affiliation with any foreign country of
risk; |
| 12. | Any current or pending technology licensing,
transfer or intellectual property sales to a foreign country of risk within the same technology
area as the award (e.g., batteries, biotechnology, grid, energy generation and storage, advanced
computing); |
| 13. | Any changes to the recipient or the
subrecipient’s board of directors, including additions to the number of directors,
the identity of new directors, as well as each new director’s citizenship, shareholder
affiliation (if applicable); each notification shall include a complete up-to-date list of
all directors (and board observers), including their full name, citizenship and shareholder
affiliation, date of appointment, duration of term, as well as a description of observer
rights as applicable. |
| 14. | Any proposed changes to the equipment
used on the project that would result in: |
| a. | Unmanned aircraft, control, and communications
components originally made or manufactured in a foreign country of risk (including relabeled
or rebranded equipment). |
| b. | Coded equipment where the source code is written in a foreign country of risk. |
| c. | Equipment from a foreign country of risk that will be connected to the internet
or other remote communication system. |
| d. | Any entity from a foreign country or risk that will have physical or remote access
to any part of the equipment used on the project after delivery. |
| 15. | Potential or actual violations of environmental,
health, safety, or labor laws and regulations, any significant environmental permit violation,
and any incident which causes a significant process or hazard control system failure; |
| 16. | Any incident arising out of or relating
to work under the award that has the potential for high visibility in the media; |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 17. | Potential or actual violations of federal,
state, and municipal laws arising out of or relating to work under the award; |
| 18. | Potential or actual noncompliance with DOE reporting requirements under the award; |
| 19. | Potential or actual bankruptcy/insolvency of the prime recipient or subrecipient; |
| 20. | Potential or actual violation of U.S. export control laws and regulations arising
out of or relating to the work under the award; |
| 21. | Any notices or claims of patent or copyright infringement arising out of or relating
to the performance of the DOE award; |
| 22. | Refusal of a subrecipient to accept flow down requirements in the Special Terms
and Conditions and/or any Attachment to the DOE award; |
| 23. | Any improper claims or excess payments arising out of or relating to work under
the award; |
| 24. | Potential or actual violations of the cost share requirements under the award; |
| 25. | Potential or actual violations of the lobbying restrictions in the award; |
| 26. | Any event which is anticipated to cause a significant schedule slippage or
cost increase; and |
| 27. | Developments that have a significant favorable impact on the project. |
| H. | Continuation Application |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
A continuation application
is a non-competitive application for an additional budget period within a previously approved period of performance. The continuation
application should be submitted at least ninety (90) calendar days before the end of each budget period, or as specified in the Special
Terms and Conditions of the award.
| I. | Other (see Special Instructions) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
| II. | Award Management Reporting |
| A. | Current and Pending Support |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx
or as instructed below. |
Submission
deadline: |
Within
thirty (30) calendar days only when there is a change to Current and Pending Support for existing covered individuals |
Prior to award,
the Recipient was required to provide current and pending support disclosure statements for each covered individual, as defined by the
award Terms and Conditions, at the recipient and subrecipient level, regardless of funding source.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
New Covered Individuals:
Prior to starting work on
the project, new covered individuals must submit a current and pending support disclosure and biosketch/resume to the cognizant Technical
Project Officer and Grants officer and must receive approval from DOE. R&D covered individuals are encouraged to comply with the
Digital Persistent Identifier (PID) and Research Security training Requirements term. The PID and Research Training will be required
for all R&D covered individuals on May 1, 2025.
Existing Covered Individuals:
If there are any changes
to current and pending support disclosure statements previously submitted to DOE, the Recipient must submit updated current and pending
disclosure statements within thirty (30) days of the change. The Recipient must ensure all covered individuals at the recipient and subrecipient
level, are aware of the requirement to submit updated current and pending support disclosure statements to DOE.
If there has been a change
that would prompt the submission of a new or updated current and pending support disclosure, the instructions to complete the new or
updated disclosure is listed below.
Current and pending support
is intended to allow the identification of potential duplication, overcommitment, potential conflicts of interest or commitment, and
all other sources of support. All covered individuals at the recipient and subrecipient level must provide a list of all sponsored activities,
awards, and appointments, whether paid or unpaid; provided as a gift with terms or conditions or provided as a gift without terms or
conditions; full-time, part-time, or voluntary; faculty, visiting, adjunct, or honorary; cash or in-kind; foreign or domestic; governmental
or private-sector; directly supporting the individual’s research or indirectly supporting the individual by supporting students,
research staff, space, equipment, or other research expenses. All foreign government-sponsored talent recruitment programs must be identified
in current and pending support.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
For every activity, list
the following items:
Information
Required for Each Activity |
Sponsor
of the Activity |
The
sponsor of the activity or the source of funding. |
Award
Number |
The
federal award number or any other identifying number. |
Award
Title |
The
title of the award or activity. If the title of the award or activity is not descriptive, add a brief description of the research
being performed that would identify any overlaps or synergies with the proposed research. |
Total
Cost or Value |
The
total cost or value of the award or activity, including direct and indirect costs and cost share. For pending proposals, provide
the total amount of requested funding. |
Award
Period |
The
"Start Date" through "End Date". |
Person-months |
The
person-months of effort per year dedicated to the award or activity. |
Description |
To
identify overlap, duplication of effort, or synergistic efforts, append a description of the other award or activity to the current
and pending support. |
Details |
Details
of any obligations, contractual or otherwise, to any program, entity, or organization sponsored by a foreign government must be provided
to DOE upon request to either the applicant institution or DOE. Supporting documents of any identified source of support must be
provided to DOE on request, including certified translations of any document. |
Digital
Persistent Identifier (e.g., ORCID iD) |
Providing
an ORCID iD is optional until May 2025, and required thereafter for R&D projects. |
Certification
Statement |
All
covered individuals must provide a separate disclosure statement listing the required information
above regarding current and pending support. Each individual must sign and date their respective
certification statement:
I, [Full Name and Title],
understand that I have been designated as a covered individual by the federal funding agency.
I certify to the best
of my knowledge and belief that the information contained in this Current and Pending Support Disclosure Statement is true, complete,
and accurate. I understand that any false, fictitious, or fraudulent information, misrepresentations, half-truths, or omissions of
any material fact, may subject me to criminal, civil, or administrative penalties for fraud, false statements, false claims, or otherwise.
(18 U.S.C. §§ 1001 and 287, and 31 U.S.C. §§ 3729-3733 and 3801-3812). I further understand and agree that (1) the
statements and representations made herein are material to DOE’s funding decision, and (2) I have a responsibility to
update the disclosures during the period of performance of the award should circumstances change which impact the responses provided
above.
I also certify that,
at the time of submission, I am not a party in a malign foreign talent recruitment program.
The following certification is
optional until May 1, 2025, and mandatory thereafter for R&D projects:
I further certify that
within the past 12 months I have completed one of the following: (1) research security training meeting the guidelines in SEC.
10634(b) of 42 USC 19234, or (2) all of the NSF training modules located https://new.nsf.gov/research-security/training. |
Foreign
Government Sponsorship |
Details
of any obligations, contractual or otherwise, to any program, entity, or organization sponsored by a foreign government must be provided
on request to either the applicant institution or DOE. Supporting documents of any identified source of support must be provided
to DOE on request, including certified translations of any document. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
The information may be provided
in the common disclosure format available at Common Form for Current and Pending (Other) Support (nsf.gov) to be implemented
by DOE. Regardless of the format used, the individual must still include a signature, date, and a certification statement using the language
included in the paragraph above.
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
30 days after issuance of award |
DEMOGRAPHIC INFORMATION FOR
SIGNIFICANT CONTRIBUTORS
Demographic data (i.e., gender,
ethnicity, race, and disability status) should be provided directly by the Principal Investigator, Program Director, and Business Contact
with the understanding that the submission of this report is mandatory. There are no adverse consequences for responding “Do not
wish to provide” in any question. Confidentiality of demographic data will be in accordance with agency’s policy and practices
for complying with the requirements of the Privacy Act. Demographic Reporting is submitted via a web-based form in the PMC and includes
the questions outlined below.
Gender:
| o | Male |
| o | Female |
| o | Do
not wish to provide |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Ethnicity:
| o | Hispanic
or Latina/o |
| o | Not-Hispanic
or not-Latina/o |
| o | Do
not wish to provide |
Race (select one
or more):
| o | American
Indian or Alaska Native |
| o | Asian |
| o | Black
or African American |
| o | Native
Hawaiian or other Pacific Islander |
| o | White |
| o | Do
not wish to provide |
Disability Status:
| o | Yes
(check yes if any of the following apply to you) |
| § | Deaf
or serious difficulty hearing |
| § | Blind
or serious difficulty seeing even when wearing glasses |
| § | Serious
difficulty walking or climbing stairs |
| § | Other
serious disability related to a physical, mental, or emotional condition. |
| o | No |
| o | Do
not wish to provide |
This measure is designed as
a binary measure; it encompasses all self-reported disabilities. Please do not use it to report the number of individuals who have different
types of disabilities (e.g., hearing impairments).
Note: This construct is not
designed to be used at an individual-level (i.e., it should not be used for determining accommodation needs or disability status for
particular individuals associated with the project).
| C. | Financial Conflict of Interest
Report |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
180 days of the date of the award and within thirty (30) calendar days only when there is a change |
Prior to award, the Recipient
was required to: 1) ensure all Investigators on this Award completed their significant financial disclosures; 2) review the disclosures;
3) determine whether a FCOI exists; 4) develop and implement a management plan for FCOIs; and 5) provide DOE with an initial FCOI report
that includes all FCOIs (i.e., managed and unmanaged/unmanageable). Within 180 days of the date of the Award, the Recipient must be in
full compliance with the other requirements set forth in DOE’s interim COI Policy https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance.
Further, the recipient must submit updated reports within 30 days of a change.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
The DOE interim Conflict
of Interest Policy for Financial Assistance (COI Policy) is applicable to all recipients that receive, DOE funding by means of a financial
assistance award (e.g., a grant, cooperative agreement, or technology investment agreement) and, through the implementation of this policy
by the entity, to each Investigator who is planning to participate in, or is participating in, the project funded wholly or in part under
this Award. The term “Investigator” means the PI and any other person, regardless of title or position, who is responsible
for the purpose, design, conduct, or reporting of a project funded by DOE or proposed for funding by DOE. The Recipient must flow down
the requirements of the interim COI Policy to any subrecipient with the exception of DOE National Laboratories. Further, the Recipient
must identify all financial conflicts of interests (FCOI), i.e., managed and unmanaged/ unmanageable, in its initial and ongoing FCOI
reports.
| D. | Tangible Personal Property Report
– Annual Property Report (SF-428 & SF-428A) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
90 calendar days after the end of the annual reporting period |
The prime recipient must
submit an annual inventory of federally-owned property (government-furnished) where the award specifies that title to the property vests
with the federal government, whether it is in the possession of the prime recipient or subrecipient(s). The prime recipient must complete
an SF-428 and SF-428A, available at Post-Award Reporting Forms – Grants.gov or https://www.netl.doe.gov/business/business-forms/financial-assistance.
| E. | Tangible Personal Property Report
– Disposition Request/Report (SF-428 & SF-428C) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
5 calendar days of the event or as specified |
The prime recipient must
request disposition instructions for, or report disposition of federally-owned property or equipment acquired with project funds, whether
the property or equipment is/was in the possession of the prime recipient or subrecipient(s). Recipients may also be required to provide
compensation to the awarding agency when acquired equipment is sold or retained for use on activities not sponsored by the federal government.
Any equipment with an acquisition cost above $5,000 must be included in the inventory.
If disposition occurs at
any time other than award closeout (i.e., at any time throughout the life of the project or after project completion and closeout as
long as the federal government retains an interest in the item), the prime recipient must complete an SF-428 and SF-428C, available at
Post-Award Reporting Forms | Grants.gov or https://www.netl.doe.gov/business/business-forms/financial-assistance.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
If disposition instructions
are requested at the time of award closeout, the prime recipient must submit the SF-428 and SF-428B (see section III Closeout Reporting).
Please note that the SF-428
family of documents is in the process of being updated to increase the threshold to $10,000 per the 2024 updates to 2 CFR effective
October 1, 2024. Only the DOE Grants Officer has authority to approve disposition requests and issue disposition instructions.
| F. | Uniform Commercial Code (UCC)
Financing Statements |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified. |
If a for-profit recipient
or subrecipient desires to purchase a piece of equipment for their project, and the per-unit dollar value of said equipment is $10,000
or more, and the federal share of the financial assistance agreement is more than $1M, the recipient or subrecipient must file a UCC
financing statement.
A UCC financing statement
provides public notice that the federal government has an undivided reversionary interest in the equipment, and as such the equipment
cannot be sold or used as collateral for a loan (encumbered).
The for-profit recipient
or subrecipient must file the UCC financing statement(s) with the Secretary of State where the equipment will be physically located
and must pay any associated costs for such filings.
The initial UCC financing
statement may also be referred to as a UCC1. For additional pieces of equipment not specified in the award budget, TBD equipment, or
equipment needed in future budget periods, the recipient can file an amendment to the original UCC1 financing statement, by submitting
the UCC3 financing statement amendment.
Each UCC financing statement
or amendment is to be filed with the appropriate Secretary of State office, where the equipment will be physically located.
Note: All costs associated
with filing UCC financing statements, UCC financing statement amendments, and UCC financing statement terminations, are allowable and
allocable costs which can be charged to the federal award.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
At a minimum, the recipient
must have stated in their UCC financing statement in block 4. (collateral) the following:
| · | “Title
to all equipment (not real property) purchased with federal funds under this financial assistance
agreement is conditional pursuant to the terms of 2 CFR 910.360, and the federal government
retains an undivided reversionary interest in the equipment at the federal cost-share proportion
specified in the award terms and conditions.” |
| · | Federal
Award Identification Number (e.g., DE-EE000XXXX) |
| G. | Federal Subaward Reporting System
(FSRS) |
Submit to: |
https://www.fsrs.gov/ |
Submission
deadline: |
The
prime recipient is required to file a FFATA sub-award report by the end of the month following the month in which the prime recipient
awards any sub-grant greater than or equal to $30,000. The recipient must also report a subaward if a modification increases
the Federal funding to an amount that equals or exceeds $30,000. |
The Federal Subaward Reporting
System (FSRS) is the reporting tool prime recipients use to capture and report subaward and executive compensation data regarding their
first-tier subrecipients to meet the FFATA reporting requirements. Prime recipients will report against subrecipients’ awards.
The subrecipient information entered in FSRS will then be displayed on USASpending.gov associated with the prime recipient’s
award furthering federal spending transparency.
The prime recipient is required
to file a FFATA sub-award report by the end of the month following the month in which the prime recipient awards any sub-award greater
than or equal to $30,000. The recipient must also report a subaward if a modification increases the Federal funding to an amount that
equals or exceeds $30,000.
| H. | Annual Incurred Cost Proposals |
Submit to: |
If
DOE is the Cognizant Federal Agency, send the Annual Incurred Cost
Proposal to one of the following
offices:
· CostPrice@ee.doe.gov
(if the Golden Field Office is Cognizant)
OR
· IndirectRates@hq.doe.gov
(if OCED is Cognizant)
OR
· FITS@netl.doe.gov
and PricingGroup@netl.doe.gov (if NETL is Cognizant)
Otherwise, submit the proposal to
the Recipient’s appropriate Cognizant Federal Agency office. |
Submission
deadline: |
Within
180 calendar days after the close of the recipient’s fiscal year*
*The end of the period of the performance,
or closure of an award, does not dismiss this reporting requirement. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Prime recipients must submit
a certified annual Incurred Cost Proposal (ICP), reconciled to its financial records, in order to finalize and reconcile billing rates
incurred and billed to the Government.
An ICP submission is required
unless one of the following conditions apply to the DOE award:
| · | Recipient
elected to apply the de minimis rate of up to 15% as allowed under 2 CFR 200.414(f); |
| · | Recipient
proposed fringe benefits only; or |
| · | Recipient
has a pre-determined Negotiated Indirect Cost Rate Agreement (NICRA). |
Recipients are strongly encouraged
to self-assess their ICP using the Defense Contract Audit Agency’s (DCAA) ICP Adequacy Checklist to ensure an adequate submission.
The ICP must be reconciled to the recipient’s financial statements, within 180 calendar days after the close of the recipient’s
fiscal year, unless the award is based on a predetermined or fixed indirect rate(s), or a fixed amount for indirect or facilities and
administration (F&A) costs. The Contracting Officer for Indirect Cost Rates may grant, in writing, reasonable extensions for exceptional
circumstances only. The written request for extension should be sent to the cognizant DOE office email address. The format and content
of the incurred cost proposal should follow the DCAA ICE (Incurred Cost Electronically) Model in order to be considered an adequate proposal.
DCAA’s ICE Model and Adequacy Checklist can be found on the DCAA website at: https://www.dcaa.mil/Home/ICEmodel and https://www.dcaa.mil/Home/ICSubmissionAdequacy.
| I. | Fringe Reconciliation Form |
Submit to: |
FITS@netl.doe.gov
and PricingGroup@netl.doe.gov |
Submission
deadline: |
Within
180 calendar days after the close of the recipient’s fiscal year*
*The end of the period of the performance,
or closure of an award, does not dismiss this reporting requirement. |
Prime recipients must submit
a certified annual Fringe Reconciliation Form, reconciled to its financial records, to finalize and reconcile fringe billing rates incurred
and billed to the Government.
A Fringe Reconciliation Form submission
is required when one of the following circumstances apply to the DOE award:
| · | Recipient
elected to apply the de minimis rate of up to 15% as allowed under 2 CFR 200.414(f) and
proposed fringe; or |
| · | Recipient
proposed fringe benefits only. |
The Fringe Reconciliation
Form must be reconciled to the recipient’s financial statements, within 180 calendar days after the close of the recipient’s
fiscal year. The Grants Officer for Fringe Costs may grant, in writing, reasonable extensions for exceptional circumstances only. The
written request for extension should be sent to PricingGroup@netl.doe.gov. To be considered an adequate submission, Recipients
must use the Fringe Reconciliation Form located at: Fringe Reconciliation Form. The Fringe Reconciliation Form must
be sent to FITS@NETL.DOE.GOV and PricingGroup@netl.doe.gov.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| J. | DOE For-Profit Compliance Audit |
Submit to: |
Email
a copy of the annual DOE For-Profit Compliance Audit to:
· DOE-Audit-Submission@hq.doe.gov
and
· The
DOE Grants Officer
· For
awards administered by OCED, also email a copy to RecipientAudits@hq.doe.gov
· For
awards administered by the DOE NETL Office, also email a copy to PricingGroup@netl.doe.gov and FITS@netl.doe.gov
|
Submission
deadline: |
Within
the earlier of 30 days after receipt of the auditor’s report(s) or 9 months after
the end of the audit period (recipient’s fiscal year-end)*
*The end of the period of the performance,
or closure of an award, does not dismiss this reporting requirement. |
A-for-profit recipient which
expends $1 million or more during the recipient’s fiscal year in DOE awards may have a compliance audit conducted for that year
in accordance with 2 CFR 910.500 through .521 (subject to any deviation issued pursuant to 2 CFR §
910.133).
