ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for tools Level up your trading with our powerful tools and real-time insights all in one place.
Amex Exploration Inc

Amex Exploration Inc (AMX)

1.12
0.04
( 3.70% )
Updated: 03:35:34

Professional-Grade Tools, for Individual Investors.

AMX News

Official News Only

AMX Discussion

View Posts
Explore4more Explore4more 3 years ago
AMEX MAKES COPPER RICH VMS DISCOVERY AT PERRON, INTERSECTS 2.40% COPPER, 0.72% ZINC, 0.27 G/T GOLD AND 22.15 G/T SILVER OVER 7.80 M

Trottier Continued, "Should this discovery lead to the development of a deposit it has the potential to be a company maker on its own. We are obviously very excited by this opportunity for Amex. Our VMS discovery is 100% accretive to the high-grade gold zones which we are currently drilling off at Perron and provides our shareholders and investors with exposure to highly sought-after copper-rich base metal discoveries."
๐Ÿ‘๏ธ0
Explore4more Explore4more 3 years ago
Amex Exploration keeps putting out great drill results the stock has sold off from $4 making it a good buy at these levels.
๐Ÿ‘๏ธ0
Ezy1955 Ezy1955 3 years ago
Looking forward to Kelly's presentation. He's one of my favorite presenters.
๐Ÿ‘๏ธ0
Explore4more Explore4more 3 years ago
Kelly Malcom Vice President of Amex Exploration will be speaking with InvestInGold on the Thursdays 10@10 segment this coming Thursday, July 15, 2021 at 10 am EDT. Kelly will give a brief 10 min presentation followed by 10 min Q&A. To register please go here https://investingold.ca/thursdays10at10
๐Ÿ‘๏ธ0
Explore4more Explore4more 3 years ago
AMEX DRILLS LARGE INTERVALS OF NEAR-SURFACE GOLD MINERALIZATION AT DENISE ZONE EXPANDING LATERAL STRIKE TO 450 M AT PERRON, QUEBEC

https://www.amexexploration.com/news/news/84-news-2021/1267-amex-drills-large-intervals-of-near-surface-gold-mineralization-at-denise-zone-expanding-lateral-strike-to-450-m-at-perron-quebec.html
๐Ÿ‘๏ธ0
chasing stocks chasing stocks 3 years ago
Three great drilling results within 20 days - if the price of gold would cooperate AMEX could have a big upside ( nice move this morning!!)
๐Ÿ‘๏ธ0
Explore4more Explore4more 3 years ago
929.24 g/t gold is incredible

AMEX DRILLS HIGHEST GRADE ASSAY AT PERRON - REPORTS 79.22 G/T GOLD OVER 6.15 METRES INCLUDING 929.24 G/T GOLD OVER 0.50 METRES AT THE HIGH GRADE ZONE OF PERRON
https://www.amexexploration.com/news/news/84-news-2021/1265-mexrillsighestradessayaterroneports7922g20210628030000.html
๐Ÿ‘๏ธ0
Ezy1955 Ezy1955 4 years ago
More great news out of Perron.

https://www.amexexploration.com/news/news/84-news-2021/1263-mexxpandstheoreoftheighradeoneearurfacea20210615030000.html
๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
Amex's Core Shack Interview with Jacques Trottier, Chairman

๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
AMEX EXPANDS THE CORE OF THE HIGH GRADE ZONE NEAR SURFACE AT PERRON WITH INTERCEPTS OF UP TO 36.86 G/T AU OVER 13.10 METRES, INCLUDING 529.06 G/T AU OVER 0.75 METRE FROM HOLE PE-21-329

https://www.amexexploration.com/news/news/84-news-2021/1263-mexxpandstheoreoftheighradeoneearurfacea20210615030000.html

๐Ÿ‘๏ธ0
Ezy1955 Ezy1955 4 years ago
Yes Excellent results. More to come!
๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
More great drilling results from Amex
HGZ - near surface
32.91 g/t Au over 6.40 metres, including 148.82 g/t Au over 1.40 metres, for a metal factor of 210 at a vertical depth of approximately 130.00 metres in hole PE-21-321

HGZ - at depth
27.06 g/t Au over 8.85 metres, including 317.18 g/t Au over 0.70 metres, for a metal factor of 239 at a vertical depth of approximately 930.00 metres in hole PE-21-301
๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
AMEX REPORTS HIGH GRADE ZONE DEFINITION DRILLING RESULTS UP TO 70.92 G/T AU OVER 3.90 M AND 25.12 G/T AU OVER 4.95 M

