Oleblue
3 weeks ago
VIZSLA SILVER RECEIVES FINAL APPROVAL TO GRADUATE TO THE TORONTO STOCK EXCHANGE
Vancouver, British Columbia (November 5, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased announce that it has received final listing approval from the Toronto Stock Exchange (the “TSX”) to graduate from the TSX Venture Exchange (the “TSXV”). The common shares of the Company (the “Common Shares”) will begin trading on the TSX effective at the market open on November 7, 2024, under the symbol “VZLA”.
In conjunction with the graduation to the TSX, the Common Shares will be voluntarily delisted from, and will no longer trade on the TSXV, effective at the market close on November 6, 2024.
The Common Shares will continue to trade on the NYSE American under the symbol “VZLA”.
"Uplisting to the TSX represents another significant growth milestone for Vizsla Silver and its shareholders,” commented Michael Konnert, President & CEO. “As the TSX is Canada’s premier stock exchange, we expect the higher profile listing will increase market visibility and provide exposure to a broader range of investors.”
Shareholders will not be required to take any action in connection with the graduation and listing on the TSX. There will be no change in the Company’s CUSIP.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. The Company recently completed a Preliminary Economic Study for Panuco in July 2024 which highlights 15.2 Moz AgEq of annual production over an initial 10.6-year mine life, an after-tax NPV5% of US$1.1B, 86% IRR and a 9-month payback at US$26/oz Ag and US$1,975/oz Au. Vizsla Silver aims to become the world's leading silver company by implementing a dual track development approach at Panuco, advancing mine development, while continuing district scale exploration through low-cost means.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the date of commencement of trading on the TSX and other statements that are not historical facts.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://mailchi.mp/913267ea5d50/9q3gdbv5bm-5849789?e=0ca03548e2
Oleblue
3 weeks ago
VIZSLA SILVER RECEIVES CONDITIONAL APPROVAL TO GRADUATE TO THE TORONTO STOCK EXCHANGE AND ANNOUNCES CORPORATE UPDATE
Vancouver, British Columbia (November 1, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce that it has received conditional approval to graduate from the TSX Venture Exchange (the “TSXV”) and list its common shares (the “Common Shares”) on the Toronto Stock Exchange (the “TSX”).
Final approval of the listing is subject to the Company meeting certain customary conditions required by the TSX. Upon receipt of the final TSX approval, the Common Shares will be delisted from the TSXV and commence trading on the TSX under the symbol “VZLA”. The Company will issue a press release once it has confirmed the date when trading of the Common Shares is expected to commence on the TSX.
Shareholders are not required to exchange their share certificates or direct registration system advices or take any other action in connection with the listing on the TSX, as there will be no change in the trading symbol or CUSIP for the Common Shares.
The Common Shares will continue to trade on the NYSE American under the symbol “VZLA”.
Corporate Update
The Company also announces today a quarterly update with respect to the Company’s previously announced “at-the-market” equity program (the “ATM Program”) launched on September 13, 2024. The ATM Program allows the Company to issue and sell, from time to time, up to US$100,000,000 (or the Canadian dollar equivalent) of its common shares (“Common Shares”) from treasury to the public, at the Company’s discretion, pursuant to an equity distribution agreement (the “Equity Distribution Agreement”) among the Company and Canaccord Genuity and CIBC Capital Markets, as lead agents, and National Bank Financial and BMO Capital Markets (collectively, the “Agents”).
During the quarterly period ended October 31, 2024, the Company issued a total of 3,900,000 Common Shares on the NYSE American LLC at an average price of US$2.1892 under the ATM Program, providing gross proceeds of US$8,537,880.00, respectively. Commissions of US$256,136.40 were paid to the Agents in relation to these distributions.
For further details on the ATM Program, see the Company’s news release dated September 13, 2024.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. The Company recently completed a Preliminary Economic Study for Panuco in July 2024 which highlights 15.2 Moz AgEq of annual production over an initial 10.6-year mine life, an after-tax NPV5% of US$1.1B, 86% IRR and a 9-month payback at US$26/oz Ag and US$1,975/oz Au. Vizsla Silver aims to become the world's leading silver company by implementing a dual track development approach at Panuco, advancing mine development, while continuing district scale exploration through low-cost means.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the listing of the Common Shares on the TSX and other statements that are not historical facts.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://mailchi.mp/3acf0adf2c01/9q3gdbv5bm-5849720?e=0ca03548e2
Oleblue
4 weeks ago
VIZSLA SILVER RECEIVES NATIONAL RECOGNITION FOR ITS HEALTH, SAFETY AND SUSTAINABILITY EFFORTS FOR THIRD YEAR IN A ROW
Vancouver, British Columbia (October 29, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla” or the “Company”) is pleased to announce it’s wholly owned Mexican subsidiary, Minera CANAM, has received the Socially Responsible Company Distinction (ESR) for the third year since 2022. This distinction is awarded to companies that are leaders in their sector for commitment to integrating social and environmental values into their operations. The Socially Responsible Company Distinction is Mexico's highest corporate social responsibility recognition, awarded jointly by the Mexican Center for Philanthropy (CEMEFI) and the Foundation for Sustainability and Equity (ALIARSE).
“I am extremely proud of all Vizsla employees and contractors working at the Panuco Project” commented Michael Konnert, President & CEO. “Since 2019, when work began at Panuco, the Company has been committed to responsible mining done right. This includes being trustworthy stewards of the local environment, operating with accountability and transparency, supporting initiatives that provide long-term benefits to the surrounding Ejidos and providing a safe, respectful, and healthy work environment for all employees. This achievement is a testament to this philosophy.”
Figure 1: Minera CANAM personnel receiving the ESR Distinction.
Additionally, Minera Canam obtained the Safe and Healthy Work Environments Distinction (ELSSA), which represents a voluntary program for companies to implement strategies and actions to improve workers' health, safety, and well-being, as well as productivity and quality in the workplace.
The Company would like to acknowledge the health and safety department for developing and implementing a world-class safety program. With support at all levels of management from site through to the board of directors, the health and safety department have achieved buy-in to their safety program from the workforce, partner companies and other stakeholders on site.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to our Company´s press release dated January 8, 2024).
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. The Company recently completed a Preliminary Economic Study for Panuco in July 2024 which highlights 15.2 Moz AgEq of annual production over an initial 10.6-year mine life, an after-tax NPV5% of US$1.1B, 86% IRR and a 9-month payback at US$26/oz Ag and US$1,975/oz Au. Vizsla Silver aims to become the world's leading silver company by implementing a dual track development approach at Panuco, advancing mine development, while continuing district scale exploration through low-cost means.
Quality Assurance / Quality Control
Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver and rock samples were shipped to SGS Lab in Durango Mexico for sample preparation and analysis. The ALS Zacatecas, North Vancouver facilities and SGS lab are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption (“AA”) spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.
Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company’s quality assurance / quality control protocol.
Qualified Person
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.
Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the “CIM Definition Standards”), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.
You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, “inferred mineral resources” are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures.
Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the “SEC Modernization Rules”), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be “substantially similar” to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling, designed to upgrade, and expand the maiden resource as well as test other high priority targets across the district.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://mailchi.mp/a6e786e68027/9q3gdbv5bm-5849594?e=0ca03548e2
[/img]
Oleblue
2 months ago
VIZSLA SILVER REPORTS ADDITIONAL HIGH-GRADE SILVER AND GOLD THROUGH ONGOING INFILL DRILLING AND EXPANDS NEAR SURFACE MINERALIZATION AT COPALA CENTRAL
Vancouver, British Columbia (October 1, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla” or the “Company”) is pleased to report results from 11 new drill holes targeting the Copala resource area at its 100%-owned, flagship Panuco silver-gold project ("Panuco" or the "Project") located in Mexico. The reported drill results are from the recently completed infill program, designed to upgrade and expand Mineral Resources within areas designated for initial production at Copala.
Highlights
CS-24-393 returned 4,573 grams per tonne (g/t) silver equivalent (AgEq) over 5.65 metres true width (mTW) (3,007 g/t silver and 26.06 g/t gold)
Including 16,666 g/t AgEq over 1.48 mTW (10,869 g/t silver and 96.11 g/t gold)
CS-24-390 returned 3,368 g/t AgEq over 5.80 mTW (2,551 g/t silver and 14.85 g/t gold)
Including 30,305 g/t AgEq over 0.46 mTW (21,953 g/t silver and 146.50 g/t gold)
CS-24-389 returned 5,224 g/t AgEq over 2.30 mTW (2,851 g/t silver and 37.30 g/t gold)
Including 10,077 g/t AgEq over 1.05 mTW (5,410 g/t silver and 73.10 g/t gold)
“This latest round of infill drill results continues to support improved mineral continuity along the Copala structure,” commented Michael Konnert, President & CEO. “It is very rare for an infill program to add such a significant amount of new mineralization, particularly at higher-than-average grades. This speaks to the exceptional quality of the Copala structure which remains open in all directions. Additionally, the discovery of a historic mine adit at Copala combined with new 3D interpretations based on updated drill data, highlights the potential for additional near surface resources outboard of both the current PEA mine plan and MRE boundary. With the infill program now complete, we are looking forward to mobilizing our drill rigs to the eastern portion of the district to begin discovery-based drilling on several high-priority targets.”