The DOE For-Profit Compliance
Audit must be conducted in accordance with the regulations at 2 CFR 910.500-521 (subject to any deviation issued pursuant to 2 CFR §
910.133) and must refer to the appropriate regulations used by the auditor in their examination.
The compliance audit report
must be submitted, along with audited financial statements, if required and available.
| K. | Single Audit: States, Local Government,
Tribal Governments, Institution of Higher Education (IHE), or Non-Profit Organization |
Submit
to: |
Federal
Audit Clearinghouse - https://www.fac.gov/ |
Submission
deadline: |
Within
the earlier of 30 days after receipt of the auditor’s report(s) or 9 months after
the end of the audit period (recipient’s fiscal year-end)*
*The end of the period
of the performance, or closure of an award, does not dismiss this reporting requirement. |
As required by 2 CFR 200
Subpart F, recipients that expend $1 million or more during the recipient’s fiscal year in federal awards must have a single or
program-specific audit conducted. The single audit must be conducted in accordance with §200.514 Scope of audit, except when it
elects to have a program-specific audit conducted.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
For most single audits, the
requirement is for annual single audits. However, there are occasions where a single audit is not required annually. Per 2 CFR 200.504 -
Frequency of audits, a state, local government, or Indian tribe that is required by constitution or statute to undergo its audits less
frequently than annually, is permitted to undergo its audits biennially. Also, any nonprofit organization that had biennial audits for
all biennial periods ending between July 1, 1992, and January 1, 1995, is permitted to undergo its single audits biennially.
For a program-specific audit,
when a recipient expends federal award funds under only one federal program (excluding R&D) and the federal program's statutes, regulations,
or the terms and conditions of the federal award do not require a financial statement audit of the auditee, the auditee may elect to
have a program-specific audit conducted. A program-specific audit may not be elected for R&D unless all of the federal awards expended
were received from the same federal agency, or the same federal agency and the same pass-through entity, and that federal agency, or
pass-through entity in the case of a subrecipient, approves in advance a program-specific audit.
The single audit report shall
include audited financial statements.
| L. | Other (see Special Instructions) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
five (5) calendar days after the event, or as specified |
| A. | Final Scientific/Technical Report |
Submit to: |
DOE
Energy Link System (E-Link) available at https://www.osti.gov/elink/2413-submission.jsp |
Submission
deadline: |
Within
120 calendar days after expiration or termination of the award |
The prime recipient must
submit a Final Scientific/Technical Report to DOE for all projects.
The scientific/technical
report is intended to increase the diffusion of knowledge gained by DOE-funded research, and all requirements shall be interpreted in
that light.
Content: Research findings
and other significant scientific and technical information (STI) resulting from the DOE-sponsored projects shall be included in the final
scientific/technical report, subject to the following provisions:
| 1. | The scientific/technical report is to
cover the entire period of performance. For Small Business Innovation Research (SBIR) and
Small Business Technology Transfer (STTR) awards, a final scientific/technical report must
be submitted after the completion of each phase, e.g., Phase I, Phase II, and sequential
Phase II, as described in the Special Instructions. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 2. | STI that is publicly accessible need
not be duplicated in the report if a citation with a link to where the information may be
found is included in the report. For example, articles found in PAGES (i.e., DOE’s
Public Access Gateway for Energy and Science, https://www.osti.gov/pages/) are accessible
to the public. |
| 3. | Provide identifying information: the
DOE award number; sponsoring program office; name of recipient; project title; name of project
director/principal investigator; and consortium/team members. |
| 4. | Include the DOE acknowledgement and
legal disclaimer language as described in the Special Terms and Conditions. |
| 5. | Include any limitations on public release
of the report, if authorized by the award agreement. If the document being submitted contains
patentable material or protected data (i.e., data first produced in the performance of the
award that is protected from public release for a period of time by terms of the award agreement)
as set forth in the award agreement, then (1) prominently display on the cover of the
report any authorized distribution limitation notices, such as patentable material or protected
data and (2) clearly identify patentable or protected data on each page of the
report. Reports delivered without such notices or with restrictive notices not authorized
by the award agreement may be deemed to have been furnished with unlimited rights, and the
Government assumes no liability for the disclosure, use or reproduction of such reports.
Any restrictive markings must also be noted in the distribution limitation section of the
Announcement Notice (AN) 241.3. No protected PII should be included. |
| 6. | Provide an abstract or executive summary,
which should be a minimum of one paragraph and written in terms understandable by an educated
layperson. (Refer to https://www.osti.gov/stip/standards for ANSI/NISO guidance as
needed.) The abstract included in an application may serve as a model for this. |
| 7. | Summarize project activities for the
entire period of funding, including original hypotheses, approaches used, and findings. Include,
if applicable, facts, figures, analyses, and assumptions used during the life of the project
to support the results in a manner that conveys to the scientific community the STI created
during the project. To minimize duplication, the report may reference STI, including journal
articles, that is publicly accessible. See also #2. |
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 8. | For guidance offered by the National
Information Standards Organization on typical attributes and content of a technical report,
if needed, refer to ANSI/NISO Z39.18-2005 (R2010), Scientific and Technical Reports –
Preparation, Presentation, and Preservation (see https://www.osti.gov/stip/standards). |
Electronic Submission
Process: The final scientific/technical report must be submitted via the DOE Energy Link System (E-Link) with a completed electronic
version of DOE Announcement Notice (AN) 241.3, “U.S. Department of Energy (DOE), Announcement of Scientific and Technical Information
(STI).” The recipient can complete, upload, and submit the DOE AN 241.3 online via E-Link (https://www.osti.gov/elink/2413-submission.jsp).
Please refer to https://www.osti.gov/stip/best-practices-portable-document-format-pdf-creation for PDF document creation.
The recipient must mark the
appropriate block in the “Intellectual Property/Distribution Limitations” Section of the DOE AN 241.3. Reports that
are electronically uploaded must not contain any limited rights data (proprietary data), classified information, protected PII,
information subject to export control classification, or other information not subject to release. During the upload process, the recipient
must self-certify that no content of this nature is being submitted. For assistance with reports containing such content, contact the
Grants Officer.
| 1. | Final Technical Reports –
Unlimited |
If the award does NOT
authorize the recipient, under the provisions of the Energy Policy Act of 2005, to protect the data produced during the award,
where public release of the technical report is protected for a limited period-of-time, the technical report must be submitted to E-Link
as a “Final Technical Report” (covering the entire project period of performance) and must not have any data protection markings
on the cover page. The “STI Product Type” of “Technical Report” with the “Report Sub Type” of “Final
Technical Report” must be selected. When submitting the final technical report to E-Link, the recipient must select “unlimited”
from the Intellectual Property/Distribution Limitation selections. The final technical report will be released without any protections
and may become publicly available immediately.
| 2. | Final Technical Reports –
Protected Data. |
If the award authorizes the
recipient, under the provisions of the Energy Policy Act of 2005, to protect the data produced during the course of the award, where
public release of the final technical report is protected for a limited period-of-time, and the recipient elects to protect the report,
the recipient will be required to 1) submit a final technical report with the protected data (which will be protected during the identified
data protection period) and 2) a version of the technical report that can be publicly disseminated immediately.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
For the protected data version
of the final technical report, the report must cover the entire project period of performance, include the proper data protection marking
(included in the terms of the award), and place that marking on the cover page of the final technical report before submitting it
to E-Link. The “STI Product Type” of “Technical Report” with the “Report Sub Type” of “Final
Technical Report” must be selected. The recipient must also select the block in the Intellectual Property/Distribution Limitation
section of the DOE AN 241.3 as “Protected Data” and provide a release date for the technical report when submitting the final
technical report.
The release date is the date
the technical report will become publicly available. The release date must be based on the data protection period authorized by the award.
The release date must coincide with the data marking on the technical report.
Additionally, the Department’s
policy is to ensure timely public access to unrestricted scientific and technical research results. To make these results publicly accessible,
even when the award authorizes the recipient to protect the data for a period-of-time, the recipient must also submit an “unlimited”
version of the technical report. This version should not include any data subject to data protections. The “unlimited” version
of the technical report must be uploaded to E-Link without any markings. The “STI Product Type” of “Technical Report”
with the “Report Sub Type” of “Technical Report Other” must be selected. The recipient must select “unlimited”
from the Intellectual Property/Distribution Limitation selections. The “unlimited” version of the technical report is submitted
with unlimited data rights, and the Government assumes no liability for the disclosure, use or reproduction of such report.
| B. | Invention Certification (DOE F
2050.11) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
120 calendar days after expiration or termination of the award |
The prime recipient is required
to submit an Invention Certification DOE F 2050.11. The Invention Certification form is available at https://www.netl.doe.gov/business/business-forms/financial-assistance.
The Invention Certification
must include a list of all subcontracts at any tier containing a patent rights clause (or state that there were none).
| C. | Tangible Personal Property Report
– Final Report (SF-428 & SF-428B) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
120 calendar days after expiration or termination of the award |
The prime recipient must
submit a final inventory of and request disposition instructions for any federally-owned property and/or property or equipment acquired
with project funds with an acquisition cost above $10,000, whether the property is/was in the possession of the prime recipient or subrecipients.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
The prime recipient must
complete an SF-428 and SF-428B, available at Post Award Reporting Forms | Grants.gov or https://www.netl.doe.gov/business/business-forms.
If disposition occurs at
any time other than award closeout, the prime recipient must complete an SF-428 and SF-428C (see section IV Other Reporting H. –
Disposition Request/Report).
Please note that the SF-428
family of documents is in the process of being updated to increase the threshold to $10,000 per the 2024 updates to 2 CFR effective
October 1, 2024. Only the DOE Grants Officer has authority to approve disposition requests and issue disposition instructions.
| D. | Verification of Receipt of Accepted
Manuscripts |
Recipients are required to
submit Accepted Manuscripts of Journal Articles resulting in whole or in part from a DOE-funded project to E-Link (see section I. C.
1. Accepted Manuscript of Journal Article).
As part of the closeout process,
DOE will verify that all accepted manuscripts have been submitted. Recipients are required to submit all missing accepted manuscript
before closeout is finalized.
| E. | Other (see Special Instructions) |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Within
120 calendar days after expiration or termination of the award |
| IV. | Post-Project Reporting |
| A. | Scientific and Technical Reporting |
Scientific and Technical
Reporting requirements as outlined in I. C. Scientific and Technical Reporting remain applicable after the award ends. If the
recipient has created Scientific and Technical Information (STI) such as publications, conference products, technical reports, book chapters, etc.
which include information/data produced under the award, they are required to submit this document to https://www.osti.gov/elink/forms.jsp.
Recipients must continue to include proper DOE Acknowledgement and Legal Disclaimer language in all STI. Please see section I. C.
Scientific and Technical Reporting for additional information on submissions.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Note that after the project
ends, recipients are no longer required to submit notification of STI directly to DOE.
| B. | Intellectual Property Reporting |
Intellectual Property Reporting
requirements as outlined in section I. D. Intellectual Property Reporting remain applicable after the award ends.
Recipients are required to
continue submitting intellectual property reports, as applicable, to iEdison at https://public.era.nih.gov/iedison.
Note that after the project
ends, recipients are no longer required to submit notification of intellectual property directly to DOE.
| V. | Bipartisan Infrastructure Law/Inflation
Reduction Act Reporting |
| A. | Community Benefits Report |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
specified, within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days
after the end of the federal fiscal year; and Final; within 120 calendar days after expiration or termination of the award. |
The
Recipient must meet the stated objectives and milestones set forth in its Community Benefits Outcomes and Objectives, which is incorporated
into the Award. A report on the Recipient’s progress towards meeting the objectives and milestones must be reported annually. A
Community Benefits Reporting Template is available at https://www.energy.gov/infrastructure/reporting-checklists with the intent
to reduce the administrative burden by promoting the use of common formats.
| B. | Boosting Domestic Manufacturing |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
Specified, within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days
after the end of the federal fiscal year and Final; within 120 calendar days after expiration or termination of the award. |
There
are three tabs of the Boosting Domestic Manufacturing Report. The information contained in all three tabs is required for reporting.
A Boosting Domestic Manufacturing reporting template is available at: https://www.energy.gov/infrastructure/reporting-checklists with
the intent to reduce the administrative burden by promoting the use of common formats.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| 1. | Domestic Manufacturing &
Critical Materials and Rare Earth Element Mining, Processing, Production & Recycling
Capacity |
This report applies to projects
that support (i.e., construct, establish, retool, re-equip, or retrofit) manufacturing capacity as well as projects that support the
mining, processing, production, or recycling of critical minerals or rare earth materials and elements. Recipients of such projects are
required to report on direct domestic manufacturing capacity as well as critical materials and rare earth element mining, processing,
production, or recycling capacity.
| 2. | GHG Emissions &
Air Pollutants |
This report documents the
increases and decreases in pollutants across the effective useful life of the project as well as GHG emissions created through mining,
processing, production, or recycling operations projects and indirect changes in GHG emissions resulting from projects.
Recipients must provide a
list of all equipment in mining, processing, production or recycling facilities projects that emit pollutants or GHGs onsite in facilities
listed in the mining processing & production or recycling tab.
Submit to: |
https://www.lcptracker.com/ |
Submission
deadline: |
Weekly |
This award is funded under
Division D of the Bipartisan Infrastructure Law (BIL). All laborers and mechanics employed by the recipient, subrecipients, contractors
or subcontractors in the performance of construction, alteration, or repair work in excess of $2000 on an award funded directly by or
assisted in whole or in part by funds made available under this award shall be paid wages at rates not less than those prevailing on
similar projects in the locality, as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40,
United States Code commonly referred to as the “Davis-Bacon Act” (DBA).
The Recipient must ensure
the timely electronic submission of weekly certified payrolls to LCPtracker unless a waiver is granted to a particular contractor
or subcontractor because they are unable or limited in their ability to use or access the software.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
Specified, within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days
after the end of the federal fiscal year and Final; within 120 calendar days after expiration or termination of the award. |
This report on training and
training outcomes is required for all projects requiring DBA compliance, those that discuss workforce development or training in statute,
as well as any projects where recipients utilize a portion of their BIL funding on workforce development. Only career-track training
that focuses on skill development or pathways into career-track training such as pre-apprenticeship should be tracked for this metric.
Career-track training leads to an appropriate industry-recognized credential, professional qualification, or license. It teaches broad
occupational knowledge and skills that can be applied across a range of technologies, leading to several different career paths. Continuing
education allowing incumbent workers to keep up with the latest technology and practices, and to advance in their careers, is another
important element of career-track training. This report will also track the number of workforce partnerships involving employers, community-based
organizations (CBOs), or labor unions, including partnerships specified in community benefits agreements and project labor agreements,
or similar.
A Training Outcomes reporting
template is available at: https://www.energy.gov/infrastructure/reporting-checklists with the intent to reduce administrative burden
by promoting the use of common formats.
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
Specified, within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days
after the end of the federal fiscal year and Final; within 120 calendar days after expiration or termination of the award. |
This report is required of
all recipients of BIL funding. To assess activities contributing to growing American jobs, improving the quality of energy jobs, and
facilitating equitable access to good jobs and training opportunities, all BIL recipients must report annually on good jobs outcomes.
A Good Jobs Outcomes reporting
template is available at: https://www.energy.gov/infrastructure/reporting-checklists with the intent to reduce the administrative
burden by promoting the use of common formats.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
specified; within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days
after the end of the federal fiscal year and Final; within 120 calendar days after expiration or termination of the award.
|
All BIL funding recipients
who are creating ongoing operations, maintenance, and production jobs must report the number of hires for each reporting period and associated
demographic information.
A Permanent Jobs reporting
template is available at: https://www.energy.gov/infrastructure/reporting-checklists with the intent to reduce the administrative
burden by promoting the use of common formats.
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
Quarterly;
within 30 calendar days after the end of the federal fiscal year quarter |
There are three reports associated
with Equity and Justice. All three reports are included on the same form provided by the DOE Project Team. While the reports are included
on the same form, some recipients may not need to complete all three. Refer to the checklist at the beginning of this document for applicability.
An Equity and Justice reporting
template is available at: https://www.energy.gov/infrastructure/reporting-checklists with the intent to reduce the administrative
burden by promoting the use of common formats.
| 1. | Community Engagement Process |
This report applies to all
projects that include building, expanding, or retrofitting a facility. Recipients should report on engagement activities such as participatory
research, citizen advisory committees, open planning forums, etc. and the outputs of those activities such as negotiated community
or workforce agreements, memorandums of understanding, letters of support, etc. Information in this tab should reflect the objectives
outlined in the Community Benefits Plan.
| 2. | Engagement Events and Technical
Assistance |
This report applies to all
projects that hold stakeholder engagement events as outlined in their Community Benefits Plan. Recipients are required to report on stakeholders
engaged and from what, if any, communities of interest.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
This report applies to all
projects that build or install new clean energy or climate assets. Recipients should report whether any or all their project will be
community owned, as well as the compensation the community will receive.
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx |
Submission
deadline: |
As
Specified, within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days
after the end of the federal fiscal year and Final; within 120 calendar days after expiration or termination of the award. |
There are four reports associated
with Pathways to Net Zero. While all four reports are included on the same form, all four reports are not applicable to each project.
Refer to the checklist at the beginning of this document for applicability. All four reports are also required to complete the Infrastructure
Identifier tab. The purpose of this tab is to record the infrastructure, facility, or operating site. The metrics associated with each
site will be reported in the individual reports (Infrastructure Supported, Hydrogen Production, Carbon Capture, Removal, Storage, and
Energy Saved) as applicable.
A Pathways to Net Zero reporting
template is available at: https://www.energy.gov/infrastructure/reporting-checklists with the intent to reduce the administrative
burden by promoting the use of common formats.
| 1. | Infrastructure Supported |
This report applies to projects
that build, retrofit, retool, repurpose, or otherwise support the construction or continued operation of energy generation, energy storage,
or other clean energy infrastructure. Projects that fund infrastructure planning should also report.
Recipients are required to
report on planned values, annual actual values for the life of project, and values at closeout. This report is structured by technology
type, recipients need only complete the technology type applicable to their project as indicated by the DOE project team.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
This report applies to projects
that build, retrofit, retool, repurpose, or otherwise support the construction or continued operation of hydrogen fuel production. Hydrogen
can be utilized across sectors to generate electricity, replace existing feedstock or fuel in the industrial sector, provide residential
and commercial heating, or fuel transportation.
Recipients are required to
report on planned values, annual actual values for the life of project, and values at closeout.
| 3. | Carbon Capture, Removal,
Storage |
This report applies to projects
that build, or otherwise support the construction or continued operation of carbon capture, carbon removal, carbon storage, or carbon
dioxide transport.
Recipients are required to
report on planned values, annual actual values for the life of project, and values at closeout. This report is structured by technology
type, recipients need only complete the technology type applicable to their project as indicated by the DOE project team.