Check out the visible gold in the core

๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
Amex Exploration share price is back on an uptrend
๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
Amex Exploration has made another discovery of an additional high grade gold structure 58.25 G/T AU OVER 3.90 M ON THE NORTHERN NORMETAL FAULT
๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
The Denise Zone will be an open starter pit for the High Grade Zone.
Recent Assay results on Denise Zone 10.63 G/T AU OVER 9.65 M AND 1.44 G/T AU OVER 88.00 M
๐Ÿ‘๏ธ0
Explore4more Explore4more 4 years ago
Amex has 24,400 samples at two separate labs awaiting assay results. Lots of news to come.
๐Ÿ‘๏ธ0
704 Hauser St 704 Hauser St 4 years ago
All this does is go up EVERY damn day.
๐Ÿ‘๏ธ0
micar micar 4 years ago
You should be following the last 15 days.
๐Ÿ‘๏ธ0
mmm21 mmm21 5 years ago
anyone following this? could be a big one...
๐Ÿ‘๏ธ0
ogenjacki ogenjacki 5 years ago
Awesome!
๐Ÿ‘๏ธ0
MC2 Atlantis MC2 Atlantis 6 years ago
Itโ€™s not a Grey Co. anymore.
๐Ÿ‘๏ธ0
PerdonMe PerdonMe 6 years ago
You really tight. Shares are hard to come by


News out, intersected more gold

https://finance.yahoo.com/news/amex-intersects-581-59-g-110000726.html
FRA: MX0) is very pleased to announce that ongoing drilling of the Eastern Gold Zone (โ€œEGZโ€) at the Perron project (โ€œPerronโ€) has successfully intersected additional high grade gold mineralization in the first lateral step-out program on the High Grade Zone ("HGZ") of the EGZ. Drill hole PE-19-27 intersected 56.75 g/t Au over 8.50 m including 581.59 g/t Au over 0.80 m (see Table 1) at a vertical depth of ~225 m and a lateral distance of ~25 m to the East from the previously defined vertical section of the High Grade Zone (see fig.
๐Ÿ‘๏ธ0
MC2 Atlantis MC2 Atlantis 6 years ago
Just a 100 share purchase moves the price up now.
Talk about a tight float.
๐Ÿ‘๏ธ0
PerdonMe PerdonMe 6 years ago
Two bucks Canadian coming EOW in my opinion
๐Ÿ‘๏ธ0
PerdonMe PerdonMe 6 years ago
Can't believe people are sleeping on this stock. Can't wait for the next drill results
๐Ÿ‘๏ธ0
PerdonMe PerdonMe 6 years ago
Nice! Ready for takeoff
๐Ÿ‘๏ธ0
PerdonMe PerdonMe 6 years ago
News out

https://finance.yahoo.com/news/amex-completes-5-4-million-221627557.html
In connection with the offering (the โ€œOfferingโ€) 7,256,000 units, each priced at $0.75 (the โ€œUnitsโ€) were issued, with each Unit consisting of one common share and one half (½) of one common share purchase warrant (the โ€œWarrantโ€) having an exercise price of $1.25 and a term of 18 months provided that, the Company may issue a notice of acceleration to the Warrant holders if the volume weighted average price of the common shares is greater or equal to, $1.50 for 20 consecutive trading days in which case the Warrants will expire 30 days later. Victor Cantore, President and CEO of Amex Exploration commented, โ€˜With this financing we are very pleased to welcome Mr. Eric Sprott as a new strategic investor.
๐Ÿ‘๏ธ0
MC2 Atlantis MC2 Atlantis 6 years ago
This little grey company with the richest core results that I or probably anyone has ever heard of is steadily moving up. 400 grams per ton and 200 grams per ton so far, while the best producing mine in the world only produces I believe around 14 to 19 grams per ton. Plus, the share price moves up pennies on just a 1,000 share trade.
๐Ÿ‘๏ธ0
MC2 Atlantis MC2 Atlantis 6 years ago
Yes and? Many good companyโ€™s on the TSX will also trade on the greys or OTC. Do you know anything about the company that could be of concern to investors?
๐Ÿ‘๏ธ0
Ace 420 Ace 420 6 years ago
This is a grey co.
๐Ÿ‘๏ธ0
MC2 Atlantis MC2 Atlantis 6 years ago
6:30 AM ET 1/23/19 | GlobeNewswire
First Hole in Amex 2019 Drill Program Returns 393.33 g/t Au Over 1.70 m at Perron Eastern Gold Zone