Figure 1: Plan map of recent drilling centered on the Copala structure.
The precious metals dominant Copala structure, located in the western portion of the Panuco district, is situated ~800 m to the east of the Napoleon Vein. Copala currently hosts Indicated Resources of 83.3 Moz AgEq at 573 g/t AgEq and Inferred Resources of 48.3 Moz AgEq at 476 g/t AgEq within a broad envelope of vein-breccia interlayered with host rock, up to 82 metres thick (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and Vizsla’s press release dated January 8, 2024). Observations by Vizsla geologists indicate Copala has an average dip of ~46° to the east (~35° in its northern sector and steepening to ~65° in the southern sector).
Exploration and resource focused drilling at Copala has traced mineralization along ~1,770 metres of strike length and ~400 metres down dip. Recent mapping, supported with LiDAR, led to the discovery of a historic mine adit on surface located at Copala Central. The location of the historic adit (see figure 2) combined with new 3D interpretations of drilling data highlight the potential for resource expansion up dip from the previously reported CS-24-356 hole containing visible gold (see press release dated June 26, 2024). This area is currently outboard of both the PEA mine plan and MRE boundary, representing an excellent target to expand high-grade mineralization closer to surface.
The 11 holes reported herein are from the recently completed ~5,000 metre drill program designed to infill and expand mineral resources at intermediate elevation and near surface in the central portion of the main Copala structure. Both primary target areas are situated outside the proposed first two years of mine production at Copala. Three infill holes continue to confirm high-grade continuity immediately adjacent to the areas designated for the first two years mining, whereas four holes drilled close to surface, have confirmed that high-grade mineralization extends up-dip by approximately 100 meters towards the recently discovered, historic Copala adit. Previous interpretations suggested that the up-dip projection of Copala was truncated by the Cristiano Vein. New interpretations based on recent mapping, new drill data and 3D modelling indicate Copala extends to the surface therefore creating potential for additional high-grade shoots extending up-dip above the intersection with the Cristiano Vein (red dash line in figure 2). Additionally, our updated 3D model has highlighted two vein intercepts in holes CS-22-156 and CS-22-182 that were previously reported for Cristiano, are now re-interpreted to be on Copala (see figures 1 and 2). Vizsla’s geologists are now preparing drill-hole proposals to explore other zones along-strike Copala where mineralization could extend near to surface.
Figure 2: Inclined longitudinal section for Copala structure with drillhole pierce points and location of the recently discovered historic adit on Copala. The section is 1x along strike to 1.4x along the dip to compensate for the average 46-degree dip of Copala. The black dash outlines represent Copala 3 sitting on the hanging wall of Copala.
Figure 3: Cross section showing Copala structure, Cristiano, Copala 3, and Tajitos veins with completed drilling.
Note: AgEq = Ag g/t x Ag rec. + (Au g/t x Au Rec x Au price/gram)/Ag price/gram. Metal price assumptions are $24.00/oz silver and $1,800/oz gold and metallurgical recoveries assumed are 91% for silver and 94% for gold. Gold and silver metallurgical recoveries used in this release are from metallurgical test results of the Copala vein (see press release dated August 16, 2023)
Table 1: Downhole drill intersections from the holes reported for Copala and Copala 3 veins. Holes with “*” were reported previously for Cristiano vein.
Table 2: Drillhole details for the reported drillholes. Coordinates in WGS84, Zone 13. Holes with “*” were reported previously for Cristiano vein.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to our Company´s press release dated January 8, 2024).
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 380,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +45,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.
Quality Assurance / Quality Control
Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver and rock samples were shipped to SGS Lab in Durango Mexico for sample preparation and analysis. The ALS Zacatecas, North Vancouver facilities and SGS lab are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption (“AA”) spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.
Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company’s quality assurance / quality control protocol.
Qualified Person
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.
Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the “CIM Definition Standards”), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.
You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, “inferred mineral resources” are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures.
Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the “SEC Modernization Rules”), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be “substantially similar” to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling, designed to upgrade, and expand the maiden resource as well as test other high priority targets across the district.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://mailchi.mp/3a5afa3315f5/9q3gdbv5bm-5848702?e=0ca03548e2
Oleblue
2 months ago
VIZSLA SILVER ANNOUNCES $65 MILLION BOUGHT DEAL FINANCING
Vancouver, British Columbia (September 16, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla” or the “Company”) is pleased to announce that it has entered into an agreement with Canaccord Genuity as sole bookrunner, on behalf of itself and syndicate of underwriters (the “Underwriters”), pursuant to which the Underwriters have agreed to purchase, on a bought deal basis, 25,000,000 common shares (the "Common Shares"), at a price of $2.60 per Common Share, for gross proceeds of approximately $65,000,000 (the "Offering").
The Company has granted the Underwriters an option (the “Over-Allotment Option”), exercisable at the offering price for a period of 30 days after and including the closing of the Offering, to purchase up to an additional 15% of the Offering to cover over-allotments, if any. The Offering is expected to close on or about September 19, 2024, and is subject to the Company receiving all necessary regulatory approvals. In the event that the Over Allotment Option is exercised in full, the total gross proceeds of the Offering will be $74,750,000.
The Company currently intends to use the net proceeds of the Offering to advance the exploration, drilling and development of the Company’s Panuco Project, as well as for working capital and general corporate purposes as set out in the Prospectus Supplement (as defined below).
The Common Shares will be offered by way of a prospectus supplement (the “Prospectus Supplement”) in all of the provinces and territories of Canada, other than Quebec, pursuant to the Company's base shelf prospectus dated March 31, 2023 (the “Base Shelf Prospectus”), and will be offered in the United States pursuant to a prospectus supplement (the “US Prospectus Supplement”) filed as part of an effective registration statement on Form F-10 (the “Registration Statement”) filed under the Canada/U.S. multi-jurisdictional disclosure system. Before investing, prospective purchasers in Canada should read the Prospectus Supplement, the Base Shelf Prospectus, and the documents incorporated by reference therein, and prospective purchasers in the United States should read the US Prospectus Supplement, the Base Shelf Prospectus and the Registration Statement and the documents incorporated by reference therein for more complete information about the Company and the Offering.
Copies of the applicable offering documents, when available, can be obtained free of charge under the Company’s profile on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov. Delivery of the Base Shelf Prospectus and the Prospectus Supplement and any amendments thereto will be satisfied in accordance with the "access equals delivery" provisions of applicable Canadian securities legislation. An electronic or paper copy of Prospectus Supplement, the US Prospectus Supplement, the Base Shelf Prospectus and the Registration Statement, when available, may be obtained, without charge, from Canaccord Genuity by phone at 416-869-3052 or by e-mail at ecm@cgf.com by providing Canaccord Genuity with an email address or address, as applicable.
This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.
About Vizsla Silver Corp.
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 380,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +45,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws, including those regarding the terms of the Offering and the expected completion and use of proceeds thereof, which ultimately remains the subject of the Company's discretion. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information.
Forward-looking statements and forward-looking information are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in the Prospectus Supplement, the US Prospectus Supplement and Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://mailchi.mp/c2ad01079f6d/9q3gdbv5bm-5848292?e=0ca03548e2
Joe Kaplan
3 months ago
Silver set to soar on Samsung’s solid-state battery breakthrough – analysts
......According to retired investment professional Kevin Bambrough, Samsung has developed a new solid-state (SS) battery. The inclusion of silver as a key component, combined with the increasing demand for electric vehicles, means that demand for the grey metal will soon increase.
“The key drivers that will ramp up demand for EVs are range, charge time, battery life and safety,” Bambrough said. “Samsung's new solid-state battery technology, incorporating a silver-carbon (Ag-C) composite layer for the anode, exemplifies this advancement. Silver's exceptional electrical conductivity and stability are leveraged to enhance battery performance and durability, achieving amazing benchmarks like a 600-mile range and a 20-year lifespan and 9-minute charge.”
He noted that while official numbers are currently unavailable, estimates show that there could be as much as five grams of silver per cell in Samsung's solid-state batteries, meaning “a typical EV battery pack containing around 200 cells for a 100 kWh capacity could require about 1 kg of silver per vehicle.”
“With global car production standing at about 80 million vehicles per year, if 20% of these vehicles (16 million EVs) were to adopt Samsung's solid-state batteries, the annual demand for silver would be around 16,000 metric tons (16 million vehicles * 1 kg of silver per vehicle),” Bambrough said. “This would represent a significant portion of the current global silver production, which is approximately 25,000 metric tons annually, highlighting the substantial impact on the silver market.”
He noted that this alone presents a bullish trajectory for silver and doesn’t even account for demand from the solar industry.
“Add in the fact that silver is already in a deficit with industrial demand from the solar industry pushing total yearly consumption ahead of supply,” he said. “So we don’t even have any silver capacity to spare!”
Bambrough provided some caveats to his thesis, saying, “Perhaps 5 grams might be high. Perhaps 20% will prove low for solid-state battery penetration into the auto industry. It could be as much as 50% or greater looking 10-15 years out.”