This report applies to all
projects that include energy efficiency upgrades or fuel switching, water conservation upgrades that save energy, or distributed energy
resources. Recipients are required to report on interventions completed as well as planned and actual energy savings.
| F. | Davis Bacon Act Semi-Annual Labor
Compliance Report |
Submit to: |
https://www.eere-pmc.energy.gov/SubmitReports.aspx
and email DBAenforcementreports@hq.doe.gov |
Submission
deadline: |
As
Specified, April 21 and October 21 |
This award is funded under
Division D of the Bipartisan Infrastructure Law (BIL). All laborers and mechanics employed by the recipient, subrecipients, contractors
or subcontractors in the performance of construction, alteration, or repair work in excess of $2,000 on an award funded directly by or
assisted in whole or in part by funds made available under this award shall be paid wages at rates not less than those prevailing on
similar projects in the locality, as determined by the Secretary of Labor in accordance with Subchapter IV of Chapter 31 of Title 40,
United States Code commonly referred to as the “Davis-Bacon Act” (DBA).
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
Calendar year semi-annual
reports are required on compliance with and enforcement of the labor standards provisions of the Davis-Bacon Act and its related acts
covering the periods of October 1st through March 31st, and April 1st through September 30th, respectively. Please
submit your semi-annual report to DOE three weeks after the end of semi-annual reporting period by April 21st and October 21st
for the applicable performance period. The Davis Bacon Semi-Annual Labor Compliance Report may be accessed at https://www.energy.gov/infrastructure/davis-bacon-act.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
| VI. | Appendix A: Notice To Recipients
(Prime Recipients And Subrecipients) Regarding Protected Data, Limited Rights Data And Protected
Personally Identifiable Information |
I. PROTECTED DATA AND LIMITED RIGHTS
DATA
The recipient is required to mark protected
data and limited rights data in accordance with the IP clause set of the award agreement. Failure to properly mark data may result in
its public disclosure under the Freedom of Information Act (FOIA, 5 U.S.C. § 552) or otherwise.
| A. | Protected Data - Technical
Data or Commercial or Financial Data First Produced in the Performance of the Award |
The U.S. Government normally retains
unlimited rights in any technical data, or commercial or financial data produced in performance of Government financial assistance awards,
including the right to distribute to the public.
However, under certain DOE awards, the
recipient may mark certain categories of data produced under the award as protected from public disclosure for a period of time (“Protected
Data”). If the award agreement provides for protected data and the recipient wants the data to be protected, the recipient must
properly mark any documents containing Protected Data. The recipient should review the IP clause set of the award agreement to determine
the applicability of protected data, the maximum length of period of time for data protection and the required markings that must be
used to invoke data protection for the award.
| B. | Limited Rights Data - Data
Produced Outside of the Award at Private Expense |
Limited Rights Data is data (other than
computer software) developed at private expense outside any Government financial assistance award or contract that embody trade secrets
or are commercial or financial and confidential or privileged. Prior to including any Limited Rights Data in any documents to DOE, the
recipient should review the award agreement. In most DOE awards, the recipient should not deliver any limited rights data to DOE if the
recipient wants to protect the Limited Rights Data. If the DOE award does allow and require the delivery of limited rights data, then
the recipient must properly mark any documents containing Limited Rights Data as set forth in the IP clause of the award agreement.
 |
Federal
Assistance Reporting Checklist
Attachment
2 |
II. PROTECTED PERSONALLY IDENTIFIABLE
INFORMATION
The recipient should not include any
Protected Personally Identifiable Information (Protected PII) in their submissions to DOE. Protected PII is defined as any data that,
if compromised, could cause harm to an individual such as identify theft. Protected PII includes, but is not limited to:
| · | Social
Security Numbers in any form; |
| · | Place
of Birth associated with an individual; |
| · | Date
of Birth associated with an individual; |
| · | Mother’s
maiden name associated with an individual; |
| · | Biometric
record associated with an individual; |
| · | Fingerprint; |
| · | Iris
Scan; |
| · | DNA; |
| · | Medical
history information associated with an individual; |
| · | Medical
conditions, including history of disease; |
| · | Metric
information, e.g., weight, height, blood pressure; |
| · | Criminal
history associated with an individual; |
| · | Ratings; |
| · | Disciplinary
actions; |
| · | Passport
number; |
| · | Educational
transcripts; |
| · | Financial
information associated with an individual; |
| · | Credit
card numbers; and |
| · | Security
clearance history or related information (not including actual clearances held). |
Applicant Name: |
Solid Power Operating, Inc. |
Award Number: |
DE-MS0000122 |
Budget
Information - Non Construction Programs
*Estimated
costs subject to DOE review/approval of submitted Continuation Application
OMB Approval No. 0348-0044
Section A - Budget Summary
| |
| | |
| Estimated Unobligated Funds | | |
| New or Revised Budget | |
Grant Program Function or
Activity | |
| Catalog of Federal
Domestic Assistance
Number | |
| Federal | | |
| Non-Federal | | |
| Federal | | |
| Non-Federal | | |
| Total | |
(a) | |
| (b) | |
| (c) | | |
| (d) | | |
| (e) | | |
| (f) | | |
| (g) | |
1. Budget Period 1 | |
| 81.253 | |
| | | |
| | | |
$ | 10,026,036 | | |
$ | 12,031,243 | | |
$ | 22,057,279 | |
2. Budget Period 2* | |
| 81.253 | |
| | | |
| | | |
$ | 10,800,405 | | |
$ | 12,960,486 | | |
$ | 23,760,891 | |
3. Budget Period 3* | |
| 81.253 | |
| | | |
| | | |
$ | 14,787,891 | | |
$ | 17,745,469 | | |
$ | 32,533,360 | |
4. Budget Period 4* | |
| 81.253 | |
| | | |
| | | |
$ | 14,385,668 | | |
$ | 17,262,802 | | |
$ | 31,648,470 | |
5. Totals | |
| | |
$ | 0 | | |
$ | 0 | | |
$ | 50,000,000 | | |
$ | 60,000,000 | | |
$ | 110,000,000 | |
Section B - Budget Categories
|
|
| Grant Program, Function or Activity |
| |
| | |
6. Object Class Categories |
|
| (1) BP1 |
| |
| (2) BP2 |
| |
| (3) BP3 |
| |
| (4) BP4 |
| |
| Total (5) | |
a. Personnel |
|
$ | 2,283,946 |
| |
$ | 2,959,303 |
| |
$ | 1,923,878 |
| |
$ | 2,145,720 |
| |
$ | 9,312,847 | |
b. Fringe Benefits |
|
$ | 0 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 0 | |
c. Travel |
|
$ | 0 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 0 | |
d. Equipment |
|
$ | 9,494,800 |
| |
$ | 0 |
| |
$ | 16,205,194 |
| |
$ | 0 |
| |
$ | 25,699,994 | |
e. Supplies |
|
$ | 0 |
| |
$ | 2,645,962 |
| |
$ | 0 |
| |
$ | 3,533,064 |
| |
$ | 6,179,026 | |
f. Contractual |
|
$ | 880,000 |
| |
$ | 9,902,786 |
| |
$ | 3,171,358 |
| |
$ | 19,282,067 |
| |
$ | 33,236,211 | |
g. Construction |
|
$ | 0 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 0 | |
h. Other |
|
$ | 210,500 |
| |
$ | 210,500 |
| |
$ | 210,500 |
| |
$ | 210,494 |
| |
$ | 841,994 | |
i. Total Direct Charges (sum of 6a-6h) |
|
$ | 12,869,246 |
| |
$ | 15,718,551 |
| |
$ | 21,510,930 |
| |
$ | 25,171,345 |
| |
$ | 75,270,072 | |
j. Indirect Charges |
|
$ | 9,188,033 |
| |
$ | 8,042,340 |
| |
$ | 11,022,430 |
| |
$ | 6,477,125 |
| |
$ | 34,729,928 | |
k. Totals (sum of 6i-6j) |
|
$ | 22,057,279 |
| |
$ | 23,760,891 |
| |
$ | 32,533,360 |
| |
$ | 31,648,470 |
| |
$ | 110,000,000 | |
7. Program Income |
|
| |
| |
| |
| |
| |
| |
| |
| |
$ | 0 | |
Previous Edition Usable | Page 1 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Section
C - Non-Federal Resources
(a) Grant Program | |
(b) Applicant | | |
(c) State | | |
(d) Other Sources | | |
(e) Totals | |
8. Budget Period 1 | |
$ | 12,031,243 | | |
| | | |
| | | |
$ | 12,031,243 | |
9. Budget Period 2 | |
$ | 12,960,486 | | |
| | | |
| | | |
$ | 12,960,486 | |
10. Budget Period 3 | |
$ | 17,745,469 | | |
| | | |
| | | |
$ | 17,745,469 | |
11. Budget Period 4 | |
$ | 17,262,802 | | |
| | | |
| | | |
$ | 17,262,802 | |
12. Total (sum
of lines 8 - 11) | |
$ | 60,000,000 | | |
$ | 0 | | |
$ | 0 | | |
$ | 60,000,000 | |
Section D - Forecasted Cash Needs
| |
Total for 1st Year | | |
1st Quarter | | |
2nd Quarter | | |
3rd Quarter | | |
4th quarter | |
13. Federal | |
$ | 10,026,036 | | |
$ | 3,759,764 | | |
$ | 2,506,509 | | |
$ | 2,506,509 | | |
$ | 1,253,255 | |
14. Non-Federal | |
$ | 12,031,243 | | |
$ | 4,511,716 | | |
$ | 3,007,811 | | |
$ | 3,007,811 | | |
$ | 1,503,905 | |
15. Total (sum
of lines 13 and 14) | |
$ | 22,057,279 | | |
$ | 8,271,480 | | |
$ | 5,514,320 | | |
$ | 5,514,320 | | |
$ | 2,757,160 | |
Section E - Budget Estimates of Federal Funds Needed for Balance of the Project
| |
Future Funding Periods (Years) | |
(a) Grant Program | |
(b) First | | |
(c) Second | | |
(d) Third | | |
(e) Fourth | |
16. | |
| | | |
| | | |
| | | |
| | |
17. | |
| | | |
| | | |
| | | |
| | |
18. | |
| | | |
| | | |
| | | |
| | |
19. | |
| | | |
| | | |
| | | |
| | |
20. Total (sum of lines 16-19) | |
$ | 0 | | |
$ | 0 | | |
$ | 0 | | |
$ | 0 | |
Section F - Other Budget Information
21. Direct Charges |
|
|
$ |
75,270,072 |
|
|
|
|
|
|
22. Indirect Charges Capped Provisional Rates: OH 140.00% 40.00% G&A |
|
|
$ |
34,729,928 |
|
|
|
|
|
|
23. Remarks |
|
|
|
|
|
|
|
|
|
|
Previous Edition Usable | Page 2 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Instructions for the SF-424A
Public Reporting Burden for this collection of information
is estimated to average 3.0 hours per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Please do not return your completed form
to the Office of Management and Budget; send it to the address provided by the sponsoring agency.
|
General Instructions
This form is designed so that application can be made for funds from
one or more grant programs. In preparing the budget, adhere to any existing Federal grantor agency guidelines which prescribe how and
whether budgeted amounts should be separately shown for different functions or activities within the program. For some programs, grantor
agencies may require budgets to be separately shown by function or activity. For other programs, grantor agencies may require a breakdown
by function or activity. Sections A, B, C, and D should include budget estimates for the whole project except when applying for assistance
which requires Federal authorization in annual or other funding period increments. In the later case, Sections A, B, C, and D should provide
the budget for the first budget period (usually a year) and Section E should present the need for Federal assistance in the subsequent
budget periods. All applications should contain a breakdown by the object class categories shown in Lines a-k of Section B.
Section A. Budget Summary Lines 1-4 Columns (a) and (b)
For applications pertaining to a single Federal grant
program (Federal Domestic Assistance Catalog number) and not requiring a functional or activity breakdown, enter on Line 1 under
Column (a) the catalog program title and the catalog number in Column (b).
For applications pertaining to a single program requiring
budget amounts by multiple functions or activities, enter the name of each activity or function on each line in Column (a), and enter
the catalog number in Column (b). For applications pertaining to multiple programs where none of the programs require a breakdown by function
or activity, enter the catalog program title on each line in Column (a) and the respective catalog number on each line in Column
(b).
For applications pertaining to multiple programs where one or
more programs require a breakdown by function or activity, prepare a separate sheet for each program requiring the breakdown. Additional
sheets should be used when one form does not provide adequate space for all breakdown of data required. However, when more than one sheet
is used, the first page should provide the summary totals by programs.
Lines 1-4, Columns (c) through (g)
For new applications, leave Columns (c) and (d) blank. For
each line entry in Columns (a) and (b), enter in Columns (e), (f), and (g) the appropriate amounts of funds needed to support the project
for the first funding period (usually a year).
For continuing grant program applications, submit these forms
before the end of each funding period as required by the grantor agency. Enter in Columns (c) and (d) the estimated amounts of funds which
will remain unobligated at the end of the grant funding period only if the Federal grantor agency instructions provide for this. Otherwise,
leave these columns blank. Enter in columns (e) and (f) the amounts of funds needed for the upcoming period. The amount(s) in Column (g)
should be the sum of amounts in Columns (e) and (f).
For supplemental grants and changes to existing grants,
do not use Columns (c) and (d). Enter in Column (e) the amount of the increase or decrease of Federal funds and enter in Column (f) the
amount of the increase or decrease of non-Federal funds. In Column (g) enter the new total budgeted amount (Federal and non-Federal) which
includes the total previous authorized budgeted amounts plus or minus, as appropriate, the amounts shown in Columns (e) and (f). The amount(s)
in Column (g) should not equal the sum of amounts in Columns (e) and (f).
Line 5—Show the totals for all columns used.
Section B. Budget Categories
In the column headings (a) through (4), enter the titles of the same
programs, functions, and activities shown on Lines 1-4, Column (a), Section A. When additional sheets are prepared for Section A,
provide similar column headings on each sheet. For each program, function or activity, fill in the total requirements for funds (both
Federal and non-Federal) by object class categories.
Lines 6a-i—Show the totals of Lines 6a to 6h in each column.
Line 6j—Show the amount of indirect cost.
Line 6k—Enter the total of amounts on Lines
6i and 6j. For all applications for new grants and continuation grants the total amount in column (5), Line 6k, should be the same as
the total amount shown in Section A, Column (g), Line 5. For supplemental grants and changes to grants, the total amount of the increase
or decrease as shown in Columns (1)-(4), Line 6k should be the same as the sum of the amounts in Section A, Columns (e) and (f) on Line
5.
Previous Edition Usable | Page 3 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Line 7—Enter the estimated amount of income,
if any, expected to be generated from this project. Do not add or subtract this amount from the total project amount. Show under the
program narrative statement the nature and source of income. The estimated amount of program income may be considered by the federal
grantor agency in determining the total amount of the grant.
Section C. Non-Federal Resources
Lines 8-11—Enter
amounts of non-Federal resources that will be used on the grant. If in-kind contributions are included, provide a brief explanation on
a separate sheet.
Column (a)—Enter
the program titles identical to Column (a), Section A. A breakdown by function or activity is not necessary.
Column (b)—Enter
the contribution to be made by the applicant.
Column (c)—Enter
the amount of the State's cash and in-kind contribution if the applicant is not a State or State agency. Applicants which are a State
or State agencies should leave this column blank.
Column (d)—Enter
the amount of cash and in-kind contributions to be made from all other sources.
Column (e)—Enter
totals of Columns (b), (c), and (d).
Line 12—Enter
the total for each of Columns (b)-(e). The amount in Column (e) should be equal to the amount on Line 5, Column (f) Section A.
Section D. Forecasted Cash Needs
Line 13—Enter
the amount of cash needed by quarter from the grantor agency during the first year.
Line 14—Enter
the amount of cash from all other sources needed by quarter during the first year.
Line 15—Enter
the totals of amounts on Lines 13 and 14.
Section E. Budget Estimates of Federal Funds Needed for
Balance of the Project
Lines 16-19—Enter
in Column (a) the same grant program titles shown in Column (a), Section A. A breakdown by function or activity is not necessary. For
new applications and continuation grant applications, enter in the proper columns amounts of Federal funds which will be needed to complete
the program or project over the succeeding funding periods (usually in years). This section need not be completed for revisions (amendments,
changes, or supplements) to funds for the current year of existing grants.
If more than four lines are needed to list the program titles,
submit additional schedules as necessary.
Line 20—Enter
the total for each of the Columns (b)-(e). When additional schedules are prepared for this Section, annotate accordingly and show the
overall totals on this line.
Section F. Other Budget Information
Line 21—Use
this space to explain amounts for individual direct object-class cost categories that may appear to be out of the ordinary or to explain
the details as required by the Federal grantor agency.
Line 22—Enter
the type of indirect rate (provisional, predetermined, final or fixed) that will be in effect during the funding period, the estimated
amount of the base to which the rate is applied, and the total indirect expense.
Line 23—Provide
any other explanations or comments deemed necessary.