Extends High Grade Zone at Perron

MONTREAL, Jan. 23, 2019 (GLOBE NEWSWIRE) -- Amex Exploration Inc. ("Amex or the Company") (AMX: TSX-V; FRA: MX0) is very pleased to announce that it has launched its 2019 diamond drill program on the Perron property Eastern Gold Zone (EGZ) and reports 393.33 g/t Au over 1.70 m in hole PE2019-22 (see Table 1) at a vertical depth of 170 m (see Fig. 1, 2 and 3). This hole was planned to test the high-grade vein interval in hole PE2018-17 that returned 269.2 g/t Au over 1.35 m (see PR2018-12-13B) at a vertical distance of 25 m above it, starting from the same collar location. The Perron property is located approximately 110 kilometers North of the town of Rouyn-Noranda in the Abitibi region of Quebec and is accessible year-round by road and is serviced by excellent infrastructure.

Table 1: 2019 Winter Follow-up Drilling results on the EGZ from Hole PE2019-22

Hole From To Length (m) Au (g/t)

PE2019-22 48.00 51.00 3.00 2.62

PE2019-22 incl 48.00 49.00 1.00 6.38

PE2019-22 225.85 227.55 1.70 393.33*

PE2019-22 incl 225.85 226.40 0.55 236.51*

PE2019-22 incl 226.40 226.90 0.50 677.62*

PE2019-22 Incl 226.90 227.55 0.65 307.33*

PE2019-22 298.35 298.85 0.50 18.11*

PE2019-22 369.80 370.30 0.50 2.13*

Interval intersected along the hole, undetermined true thickness.

*VG: Visible Gold or Coarse gold grains

Additionally, the low-grade zone results from hole PE2019-22 are still pending. Results above only report intersections with visible gold or coarse gold grains. Hole PE2019-23 drilled at about 25 meters vertically above hole PE2019-22 (see Fig. 3) intersected the same quartz vein and visible gold grains has been identified. Results are also pending.

Jacques Trottier PhD, Chairman of Amex Exploration commented, "The 2019 drill program is off to an exciting start with the excellent high-grade results from hole PE2019-22 that is at a vertical depth of about 170 metres from surface, which is quite shallow. Our current drilling suggests the EGZ is holding together very well, with high-grade gold mineralization being reported as the zone comes to surface. It looks very consistent in terms of grade and width. I believe 2019 will be a very outstanding year for Amex and its shareholders."

With the very positive 2018 drill results on the EGZ (see table 2), Amex launched, on January 7, 2019, a program of 12 high priority drill holes totalling 3,000 meters aimed at testing the lateral and shallow extensions of the high-grade zone (see Fig. 1 and 3). In addition, the program is designed to test the continuity between the mineralized intersections of previous drill holes that intersected the EGZ (i.e. infill drilling). The planned intersection spacing should enable Amex to establish an initial estimate of a potential resource calculation on the Perron EGZ.

Following the 2018 program the EGZ can now be followed from surface (from intersect in hole PE97s-35) down to a minimum vertical depth of 375 meters (from intersect in hole PE2017-03) on a minimum of strike length of at least 300 meters and still open in at depth and to the East.

Trottier continued, "The 2018 drill program added another 100 metres of strike length to the EGZ. The goal of the 2019 program is to basically target the high-grade zone of the EGZ and trace it closer to surface. We will also drill the low-grade zone of the EGZ as a second priority to establish its continuity to surface and East."

To view Figure 1, please visit the following link: http://www.globenewswire.com/NewsRoom/AttachmentNg/1c918732-09a9-4d5c-aa79-9d8d78713116

To view Figure 2, please visit the following link: http://www.globenewswire.com/NewsRoom/AttachmentNg/99a99ef6-ca57-4f08-b958-da57fde94c3a

To view Figure 3, please visit the following link: http://www.globenewswire.com/NewsRoom/AttachmentNg/e41bc65d-fff4-4e97-8e83-8ea0f9d3dba9

2018 Drill Program

As a reminder, the 2018 drill program consisted of 18 diamond drill holes (DDH) totalling 6,171 meters designed primarily to test the lateral and depth extensions of the known EGZ which consist if a wide low-grade zone and a high-grade zone which appears to run parallel to each other.

To conclude this first follow up drilling phase on the EGZ that ended on December 22nd 2018, a total of 7 holes were drilled totaling 2,386 meters (PE2018-15 to PE2018-21). As a point of reference, 4 holes were drilled to the West of hole PE2018-17 (holes PE2018-15 PE2018-16, PE2018-18 and PE2018-21) and 2 to the East of the same hole (PE2018-19 and PE2018-20).