“For me, it’s just another reason to expect silver markets to tighten up [further] and the price of silver to take a run at its all-time inflation-adjusted high [of] $200/oz will likely be seen in the [coming] 10-15 years,” he said. “If estimates of the true short position bullion banks currently carry in the silver market that price could be seen much sooner.”
“All one needs to do is look back at the silver chart of the 1970s to see how explosive the precious metal can move skyward when a true shortage develops and speculators decide to hoard,” he concluded. “My bet is… we will hoard.”
According to a report written by Enrico Punsalang at Ride Apart, Samsung is already working with big automakers to incorporate its SS battery tech into EVs in development. The firm has signed an agreement with Toyota to begin mass production of SS batteries in 2027, with Lexus vehicles scheduled to be among the first to integrate the new technology.
Punsalang noted that one thing that will hinder a faster roll-out of SS battery-enabled EVs is the fact that “these ultra-fast charging batteries require some pretty solid infrastructure for you to get the claimed nine-minute charge time. If we look at China, whose EV makers offer similar charging speeds, 480kW and sometimes even 600kW chargers are an absolute must. But even in China, charging stations of this capacity are far and few in between.”
“So the real challenge here isn’t so much whether or not it’s possible – we know that it certainly is – but rather, how quickly ultra-fast-charging infrastructure can be made available to the masses,” Punsalang said. “Then, of course, there’s the issue of cost. At present, it costs way more to manufacture solid-state EV batteries than Lithium-ion and LFP batteries found in current EVs – around three or four times, to be specific. Perhaps that’s why Toyota plans on introducing solid-state batteries on its Lexus vehicles first, where profit margins are much higher.”
“At the end of the day, the advancement of solid-state batteries is a good thing for everyone,” he concluded. “Sure, at the moment, they’re super expensive and require specialized tech to make the most out of. But less than 20 years ago, SSDs were super expensive and HDDs were the norm. But now, even boomers have SSDs in their laptops and home computers. Who’s to say that in the next 20 years, or maybe even less, SS batteries will be the standard for EVs?”
According to Charlie Morris, founder of ByteTree, this development sets the stage for silver to have a 2010-like rally.
“This reminds me of the silver rally of 2010, which saw the price surge to $50 on the back of demand for solar panels,” he said. “The slump that followed was weighed down not only by a weak gold market but also by substitution, something that has killed many commodity rallies.”
https://www.kitco.com/news/article/2024-08-19/silver-set-soar-samsungs-solid-state-battery-breakthrough-analysts
Oleblue
5 months ago
VIZSLA SILVER REPORTS MORE HIGH-GRADE RESULTS AT COPALA AND COPALA 3, DEMONSTRATING STRONG MINERAL CONTINUITY
Vancouver, British Columbia (July 09, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla” or the “Company”) is pleased to report results from six new drill holes targeting the Copala resource area at its 100%-owned, flagship Panuco silver-gold project ("Panuco" or the "Project") located in Mexico. The reported drilling, designed to infill near-surface Indicated Mineral Resources, continues to confirm high-grade continuity throughout Copala including new high-grade intercepts on the Copala 3 hanging-wall vein splay.
Highlights
CS-24-366 returned 2,398 grams per tonne (g/t) silver equivalent (AgEq) over 7.00 metres true width (mTW) (1,898 g/t silver and 9.51 g/t gold)
Including 5,385 g/t AgEq over 0.56 mTW (3,950 g/t silver and 25.40 g/t gold)
And, 4,457 g/t AgEq over 1.29 mTW (3,430 g/t silver and 18.95 g/t gold)
CS-24-359 returned 1,027 g/t AgEq over 7.80 mTW (788 g/t silver and 4.40 g/t gold)
Including 6,343 g/t AgEq over 0.86 mTW (5,010 g/t silver and 25.30 g/t gold)
And, 1,749 g/t AgEq over 0.53 m TW (1,360 g/t silver and 7.26 g/t gold)
CS-24-361 returned 2,023 g/t AgEq over 3.50 mTW (1,617 g/t silver and 7.83 g/t gold)
Including 6,331 g/t AgEq over 0.39 mTW (5,230 g/t silver and 22.30 g/t gold)
CS-24-363 returned 2,193 g/t AgEq over 2.68 mTW (1,831 g/t silver and 7.47 g/t gold)
Including 4,787 g/t AgEq over 0.78 mTW (4,040 g/t silver and 15.75 g/t gold)
“Ongoing infill drilling at Copala, where initial mining will likely take place, continues to demonstrate exceptional mineral continuity,” commented Michael Konnert, President & CEO. “Tight-spaced drilling along Copala Main and its hanging-wall splay structures has now expanded the high-grade footprint closer to surface, potentially reducing the overall development required to access the minerlization. The more we drill on the property, the more confidence we have that Panuco will be a high-margin, low capex project. Moving forward, we will continue our conversion drilling at Copala as we de-risk the Project ahead of the maiden PEA, slated for early Q3 2024.”
Figure 1: Plan map of recent drilling centered on the Copala structure.
The precious metals dominant Copala structure, located in the western portion of the Panuco district, is situated ~800 m to the east of the Napoleon Vein. Copala currently hosts Indicated Resources of 83.3 Moz AgEq at 573 g/t AgEq and Inferred Resources of 48.3 Moz AgEq at 476 g/t AgEq within a broad envelope of vein-breccia interlayered with host rock, up to 82 metres thick (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to Vizsla’s press release dated January 8, 2024). Interpretations by Vizsla geologists indicate Copala has an average dip of ~46° to the east (~35° in its northern sector and steepening to ~65° in the southern sector).
Exploration and Resource drilling at Copala has traced mineralization along ~1,770 metres of strike length and ~400 metres down dip. The infill holes reported herein are part of an ongoing ~10,000 program (~35 holes), planned to convert near surface Indicated Mineral Resources in the central portion of main Copala into the Measured Resource category. The six infill holes reported were drilled at approximately 25 metre centers from pre-existing holes and continue to successfully confirm grade continuity along the main Copala structure. Additionally, some of these holes also intercepted high-grades on Copala 3, which sits between 10-45 metres to the east of Copala main, on the hanging-wall side of the structure. The Copala 3 vein is demonstrating good continuity with many holes having previously intercepted the structure, as shown by the blue pierce points in Figure 3. The high grades seen in Copala 3, may contribute to a further improved, overall grade profile as more resources are converted to higher confidence categories in the central portion of Copala. Vizsla plans to complete its ongoing ~10,000 infill program by mid to late July. Based on the results received, Vizsla is analysing additional drilling metres to continue upgrading and expanding mineral resources in high priority areas at Copala.
Figure 2: Inclined longitudinal section for Copala structure with drillhole pierce points. The section is 1x along strike to 1.4x along the dip to compensate for the average 46-degree dip of Copala. The gray and black dash outlines represent Copala 2, Copala 3 and Copala 4 vein splays.
Figure 3: Inclined longitudinal section for Copala 3 vein splay with drillhole pierce points. The section is 1x along strike to 1.4x along the dip to compensate for the average 46-degree dip of Copala.
Figure 4: Cross section showing Copala structure, Cristiano, Copala 3, Copala 4 and FW Splay veins with completed drilling.
Note: AgEq = Ag g/t x Ag rec. + (Au g/t x Au Rec x Au price/gram)/Ag price/gram. Metal price assumptions are $24.00/oz silver and $1,800/oz gold and metallurgical recoveries assumed are 91% for silver and 94% for gold. Gold and silver metallurgical recoveries used in this release are from metallurgical test results of the Copala vein (see press release dated August 16, 2023).
Table 1: Downhole drill intersections from the holes reported for Copala and Copala 3 veins. The two intercepts on main Copala for CS-24-359 occur within a broad (9.90 m) lower grade vein-breccia structure.
Table 2: Drillhole details for the reported drillholes. Coordinates in WGS84, Zone 13.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to our Company´s press release dated January 8, 2024).
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 368,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +30,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.
Quality Assurance / Quality Control
Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver and rock samples were shipped to SGS Lab in Durango Mexico for sample preparation and analysis. The ALS Zacatecas, North Vancouver facilities and SGS lab are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption (“AA”) spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.
Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company’s quality assurance / quality control protocol.
Qualified Person
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP., Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.
Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the “CIM Definition Standards”), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.
You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, “inferred mineral resources” are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures.
Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the “SEC Modernization Rules”), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be “substantially similar” to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling, designed to upgrade, and expand the maiden resource as well as test other high priority targets across the district.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://mailchi.mp/9097f1f06fe7/9q3gdbv5bm-5692500?e=0ca03548e2
Weekly Chart
Oleblue
5 months ago
Vizsla Silver Announces Shareholder Approval at Special Meeting
Vancouver, British Columbia (June 17, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce that Vizsla Silver shareholders (“Shareholders”) approved the plan of arrangement (the “Arrangement”) with Vizsla Royalties Corp. (“Spinco”) at the special meeting of Shareholders held today (the “Meeting”).
Under the Arrangement, the owners of common shares of Vizsla Silver (each a “VZLA Share”) are entitled to receive one-third of a common share of Spinco and one-third of a common share purchase warrant of Spinco for each VZLA Share held immediately prior to the closing of the Arrangement. Following the Arrangement, Spinco will no longer be a wholly owned subsidiary of Vizsla Silver.