Previous Edition Usable | Page 4 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Applicant
Name: |
Solid
Power Operating, Inc. |
Award
Number: |
DE-MS0000122 |
Budget
Information - Non Construction Programs
OMB
Approval No. 0348-0044
Section
A - Budget Summary |
|
|
|
|
|
|
|
Grant
Program Function or |
|
Catalog
of Federal
Domestic Assistance |
|
|
Estimated
Unobligated Funds |
|
|
New
or Revised Budget |
|
|
|
Activity |
|
Number |
|
|
Federal |
|
|
Non-Federal |
|
|
Federal |
|
|
Non-Federal |
|
|
Total |
|
|
|
(a) |
|
(b) |
|
|
(c) |
|
|
(d) |
|
|
(e) |
|
|
(f) |
|
|
(g) |
|
1. |
|
Budget Period 1 |
|
81.253 |
|
|
|
|
|
|
|
|
|
|
$ |
10,026,036 |
|
|
$ |
12,031,243 |
|
$ |
22,057,279 |
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
3. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
4. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
5. |
|
Totals |
|
|
|
|
$ |
0 |
|
|
$ |
0 |
|
|
$ |
10,026,036 |
|
|
$ |
12,031,243 |
|
$ |
22,057,279 |
|
Section
B - Budget Categories |
|
|
|
|
|
|
Grant
Program, Function or Activity |
|
|
|
6. |
|
Object
Class Categories |
|
(1)
Federal |
|
|
(2)
Non-Federal |
|
|
(3) |
|
|
(4) |
|
|
Total
(5) |
|
|
|
a.Personnel |
|
$ |
1,038,157 |
|
|
$ |
1,245,789 |
|
|
|
|
|
|
|
|
|
$ |
2,283,946 |
|
|
|
b.Fringe Benefits |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
|
c.Travel |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
|
d.Equipment |
|
$ |
4,315,818 |
|
|
$ |
5,178,982 |
|
|
|
|
|
|
|
|
|
$ |
9,494,800 |
|
|
|
e.Supplies |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
|
f.Contractual |
|
$ |
400,000 |
|
|
$ |
480,000 |
|
|
|
|
|
|
|
|
|
$ |
880,000 |
|
|
|
g.Construction |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
|
h.Other |
|
$ |
95,682 |
|
|
$ |
114,818 |
|
|
|
|
|
|
|
|
|
$ |
210,500 |
|
|
|
i.Total Direct Charges (sum of 6a-6h) |
|
$ |
5,849,657 |
|
|
$ |
7,019,589 |
|
|
$ |
0 |
|
|
$ |
0 |
|
$ |
12,869,246 |
|
|
|
j.Indirect Charges |
|
$ |
4,176,379 |
|
|
$ |
5,011,654 |
|
|
|
|
|
|
|
|
|
$ |
9,188,033 |
|
|
|
k.Totals (sum of 6i-6j) |
|
$ |
10,026,036 |
|
|
$ |
12,031,243 |
|
|
$ |
0 |
|
|
$ |
0 |
|
$ |
22,057,279 |
|
7. |
|
Program Income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
Previous Edition Usable | Page 5 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Section C - Non-Federal Resources |
|
| |
(a) Grant Program | |
(b) Applicant | | |
(c) State | | |
(d) Other Sources | | |
(e)
Totals | |
8. | |
Budget Period 1 | |
$ | 12,031,243 | | |
| | | |
| | | |
$ | 12,031,243 | |
9. | |
| |
| | | |
| | | |
| | | |
$ | 0 | |
10. | |
| |
| | | |
| | | |
| | | |
$ | 0 | |
11. | |
| |
| | | |
| | | |
| | | |
$ | 0 | |
12. | |
Total (sum
of lines 8 - 11) | |
$ | 12,031,243 | | |
$ | 0 | | |
$ | 0 | | |
$ | 12,031,243 | |
Section D - Forecasted Cash Needs |
|
| |
Total for 1st
Year | | |
1st Quarter | | |
2nd Quarter | | |
3rd Quarter | | |
4th quarter | |
13. | |
Federal | |
$ | 10,026,036 | | |
$ | 3,759,764 | | |
$ | 2,506,509 | | |
$ | 2,506,509 | | |
$ | 1,253,255 | |
14. | |
Non-Federal | |
$ | 12,031,243 | | |
$ | 4,511,716 | | |
$ | 3,007,811 | | |
$ | 3,007,811 | | |
$ | 1,503,905 | |
15. | |
Total (sum of lines 13
and 14) | |
$ | 22,057,279 | | |
$ | 8,271,480 | | |
$ | 5,514,320 | | |
$ | 5,514,320 | | |
$ | 2,757,160 | |
Section E - Budget Estimates of Federal Funds Needed for Balance
of the Project |
|
| |
Future
Funding Periods (Years) | |
(a) Grant Program | |
(b) First | | |
(c) Second | | |
(d) Third | | |
(e) Fourth | |
16. | |
| |
$ | 10,800,405 | | |
$ | 14,787,891 | | |
$ | 14,385,668 | | |
| | |
17. | |
| |
| | | |
| | | |
| | | |
| | |
18. | |
| |
| | | |
| | | |
| | | |
| | |
19. | |
| |
| | | |
| | | |
| | | |
| | |
20. | |
Total (sum
of lines 16-19) | |
$ | 10,800,405 | | |
$ | 14,787,891 | | |
$ | 14,385,668 | | |
$ | 0 | |
Section F - Other Budget Information |
|
21. Direct Charges | |
|
22. Indirect Charges | |
|
23. Remarks | |
|
Previous Edition Usable | Page 6 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Instructions for the
SF-424A
Public Reporting Burden for this collection of information
is estimated to average 3.0 hours per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Please do not return your completed form
to the Office of Management and Budget; send it to the address provided by the sponsoring agency.
General Instructions
This form is designed so that application can be made for funds from
one or more grant programs. In preparing the budget, adhere to any existing Federal grantor agency guidelines which prescribe how and
whether budgeted amounts should be separately shown for different functions or activities within the program. For some programs, grantor
agencies may require budgets to be separately shown by function or activity. For other programs, grantor agencies may require a breakdown
by function or activity. Sections A, B, C, and D should include budget estimates for the whole project except when applying for assistance
which requires Federal authorization in annual or other funding period increments. In the later case, Sections A, B, C, and D should
provide the budget for the first budget period (usually a year) and Section E should present the need for Federal assistance in the subsequent
budget periods. All applications should contain a breakdown by the object class categories shown in Lines a-k of Section B.
Section A. Budget Summary Lines 1-4 Columns (a) and (b)
For applications pertaining to a single Federal
grant program (Federal Domestic Assistance Catalog number) and not requiring a functional or activity breakdown, enter on Line
1 under Column (a) the catalog program title and the catalog number in Column (b).
For applications pertaining to a single program
requiring budget amounts by multiple functions or activities, enter the name of each activity or function on each line in Column
(a), and enter the catalog number in Column (b). For applications pertaining to multiple programs where none of the programs require
a breakdown by function or activity, enter the catalog program title on each line in Column (a) and the respective catalog number
on each line in Column (b).
For applications pertaining to multiple programs where one
or more programs require a breakdown by function or activity, prepare a separate sheet for each program requiring the breakdown.
Additional sheets should be used when one form does not provide adequate space for all breakdown of data required. However, when more
than one sheet is used, the first page should provide the summary totals by programs.
Lines 1-4, Columns (c) through (g)
For new applications, leave Columns (c) and (d) blank. For
each line entry in
Columns (a) and (b), enter in Columns (e), (f), and (g)
the appropriate amounts of funds needed to support the project for the first funding period (usually a year).
For continuing grant program applications, submit these forms
before the end of each funding period as required by the grantor agency. Enter in Columns (c) and (d) the estimated amounts of funds
which will remain unobligated at the end of the grant funding period only if the Federal grantor agency instructions provide for this.
Otherwise, leave these columns blank. Enter in columns (e) and (f) the amounts of funds needed for the upcoming period. The amount(s)
in Column (g) should be the sum of amounts in Columns (e) and (f).
For supplemental grants and changes to existing
grants, do not use Columns (c) and (d). Enter in Column (e) the amount of the increase or decrease of Federal funds and enter in Column
(f) the amount of the increase or decrease of non-Federal funds. In Column (g) enter the new total budgeted amount (Federal and non-Federal)
which includes the total previous authorized budgeted amounts plus or minus, as appropriate, the amounts shown in Columns (e) and (f).
The amount(s) in Column (g) should not equal the sum of amounts in Columns (e) and (f).
Line 5—Show the totals for all columns used.
Section B. Budget Categories
In the column headings (a) through (4), enter the titles of the same
programs, functions, and activities shown on Lines 1-4, Column (a), Section A. When additional sheets are prepared for Section A, provide
similar column headings on each sheet. For each program, function or activity, fill in the total requirements for funds (both Federal
and non-Federal) by object class categories.
Lines 6a-i—Show the totals of Lines 6a to 6h in each
column.
Line 6j—Show the amount of indirect cost.
Line 6k—Enter the total of amounts on Lines
6i and 6j. For all applications for new grants and continuation grants the total amount in column (5), Line 6k, should be the same as
the total amount shown in Section A, Column (g), Line 5. For supplemental grants and changes to grants, the total amount of the increase
or decrease as shown in Columns (1)-(4), Line 6k should be the same as the sum of the amounts in Section A, Columns (e) and (f) on Line
5.
Line 7—Enter the estimated amount of income,
if any, expected to be generated from this project. Do not add or subtract this amount from the total project amount. Show under the
program narrative statement the nature and source of income. The estimated amount of program income may be considered by the federal
grantor agency in determining the total amount of the grant.
Previous Edition Usable | Page 7 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Section C. Non-Federal Resources
Lines 8-11—Enter
amounts of non-Federal resources that will be used on the grant. If in-kind contributions are included, provide a brief explanation on
a separate sheet.
Column (a)—Enter
the program titles identical to Column (a), Section A. A breakdown by function or activity is not necessary.
Column (b)—Enter
the contribution to be made by the applicant.
Column (c)—Enter
the amount of the State's cash and in-kind contribution if the applicant is not a State or State agency. Applicants which are a State
or
State agencies should leave
this column blank.
Column (d)—Enter
the amount of cash and in-kind contributions to be made from all other sources.
Column (e)—Enter
totals of Columns (b), (c), and (d).
Line 12—Enter
the total for each of Columns (b)-(e). The amount in Column (e) should be equal to the amount on Line 5, Column (f) Section A.
Section D. Forecasted Cash Needs
Line 13—Enter
the amount of cash needed by quarter from the grantor agency during the first year.
Line 14—Enter
the amount of cash from all other sources needed by quarter during the first year.
Line 15—Enter
the totals of amounts on Lines 13 and 14.
Section E. Budget Estimates of Federal Funds Needed for
Balance of the Project
Lines 16-19—Enter
in Column (a) the same grant program titles shown in Column
(a), Section A. A breakdown by function or activity is not necessary.
For new applications and continuation grant applications, enter in the proper columns amounts of Federal funds which will be needed to
complete the program or project over the succeeding funding periods (usually in years). This section need not be completed for revisions
(amendments, changes, or supplements) to funds for the current year of existing grants.
If more than four lines are needed to list the program titles,
submit additional schedules as necessary.
Line 20—Enter
the total for each of the Columns (b)-(e). When additional schedules are prepared for this Section, annotate accordingly and show the
overall totals on this line.
Section F. Other Budget Information
Line 21—Use
this space to explain amounts for individual direct object-class cost categories that may appear to be out of the ordinary or to explain
the details as required by the Federal grantor agency.
Line 22—Enter
the type of indirect rate (provisional, predetermined, final or fixed) that will be in effect during the funding period, the estimated
amount of the base to which the rate is applied, and the total indirect expense.
Line 23—Provide
any other explanations or comments deemed necessary.
Previous Edition Usable | Page 8 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Applicant Name: |
Solid Power Operating, Inc. |
Award Number: |
DE-MS0000122 |
Budget Information - Non Construction Programs
*Estimated costs subject to DOE review/approval of submitted Continuation Application
OMB Approval No. 0348-0044
Section
A - Budget Summary
|
|
|
|
|
|
Estimated
Unobligated Funds |
|
|
|
New
or Revised Budget |
|
Grant Program
Function or
Activity |
|
|
Catalog
of Federal Domestic Assistance Number |
|
|
Federal |
|
|
|
Non-Federal |
|
|
|
Federal |
|
|
|
Non-Federal |
|
|
|
Total |
|
(a) |
|
|
(b) |
|
|
(c) |
|
|
|
(d) |
|
|
|
(e) |
|
|
|
(f) |
|
|
|
(g) |
|
1. Budget
Period 2* |
|
|
81.253 |
|
|
|
|
|
|
|
|
|
$ |
10,800,405 |
|
|
$ |
12,960,486 |
|
|
$ |
23,760,891 | |
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
|
|
|
$ |
0 |
|
3. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
|
|
|
$ |
0 |
|
4. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
|
|
|
$ |
0 |
|
5. Totals |
|
|
|
|
$ |
0 |
|
|
$ |
0 |
|
|
$ |
10,800,405 |
|
|
$ |
12,960,486 |
|
|
$ |
23,760,891 |
Section B - Budget Categories
|
|
| Grant Program, Function or Activity |
| |
| | |
6. Object Class Categories |
|
| (1)
Federal |
| |
| (2)
Non-Federal |
| |
| (3) |
| |
| (4) |
| |
| Total (5) | |
a. Personnel |
|
$ | 1,345,138 |
| |
$ | 1,614,165 |
| |
| |
| |
| |
| |
$ | 2,959,303 | |
b. Fringe Benefits |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
c. Travel |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
d. Equipment |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
e. Supplies |
|
$ | 1,202,710 |
| |
$ | 1,443,252 |
| |
| |
| |
| |
| |
$ | 2,645,962 | |
f. Contractual |
|
$ | 4,501,266 |
| |
$ | 5,401,520 |
| |
| |
| |
| |
| |
$ | 9,902,786 | |
g. Construction |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
h. Other |
|
$ | 95,682 |
| |
$ | 114,818 |
| |
| |
| |
| |
| |
$ | 210,500 | |
i. Total Direct Charges (sum of 6a-6h) |
|
$ | 7,144,796 |
| |
$ | 8,573,755 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 15,718,551 | |
j. Indirect Charges |
|
$ | 3,655,609 |
| |
$ | 4,386,731 |
| |
| |
| |
| |
| |
$ | 8,042,340 | |
k. Totals (sum of 6i-6j) |
|
$ | 10,800,405 |
| |
$ | 12,960,486 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 23,760,891 | |
7. Program Income |
|
| |
| |
| |
| |
| |
| |
| |
| |
$ | 0 | |
Previous Edition Usable | Page 9 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Section C - Non-Federal Resources
(a) Grant Program | |
(b) Applicant | | |
(c) State | | |
(d) Other Sources | | |
(e) Totals | |
8. Budget Period 2 | |
$ | 12,960,486 | | |
| | | |
| | | |
$ | 12,960,486 | |
9. | |
| | | |
| | | |
| | | |
$ | 0 | |
10. | |
| | | |
| | | |
| | | |
$ | 0 | |
11. | |
| | | |
| | | |
| | | |
$ | 0 | |
12. Total (sum
of lines 8 - 11) | |
$ | 12,960,486 | | |
$ | 0 | | |
$ | 0 | | |
$ | 12,960,486 | |
Section D - Forecasted Cash Needs
| |
Total for 1st Year | | |
1st Quarter | | |
2nd Quarter | | |
3rd Quarter | | |
4th quarter | |
13. Federal | |
$ | 10,800,405 | | |
$ | 2,700,101 | | |
$ | 2,700,101 | | |
$ | 2,700,101 | | |
$ | 2,700,101 | |
14. Non-Federal | |
$ | 12,960,486 | | |
$ | 3,240,122 | | |
$ | 3,240,122 | | |
$ | 3,240,122 | | |
$ | 3,240,122 | |
15. Total (sum
of lines 13 and 14) | |
$ | 23,760,891 | | |
$ | 5,940,223 | | |
$ | 5,940,223 | | |
$ | 5,940,223 | | |
$ | 5,940,223 | |
Section E - Budget Estimates of Federal Funds Needed for Balance
of the Project | |
| |
| |
Future
Funding Periods (Years) | |
| |
(a) Grant Program | |
| (b)
First | | |
| (c) Second | | |
| (d)
Third | | |
| (e)
Fourth | |
16. | |
| |
$ | 14,787,891 | | |
$ | 14,385,668 | | |
| | | |
| | |
17. | |
| |
| | | |
| | | |
| | | |
| | |
18. | |
| |
| | | |
| | | |
| | | |
| | |
19. | |
| |
| | | |
| | | |
| | | |
| | |
20. | |
Total (sum of lines 16-19) | |
$ | 14,787,891 | | |
$ | 14,385,668 | | |
$ | 0 | | |
$ | 0 | |
Section F - Other Budget Information |
|
21. |
Direct Charges | |
|
22. |
Indirect Charges | |
|
23. |
Remarks | |
|
Previous Edition Usable | Page 10 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Instructions
for the SF-424A
Public Reporting Burden for this collection of information
is estimated to average 3.0 hours per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Please do not return your completed form
to the Office of Management and Budget; send it to the address provided by the sponsoring agency.
General Instructions
This form is designed so that application can be made for funds from
one or more grant programs. In preparing the budget, adhere to any existing Federal grantor agency guidelines which prescribe how and
whether budgeted amounts should be separately shown for different functions or activities within the program. For some programs, grantor
agencies may require budgets to be separately shown by function or activity. For other programs, grantor agencies may require a breakdown
by function or activity. Sections A, B, C, and D should include budget estimates for the whole project except when applying for assistance
which requires Federal authorization in annual or other funding period increments. In the later case, Sections A, B, C, and D should
provide the budget for the first budget period (usually a year) and Section E should present the need for Federal assistance in the subsequent
budget periods. All applications should contain a breakdown by the object class categories shown in Lines a-k of Section B.
Section A. Budget Summary Lines 1-4 Columns (a) and (b)
For applications pertaining to a single Federal
grant program (Federal Domestic Assistance Catalog number) and not requiring a functional or activity breakdown, enter on Line
1 under Column (a) the catalog program title and the catalog number in Column (b).
For applications pertaining to a single program
requiring budget amounts by multiple functions or activities, enter the name of each activity or function on each line in Column
(a), and enter the catalog number in Column (b). For applications pertaining to multiple programs where none of the programs require
a breakdown by function or activity, enter the catalog program title on each line in Column (a) and the respective catalog number
on each line in Column (b).
For applications pertaining to multiple programs where one
or more programs require a breakdown by function or activity, prepare a separate sheet for each program requiring the breakdown.
Additional sheets should be used when one form does not provide adequate space for all breakdown of data required. However, when more
than one sheet is used, the first page should provide the summary totals by programs.
Lines 1-4, Columns (c) through (g)
For new applications, leave Columns (c) and (d) blank. For
each line entry in Columns (a) and (b), enter in Columns (e), (f), and (g) the appropriate amounts of funds needed to support the
project for the first funding period (usually a year).
For continuing grant program applications, submit these forms
before the end of each funding period as required by the grantor agency. Enter in Columns (c) and (d) the estimated amounts of funds
which will remain unobligated at the end of the grant funding period only if the Federal grantor agency instructions provide for this.
Otherwise, leave these columns blank. Enter in columns (e) and (f) the amounts of funds needed for the upcoming period. The amount(s)
in Column (g) should be the sum of amounts in Columns (e) and (f).
For supplemental grants and changes to existing
grants, do not use Columns (c) and (d). Enter in Column (e) the amount of the increase or decrease of Federal funds and enter in Column
(f) the amount of the increase or decrease of non-Federal funds. In Column (g) enter the new total budgeted amount (Federal and non-Federal)
which includes the total previous authorized budgeted amounts plus or minus, as appropriate, the amounts shown in Columns (e) and (f).
The amount(s) in Column (g) should not equal the sum of amounts in Columns (e) and (f).
Line 5—Show the totals for all columns used.
Section B. Budget Categories
In the column headings (a) through (4), enter the titles of the
same programs, functions, and activities shown on Lines 1-4, Column (a), Section A. When additional sheets are prepared for Section
A, provide similar column headings on each sheet. For each program, function or activity, fill in the total requirements for funds
(both Federal and non-Federal) by object class categories.
Lines 6a-i—Show the totals of Lines 6a to 6h in each
column.
Line 6j—Show the amount of indirect cost.
Line 6k—Enter the total of amounts on Lines
6i and 6j. For all applications for new grants and continuation grants the total amount in column (5), Line 6k, should be the same as
the total amount shown in Section A, Column (g), Line 5. For supplemental grants and changes to grants, the total amount of the increase
or decrease as shown in Columns (1)-(4), Line 6k should be the same as the sum of the amounts in Section A, Columns (e) and (f) on Line
5.
Line 7—Enter the estimated amount of income,
if any, expected to be generated from this project. Do not add or subtract this amount from the total project amount. Show under the
program narrative statement the nature and source of income. The estimated amount of program income may be considered by the federal
grantor agency in determining the total amount of the grant.
Previous Edition Usable | Page 11 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Section C. Non-Federal Resources
Lines 8-11—Enter
amounts of non-Federal resources that will be used on the grant. If in-kind contributions are included, provide a brief explanation on
a separate sheet.
Column (a)—Enter
the program titles identical to Column (a), Section A. A breakdown by function or activity is not necessary.
Column (b)—Enter
the contribution to be made by the applicant.
Column (c)—Enter
the amount of the State's cash and in-kind contribution if the applicant is not a State or State agency. Applicants which are a State
or State agencies should leave this column blank.
Column (d)—Enter
the amount of cash and in-kind contributions to be made from all other sources.
Column (e)—Enter
totals of Columns (b), (c), and (d).
