Vertiv Codevelops with NVIDIA Complete Power and Cooling Blueprint for NVIDIA GB200 NVL72 Platform
16 October 2024 - 3:30AM
Business Wire
End-to-end critical power and cooling
reference designs for NVIDIA Blackwell architectures up to 7MW,
with OCP infrastructure options
Vertiv (NYSE: VRT), a global provider of critical digital
infrastructure, today announced that it is releasing a complete 7MW
reference architecture of the NVIDIA GB200 NVL72 platform,
co-developed with NVIDIA, that will enable customers to transform
traditional data center architectures into AI factories capable of
powering AI applications across the enterprise.
This press release features multimedia. View
the full release here:
https://www.businesswire.com/news/home/20241014494536/en/
Vertiv and NVIDIA collaborative reference
design for power and cooling infrastructure to enable NVIDIA
Blackwell architectures up to 7MW (Photo: Business Wire)
The reference architecture will accelerate the deployment of the
NVIDIA GB200 NVL72 liquid-cooled rack-scale platform and supports
up to 132kW per rack. The architecture takes an end-to-end approach
to infrastructure design to optimize deployment speed, performance,
resiliency, cost, energy efficiency and scalability for current-
and future-generation data centers.
“We are proud to deepen our collaboration with NVIDIA to enable
AI-driven data centers of today and tomorrow,” said Giordano (Gio)
Albertazzi, CEO of Vertiv. “As a leader in critical power and
cooling infrastructure, Vertiv is uniquely positioned to support
the NVIDIA GB200 NVL72 platform. Our portfolio of high-performance
power and cooling solutions, combined with our global scale, will
enable customers to deploy AI data centers faster, more efficiently
and with greater flexibility to address densification, dynamic
workloads, retrofits and enable future-ready designs.”
“New data centers are built for accelerated computing and
generative AI with architectures that are significantly more
complex than those for general-purpose computing,” said Jensen
Huang, founder and CEO of NVIDIA. “With Vertiv's world-class
cooling and power technologies, NVIDIA can realize our vision to
reinvent computing and build a new industry of AI factories that
produce digital intelligence to benefit every company and
industry.”
With Vertiv™ power and cooling infrastructure matched to, and
closely coupled with, the NVIDIA Blackwell platform, the reference
architecture simplifies and accelerates deployment of AI workloads
in new and existing data centers while reducing risk and enabling
standardization across sites. The architecture’s complete critical
power infrastructure is designed to significantly reduce stranded
power by aligning AI clusters to data center capacity blocks. The
hybrid liquid- and air-cooling infrastructure leverages the
interdependent impact of the two approaches to efficiently manage
high-density heat removal. In addition, the design includes
guidance for optional Open Compute Project-inspired systems, such
as DC power shelves.
The reference architecture is part of the Vertiv™ 360AI
portfolio of reference designs for retrofit and greenfield data
centers, designed to help customers navigate integrated solutions
for power and cooling for AI and other high-performance computing
applications. Key benefits of the co-developed reference
architecture for the NVIDIA GB200 NVL72 design include:
- Rapid Deployment and Retrofit: Enabling the use of
preconfigured modules and factory integration, Vertiv™ MegaMod™
CoolChip delivers turnkey AI critical infrastructure up to 50%
faster than onsite builds.
- Space-Saving Power Management: Using Vertiv’s advanced
power technologies, including Vertiv™ Trinergy™ uninterruptible
power supply system (UPS) and Vertiv™ EnergyCore lithium battery
cabinet, the design delivers industry-leading reliability and
energy-efficient power management in ~40% less space compared to
legacy offerings.
- Energy-Efficient Cooling: Integrating liquid and low-GWP
(Global Warming Potential) air cooling technologies at scale -
including Vertiv™ AFC chiller, Vertiv™ Liebert® CW chilled
water-based room cooling system and Vertiv™ XDU coolant
distribution units - offers up to 20% lower annual cooling costs
compared to fixed screw solutions.
- Dynamic Workload Management: Integrated load averaging
via lithium-ion battery and next generation UPS provides support
for dynamic GPU workloads.
- Installation and Operations Services: With an
industry-leading scale, scope, and reach of ~4,000 field service
engineers globally, Vertiv is the trusted lifecycle service partner
and complex system-level expert for retrofit and newbuild.
As enterprises embrace AI at an unprecedented pace, Vertiv is
reshaping the future of critical power and cooling to support
accelerated computing, with the most complete portfolio of critical
digital infrastructure that enables AI-ready infrastructure capable
of managing the unique requirements of AI and other accelerated
compute applications.
Vertiv’s collaboration with NVIDIA sets a future-forward roadmap
for technical co-development and enables deployment of accelerated
computing at scale. To access the reference designs, visit
Vertiv.com. Vertiv experts are also available to discuss details of
the new design at OCP Summit, October 15-17, at booth #C5.
About Vertiv
Vertiv (NYSE: VRT) brings together hardware, software, analytics
and ongoing services to enable its customers’ vital applications to
run continuously, perform optimally and grow with their business
needs. Vertiv solves the most important challenges facing today’s
data centers, communication networks and commercial and industrial
facilities with a portfolio of power, cooling and IT infrastructure
solutions and services that extends from the cloud to the edge of
the network. Headquartered in Westerville, Ohio, USA, Vertiv
employs approximately 24,000 people and does business in more than
130 countries. For more information, and for the latest news and
content from Vertiv, visit Vertiv.com.
Forward-Looking Statements
This release contains forward-looking statements within the
meaning of the Private Securities Litigation Reform Act of 1995,
Section 27 of the Securities Act, and Section 21E of the Securities
Exchange Act. These statements are only a prediction. Actual events
or results may differ materially from those in the forward-looking
statements set forth herein. Readers are referred to Vertiv’s
filings with the Securities and Exchange Commission, including its
most recent Annual Report on Form 10-K and any subsequent Quarterly
Reports on Form 10-Q for a discussion of these and other important
risk factors concerning Vertiv and its operations. Vertiv is under
no obligation to, and expressly disclaims any obligation to, update
or alter its forward-looking statements, whether as a result of new
information, future events or otherwise.
View source
version on businesswire.com: https://www.businesswire.com/news/home/20241014494536/en/
Sara Steindorf E Sara.Steindorf@fleishman.com
Vertiv (NYSE:VRT)
Historical Stock Chart
From Dec 2024 to Jan 2025
Vertiv (NYSE:VRT)
Historical Stock Chart
From Jan 2024 to Jan 2025