Shareholders voted a total number of 101,847,455 Vizsla Silver shares representing 43.69% of the outstanding shares present in person or represented by proxy at the Meeting held today.
The Arrangement was approved by 85.03% of the votes cast by Shareholders.
Shareholders also approved the share option plan of the Spinco (the “Spinco Option Plan”) at the Meeting. The Spinco Option Plan was approved by 69.16% of the votes cast by Shareholders.
The Company intends to make an application to the Supreme Court of British Columbia (the “Court”) for a Final Order on June 19, 2024.
On June 11, 2024, the Company announced that it anticipated that June 21, 2024, would be the record date, and that Shareholders of record on such date will be entitled to receive Spinco securities. The Company wishes to clarify that the Transaction is an “Effective Date” transaction. Accordingly, Shareholders of record as of the close of business on the last trading day immediately prior to the Effective Date, which last trading day is currently expected to be on or about June 21, 2024, will receive Spinco securities.
This announcement is for informational purposes only and does not constitute a solicitation or a proxy.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq (please refer to our Technical Report on Updated Mineral Resource Estimate for the Panuco Ag-Au-Pb-Zn Project, Sinaloa State, Mexico, by Allan Armitage, Ben Eggers and Peter Mehrfert, dated February 12, 2024 and to our Company´s press release dated January 8, 2024).
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 368,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +30,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements with respect to timing, structure and completion of the Arrangement, the treatment of Vizsla Silver and Spinco’s securities under the Arrangement and Court, stock exchange and regulatory approvals for the Arrangement.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption “Risk Factors” in the Company’s management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
https://mailchi.mp/633822b351f8/9q3gdbv5bm-5691184?e=0ca03548e2
Oleblue
5 months ago
Vancouver, British Columbia (June 11, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) wants to remind its valued shareholders that if the spinout of Vizsla Royalties Corp. (the “Arrangement”) is approved at the Special Meeting being held on June 17, 2024, the Company will seek a final order from the Supreme Court of British Columbia (the “Court”) to approve the Arrangement and closing will occur on or about June 24, 2024. It anticipates that June 21, 2024, will be the record date (the “Record Date”), which shareholders of record will be entitled to receive spinout shares and spinout warrants.
The owners of common shares of Vizsla Silver (each a “Vizsla Silver Share”) are entitled to receive one-third of a common share of Vizsla Royalties Corp. (the “Spinco Shares”) and one-third of a common share purchase warrant of Vizsla Royalties Corp. (the “Spinco Warrants”) for each Vizsla Silver Share held on the Record Date. Each full Spinco Warrant will entitle the holder thereof to purchase one Spinco Share at an exercise price of $0.05 per share for a period expiring on the earlier of: (i) 120 days after the date the Spinco Shares and Spinco Warrants are listed on the TSX Venture Exchange (the “TSXV”); and (ii) December 31, 2025.
Current Holders of Vizsla Silver Corp. Warrants
For any current outstanding Vizsla Silver Corp. Warrants (“Vizsla Silver Warrants”) held on the Record Date that are exercised for the original exercise price following the completion of the Arrangement, the Warrantholder will be entitled to receive, and will accept (in lieu of the Vizsla share to which such Warrantholder was until then entitled), one New Vizsla Silver share and one-third of one SpinCo Share. Any fractional entitlements to SpinCo Shares will be rounded down, and no fractional SpinCo Shares will be issued.
Any Warrantholders that exercise their warrants before June 20, 2024, to receive the Vizsla Silver Shares and holds those shares on the Record Date, will receive one-third of a common share of a Spinco Share and one-third of a common share purchase warrant of a Spinco Warrant. Anyone Warrantholder wishing to exercise their warrants can contact, Jennifer Hanson, Corporate Secretary, jen@vizslasilver.ca.
This announcement is for informational purposes only and does not constitute a solicitation or a proxy.
Post-Arrangement Matters
Immediately after completion of the Arrangement, shareholders of Vizsla Silver are expected to hold approximately 45% of the issued and outstanding Spinco Shares, while Vizsla Silver will retain the remaining approximately 55%.
Spinco has made an application to list the Spinco Shares and Spinco Warrants on the TSXV. There is no guarantee when, or if, such listings will be completed. Such listings will be subject to Spinco fulfilling all of the listing requirements of the TSXV.
Following closing of the Arrangement, Vizsla Silver and Spinco intend to complete a number of steps, including the following (collectively, the “Post-Closing Steps”): (a) the parties will settle an outstanding loan from Vizsla Silver into Spinco Shares, (b) Vizsla Silver will make an additional $3,500,000 loan to Spinco, (c) Spinco will exercise its buyback right on an underlying royalty on the Panuco Project, after which point the royalty held by Spinco will consist of a 2% net smelter returns royalty on the entire Panuco Project, (d) Spinco will complete a private placement for gross proceeds of at least $3,000,000, and (e) Spinco will complete a consolidation of the Spinco Shares on the basis of one new Spinco Share for every ten old Spinco Shares.
Vizsla Silver and Spinco have entered into a royalty right agreement which provides that, if Vizsla Silver or any of its affiliates acquires any a mineral property within a two-kilometer boundary around the Panuco Project, it must offer Spinco a net smelter returns royalty on such mineral property to Spinco on terms proposed by Vizsla Silver.
The foregoing discussion of the Arrangement and the Post-Closing Steps is intended to provide a general summary only. Shareholders are encouraged to read the Circular in its entirety.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +35,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project’s mineral resource, as well as test other high priority targets across the district.
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Arrangement; the terms of the Arrangement; the Post-Closing Steps; and exploration, development, and production at Panuco.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption “Risk Factors” in the Company’s management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
https://mailchi.mp/0fe3ed1aa0f2/9q3gdbv5bm-5690532?e=0ca03548e2
Oleblue
6 months ago
Vizsla Silver Mails Management Information Circular in Connection with Special Meeting to Approve Spinout of Vizsla Royalties
Vancouver, British Columbia (May 22, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) has filed the management information circular (the “Circular”) and related meeting materials in connection with the special meeting of shareholders (the “Meeting”) to be held on June 17, 2024 at 10:00 a.m. (PST) at 555 Burrard Street, 11th Floor, Suite 1165, Vancouver, British Columbia. The board of directors of the Company set May 13, 2024 as the record date for determining the shareholders entitled to receive notice and vote at the Meeting.
The purpose of the Meeting is to seek approval of the previously announced spinout by way of a plan of arrangement (the “Arrangement”) between Vizsla Silver and Vizsla Royalties Corp. (“Spinco”), whereby the owners of common shares of Vizsla Silver (each a “Vizsla Silver Share”) are entitled to receive one-third of a common share of Spinco (the “Spinco Shares”) and one-third of a common share purchase warrant of Spinco (the “Spinco Warrants”) for each Vizsla Silver Share held immediately prior to the closing of the Arrangement. Each full Spinco Warrant will entitle the holder thereof to purchase one Spinco Share at an exercise price of $0.05 per share for a period expiring on the earlier of: (i) 120 days after the date the Spinco Shares and Spinco Warrants are listed on the TSX Venture Exchange (the “TSXV”); and (ii) December 31, 2025.
The Arrangement will require approval by at least two-thirds (66.6%) of the votes cast by shareholders present in person or represented by proxy and entitled to vote at the Meeting. Vizsla Silver has obtained an interim order of the Supreme Court of British Columbia (the “Court”). Subject to approval by the Vizsla Silver shareholders, Vizsla Silver will seek a final order from the Court approving the Arrangement. The Company anticipates the Arrangement to close on or about June 24, 2024, and it is expected that shareholders of record on June 21, 2024 will be entitled to receive spinout shares.
Mailing of the management information circular and related meeting materials has commenced and shareholders should receive them shortly. All of the meeting materials can be downloaded from Vizsla Silver’s website at https://vizslasilvercorp.ca and also from the Company’s profile on SEDAR+ at www.sedarplus.ca.
The deadline for returning proxies for the Meeting is June 15, 2024 at 10:00 a.m. (PST).
This announcement is for informational purposes only and does not constitute a solicitation or a proxy.
Post-Arrangement Matters
Immediately after completion of the Arrangement, shareholders of Vizsla Silver are expected to hold approximately 45% of the issued and outstanding Spinco Shares, while Vizsla Silver will retain the remaining approximately 55%.
Spinco has made an application to list the Spinco Shares and Spinco Warrants on the TSXV. There is no guarantee when, or if, such listings will be completed. Such listings will be subject to Spinco fulfilling all of the listing requirements of the TSXV.
Following closing of the Arrangement, Vizsla Silver and Spinco intend to complete a number of steps, including the following (collectively, the “Post-Closing Steps”): (a) the parties will settle an outstanding loan from Vizsla Silver into Spinco Shares, (b) Vizsla Silver will make an additional $3,500,000 loan to Spinco, (c) Spinco will exercise its buyback right on an underlying royalty on the Panuco Project, after which point the royalty held by Spinco will consist of a 2% net smelter returns royalty on the entire Panuco Project, (d) Spinco will complete a private placement for gross proceeds of at least $3,000,000, and (e) Spinco will complete a consolidation of the Spinco Shares on the basis of one new Spinco Share for every ten old Spinco Shares.