Line 12—Enter
the total for each of Columns (b)-(e). The amount in Column (e) should be equal to the amount on Line 5, Column (f) Section A.
Section D. Forecasted Cash Needs
Line 13—Enter
the amount of cash needed by quarter from the grantor agency during the first year.
Line 14—Enter
the amount of cash from all other sources needed by quarter during the first year.
Line 15—Enter
the totals of amounts on Lines 13 and 14.
Section E. Budget Estimates of Federal Funds Needed for
Balance of the Project
Lines 16-19—Enter
in Column (a) the same grant program titles shown in Column
(a), Section A. A breakdown by function or activity is not necessary.
For new applications and continuation grant applications, enter in the proper columns amounts of Federal funds which will be needed to
complete the program or project over the succeeding funding periods (usually in years). This section need not be completed for revisions
(amendments, changes, or supplements) to funds for the current year of existing grants.
If more than four lines are needed to list the program titles,
submit additional schedules as necessary.
Line 20—Enter
the total for each of the Columns (b)-(e). When additional schedules are prepared for this Section, annotate accordingly and show the
overall totals on this line.
Section F. Other Budget Information
Line 21—Use
this space to explain amounts for individual direct object-class cost categories that may appear to be out of the ordinary or to explain
the details as required by the Federal grantor agency.
Line 22—Enter
the type of indirect rate (provisional, predetermined, final or fixed) that will be in effect during the funding period, the estimated
amount of the base to which the rate is applied, and the total indirect expense.
Line 23—Provide
any other explanations or comments deemed necessary.
Previous Edition Usable | Page 12 of 28 Authorized for Local Reproduction | SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 |
Applicant Name: |
Solid Power Operating, Inc. |
Award Number: |
DE-MS0000122 |
Budget
Information - Non Construction Programs
*Estimated costs subject to DOE review/approval of submitted Continuation Application
OMB Approval No. 0348-0044
Section A - Budget Summary
| |
| Catalog of Federal | |
| Estimated Unobligated Funds | | |
| New or Revised Budget | |
Grant Program Function or
Activity | |
| Domestic Assistance
Number | |
| Federal | | |
| Non-Federal | | |
| Federal | | |
| Non-Federal | | |
| Total | |
(a) | |
| (b) | |
| (c ) | | |
| (d) | | |
| (e) | | |
| (f) | | |
| (g) | |
1. Budget Period 3* | |
| 81.253 | |
| | | |
| | | |
$ | 14,787,891 | | |
$ | 17,745,469 | | |
$ | 32,533,360 | |
2. | |
| | |
| | | |
| | | |
| | | |
| | | |
$ | 0 | |
3. | |
| | |
| | | |
| | | |
| | | |
| | | |
$ | 0 | |
4. | |
| | |
| | | |
| | | |
| | | |
| | | |
$ | 0 | |
5. Totals | |
| | |
$ | 0 | | |
$ | 0 | | |
$ | 14,787,891 | | |
$ | 17,745,469 | | |
$ | 32,533,360 | |
Section B - Budget Categories
|
|
| Grant Program, Function or Activity |
| |
| | |
6. Object Class Categories |
|
| (1) Federal |
| |
| (2) Non-Federal |
| |
| (3) |
| |
| (4) |
| |
| Total (5) | |
a. Personnel |
|
$ | 874,490 |
| |
$ | 1,049,388 |
| |
| |
| |
| |
| |
$ | 1,923,878 | |
b. Fringe Benefits |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
c. Travel |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
d. Equipment |
|
$ | 7,365,997 |
| |
$ | 8,839,197 |
| |
| |
| |
| |
| |
$ | 16,205,194 | |
e. Supplies |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
f. Contractual |
|
$ | 1,441,526 |
| |
$ | 1,729,832 |
| |
| |
| |
| |
| |
$ | 3,171,358 | |
g. Construction |
|
$ | 0 |
| |
$ | 0 |
| |
| |
| |
| |
| |
$ | 0 | |
h. Other |
|
$ | 95,682 |
| |
$ | 114,818 |
| |
| |
| |
| |
| |
$ | 210,500 | |
i. Total
Direct Charges (sum of 6a-6h) |
|
$ | 9,777,695 |
| |
$ | 11,733,235 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 21,510,930 | |
j. Indirect Charges |
|
$ | 5,010,196 |
| |
$ | 6,012,234 |
| |
| |
| |
| |
| |
$ | 11,022,430 | |
k. Totals (sum of 6i-6j) |
|
$ | 14,787,891 |
| |
$ | 17,745,469 |
| |
$ | 0 |
| |
$ | 0 |
| |
$ | 32,533,360 | |
7. Program Income |
|
| |
| |
| |
| |
| |
| |
| |
| |
$ | 0 | |
Previous Edition Usable | Page 17 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Section
C - Non-Federal Resources
(a) Grant Program | |
(b) Applicant | | |
(c ) State | | |
(d) Other Sources | | |
(e) Totals | |
8. Budget Period 3 | |
$ | 17,745,469 | | |
| | | |
| | | |
$ | 17,745,469 | |
9. | |
| | | |
| | | |
| | | |
$ | 0 | |
10. | |
| | | |
| | | |
| | | |
$ | 0 | |
11. | |
| | | |
| | | |
| | | |
$ | 0 | |
12. Total (sum
of lines 8 - 11) | |
$ | 17,745,469 | | |
$ | 0 | | |
$ | 0 | | |
$ | 17,745,469 | |
Section D - Forecasted Cash Needs
| |
Total for 1st Year | | |
1st Quarter | | |
2nd Quarter | | |
3rd Quarter | | |
4th quarter | |
13. Federal | |
$ | 14,787,891 | | |
$ | 3,696,973 | | |
$ | 3,696,973 | | |
$ | 3,696,973 | | |
$ | 3,696,973 | |
14. Non-Federal | |
$ | 17,745,469 | | |
$ | 4,436,367 | | |
$ | 4,436,367 | | |
$ | 4,436,367 | | |
$ | 4,436,367 | |
15. Total (sum
of lines 13 and 14) | |
$ | 32,533,360 | | |
$ | 8,133,340 | | |
$ | 8,133,340 | | |
$ | 8,133,340 | | |
$ | 8,133,340 | |
Section E - Budget Estimates of Federal Funds Needed for Balance of the Project
| |
Future Funding Periods (Years) | |
(a) Grant Program | |
(b) First | | |
(c ) Second | | |
(d) Third | | |
(e) Fourth | |
16. | |
$ | 14,385,668 | | |
| | | |
| | | |
| | |
17. | |
| | | |
| | | |
| | | |
| | |
18. | |
| | | |
| | | |
| | | |
| | |
19. | |
| | | |
| | | |
| | | |
| | |
20. Total (sum of lines 16-19) | |
$ | 14,385,668 | | |
$ | 0 | | |
$ | 0 | | |
$ | 0 | |
Section F - Other Budget Information
21. Direct Charges | |
| |
22. Indirect Charges | |
| |
23. Remarks | |
| |
Previous Edition Usable | Page 18 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Instructions for the
SF-424A
Public Reporting Burden for this collection of information
is estimated to average 3.0 hours per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Please do not return your completed form
to the Office of Management and Budget; send it to the address provided by the sponsoring agency.
General Instructions
This form is designed so that application can be made for funds from
one or more grant programs. In preparing the budget, adhere to any existing Federal grantor agency guidelines which prescribe how and
whether budgeted amounts should be separately shown for different functions or activities within the program. For some programs, grantor
agencies may require budgets to be separately shown by function or activity. For other programs, grantor agencies may require a breakdown
by function or activity. Sections A, B, C, and D should include budget estimates for the whole project except when applying for assistance
which requires Federal authorization in annual or other funding period increments. In the later case, Sections A, B, C, and D should provide
the budget for the first budget period (usually a year) and Section E should present the need for Federal assistance in the subsequent
budget periods. All applications should contain a breakdown by the object class categories shown in Lines a-k of Section B.
Section A. Budget Summary Lines 1-4 Columns (a) and (b)
For applications pertaining to a single Federal grant
program (Federal Domestic Assistance Catalog number) and not requiring a functional or activity breakdown, enter on Line 1 under
Column (a) the catalog program title and the catalog number in Column (b).
For applications pertaining to a single program requiring
budget amounts by multiple functions or activities, enter the name of each activity or function on each line in Column (a), and enter
the catalog number in Column (b). For applications pertaining to multiple programs where none of the programs require a breakdown by function
or activity, enter the catalog program title on each line in Column (a) and the respective catalog number on each line in Column
(b).
For applications pertaining to multiple programs where one or
more programs require a breakdown by function or activity, prepare a separate sheet for each program requiring the breakdown. Additional
sheets should be used when one form does not provide adequate space for all breakdown of data required. However, when more than one sheet
is used, the first page should provide the summary totals by programs.
Lines 1-4, Columns (c) through (g)
For new applications, leave Columns (c) and (d) blank. For
each line entry in Columns (a) and (b), enter in Columns (e), (f), and (g) the appropriate amounts of funds needed to support the
project for the first funding period (usually a year).
For continuing grant program applications, submit these forms
before the end of each funding period as required by the grantor agency. Enter in Columns (c) and (d) the estimated amounts of funds which
will remain unobligated at the end of the grant funding period only if the Federal grantor agency instructions provide for this. Otherwise,
leave these columns blank. Enter in columns (e) and (f) the amounts of funds needed for the upcoming period. The amount(s) in Column (g)
should be the sum of amounts in Columns (e) and (f).
For supplemental grants and changes to existing grants,
do not use Columns (c) and (d). Enter in Column (e) the amount of the increase or decrease of Federal funds and enter in Column (f) the
amount of the increase or decrease of non-Federal funds. In Column (g) enter the new total budgeted amount (Federal and non-Federal) which
includes the total previous authorized budgeted amounts plus or minus, as appropriate, the amounts shown in Columns (e) and (f). The amount(s)
in Column (g) should not equal the sum of amounts in Columns (e) and (f).
Line 5—Show the totals for all columns used.
Section B. Budget Categories
In the column headings (a) through (4), enter the titles of the
same programs, functions, and activities shown on Lines 1-4, Column (a), Section A. When additional sheets are prepared for Section
A, provide similar column headings on each sheet. For each program, function or activity, fill in the total requirements for funds
(both Federal and non-Federal) by object class categories.
Lines 6a-i—Show the totals of Lines 6a to 6h in each column.
Line 6j—Show the amount of indirect cost.
Line 6k—Enter the total of amounts on Lines
6i and 6j. For all applications for new grants and continuation grants the total amount in column (5), Line 6k, should be the same as
the total amount shown in Section A, Column (g), Line 5. For supplemental grants and changes to grants, the total amount of the increase
or decrease as shown in Columns (1)-(4), Line 6k should be the same as the sum of the amounts in Section A, Columns (e) and (f) on Line
5.
Previous Edition Usable | Page 19 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Line 7—Enter the estimated amount of income, if
any, expected to be generated from this project. Do not add or subtract this amount from the total project amount. Show under the
program narrative statement the nature and source of income. The estimated amount of program income may be considered by the federal
grantor agency in determining the total amount of the grant.
Section C. Non-Federal Resources
Lines 8-11—Enter
amounts of non-Federal resources that will be used on the grant. If in-kind contributions are included, provide a brief explanation on
a separate sheet.
Column (a)—Enter
the program titles identical to Column (a), Section A. A breakdown by function or activity is not necessary.
Column (b)—Enter
the contribution to be made by the applicant.
Column (c)—Enter
the amount of the State's cash and in-kind contribution if the applicant is not a State or State agency. Applicants which are a State
or State agencies should leave this column blank.
Column (d)—Enter
the amount of cash and in-kind contributions to be made from all other sources.
Column (e)—Enter
totals of Columns (b), (c), and (d).
Line 12—Enter
the total for each of Columns (b)-(e). The amount in Column (e) should be equal to the amount on Line 5, Column (f) Section A.
Section D. Forecasted Cash Needs
Line 13—Enter
the amount of cash needed by quarter from the grantor agency during the first year.
Line 14—Enter
the amount of cash from all other sources needed by quarter during the first year.
Line 15—Enter
the totals of amounts on Lines 13 and 14.
Section E. Budget Estimates of Federal Funds Needed for
Balance of the Project
Lines 16-19—Enter
in Column (a) the same grant program titles shown in Column
(a), Section A. A breakdown by function or activity is not necessary.
For new applications and continuation grant applications, enter in the proper columns amounts of Federal funds which will be needed to
complete the program or project over the succeeding funding periods (usually in years). This section need not be completed for revisions
(amendments, changes, or supplements) to funds for the current year of existing grants.
If more than four lines are needed to list the program titles,
submit additional schedules as necessary.
Line 20—Enter
the total for each of the Columns (b)-(e). When additional schedules are prepared for this Section, annotate accordingly and show the
overall totals on this line.
Section F. Other Budget Information
Line 21—Use
this space to explain amounts for individual direct object-class cost categories that may appear to be out of the ordinary or to explain
the details as required by the Federal grantor agency.
Line 22—Enter
the type of indirect rate (provisional, predetermined, final or fixed) that will be in effect during the funding period, the estimated
amount of the base to which the rate is applied, and the total indirect expense.
Line 23—Provide
any other explanations or comments deemed necessary.
Previous Edition Usable | Page 20 of 28 | SF-424A (Rev. 4-92) |
| | Prescribed by OMB Circular A-102 |
| Authorized for Local Reproduction | |
Applicant Name: |
Solid Power Operating, Inc. |
Award Number: |
DE-MS0000122 |
|
|
Budget Information - Non Construction Programs
*Estimated costs subject to DOE review/approval of submitted Continuation Application |
OMB Approval No. 0348-0044 |
Section A - Budget Summary |
|
Grant Program Function or |
|
Catalog of Federal
Domestic Assistance |
|
|
Estimated Unobligated Funds |
|
|
New or Revised Budget |
Activity |
|
Number |
|
|
Federal |
|
|
Non-Federal |
|
|
Federal |
|
|
Non-Federal |
|
|
Total |
(a) |
|
(b) |
|
|
(c) |
|
|
(d) |
|
|
(e) |
|
|
(f) |
|
|
(g) |
1. |
|
Budget Period 4* |
|
81.253 |
|
|
|
|
|
|
|
|
|
|
$ |
14,385,668 |
|
|
$ |
17,262,802 |
|
|
$ |
31,648,470 |
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
3. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
4. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
5. |
|
Totals |
|
|
|
|
$ |
0 |
|
|
$ |
0 |
|
|
$ |
14,385,668 |
|
|
$ |
17,262,802 |
|
|
$ |
31,648,470 |
Section B - Budget Categories |
|
|
|
Grant Program, Function or Activity |
|
|
6. |
Object Class Categories |
|
(1) Federal |
|
|
(2) Non-Federal |
|
|
(3) |
|
|
(4) |
|
|
Total (5) |
|
|
a. Personnel |
|
$ |
975,327 |
|
|
$ |
1,170,393 |
|
|
|
|
|
|
|
|
|
|
$ |
2,145,720 |
|
|
b. Fringe Benefits |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
c. Travel |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
d. Equipment |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
e. Supplies |
|
$ |
1,605,938 |
|
|
$ |
1,927,126 |
|
|
|
|
|
|
|
|
|
|
$ |
3,533,064 |
|
|
f. Contractual |
|
$ |
8,764,576 |
|
|
$ |
10,517,491 |
|
|
|
|
|
|
|
|
|
|
$ |
19,282,067 |
|
|
g. Construction |
|
$ |
0 |
|
|
$ |
0 |
|
|
|
|
|
|
|
|
|
|
$ |
0 |
|
|
h. Other |
|
$ |
95,679 |
|
|
$ |
114,815 |
|
|
|
|
|
|
|
|
|
|
$ |
210,494 |
|
|
i. Total Direct Charges (sum of 6a-6h) |
|
$ |
11,441,520 |
|
|
$ |
13,729,825 |
|
|
$ |
0 |
|
|
$ |
0 |
|
|
$ |
25,171,345 |
|
|
j. Indirect Charges |
|
$ |
2,944,148 |
|
|
$ |
3,532,977 |
|
|
|
|
|
|
|
|
|
|
$ |
6,477,125 |
|
|
k. Totals (sum of 6i-6j) |
|
$ |
14,385,668 |
|
|
$ |
17,262,802 |
|
|
$ |
0 |
|
|
$ |
0 |
|
|
$ |
31,648,470 |
7. |
|
Program Income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
0 |
Previous Edition Usable | Authorized for Local Reproduction | SF-424A
(Rev. 4-92
Prescribed by OMB Circular A-102 |
Section C - Non-Federal Resources |
| |
(a) Grant Program | |
(b) Applicant | | |
(c ) State | | |
(d) Other Sources | | |
(e) Totals | |
8. | |
Budget Period 4 | |
$ | 17,262,802 | | |
| | | |
| | | |
$ | 17,262,802 | |
9. | |
| |
| | | |
| | | |
| | | |
$ | 0 | |
10. | |
| |
| | | |
| | | |
| | | |
$ | 0 | |
11. | |
| |
| | | |
| | | |
| | | |
$ | 0 | |
12. | |
Total (sum
of lines 8 - 11) | |
$ | 17,262,802 | | |
$ | 0 | | |
$ | 0 | | |
$ | 17,262,802 | |
Section D - Forecasted Cash Needs |
| |
Total for 1st Year | | |
1st Quarter | | |
2nd Quarter | | |
3rd Quarter | | |
4th quarter | |
13. | |
Federal | |
$ | 14,385,668 | | |
$ | 3,596,417 | | |
$ | 3,596,417 | | |
$ | 3,596,417 | | |
$ | 3,596,417 | |
14. | |
Non-Federal | |
$ | 17,262,802 | | |
$ | 4,315,701 | | |
$ | 4,315,701 | | |
$ | 4,315,701 | | |
$ | 4,315,701 | |
15. | |
Total (sum
of lines 13 and 14) | |
$ | 31,648,470 | | |
$ | 7,912,118 | | |
$ | 7,912,118 | | |
$ | 7,912,118 | | |
$ | 7,912,118 | |
Section E - Budget Estimates of Federal Funds Needed for Balance of the Project |
| |
Future Funding Periods (Years) | |
(a) Grant Program | |
(b) First | | |
(c ) Second | | |
(d) Third | | |
(e) Fourth | |
16. | |
| |
| | | |
| | | |
| | | |
| | |
17. | |
| |
| | | |
| | | |
| | | |
| | |
18. | |
| |
| | | |
| | | |
| | | |
| | |
19. | |
| |
| | | |
| | | |
| | | |
| | |
20. | |
Total (sum
of lines 16-19) | |
$ | 0 | | |
$ | 0 | | |
$ | 0 | | |
$ | 0 | |
Section F - Other Budget Information |
21. Direct Charges | |
22. Indirect Charges |
| |
|
23. Remarks | |
|
Previous Edition Usable | Authorized for Local Reproduction | SF-424A
(Rev. 4-92
Prescribed by OMB Circular A-102 |
Instructions for the SF-424A
Public Reporting Burden for this collection
of information is estimated to average 3.0 hours per response, including the time for reviewing instructions, searching existing data
sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Please do not return
your completed form to the Office of Management and Budget; send it to the address provided by the sponsoring agency.
|
General Instructions
This form is designed so that application
can be made for funds from one or more grant programs. In preparing the budget, adhere to any existing Federal grantor agency guidelines
which prescribe how and whether budgeted amounts should be separately shown for different functions or activities within the program.