Vizsla Silver and Spinco have entered into a royalty right agreement which provides that, if Vizsla Silver or any of its affiliates acquires any a mineral property within a two-kilometer boundary around the Panuco Project, it must offer Spinco a net smelter returns royalty on such mineral property to Spinco on terms proposed by Vizsla Silver.
The foregoing discussion of the Arrangement and the Post-Closing Steps is intended to provide a general summary only. Shareholders are encouraged to read the Circular in its entirety.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project’s mineral resource, as well as test other high priority targets across the district.
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Arrangement; the terms of the Arrangement; the Post-Closing Steps; and exploration, development, and production at Panuco.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption “Risk Factors” in the Company’s management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
https://mailchi.mp/02106e6c15e2/9q3gdbv5bm-5689072?e=0ca03548e2
Oleblue
7 months ago
VIZSLA SILVER TO ACQUIRE LARGE CLAIM PACKAGE ALONG HIGHLY PROSPECTIVE STRUCTURAL TREND, SOUTH OF PANUCO
Vancouver, British Columbia (April 16, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce that it has entered into an agreement to acquire two large claims comprising 10,667.0 Ha (the “El Richard – San Enrique claims” or “San Enrique prospect”) located south and partially adjacent to the Company’s Panuco project (the “Panuco Project” or “Panuco”). The San Enrique prospect is situated along the highly prospective Panuco – San Dimas corridor and is covered 100% with LiDAR and partially covered with high-resolution aero-magnetic and radiometric surveys.
Highlights
Large property package comprised of 10,667 Ha just south of Panuco (almost 50% larger than Panuco).
The area is covered with a LiDAR survey and partially covered (~60%) with high-resolution air magnetic and radiometric surveys.
The prospect contains dome complexes and covers the SE extensions of the NW trending Copala fault and Cordon del Oro - Animas veins.
Preliminary recognizance mapping in the NE has identified favourable andesite lithologies, quartz veining and breccias.
The area has never been systematically mapped and prospected.
Vizsla Silver has agreed to issue to the seller US$650,000 in common shares.
“Vizsla Silver continues to expand its land position in the Sinaloa Silver Belt with the acquisition of the San Enrique prospect,” stated Michael Konnert, President, and CEO. “These claims are located southeast along trend from several of our existing mineralised vein corridors, including the high grade Copala structure and they add significant exploration upside potential to Vizsla’s growing portfolio of projects. With preliminary geophysics and LiDAR complete, we intend to move forward with regional recognizance-mapping and a stream-sediment geochemical survey to aid in ongoing drill targeting. Although Vizsla Silver remains committed to the near-term development of the advanced-stage Panuco-Copala district, this acquisition combined with the recently announced La Garra acquisition, further positions Vizsla Silver as a globally significant silver explorer-developer, with the potential to build a multi-generational asset base in Mexico.”
Figure 1: Location map of the San Enrique Prospect, Panuco Project and La Garra. See Company news release dated January 8, 2024 on “Updated Mineral Resource Estimate” for the Panuco project.
Figure 2. Geology of the silver-gold-rich Panuco – San Dimas corridor.
Figure 3. Map showing the San Enrique prospect with high resolution aero-mag overlain on top of the LiDAR terrain model.
About the San Enrique prospect
The San Enrique prospect area is adjacent to the southern boundary of the Panuco project. The prospect comprises two titled mining claims covering 10,667.0 Ha (El Richard with 3,688.6 Ha and San Enrique with 6,978.4 Ha) in the emerging silver-gold-rich Panuco – San Dimas corridor with estimated past production plus current resources and reserves of 1.2-Boz Ag and 15-Moz Au (Figure 2).
The LiDAR and mag survey from the San Enrique prospect show strong NW-trending lineaments, indicative of regional faults and fractures. Two of these lineaments are aligned and seem to be the SE extensions of the Copala fault and the Cordon del Oro - Animas vein structures in Panuco (Figure 3). The main lithologies identified to date are predominantly rhyolite domes which produce strong magnetic anomalies in the north, and felsic flows and tuffs (rhyolites and dacites). Recent 40Ar/39Ar age dating on adularia separates from veins in Panuco project indicates that epithermal mineralization post dates felsic volcanism in the area. Additionally, preliminary recognizance mapping in the northeast has revealed the presence of andesite tuffs and flows, quartz veining and breccia structures. The Santa Fe mine is located three kilometres south of San Enrique, is owned and operated by Inca Azteca Gold and is a small scale mine producing high-grade silver and gold from a NW trending epithermal vein. This supports the hypothesis that the NW trending structures within San Enrique have the potential to host additional veins yet to be discovered.
The San Enrique prospect contains several indicators that suggest it is a highly prospective area, namely: location (Panuco – San Dimas corridor), high-grade deposits immediately north (Copala and Panuco), structural controls (southeast extensions of the Copala fault and Cordon - Animas lineament), domes and an operating mine to the south along another NW regional fault (Santa Fe mine, Inca Azteca).
Vizsla Silver is in the process of acquiring a multispectral World View III satellite image covering the whole Panuco and San Enrique claims to speed up the target generation process. Furthermore, the Company intends to conduct regional recognizance-mapping and a stream-sediment geochemical survey at San Enrique in the near future.
Terms of the Acquisition
The Company entered into an asset purchase agreement (the “Acquisition Agreement”) dated March 5, 2024, with Inca Azteca Gold S.A.P.I. de C.V. (the “Seller”) and the Company’s wholly owned subsidiary, Minera Canam, S.A. de C.V. (“Minera Canam”) pursuant to which the Company agreed to acquire, through Minera Canam, all of the Seller’s right, title and interest in and to the mineral concessions (the “Acquisition”).
Pursuant to the Acquisition Agreement, the Company has agreed to issue an aggregate of US$650,000 in common shares in the capital of the Company, at the exchange rate and market price applicable on the effective date (collectively, the “Consideration Shares”) plus any applicable value added tax to the Seller. The Consideration Shares are subject to a four-month hold period pursuant to applicable Canadian securities laws and the Seller has agreed to voluntary resale restrictions, whereby 12.5% of the Consideration Shares will become free trading on the date that is four months and one day from the effective date and an additional 12.5% will become free trading every three months thereafter.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as test other high priority targets across the district.
Qualified Person
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP., Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.
Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the “CIM Definition Standards”), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.
You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, “inferred mineral resources” are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures.
Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the “SEC Modernization Rules”), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be “substantially similar” to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at the Panuco Project and the San Enrique prospect, including the potential acquisition of a multispectral World View III satellite image covering the whole Panuco and San Enrique claims and the conduct of regional recognizance-mapping and a stream-sediment geochemical survey at San Enrique.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
https://finance.yahoo.com/news/vizsla-silver-acquire-large-claim-110000093.html
Oleblue
8 months ago
VIZSLA SILVER PROVIDES CORPORATE AND ROYALTY UPDATE
CNW Group
Wed, Mar 27, 2024, 7:00 AM EDT10 min read
NYSE: VZLA TSX-V: VZLA
/This news release is not for distribution to U.S. newswire services or for dissemination in the United Shares/
VANCOUVER, BC, March 27, 2024 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce that it has executed an arrangement agreement with Vizsla Royalties Corp. ("Vizsla Royalties"), whereby the business of the Company will be reorganized into two companies by way of a plan of arrangement (the "Arrangement") under the Business Corporations Act (British Columbia). Vizsla Silver shareholders will vote on the Arrangement at a special meeting of shareholders ("Meeting") to be held on a date to be announced. To be effective, the Arrangement must be approved by a special resolution passed by at least 66?% of the votes cast by Vizsla Silver shareholders present in person or represented by proxy at the Meeting, which shareholders are entitled to one vote for each Vizsla Silver share held.
Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)
Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)
The Arrangement involves, among other things, the distribution of common shares (the "Vizsla Royalties Shares") and warrants of Vizsla Royalties (the "Vizsla Royalties Warrants") to Vizsla Silver shareholders such that each shareholder as of a particular date, immediately prior to closing of the transaction (the "Record Date") will receive 1/3 of a Vizsla Royalties Share and 1/3 of a Vizsla Royalties Warrant for each common share of Vizsla Silver (the "Vizsla Silver Shares") held as of the Record Date. Vizsla Silver warrants will also be adjusted and Vizsla Silver options will be replaced pursuant to the Arrangement as described in more detail in the information circular ("Circular") that will be mailed to shareholders prior to the Meeting.
After careful consideration, the Board of Directors has unanimously determined that the Arrangement is fair to shareholders and is in the best interests of the Company. A description of the various factors considered by the Board of Directors in arriving at this determination will be provided in the Circular.
ATM Program
The Company also announces that it has entered into an equity distribution agreement (the "Distribution Agreement") with Canaccord Genuity Corp. ("Canaccord Genuity") and filed a Prospectus Supplement (as defined below) in respect of an at-the-market equity program (the "ATM Program").
The ATM Program allows the Company to issue and sell up to C$50,000,000 of Vizsla Silver Shares from treasury to the public, from time to time, through Canaccord Genuity, at the Company's discretion and in accordance with the terms and conditions of the Distribution Agreement. All Vizsla Silver Shares issued under the ATM Program will be sold in transactions that are deemed to be "at-the-market distributions" as defined in National Instrument 44-102 – Shelf Distributions, including sales made directly on the TSX Venture Exchange or on any other "marketplace" (as defined in National Instrument 21-101 – Marketplace Operation) in Canada, and/or any other method permitted by applicable law, at the prevailing market price at the time of sale and, as such, prices may vary among purchasers during the period of the ATM Program.
"It is prudent for Vizsla Silver to have an ATM Program available for optionality," commented Michael Konnert, President & CEO. "The Company never utilized the ATM that it had in place from April 2021 until March 2023. The Company does not expect to use the ATM Program in the regular course of business."
The ATM Program is intended to provide the Company with additional financing flexibility should it be required in the future. The volume and timing of distributions under the ATM Program, if any, will be determined in the Company's sole discretion. Distributions of the Vizsla Silver Shares under the ATM Program will be made pursuant to the terms and conditions of the Distribution Agreement.
The ATM Program will be effective until the earlier of the date on which (i) the issuance and sale of all of the Vizsla Silver Shares issuable pursuant to the ATM Program have been completed, and (ii) the receipt issued for the Shelf Prospectus (as defined below) ceases to be effective, unless earlier terminated prior to such date by the Company or Canaccord Genuity in accordance with the terms of the Distribution Agreement. The Company intends to use the net proceeds from the ATM Program, if any, for general corporate purposes and working capital needs. The Company will pay Canaccord Genuity a cash fee equal to 3% of the gross proceeds of Vizsla Silver Shares sold under the Distribution Agreement.
The offering of Vizsla Silver Shares under the ATM Program is qualified by a prospectus supplement dated March 26, 2024 (the "Prospectus Supplement") to the short form base shelf prospectus dated March 31, 2023 (the "Shelf Prospectus"), which were each filed with the applicable securities regulatory authorities in each of the provinces and territories in Canada. The Distribution Agreement, the Prospectus Supplement and the Shelf Prospectus are available on the System for Electronic Document Analysis and Retrieval + website at www.sedarplus.ca. Alternatively, Canaccord Genuity will send copies of the Distribution Agreement, the Prospectus Supplement and the Shelf Prospectus upon request by contacting Canaccord Genuity at: Canaccord Genuity Corp., Suite 2100, 40 Temperance Street, Toronto, Ontario M5H 0B4 or by email at ecm@cgf.com.
This news release does not constitute an offer to sell or the solicitation of an offer to buy the Vizsla Silver Shares, nor shall there be any sale of the Vizsla Silver Shares in any province, state or jurisdiction in which such an offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such province, state or jurisdiction.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on derisking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.
Qualified Person
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP., Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements in this news release include, among other things, statements regarding the Arrangement, including statements regarding the Meeting and the Circular, the issuance, sale and distribution of Vizsla Silver Shares pursuant to the ATM Program, including the price, volume and timing of any distributions; the intended use of net proceeds from the ATM Program, if any; and other statements that are not historical facts.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption "Risk Factors" in the Company's annual information form and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
SOURCE Vizsla Silver Corp.
https://finance.yahoo.com/news/vizsla-silver-provides-corporate-royalty-110000400.html
Oleblue
9 months ago
VIZSLA SILVER ANNOUNCES CLOSING OF $34.5 MILLION BOUGHT DEAL FINANCING
CNW Group
Thu, Feb 29, 2024, 8:33 AM EST
/NOT FOR DISSEMINATION IN THE US OR THROUGH US NEWSWIRE SERVICES/
NYSE: VZLA TSX-V: VZLA
VANCOUVER, BC, Feb. 29, 2024 /CNW/ - Vizsla Silver Corp. (TSXV: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce that it has completed its previously announced bought deal prospectus offering of 23,000,000 common shares of the Company (the "Offered Shares") at a price of C$1.50 per Offered Share for aggregate gross proceeds of C$34,500,000, which includes the exercise in full of the Underwriters' (as defined below) over-allotment option for 3,000,000 Offered Shares (the "Offering").
Vizsla Silver Corp. logo (CNW Group/Vizsla Silver Corp.)
The Offering was conducted by PI Financial Corp., as lead underwriter and sole bookrunner, and Canaccord Genuity Corp., CIBC World Markets Inc., Raymond James Ltd., Stifel Nicolaus Canada Inc. and BMO Nesbitt Burns Inc. (collectively, the "Underwriters"). In consideration for the services provided by the Underwriters in connection with the Offering, the Company paid to the Underwriter a cash commission equal to 6% of the gross proceeds raised under the Offering. As further consideration for the services provided by the Underwriters in connection with the Offering, the Company issued compensation warrants to the Underwriters, exercisable at any time on or before February 28, 2026, to acquire that number of common shares of the Company which is equal to 6% of the number of Offered Shares sold under the Offering at an exercise price of C$1.50. The Offering was completed pursuant to a prospectus supplement dated February 23, 2024 to the short form base shelf prospectus of the Company dated March 31, 2023 in each of the provinces and territories of Canada (except Quebec), in the United States on a private placement basis pursuant to an exemption from the registration requirements of the U.S. Securities Act of 1933, as amended (the "U.S. Securities Act") and applicable state securities laws and other jurisdictions outside of Canada and the United States on an exempt basis. The Offering remains subject to the final approval of the TSX Venture Exchange (the "TSX-V").
The net proceeds of the Offering will be used to advance the exploration, drilling and development of the Company's Panuco Project, as well as for working capital and general corporate purposes.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the U.S. Securities Act or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.
This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.
About the Panuco project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits. The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. The indicated mineral resource is estimated at 9.5 million tonnes ("Mt") grading 289 grams per tonne ("g/t") silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (511 g/t silver equivalent). The mineral resource estimate includes indicated mineral resources of 88.2 million ounces ("Moz") of silver, 736 thousand ounces ("koz") of gold, 25.4 kilotonnes ("kt") of lead, and 79.9 kt of zinc (155.8 Moz AgEq). The inferred mineral resource is estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29% lead, and 1.03% zinc (433 g/t AgEq). The mineral resource estimate includes inferred mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (169.6 Moz AgEq). Silver equivalent is calculated using the following formula: AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Panuco Project's mineral resource, as well as test other high priority targets across the district.
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: the intended use of the net proceeds of the Offering, receipt of final TSX-V approval; and future drilling and exploration activities at the Panuco Project.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption "Risk Factors" in the Company's management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
SOURCE Vizsla Silver Corp.
Oleblue
9 months ago
Vizsla Silver Announces $30 Million Bought Deal Financing
PI Financial Corp.
Wed, Feb 21, 2024, 7:15 AM EST9 min read
In This Article:
VZLA
-1.35%
NOT FOR DISSEMINATION IN THE US OR THROUGH US NEWSWIRE SERVICES
VANCOUVER, British Columbia, Feb. 21, 2024 (GLOBE NEWSWIRE) -- Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce that it has entered into an agreement with PI Financial Corp. as sole bookrunner and lead underwriter, on its own behalf and on behalf of a syndicate of underwriters (the “Underwriters”), pursuant to which the Underwriters have agreed to purchase, on a “bought deal” basis, 20,000,000 common shares (the “Shares”) of the Company at a price of $1.50 per Share for aggregate gross proceeds of $30,000,000 (the “Offering”), excluding additional proceeds raised from the exercise of the Over-Allotment Option (defined below).
The Company has agreed to grant the Underwriters an option to cover over-allotments (the “Over-Allotment Option”), which will allow the Underwriters to purchase up to an additional 15% of the Shares sold pursuant to the Offering, on the same terms as the Offering. The Over-Allotment Option may be exercised in whole or in part at any time, for a period of 30 days after the Closing Date (as defined herein).
The net proceeds from the Offering will be used to advance the exploration, drilling and development of the Company’s Panuco Project, as well as for working capital and general corporate purposes. The Shares will be offered in each of the provinces and territories of Canada (other than the Province of Quebec) by way of a prospectus supplement to the Company’s base shelf prospectus dated March 31, 2023, which will be filed with the securities regulators in each of the provinces and territories of Canada, and may also be offered by way of private placement in the United States and such other jurisdictions as agreed between the parties.
The closing of the Offering is anticipated to occur on or about February 29, 2024 (the “Closing Date”) and is subject to certain conditions including, but not limited to, the receipt of all necessary regulatory approvals, including the acceptance of the TSX Venture Exchange.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.
This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.
About the Panuco project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits. The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. The indicated mineral resource is estimated at 9.5 million tonnes (“Mt”) grading 289 grams per tonne (“g/t”) silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (511 g/t silver equivalent). The mineral resource estimate includes indicated mineral resources of 88.2 million ounces (“Moz”) of silver, 736 thousand ounces (“koz”) of gold, 25.4 kilotonnes (“kt”) of lead, and 79.9 kt of zinc (155.8 Moz AgEq). The inferred mineral resource is estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29% lead, and 1.03% zinc (433 g/t AgEq). The mineral resource estimate includes inferred mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (169.6 Moz AgEq). Silver equivalent is calculated using the following formula: AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project’s mineral resource, as well as test other high priority targets across the district.