For some programs, grantor agencies may require budgets to be separately shown by function or activity. For other programs, grantor agencies
may require a breakdown by function or activity. Sections A, B, C, and D should include budget estimates for the whole project except
when applying for assistance which requires Federal authorization in annual or other funding period increments. In the later case, Sections
A, B, C, and D should provide the budget for the first budget period (usually a year) and Section E should present the need for Federal
assistance in the subsequent budget periods. All applications should contain a breakdown by the object class categories shown in Lines
a-k of Section B.
Section A. Budget Summary Lines 1-4
Columns (a) and (b)
For applications pertaining
to a single Federal grant program (Federal Domestic Assistance Catalog number) and not requiring a functional or activity
breakdown, enter on Line 1 under Column (a) the catalog program title and the catalog number in Column (b).
For applications pertaining
to a single program requiring budget amounts by multiple functions or activities, enter the name of each activity or function
on each line in Column (a), and enter the catalog number in Column (b). For applications pertaining to multiple programs where none of
the programs require a breakdown by function or activity, enter the catalog program title on each line in Column (a) and the respective
catalog number on each line in Column (b).
For applications pertaining to multiple
programs where one or more programs require a breakdown by function or activity, prepare a separate sheet for each program
requiring the breakdown. Additional sheets should be used when one form does not provide adequate space for all breakdown of data required.
However, when more than one sheet is used, the first page should provide the summary totals by programs.
Lines 1-4, Columns (c) through (g)
For new applications, leave Columns
(c) and (d) blank. For each line entry in Columns (a) and (b), enter in Columns (e), (f), and (g) the appropriate amounts of funds needed
to support the project for the first funding period (usually a year).
For continuing grant program applications,
submit these forms before the end of each funding period as required by the grantor agency. Enter in Columns (c) and (d) the estimated
amounts of funds which will remain unobligated at the end of the grant funding period only if the Federal grantor agency instructions
provide for this. Otherwise, leave these columns blank. Enter in columns (e) and (f) the amounts of funds needed for the upcoming period.
The amount(s) in Column (g) should be the sum of amounts in Columns (e) and (f).
For supplemental grants
and changes to existing grants, do not use Columns (c) and (d). Enter in Column (e) the amount of the increase or decrease of Federal
funds and enter in Column (f) the amount of the increase or decrease of non-Federal funds. In Column (g) enter the new total budgeted
amount (Federal and non-Federal) which includes the total previous authorized budgeted amounts plus or minus, as appropriate, the amounts
shown in Columns (e) and (f). The amount(s) in Column (g) should not equal the sum of amounts in Columns (e) and (f).
Line 5—Show the totals
for all columns used.
Section B. Budget Categories
In the column headings (a) through
(4), enter the titles of the same programs, functions, and activities shown on Lines 1-4, Column (a), Section A. When additional
sheets are prepared for Section A, provide similar column headings on each sheet. For each program, function or activity, fill in
the total requirements for funds (both Federal and non-Federal) by object class categories.
Lines 6a-i—Show the totals
of Lines 6a to 6h in each column.
Line 6j—Show the amount of indirect cost.
Line 6k—Enter
the total of amounts on Lines 6i and 6j. For all applications for new grants and continuation grants the total amount in column (5),
Line 6k, should be the same as the total amount shown in Section A, Column (g), Line 5. For supplemental grants and changes to grants,
the total amount of the increase or decrease as shown in Columns (1)-(4), Line 6k should be the same as the sum of the amounts in Section
A, Columns (e) and (f) on Line 5.
Line 7—Enter
the estimated amount of income, if any, expected to be generated from this project. Do not add or subtract this amount from the total
project amount. Show under the program narrative statement the nature and source of income. The estimated amount of program income may
be considered by the federal grantor agency in determining the total amount of the grant.
Previous Edition Usable | Authorized for Local Reproduction | SF-424A
(Rev. 4-92
Prescribed by OMB Circular A-102 |
Section C. Non-Federal
Resources
Lines 8-11—Enter
amounts of non-Federal resources that will be used on the grant. If in-kind contributions are included, provide a brief explanation on
a separate sheet.
Column (a)—Enter
the program titles identical to Column (a), Section A. A breakdown by function or activity is not necessary.
Column (b)—Enter the contribution
to be made by the applicant.
Column (c)—Enter
the amount of the State's cash and in-kind contribution if the applicant is not a State or State agency. Applicants which are a State
or State agencies should leave this column blank.
Column (d)—Enter
the amount of cash and in-kind contributions to be made from all other sources.
Column (e)—Enter totals
of Columns (b), (c), and (d).
Line 12—Enter the total
for each of Columns (b)-(e). The amount in Column (e) should be equal to the amount on Line 5, Column (f) Section A.
Section D. Forecasted Cash Needs
Line 13—Enter the amount
of cash needed by quarter from the grantor agency during the first year.
Line 14—Enter
the amount of cash from all other sources needed by quarter during the first year.
Line 15—Enter the totals
of amounts on Lines 13 and 14.
Section E. Budget Estimates
of Federal Funds Needed for Balance of the Project
Lines 16-19—Enter
in Column (a) the same grant program titles shown in Column
(a), Section A. A breakdown by function
or activity is not necessary. For new applications and continuation grant applications, enter in the proper columns amounts of Federal
funds which will be needed to complete the program or project over the succeeding funding periods (usually in years). This section need
not be completed for revisions (amendments, changes, or supplements) to funds for the current year of existing grants.
If more than four lines are
needed to list the program titles, submit additional schedules as necessary.
Line 20—Enter
the total for each of the Columns (b)-(e). When additional schedules are prepared for this Section, annotate accordingly and show the
overall totals on this line.
Section F. Other Budget Information
Line 21—Use this
space to explain amounts for individual direct object-class cost categories that may appear to be out of the ordinary or to explain the
details as required by the Federal grantor agency.
Line 22—Enter
the type of indirect rate (provisional, predetermined, final or fixed) that will be in effect during the funding period, the estimated
amount of the base to which the rate is applied, and the total indirect expense.
Line 23—Provide any other
explanations or comments deemed necessary.
Previous Edition Usable | Authorized for Local Reproduction | SF-424A
(Rev. 4-92
Prescribed by OMB Circular A-102 |
|  | October 2, 2023 |
Department of
Energy
Standard
Intellectual Property (IP) Provisions for Financial Assistance
Awards issued ON OR AFTER October 1, 2021
Recipient Name | |
Solid Power Operating, Inc. |
Award Number | |
DE-MS0000122 |
Type of Award | |
Grant |
Type of Project | |
Research Development or Demonstration (RD&D) |
Type of Recipient | |
Domestic Small Business (excluding SBIR/STTR Awards) |
US Manufacture/DEC | |
US Comp. (S&E DEC) |
Special Data Statute | |
EPACT |
Name of Program | |
Office of Manufacturing and Energy Supply Chains (MESC) |
Unprotected Data Categories (g(4)) | |
See Appendix to Attachment 4 |
Protection Period | |
5 |
Delivery of Limited Rights Data | |
No |
Delivery of Restricted Computer Software | |
No |
Data Management Plan | |
N/A or Included Elsewhere |
Supplemental Instructions | |
None |
DOE IP Clause Number | |
GDSB-821-US |
Data Rights | |
Special Data (EPAct) |
Patent Rights | |
Bayh-Dole |
USM Requirements | |
U.S. Comp. – S&E DEC |
Provisions |
2
CFR 910, Appendix A of Subpart D, Rights in Data - Programs Covered Under Special Data Statutes
37 CFR 401.14 DOE Modified Patent
Rights Clause*
Data Management Plan |
The recipient and any subrecipients
are subject to the U.S. Competitiveness Provision set forth herein that requires products embodying or made through a Subject Invention
be substantially manufactured in the U.S. Implementation of the U.S. Competitiveness Provision for domestic small businesses and nonprofits
is through the Determination of Exceptional Circumstances (DEC) under the Bayh-Dole Act to Further Promote Domestic Manufacture of DOE
Science and Energy Technologies executed by DOE on June 7, 2021. A copy of the DEC is available at https://www.energy.gov/gc/determination-exceptional-circumstances-decs.
For all other types of entities, the implementation of the U.S. Competitiveness Provision is through DOE patent waivers and policy.
|  | October 2, 2023 |
Department of
Energy
In reading these provisions,
any reference to "contractor" or "subcontractor" shall mean "recipient" or "subrecipient," and
any reference to "contract" or "subcontract" shall mean "award" or "subaward." Likewise, any
reference to "recipient" or "subrecipient" shall mean "contractor" or "subcontractor," and any
reference to "award" or "subaward" shall mean "contract" or "subcontract."
Failure to comply with the terms of
the agreement may result in a loss of rights in Subject Inventions, including, but not limited to, forfeiture of retained rights. All
Subject Inventions (conceived or first actually reduced to practice in the performance of the above identified agreement) must be timely
reported at https://www.nist. gov/iedison. Invention reporting is required regardless of any patent protection sought or the subject
matter (e.g. software invention). Any manuscript describing the invention for publication or of any on sale or public use planned for
an invention must be promptly reported through iEdison. For assistance with iEdison, please contact iedison@nist.gov. For assistance
regarding DOE's administration of Subject Inventions or patents, please contact Intellectual Property Law (IPL) at (630) 283-7117 or
Chicago-IP@science.doe.gov.
|  | October 2, 2023 |
Department
of Energy
2 CFR 910, Appendix A of
Subpart D, Rights in Data - Programs Covered Under Special Data Statutes
(a) Definitions
Computer Data Bases,
as used in this clause, means a collection of data in a form capable of, and for the purpose of, being stored in, processed, and operated
on by a computer. The term does not include computer software.
Computer software, as used in
this clause, means
(i)
computer programs which are data comprising a series of instructions, rules, routines, or statements, regardless of the media in which
recorded, that allow or cause a computer to perform a specific operation or series of operations and
(ii) data comprising
source code listings, design details, algorithms, processes, flow charts, formulae and related material that would enable the computer
program to be produced, created or compiled. The term does not include computer data bases.
Data, as used in this
clause, means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data and
computer software. The term does not include information incidental to administration, such as financial, administrative, cost or pricing
or management information.
Form, fit, and function
data, as used in this clause, means data relating to items, components, or processes that are sufficient to enable physical and functional
interchangeability as well as data identifying source, size, configuration, mating and attachment characteristics, functional characteristics,
and performance requirements except that for computer software it means data identifying source, functional characteristics, and performance
requirements but specifically excludes the source code, algorithm, process, formulae, and flow charts of the software.
Limited rights data,
as used in this clause, means data (other than computer software) developed at private expense that embody trade secrets or are commercial
or financial and confidential or privileged.
Restricted computer software,
as used in this clause, means computer software developed at private expense and that is a trade secret; is commercial or financial and
confidential or privileged; or is published copyrighted computer software; including modifications of such computer software.
Protected data, as
used in this clause, means technical data or commercial or financial data first produced in the performance of the award which, if it
had been obtained from and first produced by a non-federal party, would be a trade secret or commercial or financial information that
is privileged or confidential under the meaning of 5 U.S.C. 552(b)(4) and which data is marked as being protected data by a party to
the award.
Protected rights, as
used in this clause, mean the rights in protected data set forth in the Protected Rights Notice of paragraph (g) of this clause.
Technical data, as used in this
clause, means that data which are of a scientific or technical nature. Technical data does not include computer software, but does include
manuals and instructional materials and technical data formatted as a computer data base.
|  | October 2, 2023 |
Department
of Energy
Unlimited
rights, as used in this clause, means the right of the Government to use, disclose, reproduce, prepare derivative works,
distribute copies to the public, and perform publicly and display publicly, in any manner and for any purpose whatsoever, and to
have or permit others to do so.
(b) Allocation of Rights
(1) Except as provided
in paragraph (c) of this clause regarding copyright, the Government shall have unlimited rights in --
(i)
Data specifically identified in this agreement as data to be delivered without restriction;
(ii) Form,
fit, and function data delivered under this agreement;
(iii)
Data delivered under this agreement (except for restricted computer software) that constitute manuals or instructional and training
material for installation, operation, or routine maintenance and repair of items, components, or processes delivered or furnished
for use under this agreement; and
(iv)
All other data delivered under this agreement unless provided otherwise for protected data in accordance with paragraph (g) of this
clause or for limited rights data or restricted computer software in accordance with paragraph (h) of this clause.
(2) The Recipient shall have
the right to --
(i)
Protect rights in protected data delivered under this agreement in the manner and to the extent provided in paragraph (g) of this
clause;
(ii)
Withhold from delivery those data which are limited rights data or restricted computer software to the extent provided in paragraph
(h) of this clause;
(iii)
Substantiate use of, add, or correct protected rights or copyrights notices and to take other appropriate action, in accordance with
paragraph (e) of this clause; and
(iv)
Establish claim to copyright subsisting in data first produced in the performance of this agreement to the extent provided in
paragraph (c)(1) of this clause.
(c) Copyright
(1) Data first produced
in the performance of this agreement. Except as otherwise specifically provided in this agreement, the Recipient may establish, without
the prior approval of the Contracting Officer, claim to copyright subsisting in any data first produced in the performance of this agreement.
If claim to copyright is made, the Recipient shall affix the applicable copyright notice of 17 U.S.C. 401 or 402 and acknowledgment of
Government sponsorship (including agreement number) to the data when such data are delivered to the Government, as well as when the data
are published or deposited for registration as a published work in the U. S. Copyright Office. For such copyrighted data, including computer
software, the Recipient grants to the Government, and others acting on its behalf, a paid-up nonexclusive, irrevocable, worldwide license
to reproduce, prepare derivative works,
distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government, for all such data.
|  | October 2, 2023 |
Department
of Energy
(2)
Data not first produced in the performance of this agreement. The Recipient shall not, without prior written permission of the
Contracting Officer, incorporate in data delivered under this agreement any data that are not first produced in the performance of
this agreement and that contain the copyright notice of 17 U.S.C. 401 or 402, unless the Recipient identifies such data and grants
to the Government, or acquires on its behalf, a license of the same scope as set forth in paragraph (c)(1) of this clause; provided,
however, that if such data are computer software, the Government shall acquire a copyright license as set forth in paragraph (h)(3)
of this clause if included in this agreement or as otherwise may be provided in a collateral agreement incorporated or made a part
of this agreement.
(3)
Removal of copyright notices. The Government agrees not to remove any copyright notices placed on data pursuant to this paragraph
(c), and to include such notices on all reproductions of the data.
(d) Release, Publication and Use of
Data
(1)
The Receipt shall have the right to use, release to others, reproduce, distribute, or publish any data first produced or
specifically used by the Recipient in the performance of this contract, except to the extent such data may be subject to the Federal
export control or national security laws or regulations, or unless otherwise provided in this paragraph of this clause or expressly
set forth in this contract.
(2)
The Recipient agrees that to the extent it receives or is given access to data necessary for the performance of this agreement which
contain restrictive markings, the Recipient shall treat the data in accordance with such markings unless otherwise specifically
authorized in writing by the Contracting Officer.
(e) Unauthorized Marking of Data
(1) Notwithstanding
any other provisions of this agreement concerning inspection or acceptance, if any data delivered under this agreement are marked with
notices or any other restrictive or limiting markings not authorized by this agreement, the Contracting Officer may at any time either
return the data to the Recipient or cancel or ignore the markings. However, the following procedures shall apply prior to canceling or
ignoring the markings.
(i)
The Contracting Officer shall make written inquiry to the Recipient affording the Recipient 30 days from receipt of the inquiry to
provide written justification to substantiate the propriety of the markings;
(ii)
If the Recipient fails to respond or fails to provide written justification to substantiate the propriety of the markings within the
30-day period (or a longer time not exceeding 90 days approved in writing by the Contracting Officer for good cause shown), the
Government shall have the right to cancel or ignore the markings at any time after said period and the data will no longer be made
subject to any disclosure prohibitions.
(iii) If the Recipient provides written justification to substantiate the propriety of the markings within the period set in subdivision
(e)(1)(i) of this clause, the Contracting Officer shall consider such written justification and determine whether or not the markings
are to be cancelled or ignored. If the Contracting Officer determines that the
markings are authorized, the Recipient shall be so notified in writing. If the Contracting Officer determines, with concurrence of the
head of the contracting activity, that the markings are not authorized, the Contracting Officer shall furnish the Recipient a written
determination, which determination shall become the final agency decision regarding the appropriateness of the markings unless the Recipient
files suit in a court of competent jurisdiction within 90 days of receipt of the Contracting Officer's decision. The Government shall
continue to abide by the markings under this subdivision (e)(1)(iii) until final resolution of the matter either by the Contracting Officer's
determination become final (in which instance the Government shall thereafter have the right to cancel or ignore the markings at any
time and the data will no longer be made subject to any disclosure prohibitions), or by final disposition of the matter by court decision
if suit is filed.
|  | October 2, 2023 |
Department
of Energy
(2) The time limits
in the procedures set forth in paragraph (e)(1) of this clause may be modified in accordance with agency regulations implementing the
Freedom of Information Act (5 U.S.C. 552) if necessary to respond to a request thereunder.
(f) Omitted or Incorrect Markings
(1) Data delivered to
the Government without either a notice authorized by paragraph (g) of this clause, or the copyright notice required by paragraph (c)
of this clause, shall be deemed to have been furnished with unlimited rights, and the Government assumes no liability for the disclosure,
use, or reproduction of such data. However, to the extent the data has not been disclosed without restriction outside the Government,
the Recipient may request, within 6 months (or a longer time approved by the Contracting Officer for good cause shown) after delivery
of such data, permission to have notices placed on qualifying data at the Recipient's expense, and the Contracting Officer may agree
to do so if the Recipient --
(i)
Identifies the data to which the omitted notice is to be applied;
(ii)
Demonstrates that the omission of the notice was inadvertent;
(iii)
Establishes that the use of the proposed notice is authorized; and
(iv)
Acknowledges that the Government has no liability with respect to the disclosure, use, or reproduction of any such data made prior
to the addition of the notice or resulting from the omission of the notice.
(2) The Contracting Officer
may also:
(i)
Permit correction at the Recipient's expense of incorrect notices if the Recipient identifies the data on which correction of the
notice is to be made, and demonstrates that the correct notice is authorized; or
(ii)
Correct any incorrect notices.
(g) Rights to Protected Data
(1) The Recipient may,
with the concurrence of DOE, claim and mark as protected data, any data first produced in the performance of this award that would have
been treated as a trade secret if developed at private expense. Any such claimed “protected data” will be clearly marked
with the following Protected Rights Notice, and will be treated in
accordance with such Notice, subject to the provisions of paragraphs (e) and (f) of this clause.
|  | October 2, 2023 |
Department
of Energy
Protected Rights Notice
These protected data
were produced under agreement no. DE-MS0000122 with the U.S. Department of Energy and may not be published, disseminated, or disclosed
to others outside the Government until 5 years after the date the data were first produced, unless express written authorization is obtained
from the recipient. Upon expiration of the period of protection set forth in this Notice, the Government shall have unlimited rights
in this data. This Notice shall be marked on any reproduction of this data, in whole or in part.