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: the filing of a prospectus supplement for the Offering, the timing, structure, activities and completion of the Offering; the use of proceeds from the Offering, the Over-Allotment Option; and exploration and development at Panuco.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption “Risk Factors” in the Company’s management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
Oleblue
9 months ago
VIZSLA SILVER ANNOUNCES UPDATE ON ROYALTY SPINOUT
Vancouver, British Columbia (February 12, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce that, further to its news release dated January 17, 2024, it intends to enter into an arrangement agreement with its wholly-owned subsidiary Vizsla Royalties Corp. (“Spinco”) within 45 days of this news release in respect of the spinout of the shares of Spinco to the Company’s shareholders (the “Spinout”). Spinco currently holds, indirectly, a net smelter royalty on any future mineral production at Vizsla Silver’s flagship, 100% owned Panuco silver-gold project located in Mexico.
The Company further announces that holders of its common shares (the “Vizsla Silver Shares”) will be entitled to 1/3 of a common share of Spinco and 1/3 of a common share purchase warrant of Spinco for each Vizsla Silver Share held on the share distribution record date.
Additional details regarding the Spinout, including the share distribution record date, will be disclosed as they become available.
Shareholders are invited to contact Vizsla Silver via email at info@vizslasilver.ca for additional information regarding the Spinout.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.
In accordance with NI 43-101, Jesus Velador, Ph.D. MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has validated and approved the technical and scientific content of this news release.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Spinout; the terms of the Spinout; and exploration, development, and production at Panuco.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption “Risk Factors” in the Company’s management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
Oleblue
10 months ago
VIZSLA SILVER ADDS UNPARALLELED MINE-BUILDING
AND OPERATING EXPERTISE, APPOINTS SIMON CMRLEC
TO THE ROLE OF COO
Vancouver, British Columbia (January 30, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce Simon Cmrlec will be joining Vizsla Silver as Chief Operating Officer (“COO”). Mr. Cmrlec is a highly experienced senior engineer with over 30-years of industry experience who has been a director of Vizsla Silver since its formation and has most recently held the position of Chief Operating Officer of Ausenco, a global mining engineering and consulting firm. He has extensive experience in building mining projects around the world and across a number of different commodities and will be tasked with advancing Vizsla Silver’s world-class Panuco silver-gold Project towards production, with the goal of becoming one of the world’s largest single-asset silver producers. Mr. Cmrlec commences the role on April 1, 2024.
“Simon has been involved with Vizsla Silver since its inception, preceding the acquisition of the Panuco-Copala District,” commented Michael Konnert, President & CEO. “His guidance as a director has been invaluable in establishing the culture and direction of the Company. Now, we are honoured to welcome him as the incoming Chief Operating Officer as we embark on the next stage of development for the Panuco Project. We thank Martin for all of his contributions and wish him the best in his future endeavours.”
“I am delighted to work closely with Mike and our excellent Vizsla team as we de-risk and develop the world’s next tier one silver asset,” commented Simon Cmrlec. “Projects that are as well endowed as Panuco are rare and it’s a privilege to be part of its future.”
Mr. Cmrlec began his career with Western Mining Corporation (WMC) at its Olympic Dam Mine in South Australia where he held several technical and operations roles. He was an Owners Representatives for the Olympic Dam Expansion Project (ODP) where he supported the design, construction and commissioning of the Smelter and Hydrometallurgical facilities. Following the completion of the ODP project Mr. Cmrlec joined Kvaerner and was involved in the construction and commissioning of various base metals, iron ore and gold projects in the US, South America, Middle East and South Africa. In 2001, he joined Inco on the Goro Nickel project in New Caledonia as the Project Manager responsible for the Refinery facility. Mr. Cmrlec held a number of roles on the Goro Nickel project including Senior Project Manager and Construction director in his eight years there. Mr. Cmrlec joined Ausenco in 2009 as the Manager, Project Delivery before assuming the role of President APAC/Africa. In 2015, Mr. Cmrlec moved to Canada and became Ausenco’s President North America before transitioning to President Americas in 2017 and the Chief Operating Officer in 2019.
Mr. Cmrlec graduated with a B.Eng (Hons) in Metallurgical Engineering from the Gartrell School of Mining, Metallurgy and Applied Geology at the University of South Australia in 1994.
Mr. Cmrlec will replace Martin Dupuis, who is no longer with the Company. We want to thank Mr. Dupuis for his many contributions, which have helped advance the Panuco project through its maiden resource and two subsequent resource updates.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco (the “Updated Mineral Resource”). The Updated Mineral Resource includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. An updated technical report is being prepared on the updated Mineral Resource Estimate in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects and will be available on the Company’s website and SEDAR within 45 days of the date of announcement of the Updated Mineral Resource.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.
Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the “CIM Definition Standards”), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.
You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, “inferred mineral resources” are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures.
Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the “SEC Modernization Rules”), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be “substantially similar” to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including plans for resource/discovery-based drilling designed to upgrade and expand the mineral resource.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for Vizsla and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; the ongoing military conflict in Ukraine; general economic facts; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis and other public disclosure documents. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
Oleblue
10 months ago
VIZSLA SILVER TO SPIN OUT NET SMELTER
ROYALTY TO SHAREHOLDERS
Vancouver, British Columbia (January 17, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce its intention to spin out the shares of Vizsla Royalties Corp. (“Vizsla Royalties”), a wholly-owned subsidiary of Vizsla Silver, to the Company’s shareholders (the “Spinout”). Vizsla Royalties currently holds, indirectly, a net smelter royalty (the “Royalty”) on any potential future mineral production at Vizsla Silver’s flagship, 100% owned Panuco silver-gold project located in Sinaloa, Mexico (the “Project” or “Panuco”).
The Royalty consists of: (i) a 2.0% net smelter return royalty on certain unencumbered concessions comprising the Project; and (ii) a 0.5% net smelter return royalty on certain encumbered concessions comprising the Project which have a pre-existing 3.0% net smelter return royalty (the “Underlying Royalty”).
Vizsla Silver is also expected to: (i) transfer to Vizsla Royalties the right to purchase one-half of the 3% Underlying Royalty; (ii) grant Vizsla Royalties the right to acquire a royalty on any future projects acquired by Vizsla Silver in the 24-month period after completion of the Spinout, which right would automatically terminate upon a change of control of Vizsla Royalties or Vizsla Silver and (iii) make a cash injection into Vizsla Royalties.
It is expected that the Spinout will be completed pursuant to a plan of arrangement under the Business Corporations Act (British Columbia). The Spinout would be subject to shareholder, court, stock exchange and regulatory approvals, as well as, at management’s continued discretion. Pursuant to the Spinout, common shares of Vizsla Royalties would be distributed to shareholders of Vizsla Silver. Vizsla Silver is expected to hold approximately a 49% ownership interest in Vizsla Royalties, with the remaining shares of Vizsla Royalties being distributed to shareholders of Vizsla Silver on a pro-rata basis at a time to be determined by the board of directors of Vizsla Silver. There will be no change in shareholders’ holdings in Vizsla Silver as a result of the Spinout.
Subsequent to completion of the Spinout, the board of directors of Vizsla Royalties (the “Vizsla Royalties Board”) may decide to pursue a listing on the TSX Venture Exchange if and when the Vizsla Royalties Board determines it is in the best interests of the Vizsla Royalties shareholders. It is expected that, at the time Vizsla Royalties pursues a listing on the TSX Venture Exchange, a majority of the members of its management team and the Vizsla Royalties Board will be independent of Vizsla Silver.
Additional details regarding the Spinout, including the proposed record date, will be provided as they become available. There is no certainty Vizsla Silver will proceed with the Spinout.
Shareholders are invited to contact Vizsla Silver via email at info@vizslasilver.ca for additional information regarding the Spinout.
About the Panuco Project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
On January 8, 2024, the Company announced an updated mineral resource estimate for Panuco (the “Updated Mineral Resource”). The Updated Mineral Resource includes an estimated in-situ indicated mineral resource of 155.8 Moz AgEq and an in-situ inferred resource of 169.6 Moz AgEq. An updated technical report is being prepared on the updated Mineral Resource Estimate in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects and will be available on the Company’s website and SEDAR within 45 days of the date of announcement of the Updated Mineral Resource.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 350,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla Silver has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project's mineral resource, as well as test other high priority targets across the district.
In accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects, Martin Dupuis, P.Geo., Chief Operating Officer, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: timing, structure and completion of the Spinout; the transfer of assets from Vizsla Silver to Vizsla Royalties; the timing and receipt of required shareholder, court, stock exchange and regulatory approvals for the Spinout; the retained ownership interest of Vizsla Silver in Vizsla Royalties; the terms of the Spinout; the listing of Vizsla Royalties on the TSX Venture Exchange; and exploration, development, and production at Panuco.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of the Company, future growth potential for the Company and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of public health crises; costs of exploration and development; the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company’s dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company’s mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding mineral resources and reserves; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities and artisanal miners; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; ongoing military conflicts around the world; general economic factors; and the factors identified under the caption “Risk Factors” in the Company’s management discussion and analysis and other public disclosure documents.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.
Oleblue
11 months ago
VIZSLA SILVER ANNOUNCES SIGNIFICANT INCREASE IN CONTAINED OUNCES AND INCREASE IN GRADE OF INDICATED CATEGORY TO 551 G/T AGEQ IN UPDATED MINERAL RESOURCES ESTIMATE
Vancouver, British Columbia (January 8, 2024) – Vizsla Silver Corp. (NYSE: VZLA) (TSX-V: VZLA) (Frankfurt: 0G3) (“Vizsla Silver” or the “Company”) is pleased to announce an updated mineral resource estimate (“Updated Mineral Resource Estimate”) for its flagship, 100% owned Panuco silver-gold project (the “Project” or “Panuco”) located in Sinaloa, Mexico. The Updated Mineral Resource Estimate was completed by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services.
Highlights of the Updated Mineral Resource Estimate, including a comparison to the previous mineral resource estimate released in January 2023:
48.7% increase in indicated mineral resources from 104.8 to 155.8 Moz AgEq
48.7% increase in inferred mineral resources from 114.1 to 169.6 Moz AgEq
17% increase in average indicated mineral resource grade from 437 to 511 g/t AgEq
New addition of La Luisa containing 4.0 Moz AgEq indicated and 25.3 Moz AgEq of Inferred Resources
Key Statistics:
The Updated Mineral Resource represents less than 10% of the known vein strike of the newly consolidated district
90% of the value of the Updated Mineral Resource Estimate is comprised of precious metals, including 56% from silver
A total of 11 epithermal veins were included in the Updated Mineral Resource Estimate
Total all-in exploration cost of US$0.32/oz AgEq discovered
Indicated Mineral Resources are estimated at 9.5 million tonnes (“Mt”) grading 289 grams per tonne (“g/t”) silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (511 g/t silver equivalent (“AgEq”)). The Updated Mineral Resource Estimate includes indicated mineral resources of 88.2 million ounces (“Moz”) of silver, 736 thousand ounces (“koz”) of gold, 25.4 kilotonnes (“kt”) of lead, and 79.9 kt of zinc (155.8 Moz AgEq).
Inferred Mineral Resources are estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29% lead, and 1.03% zinc (433 g/t AgEq). The Updated Mineral Resource Estimate includes inferred mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (169.6 Moz AgEq).
The Updated Mineral Resource Estimate is centred on the western portion of Panuco, encompassing ~8 km of the known 86 km of cumulative vein strike in the district. The Updated Mineral Resource Estimate includes 178 new infill/expansion holes (100,222 metres) completed by Vizsla Silver between September 2022 and September 2023. In total, the Updated Mineral Resource Estimate is based on a total drill database of 822 holes (302,931 metres) completed by Vizsla Silver since November 2019.
“We are pleased to announce another significant resource update milestone for the high-grade Panuco silver gold district,” commented Michael Konnert, President and CEO. “Although substantial, this update represents only a moment in time at the Project, as drills continue to turn in 2024.”
“The Project’s indicated resource now stands at 88 million ounces of silver and 736 thousand ounces of gold, while the inferred resource contains 94 million ounces of silver and 758 thousand ounces of gold. This represents a 49% increase in both indicated and inferred ounces and a 17% increase in indicated grade relative to the previous estimate. Resource focused drilling throughout 2023 was successful in converting almost half of the January 2023 inferred resource to the indicated category while exploration drilling added new resources at both Copala and Napoleon. The bulk of this year’s resource growth came from the Napoleon Area, largely driven by the inclusion of La Luisa, which added an additional 25Moz AgEq in inferred mineralization.”
“What’s most impressive is that although we continue to expand the Project’s mineral inventory year after year, our current resource still accounts for less than 10% of the known veins we have in the district. Going forward, we will focus on de-risking and advancing the high-grade resource in the west towards development, taking advantage of the Project’s incredible infrastructure, while simultaneously hunting for the next epicenter of mineralization in the central and eastern portions of the district. This is an outstanding achievement that comes as a result of hard work and perseverance. I want to thank everyone from the entire Vizsla team, including our contractors and local communities, and look forward to another successful year in 2024.”
Vizsla Silver will be hosting a webcast to discuss the Updated Mineral Resource Estimate at 10:00am PT on Thursday, January 11th, 2024. To register, please click here.
A technical report is being prepared on the Updated Mineral Resource Estimate in accordance with National Instrument 43-101 (“NI-43-101”) and will be available on the Company’s website and SEDAR within 45 days of the date of this release. The effective date of the Updated Mineral Resource Estimate is September 1, 2023.
Panuco Project Resource Summary (150 g/t AgEq cut-off)
Panuco Project Indicated & Inferred Mineral Resource Summary by Vein (150 g/t AgEq cut-off)
*Animas is Rosarito and Cuevillas veins
Panuco Project Indicated & Inferred Mineral Resource Sensitivity Table
Note:
1AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.
2AuEq = Au ppm + (((Ag ppm x Ag price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Au price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.
Panuco Project Updated Mineral Resource Estimate Notes:
The classification of the Updated Mineral Resource Estimate into indicated and inferred mineral resources is consistent with current 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves. The effective date for the Updated Mineral Resource Estimate is September 1, 2023.
All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.
All mineral resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.
Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves, do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
The database comprises a total of 822 drill holes for 302,931 metres of drilling completed by Vizsla Silver between November 2019 and September 2023.
The mineral resource estimate is based on 28 three-dimensional (“3D”) resource models, constructed in Leapfrog, representing the Napoleon area (15 wireframes), the Copala area (7 wireframes), Tajitos (1 wireframe), Animas (5 wireframes) and San Antonio (1 wireframe).
Silver, gold, lead and zinc were estimated for each mineralization domain in the Panuco Project. Blocks within each mineralized domain were interpolated using 1.5 metre capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains. All estimates are based on variable block dimensions (by deposit area) and estimation search parameters (by domain).
Average density values were assigned per zone based on 1,919 samples analysed by ALS in Zacatecas, Mexico or inhouse with 5% checks by ALS.
It is envisioned that the Panuco Project deposits may be mined using underground mining methods. Mineral resources are reported at a base case cut-off grade of 150 g/t AgEq. The mineral resources grade blocks were quantified above the base case cut-off grade, below surface and within the constraining mineralized wireframes.
The base-case AgEq Cut-off grade considers metal prices of $24.00/oz Ag, $1800/oz Au, $2425/t Pb and $2976/t Zn and considers metal recoveries of 93% for silver, 90% for gold, 94% for Pb and 94% for Zn.
The base case cut-off grade of 150 g/t AgEq considers a mining cost of US$45.00/t rock and processing, treatment and refining, transportation and G&A cost of US$50.00/t of mineralized material.
The Updated Mineral Resource Estimate may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
The Company remains well-funded for its ongoing +65,000 metre 2024 drill program with four drill rigs designed to upgrade and expand the Project’s resource base and test high priority targets located in the west, central and eastern areas of the district. Dependent on ongoing exploration success, the Company plans to publish a further update to the Updated Mineral Resource Estimate in the second half of 2024.
Discovery Costs
To date, the Company has incurred an aggregate of approximately US$103.0 million in exploration expenditures over the life of the Project. This equates to an estimated discovery cost per silver equivalent ounce of US$0.32 for resources defined in the Updated Mineral Resource Estimate.
About the Panuco project
The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5 hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.
The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.
About Vizsla Silver
Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. To date, Vizsla Silver has completed over 310,000 metres of drilling at Panuco leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-risking the resource base located in the western portion of the district ahead of a development decision. Additionally, Vizsla has budgeted +65,000 metres of resource/discovery-based drilling designed to upgrade and expand the Project’s mineral resource, as well as test other high priority targets across the district.
Quality Assurance / Quality Control
Drill core and rock samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver. The ALS Zacatecas and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption (“AA”) spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.
Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company’s quality assurance / quality control protocol.
Qualified Person
The Updated Mineral Resource Estimate was completed by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services. Mr. Armitage is an independent Qualified Person as defined by NI 43-101. Mr. Armitage has reviewed and approved the technical contents of this news release.
Information Concerning Estimates of Mineral Resources
The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the “CIM Definition Standards”), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.
You are cautioned not to assume that any part or all of the mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, “inferred mineral resources” are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures.
The SEC adopted new mining disclosure rules Pursuant to subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the “SEC Modernization Rules”). As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. As an eligible issuer under the Multijurisdictional Disclosure System the Company is exempt from compliance with the SEC Modernization Rules and information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according tothe SEC Modernization Rules. While the SEC Modernization Rules are purported to be “substantially similar” to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.
Contact Information: For more information and to sign-up to the mailing list, please contact:
Michael Konnert, President and Chief Executive Officer
Tel: (604) 364-2215
Email: info@vizslasilver.ca
Website: www.vizslasilvercorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS
This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “would”, “could”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including drilling programs, the mobilization of drill rigs; and the potential for underground mining methods; the preparation of a technical report on the Updated Mineral Resource Estimate; and the potential further update to the Updated Mineral Resource Estimate in the second half of 2023.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect Vizsla Silver’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption “Risk Factors” in Vizsla Silver’s management discussion and analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.