(End of notice)
(2) Any such marked Protected
Data may be disclosed under obligations of confidentiality for the following purposes:
(a)
For evaluation purposes under the restriction that the “Protected Data” be retained in confidence and not be further disclosed;
or
(b)
To subcontractors or other team members performing work under the Government's Office of Manufacturing and Energy Supply Chains (MESC)
program of which this award is a part, for information or use in connection with the work performed under their activity, and under the
restriction that the Protected Data be retained in confidence and not be further disclosed.
(3) The obligations of
confidentiality and restrictions on publication and dissemination shall end for any Protected Data:
(a)
At the end of the protected period;
(b)
If the data becomes publicly known or available from other sources without a breach of the obligation of confidentiality with respect
to the Protected Data;
(c) If
the same data is independently developed by someone who did not have access to the Protected Data and such data is made available
without obligations of confidentiality; or
(d)
If the Recipient disseminates or authorizes another to disseminate such data without obligations of confidentiality.
(4) However, the Recipient
agrees that the following types of data are not considered to be protected and shall be provided to the Government when required by this
award without any claim that the data are Protected Data. The parties agree that notwithstanding the following lists of types of data,
nothing precludes the Government from seeking delivery of additional data in accordance with this award, or from making publicly available
additional non-protected data, nor does the following list constitute any admission by the Government that technical data not on the
list is Protected Data.
See Appendix to Attachment
4
|  | October 2, 2023 |
Department
of Energy
(5) The Government's
sole obligation with respect to any protected data shall be as set forth in this paragraph (g).
(h)
Protection of Limited Rights Data
When data other than
that listed in paragraphs (b)(1)(i), (ii), and (iii) of this clause are specified to be delivered under this agreement and such data
qualify as either limited rights data or restricted computer software, the Recipient, if the Recipient desires to continue protection
of such data, shall withhold such data and not furnish them to the Government under this agreement. As a condition to this withholding
the Recipient shall identify the data being withheld and furnish form, fit, and function data in lieu thereof.
(i)
Subaward/Contract
The Recipient has the responsibility
to obtain from its subrecipients/contractors all data and rights therein necessary to fulfill the Recipient's obligations to the Government
under this agreement. If a subrecipient/ contractor refuses to accept terms affording the Government such rights, the Recipient shall
promptly bring such refusal to the attention of the Contracting Officer and not proceed with subaward/contract award without further
authorization.
(j)
Additional Data Requirements
In addition to the data specified
elsewhere in this agreement to be delivered, the Contracting Officer may, at any time during agreement performance or within a period
of 3 years after acceptance of all items to be delivered under this agreement, order any data first produced or specifically used in
the performance of this agreement. This clause is applicable to all data ordered under this subparagraph. Nothing contained in this subparagraph
shall require the Recipient to deliver any data the withholding of which is authorized by this clause or data which are specifically
identified in this agreement as not subject to this clause. When data are to be delivered under this subparagraph, the Recipient will
be compensated for converting the data into the prescribed form, for reproduction, and for delivery.
(k)
The Recipient agrees, except as may be otherwise specified in this agreement for specific data items listed as not subject to this
paragraph, that the Contracting Officer or an authorized representative may, up to three years after acceptance of all items to be
delivered under this contract, inspect at the Recipient's facility any data withheld pursuant to paragraph (h) of this clause, for
purposes of verifying the Recipient's assertion pertaining to the limited rights or restricted rights status of the data or for
evaluating work performance. Where the Recipient whose data are to be inspected demonstrates to the Contracting Officer that there
would be a possible conflict of interest if the inspection were made by a particular representative, the Contracting Officer shall
designate an alternate inspector.
|  | October 2, 2023 |
Department
of Energy
37 CFR 401.14 DOE Modified Patent
Rights Clause*
*the standard
patent rights clause at 37 CFR 401.14 has been modified to (1) reflect DOE required subcontracting instructions pursuant to 37 CFR 401.5(a)
as well as the deletion of the definition of contractor that does not apply based on the subcontracting instructions; (2) change acquisition
terms of contractor, contract and subcontract to financial assistance terms of recipient, award, subaward or agreement pursuant to 37
CFR 401.5(c); and (3) include paragraph (n) U.S. competitiveness provision pursuant to the Determination of Exceptional Circumstances
under the Bayh-Dole Act to Further Promote Domestic Manufacture of DOE Science and Energy Technologies executed by DOE on June 7,2021.
(a) Definitions
(1) Invention
means any invention or discovery which is or may be patentable or otherwise protectable under Title 35 of the United States Code, or
any novel variety of plant which is or may be protected under the Plant Variety Protection Act (7 U.S.C. 2321 et seq.).
(2)
Subject invention means any invention of the Recipient conceived or first actually reduced to practice in the performance of work under
this agreement, provided that in the case of a variety of plant, the date of determination (as defined in section 41(d) of the Plant
Variety Protection Act, 7 U.S.C. 2401(d)) must also occur during the period of agreement performance.
(3) Practical
Application means to manufacture in the case of a composition or product, to practice in the case of a process or method, or to operate
in the case of a machine or system; and, in each case, under such conditions as to establish that the invention is being utilized and
that its benefits are, to the extent permitted by law or government regulations, available to the public on reasonable terms.
(4)
Made when used in relation to any invention means the conception or first actual reduction to practice of such invention.
(5)
Small Business Firm means a small business concern as defined at section 2 of Pub. L. 85-536 ( 15 U.S.C. 632) and implementing regulations
of the Administrator of the Small Business Administration. For the purpose of this clause, the size standards for small business concerns
involved in government procurement and subcontracting at 13 CFR 121.3-8 and 13 CFR 121.3-12, respectively, will be used.
(6)
Nonprofit Organization means a university or other institution of higher education or an organization of the type described in section
501(c)(3) of the Internal Revenue Code of 1954 (26 U.S.C. 501(c) and exempt from taxation under section 501(a) of the Internal Revenue
Code (25 U.S.C. 501(a)) or any nonprofit scientific or educational organization qualified under a state nonprofit organization statute.
(7)
Statutory period means the one-year period before the effective filing date of a claimed invention in a patent application during which
exceptions to prior art exist per 35 U.S.C. 102(b) as amended by the Leahy-Smith America Invents Act, Public Law 112-29.
(b) Allocation of Principal Rights
The Recipient may retain the
entire right, title, and interest throughout the world to each subject invention subject to the provisions of this clause and 35 U.S.C.
203. With respect to any subject invention in which the Recipient retains title, the Federal government shall have a nonexclusive, nontransferable,
irrevocable, paid-up license to practice or have practiced for or on behalf of the United States the subject invention throughout the world.
|  | October 2, 2023 |
Department
of Energy
(c) Invention Disclosure, Election of
Title and Filing of Patent Application by Recipient
(1) The
Recipient will disclose each subject invention to the Federal agency within two months after the inventor discloses it in writing to
Recipient personnel responsible for patent matters. The disclosure to the agency shall be in the form of a written report and shall
identify the agreement under which the invention was made and the inventor(s). It shall be sufficiently complete in technical detail
to convey a clear understanding to the extent known at the time of the disclosure, of the nature, purpose, operation, and the
physical, chemical, biological or electrical characteristics of the invention. The disclosure shall also identify any publication,
on sale or public use of the invention, and whether a manuscript describing the invention has been submitted for publication and, if
so, whether it has been accepted for publication at the time of disclosure. In addition, after disclosure to the agency, the
Recipient will promptly notify the agency of the acceptance of any manuscript describing the invention for publication or of any on
sale or public use planned by the Recipient. If required by the Federal agency, the Recipient will provide periodic (but no more
frequently than annual) listings of all subject inventions which were disclosed to the agency during the period covered by the
report, and will provide a report prior to the close-out of a funding agreement listing all subject inventions or stating that there
were none.
(2) The
Recipient will elect in writing whether or not to retain title to any such invention by notifying the Federal agency within two
years of disclosure to the Federal agency. However, in any case where a patent, a printed publication, public use, sale, or other
availability to the public has initiated the one year statutory period wherein valid patent protection can still be obtained in the
United States, the period for election of title may be shortened by the agency to a date that is no more than 60 days prior to the
end of the statutory period.
(3)(i) The Recipient
will file its initial patent application on a subject invention to which it elects to retain title within one year after election of
title or, if earlier, prior to the end of any statutory period wherein valid patent protection can be obtained in the United States after
a publication, on sale, or public use.
(ii)
If the Recipient files a provisional application as its initial patent application, it shall file a non-provisional application within
10 months of the filing of the provisional application. So long as there is a pending patent application for the subject invention and
the statutory period wherein valid patent protection can be obtained in the United States has not expired, additional provisional applications
may be filed within the initial 10 months or any extension period granted under paragraph (c)(5) of this clause. If an extension(s) is
granted under paragraph (c)(5) of this clause, the Recipient shall file a nonprovisional patent application prior to the expiration of
the extension(s) or notify the agency of any decision not to file a nonprovisional application prior to the expiration of the extension(s),
or if earlier, 60 days prior to the end of any statutory period wherein valid patent protection can be obtained in the United States.
(iii)
The Recipient will file patent applications in additional countries or international patent offices within either ten months of the
first filed patent application or six months from the date permission is granted by the Commissioner of Patents to file foreign
patent applications where such filing has been prohibited by a Secrecy Order.
(iv) If
required by the Federal agency, the Recipient will provide the filing date, patent application number and title; a copy of the
patent application; and patent number and issue date for any subject invention in any country in which the Recipient has applied for
a patent.
|  | October 2, 2023 |
Department
of Energy
(4)
For any subject invention with Federal agency and Recipient co-inventors, where the Federal agency employing such co-inventor determines
that it would be in the interest of the government, pursuant to 35 U.S. C. 207(a)(3), to file an initial patent application on the subject
invention, the Federal agency employing such co-inventor, at its discretion and in consultation with the Recipient, may file such application
at its own expense, provided that the Recipient retains the ability to elect title pursuant to 35 U.S.C. 202(a).
(5)
Requests for extension of the time for disclosure, election, and filing under paragraphs (1), (2), and (3) of this clause may, at the
discretion of the Federal agency, be granted. When a Recipient has requested an extension for filing a non-provisional application after
filing a provisional application, a one-year extension will be granted unless the Federal agency notifies the Recipient within 60 days
of receiving the request.
(6)
In the event a subject invention is made under funding agreements of more than one agency, at the request of the Recipient or on their
own initiative the agencies shall designate one agency as responsible for administration of the rights of the government in the invention.
(d) Conditions When the Government May
Obtain Title
(1) A Federal agency may
require the Recipient to convey title to the Federal agency, of any subject invention -
(i)
If the Recipient fails to disclose or elect title to the subject invention within the times specified in paragraph (c) of this clause,
or elects not to retain title.
(ii) In those countries in which the Recipient fails to file patent applications within the times specified
in paragraph (c) of this clause; provided, however, that if the Recipient has filed a patent application in a country after the times
specified in paragraph (c) of this clause, but prior to its receipt of the written request of the Federal agency, the Recipient shall
continue to retain title in that country.
(ii) In
any country in which the Recipient decides not to continue the prosecution of any non-provisional patent application for, to pay a
maintenance, annuity or renewal fee on, or to defend in a reexamination or opposition proceeding on, a patent on a subject
invention.
(iv)
Upon breach of paragraph (n) U.S. Competitiveness of this Patent Rights clause.
(2) A Federal agency at its
discretion, may waive the requirement for the Recipient to convey title to any subject invention.
(e) Minimum Rights to Recipient and
Protection of the Recipient Right to File
(1)
The Recipient will retain a nonexclusive royalty-free license throughout the world in each subject invention to which the Government
obtains title, except if the Recipient fails to disclose the invention within the times specified in (c), above. The Recipient's license
extends to its domestic subsidiary and affiliates, if any, within the corporate structure of which the Recipient is a party and includes
the right to grant sublicenses of the same scope to the extent the Recipient was legally obligated to do so at the time the agreement
was awarded. The license is transferable only with the approval of the Federal agency except when transferred to the successor of that
party of the Recipient's business to which the invention pertains.
(2)
The Recipient's domestic license may be revoked or modified by the funding Federal agency to the extent necessary to achieve expeditious
practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with applicable
provisions at 37 CFR part 404 and agency licensing regulations (if any). This license
will not be revoked in that field of use or the geographical areas in which the Recipient has achieved practical application and continues
to make the benefits of the invention reasonably accessible to the public. The license in any foreign country may be revoked or modified
at the discretion of the funding Federal agency to the extent the Recipient, its licensees, or the domestic subsidiaries or affiliates
have failed to achieve practical application in that foreign country.
|  | October 2, 2023 |
Department
of Energy
(3) Before revocation or modification
of the license, the funding Federal agency will furnish the Recipient a written notice of its intention to revoke or modify the license,
and the Recipient will be allowed thirty days (or such other time as may be authorized by the funding Federal agency for good cause shown
by the Recipient) after the notice to show cause why the license should not be revoked or modified. The Recipient has the right to appeal,
in accordance with applicable regulations in 37 CFR part 404 and agency regulations (if any) concerning the licensing of Government-owned
inventions, any decision concerning the revocation or modification of the license.
(f) Recipient Action to Protect the
Government's Interest
(1) The
Recipient agrees to execute or to have executed and promptly deliver to the Federal agency all instruments necessary to (i) establish
or confirm the rights the Government has throughout the world in those subject inventions to which the Recipient elects to retain title,
and (ii) convey title to the Federal agency when requested under paragraph (d) above and to enable the government to obtain patent protection
throughout the world in that subject invention.
(2)
The Recipient agrees to require, by written agreement, its employees, other than clerical and nontechnical employees, to disclose promptly
in writing to personnel identified as responsible for the administration of patent matters and in a format suggested by the Recipient
each subject invention made under agreement in order that the Recipient can comply with the disclosure provisions of paragraph (c) of
this clause, to assign to the Recipient the entire right, title and interest in and to each subject invention made under agreement, and
to execute all papers necessary to file patent applications on subject inventions and to establish the government's rights in the subject
inventions. This disclosure format should require, as a minimum, the information required by paragraph (c)(1) of this clause. The Recipient
shall instruct such employees through employee agreements or other suitable educational programs on the importance of reporting inventions
in sufficient time to permit the filing of patent applications prior to U.S. or foreign statutory bars.
(3)
For each subject invention, the Recipient will, no less than 60 days prior to the expiration of the statutory deadline, notify the Federal
agency of any decision: Not to continue the prosecution of a non-provisional patent application; not to pay a maintenance, annuity or
renewal fee; not to defend in a reexamination or opposition proceeding on a patent, in any country; to request, be a party to, or take
action in a trial proceeding before the Patent Trial and Appeals Board of the U.S. Patent and Trademark Office, including but not limited
to post-grant review, review of a business method patent, inter partes review, and derivation proceeding; or to request, be a party to,
or take action in a non-trial submission of art or information at the U.S. Patent and Trademark Office, including but not limited to
a pre-issuance submission, a post-issuance submission, and supplemental examination.
(4)
The Recipient agrees to include, within the specification of any United States patent applications and any patent issuing thereon covering
a subject invention, the following statement, “This invention was made with government support under DE-MS0000122 awarded by U.S.
Department of Energy. The government has certain rights in the invention.”
|  | October 2, 2023 |
Department
of Energy
(g) Subaward/Contract
(1)
The Recipient will include this clause, suitably modified to identify the parties, in all subawards/contracts, regardless of tier, for
experimental, developmental, or research work to be performed by a domestic small business firm or nonprofit organization. The subrecipient/contractor
will retain all rights provided for the Recipient in this clause, and the Recipient will not, as part of the consideration for awarding
the subaward/ contract, obtain rights in the subrecipient's/contractor's subject inventions.
(2)
The above requirement in (g)(1) does not apply for any agreement with a DOE laboratory. The Recipient and the DOE laboratory shall use
a technology transfer agreement (e.g., Strategic Partnership Project (SPP), Cooperative Research and Development Agreement (CRADA)) that
is executed by the Recipient and the DOE laboratory and approved by DOE. The technology transfer agreement will provide the applicable
patent rights clause for the work to be performed by the DOE laboratory.
(3)
The Recipient will include in all other subawards/contracts, regardless of tier, for experimental, developmental, or research work the
patent rights clause directed by the DOE Contracting Officer.
(h) Reporting on Utilization of Subject
Inventions
The Recipient agrees to submit
on request periodic reports no more frequently than annually on the utilization of a subject invention or on efforts at obtaining such
utilization that are being made by the Recipient or its licensees or assignees. Such reports shall include information regarding the
status of development, date of first commercial sale or use, gross royalties received by the Recipient, and such other data and information
as the agency may reasonably specify. The Recipient also agrees to provide additional reports as may be requested by the agency in connection
with any march-in proceeding undertaken by the agency in accordance with paragraph (j) of this clause. As required by 35 U.S.C. 202(c)(5),
the agency agrees it will not disclose such information to persons outside the government without permission of the Recipient.
(i) Preference for United States Industry
Notwithstanding any other
provision of this clause, the Recipient agrees that neither it nor any assignee will grant to any person the exclusive right to use or
sell any subject inventions in the United States unless such person agrees that any products embodying the subject invention or produced
through the use of the subject invention will be manufactured substantially in the United States. However, in individual cases, the requirement
for such an agreement may be waived by the Federal agency upon a showing by the Recipient or its assignee that reasonable but unsuccessful
efforts have been made to grant licenses on similar terms to potential licensees that would be likely to manufacture substantially in
the United States or that under the circumstances domestic manufacture is not commercially feasible.
|  | October 2, 2023 |
Department
of Energy
(j) March-in Rights
The Recipient agrees that
with respect to any subject invention in which it has acquired title, the Federal agency has the right in accordance with the procedures
in 37 CFR 401.6 and any supplemental regulations of the agency to require the Recipient, an assignee or exclusive licensee of a subject
invention to grant a nonexclusive, partially exclusive, or exclusive license in any field of use to a responsible applicant or applicants,
upon terms that are reasonable under the circumstances, and if the Recipient, assignee, or exclusive licensee refuses such a request
the Federal agency has the right to grant such a license itself if the Federal agency determines that:
(1)
Such action is necessary because the Recipient or assignee has not taken, or is not expected to take within a reasonable time, effective
steps to achieve practical application of the subject invention in such field of use.
(2)
Such action is necessary to alleviate health or safety needs which are not reasonably satisfied by the Recipient, assignee or their licensees;
(3)
Such action is necessary to meet requirements for public use specified by Federal regulations and such requirements are not reasonably
satisfied by the Recipient, assignee or licensees; or
(4)
Such action is necessary because the agreement required by paragraph (i) of this clause has not been obtained or waived or because a
licensee of the exclusive right to use or sell any subject invention in the United States is in breach of such agreement.
(k) Special Provisions for Agreements
with Nonprofit Organizations If the Recipient is a nonprofit organization, it agrees that:
(1)
Rights to a subject invention in the United States may not be assigned without the approval of the Federal agency, except where such
assignment is made to an organization which has as one of its primary functions the management of inventions, provided that such assignee
will be subject to the same provisions as the Recipient;
(2)
The Recipient will share royalties collected on a subject invention with the inventor, including Federal employee co-inventors (when
the agency deems it appropriate) when the subject invention is assigned in accordance with 35 U.S.C. 202(e) and 37 CFR 401.10;
(3)
The balance of any royalties or income earned by the Recipient with respect to subject inventions, after payment of expenses (including
payments to inventors) incidental to the administration of subject inventions, will be utilized for the support of scientific research
or education; and
(4)
It will make efforts that are reasonable under the circumstances to attract licensees of subject inventions that are small business firms
and that, when appropriate, it will give a preference to a small business firm when licensing a subject invention;
(5)
The Federal agency may review the Recipient's licensing program and decisions regarding small business applicants, and the Recipient
will negotiate changes to its licensing policies, procedures, or practices with the Federal agency when the Federal agency's review discloses
that the Recipient could take reasonable steps to more effectively implement the requirements of paragraph (k)(4) of this clause; and
(6)
The Federal agency may take into consideration concerns presented by small businesses in making such determinations in paragraph (k)(5)
of this clause.
(l) Communication
Unless otherwise directed
by DOE Patent Counsel, all reports and notifications required by this clause shall be submitted in accordance with the instructions provided
in the Federal Assistance Reporting Checklist (FARC) of this agreement.
(m) Electronic Filing.
(1) Unless otherwise requested or directed
by the Federal agency --
|  | October 2, 2023 |
Department
of Energy
(i)
The written disclosure required in (c)(1) of this clause shall be electronically filed;
(ii) The
written election required in (c)(2) of this clause shall be electronically filed; and
(iii)
If required by the agency to be submitted, the close-out report in paragraph (c)(1) of this clause and the patent information and
periodic reporting identified in paragraph (c)(3) of this clause shall be electronically filed.
(2) Other written notices required
in this clause may be electronically delivered to the agency or the contractor through an electronic database used for reporting subject
inventions, patents, and utilization reports to the funding agency.
(n)
U.S. Competitiveness
The Recipient agrees that
any products embodying any subject invention or produced through the use of any subject invention will be manufactured substantially
in the United States unless the Recipient can show to the satisfaction of DOE that it is not commercially feasible. In the event DOE
agrees to foreign manufacture, there will be a requirement that the Government's support of the technology be recognized in some appropriate
manner, e.g., alternative binding commitments to provide an overall net benefit to the U.S. economy. The Recipient agrees that it will
not license, assign or otherwise transfer any subject invention to any entity, at any tier, unless that entity agrees to these same requirements.
In the event that the Recipient or other such entity receiving rights in the Subject Invention undergoes a change in ownership amounting
to a controlling interest, the Recipient or other such entity receiving rights shall ensure continual compliance with the requirements
of this paragraph (n) and shall inform DOE, in writing, of the change in ownership within six months of the change. The Recipient and
any successor assignee will convey to DOE, upon written request from DOE, title to any subject invention, upon a breach of this paragraph
(n). The Recipient will include this paragraph (n) in all subawards/contracts, regardless of tier, for experimental, developmental or
research work.
(o) The requirements,
rights and administration of paragraph (n) are further clarified as follows:
| 1. | Waivers.
The Recipient (or any entity subject to paragraph (n)) may request a waiver or modification
of paragraph (n). Such waivers or modifications may be granted when DOE determines that (1)
the Recipient (or any entity subject to paragraph (n)) has demonstrated, with quantifiable
data, that manufacturing in the United States is not commercially feasible and (2) a waiver
or modification would best serve the interests of the United States and the general public. |
| 2. | Final determination
of breach of paragraph (n). If DOE determines the Recipient is in breach of paragraph (n),
the Department may issue a final written determination of such breach. If such determination
includes a demand for title to the subject inventions under the award, the demand for title
will cause an immediate conveyance and assignment of all rights to all subject inventions
under the award to the United States Government, including all pending U.S. and foreign patent
applications and all U.S. and foreign patents that cover any subject invention, without compensation.
Any such final determination shall be signed by the cognizant DOE Contracting Officer with
the concurrence of the Assistant General Counsel for Technology Transfer & Intellectual
Property. Advanced notice will be provided for comment to the Recipient before any final
written determination by DOE is issued. |
| 3. | Pursuant to Recipient's agreement in
paragraph (n) to not license, assign or otherwise transfer rights to subject inventions at any
tier unless the entity agrees to paragraph (n): any such license, assignment, or other transfer of right to any subject invention developed
under the award shall contain paragraph (n) suitably modified to properly identify the parties. If a licensee, assignee, or other transferee
of rights to any subject invention is finally determined by DOE in writing to be in breach of paragraph (n), the applicable license,
assignment or other transfer shall be deemed null and void. Advanced notice will be provided for comment to the non-complying party before
any final written determination by DOE is made. |
|  | October 2, 2023 |
Department
of Energy
| 4. | For clarity,
if the forfeiture of title to any subject invention is due to a breach of paragraph (n),
the Recipient shall not be entitled to any compensation, or to a license to the subject invention
including the reserved license in section (e)(1), unless DOE grants a license through a separately
agreed upon licensing agreement. |
| 5. | Authority.
The requirements and administration of paragraph (n) is in accordance with the Determination
of Exceptional Circumstances (DEC) under the Bayh-Dole Act to Further Promote Domestic Manufacture
of DOE Science and Energy Technologies executed by DOE on June 7, 2021. A copy of the DEC
is available at https://www.energy.gov/gc/determination-exceptional-circumstances-decs.
By accepting or acknowledging the award, the Recipient is also acknowledging that it has
received a copy of the DEC through the foregoing link. As set forth in 37 CFR 401.4, any
nonprofit organization or small business firm as defined by 35 U.S.C. 201 affected by any
DEC has the right to appeal the imposition of the DEC within thirty (30) working days from
the Recipient's acceptance or acknowledgment of this award. |
|  | October 2, 2023 |
Department
of Energy
Data Management Plan
The data management plan is attached
to this intellectual property clause set or is otherwise included in the award or application documentation. The Data Management Plan
explains how data generated in the course of the work performed under this agreement will be shared or preserved or, when justified,
explains why data sharing or preservation is not possible or scientifically appropriate. In the event of a conflict between this Data
Rights clause and the Data Management Plan, the Data Rights clause takes precedence.

Department of
Energy
Appendix to Attachment
4
Unlimited Rights Data
Recipient:
| · | General
or summary data regarding: |
| § | updates
and/or assessments of project status and execution performance data; |
| § | the
status of capacity installation goals; |
| § | the
status of Community Benefits goals, including the number and type of jobs created and other
community benefits; |
| § | business
impact, including increased plant capacity and product performance; |
| § | Earned
Value Assessments or documentation; |
| § | the
status of expenditures, including the respective share of federal and non-federal share of
costs incurred under the grant; |
| § | simplified
manufacturing process data; |
| § | general
block flow diagrams and data related to general ranges of operating conditions; |
| § | general
industry-wide market and customer data such as number of customers, type and geography of
industries served; and |
| § | general
industry-wide supplier data. |
Appendix to Attachment
4
Page 1 of 1
DE-MS0000122.0000
Attachment 5 - Community
Benefits Outcomes and Objectives
Recipient Name: Solid Power Operating, Inc.
Project Title: Bipartisan Infrastructure
Law (BIL) - Continuous Production of Sulfide-based Solid Electrolyte Materials for Advanced All-Solid-State Batteries
Award Number: DE-MS0000122
The proposed project, titled “Bi-Partisan
Infrastructure Law (BIL) - Continuous Production of Sulfide-based Solid Electrolyte Materials for Advanced ASSBs”, will take place
at Solid Power’s Solid-State Electrolyte (SSE) production facility at 14902 Grant St, Thornton, CO, in Adams County, CO. Solid
Power is committed to ensuring that the project creates well-paying jobs with career-track training, prioritizes benefits to underrepresented
communities, and provides equitable access to wealth-building opportunities. Additionally, Solid Power wants to ensure that the local
community has a voice throughout the project and beyond, and that Solid Power has a plan to continue engagement with community members.
In accordance with the goals of the Funding Opportunity Announcement, Solid Power proposes a Community Benefits Plan (CBP) that exceptionally
addresses the four key pillars of the CBP, and creates accountability for the project’s long-term success.
To accomplish the goals outlined below,
Solid Power is committing $2 million of project funding to various initiatives outlined below. In addition, Solid Power is committing
to hire a full-time Community Benefits Plan Manager dedicated to the execution and management of the plan, as well as additional community
engagement. This new hire will work with the DOE, Project Manager(s), construction contractor(s), and Solid Power internal teams to ensure
the commitments made here are completed and persist after the proposed project has been completed.
|
*CBOO activities for the remaining
Budget Period tasks are subject to DOE review/approval of submitted Continuation Application
Template Version 2.0, 04/2024 | | 1 |
|
Existing
or Planned |
Budget
Period
1 milestone |
Budget
period
2 milestone* |
Budget
period
3 milestone* |
Budget
period
4 milestone* |
Community
and Labor Engagement |
|
|
|
|
|
Community
benefits agreement |
x
Yes
|
Initiate
conversations with local entities; draft agreement, review agreement with all parties; execute agreement |
|
|
|
Project
Labor Agreement (construction jobs) |
x
Yes
|
Inform
EPC and contractors of agreement requirement; review initial draft(s) |
Ensure
agreements are executed by EPC/contractors and skilled labor groups |
|
|
Community
feedback and data incorporated into the project |
x
Yes
|
|
|
|
|
MSU
Bridge Program |
|
Ensure
internal team alignment; ensure alignment between MSU and Solid Power; |
Accept
1 or more interns |
Accept
1 or more interns |
Accept
1 or more interns |
NGHS
Internship program |
|
Ensure
internal teams are aligned; ensure NGHS and Solid Power are aligned; ensure legal agreements
are signed;
Accept summer interns |
Accept
summer interns |
Accept
summer interns |
Accept
summer interns |
NGHS
Educator Grant |
|
Meet
with NGHS Staff to understand needs to educators; internally set metrics for grant program; Award and distribute NGHS grants |
Award
and distribute NGHS grants
|
Award
and distribute NGHS grants
|
Award
and distribute NGHS grants
|
Community
College Scholarship for Underrepresented Students |
|
Meet
with Front Range Community College to discuss challenges and opportunities with a scholarship fund; ensure internal alignment about
fund specifics (how to distribute, scoring criteria, etc); solicit applications and award scholarship(s) |
solicit
applications and award scholarship(s) |
solicit
applications and award scholarship(s) |
solicit
applications and award scholarship(s) |
Template Version 2.0, 04/2024 | | 2 |
Investing
in Job Quality and Workforce Continuity |
Total
Number of Permanent Operations Jobs: 20
Number of Construction phase jobs:
100+
|
|
|
|
|
Minimum
starting wage for permanent hourly jobs: |
$24.52/hr |
|
|
|
|
Pay
upper quintile wages for industry and occupation |
xYes
¨
No |
|
|
|
|
Fringe
Benefits |
x Employer-sponsored health insurance
x
Contributions to retirement
x
Transportation assistance |
|
|
|
|
Training |
x
Contributions to labor-management training partnership
x
Utilization of registered apprentices for at least 15% of construction jobs
x
Paid training
x
Tuition support or reimbursement |
|
|
|
|
Health
and Safety Committee with Hourly Worker Representation |
x
Yes
|
|
|
|
|
Support
for Worker Organizing/Collective Bargaining |
x
Pledge to remain neutral during any union organizing
campaigns
|
|
|
|
|
Other
Job Quality and Workforce |
|
|
|
|
|
Diversity,
Equity, Inclusion, and Accessibility |
x
Local and/or targeted recruitment efforts
x
MWBE contracting
|
Partnerships
with community-based organizations and ed/training providers for workforce needs planned. |
|
|
|
Other
DEIA |
|
|
|
|
|
Justice40
Initiative |
|
|
|
|
|
An
increase in quality job creation, the clean energy job pipeline, and job training for individuals |
x
Yes
|
|
|
Hire
employees, targeting majority from local community, |
Hire
remaining employees, targeting majority from local community |
Increases
in energy democracy, including community ownership of project assets |
x
Yes – Solid Power will incorporate Community Voice
in the project
|
|
|
|
|
Increased
parity in clean energy technology access and adoption |
x
Yes – Solid Power to move operations to 100% renewable energy |
Engage
local utility for options; align internal teams; formalize agreement with utility |
|
|
|
Template Version 2.0, 04/2024 | | 3 |
Attachment
6 – Data Management Plan
Attachment
6 – Data Management Plan
The Recipient will not be required to
make the underlying research data supporting findings in the deliverables under the grant publicly available other than as specified
in the Statement of Project Objectives (SOPO) and the Intellectual Property Provisions attached to the grant. Specifically, any identified
Protected Data, Restricted Computer Software, and Limited Rights Data will receive the protection available for such data under the grant
and applicable regulations. Data that qualifies as Protected Data shall be shielded from public disclosure consistent with the conditions
of the award, including the period of protection specified. The Government may verify the status of all data specifically used by or
generated by the Recipient. The DOE, and any other duly authorized government representatives, will have access, upon request, to all
data generated under the award. Other than providing the specific deliverables subject to public disclosure as specified in the award,
the Recipient does not currently intend to publish any other results from the project. Where a publication includes results of the project
or the underlying research data, these results and data will be made available according to the policies of the publication, Recipient,
and the Intellectual Property Provisions of this grant. The Recipient will ensure compliance with any requirements pertaining to advance
review by the DOE and to any clause(s) mandating the acknowledgement of federal sponsorship of the data to be published.
v3.24.4
Cover
|
Jan. 21, 2025 |
Document Information [Line Items] |
|
Document Type |
8-K
|
Amendment Flag |
false
|
Document Period End Date |
Jan. 21, 2025
|
Entity File Number |
001-40284
|
Entity Registrant Name |
Solid
Power, Inc.
|
Entity Central Index Key |
0001844862
|
Entity Tax Identification Number |
86-1888095
|
Entity Incorporation, State or Country Code |
DE
|
Entity Address, Address Line One |
486
S. Pierce Avenue
|
Entity Address, Address Line Two |
Suite E
|
Entity Address, City or Town |
Louisville
|
Entity Address, State or Province |
CO
|
Entity Address, Postal Zip Code |
80027
|
City Area Code |
303
|
Local Phone Number |
219-0720
|
Written Communications |
false
|
Soliciting Material |
false
|
Pre-commencement Tender Offer |
false
|
Pre-commencement Issuer Tender Offer |
false
|
Entity Emerging Growth Company |
false
|
Common Stock [Member] |
|
Document Information [Line Items] |
|
Title of 12(b) Security |
Common stock, par value $0.0001 per share
|
Trading Symbol |
SLDP
|
Security Exchange Name |
NASDAQ
|
Warrant [Member] |
|
Document Information [Line Items] |
|
Title of 12(b) Security |
Warrants, each whole warrant exercisable for one share of common stock at an exercise price of $11.50
|
Trading Symbol |
SLDPW
|
Security Exchange Name |
NASDAQ
|
X |
- DefinitionBoolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
+ Details
Name: |
dei_AmendmentFlag |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:booleanItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionFor the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
+ Details
Name: |
dei_DocumentPeriodEndDate |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:dateItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionThe type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
+ Details
Name: |
dei_DocumentType |
Namespace Prefix: |
dei_ |
Data Type: |
dei:submissionTypeItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionAddress Line 1 such as Attn, Building Name, Street Name
+ References
+ Details
Name: |
dei_EntityAddressAddressLine1 |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:normalizedStringItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionAddress Line 2 such as Street or Suite number
+ References
+ Details
Name: |
dei_EntityAddressAddressLine2 |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:normalizedStringItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- Definition
+ References
+ Details
Name: |
dei_EntityAddressCityOrTown |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:normalizedStringItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionCode for the postal or zip code
+ References
+ Details
Name: |
dei_EntityAddressPostalZipCode |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:normalizedStringItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionName of the state or province.
+ References
+ Details
Name: |
dei_EntityAddressStateOrProvince |
Namespace Prefix: |
dei_ |
Data Type: |
dei:stateOrProvinceItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionA unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 12 -Subsection b-2
+ Details
Name: |
dei_EntityCentralIndexKey |
Namespace Prefix: |
dei_ |
Data Type: |
dei:centralIndexKeyItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionIndicate if registrant meets the emerging growth company criteria.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 12 -Subsection b-2
+ Details
Name: |
dei_EntityEmergingGrowthCompany |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:booleanItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionCommission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
+ Details
Name: |
dei_EntityFileNumber |
Namespace Prefix: |
dei_ |
Data Type: |
dei:fileNumberItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionTwo-character EDGAR code representing the state or country of incorporation.
+ References
+ Details
Name: |
dei_EntityIncorporationStateCountryCode |
Namespace Prefix: |
dei_ |
Data Type: |
dei:edgarStateCountryItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionThe exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 12 -Subsection b-2
+ Details
Name: |
dei_EntityRegistrantName |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:normalizedStringItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionThe Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 12 -Subsection b-2
+ Details
Name: |
dei_EntityTaxIdentificationNumber |
Namespace Prefix: |
dei_ |
Data Type: |
dei:employerIdItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionLocal phone number for entity.
+ References
+ Details
Name: |
dei_LocalPhoneNumber |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:normalizedStringItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionBoolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 13e -Subsection 4c
+ Details
Name: |
dei_PreCommencementIssuerTenderOffer |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:booleanItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionBoolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 14d -Subsection 2b
+ Details
Name: |
dei_PreCommencementTenderOffer |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:booleanItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionTitle of a 12(b) registered security.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 12 -Subsection b
+ Details
Name: |
dei_Security12bTitle |
Namespace Prefix: |
dei_ |
Data Type: |
dei:securityTitleItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionName of the Exchange on which a security is registered.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Number 240 -Section 12 -Subsection d1-1
+ Details
Name: |
dei_SecurityExchangeName |
Namespace Prefix: |
dei_ |
Data Type: |
dei:edgarExchangeCodeItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionBoolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Exchange Act -Section 14a -Number 240 -Subsection 12
+ Details
Name: |
dei_SolicitingMaterial |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:booleanItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionTrading symbol of an instrument as listed on an exchange.
+ References
+ Details
Name: |
dei_TradingSymbol |
Namespace Prefix: |
dei_ |
Data Type: |
dei:tradingSymbolItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- DefinitionBoolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ ReferencesReference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher SEC -Name Securities Act -Number 230 -Section 425
+ Details
Name: |
dei_WrittenCommunications |
Namespace Prefix: |
dei_ |
Data Type: |
xbrli:booleanItemType |
Balance Type: |
na |
Period Type: |
duration |
|
X |
- Details
Name: |
us-gaap_StatementClassOfStockAxis=us-gaap_CommonStockMember |
Namespace Prefix: |
|
Data Type: |
na |
Balance Type: |
|
Period Type: |
|
|
X |
- Details
Name: |
us-gaap_StatementClassOfStockAxis=us-gaap_WarrantMember |
Namespace Prefix: |
|
Data Type: |
na |
Balance Type: |
|
Period Type: |
|
|
Solid Power (NASDAQ:SLDPW)
Historical Stock Chart
From Jan 2025 to Feb 2025
Solid Power (NASDAQ:SLDPW)
Historical Stock Chart
From Feb 2024 to Feb 2025