With the exception of hole PE2018-21, located to the Western limit of the EGZ, ALL of the holes intersected the second, wide low-grade zone of the EGZ over now a strike length of at least 300 meters, and still open at depth and to the East. In addition, the high-grade zone of the EGZ has also now being identified in three holes covering a vertical extent length of at least 100 meters. (see Fig. 2)

Table 2: 2018 Winter Follow-up Drilling results on the EGZ from Hole PE2018-15 to PE2018-21.

Hole From To Length (m) Au (g/t)

PE2018-15 370.00 396.20 26.20 1.50

PE2018-15 374.80 379.00 4.20 3.64

PE2018-15 incl 374.80 375.30 0.50 28.66*

PE2018-15 386.00 396.20 10.20 2.07

PE2018-15 incl 387.00 388.00 1.00 12.62

PE2018-15 411.60 415.05 3.45 2.19

PE2018-15 incl 411.60 411.90 0.30 22.40*

PE2018-15 414.75 415.05 0.30 2.50*

PE2018-15 442.50 443.00 0.50 2.17*

PE2018-15 469.85 475.20 5.35 3.41

PE2018-15 incl 469.85 470.40 0.55 30.77*

PE2018-15 incl 469.85 471.80 1.95 9.13



Hole From To Length (m) Au (g/t)

PE2018-16 97.60 101.55 3.95 0.71

PE2018-16 134.00 139.00 5.00 0.75

PE2018-16 incl 134.00 134.30 0.30 4.04*

PE2018-16 162.00 180.50 18.50 0.51

PE2018-16 incl 168.50 174.20 5.70 0.80

PE2018-16 194.00 195.00 1.00 1.42

PE2018-16 205.50 212.30 6.80 0.79

PE2018-16 260.30 267.00 6.70 1.57

PE2018-16 incl 260.30 261.50 1.20 4.95

PE2018-16 incl 263.55 265.00 1.45 2.69

PE2018-16 296.00 297.15 1.15 0.65

PE2018-16 301.60 305.15 3.55 0.38



Hole From To Length (m) Au (g/t)

PE2018-17 241.85 243.2 1.35 269.23*

PE2018-17 307.60 421.00 113.40 0.34

PE2018-17 incl 307.60 318.50 10.90 0.55

PE2018-17 incl 314.00 315.00 1.00 4.02

PE2018-17 incl 376.00 421.00 45.00 0.60

PE2018-17 incl 376.00 387.85 11.85 0.91

PE2018-17 incl 376.00 384.00 8.00 1.29

PE2018-17 incl 382.00 383.00 1.00 6.99

PE2018-17 incl 400.25 400.75 0.50 13.88*

PE2018-17 incl 400.25 421.00 20.75 0.74

PE2018-17 incl 417.70 418.20 0.50 4.47*

PE2018-17 incl 419.20 420.00 0.80 2.37*



Hole From To Length (m) Au (g/t)

PE2018-18 63.80 64.35 0.55 6.79

PE2018-18 88.00 89.50 1.50 2.58

PE2018-18 117.00 161.00 44.00 0.87

PE2018-18 incl 123.00 142.60 19.60 1.45

PE2018-18 incl 123.00 129.70 6.70 2.51

PE2018-18 incl 128.30 129.70 1.40 10.71

PE2018-18 incl 139.60 140.10 0.50 5.84

PE2018-18 incl 160.50 161.00 0.50 3.44*

PE2018-18 183.20 183.70 0.50 2.85*

PE2018-18 189.00 190.50 1.50 5.92

PE2018-18 215.00 219.00 4.00 0.83

PE2018-18 237.50 252.50 15.00 0.42

PE2018-18 incl 250.50 252.50 2.00 1.70

PE2018-18 incl 250.50 251.00 0.50 4.65



Hole From To Length (m) Au (g/t)

PE2018-19 217.50 220.10 2.60 0.83

PE2018-19 incl 219.00 220.10 1.10 1.25

PE2018-19 261.00 268.50 7.50 0.21



Hole From To Length (m) Au (g/t)

PE2018-20 87.20 87.65 0.45 2.16

PE2018-20 106.90 107.90 1.00 2.27

PE2018-20 175.35 177.25 1.90 0.81

PE2018-20 190.00 199.60 9.60 0.32

PE2018-20 incl 195.00 195.60 0.60 2.24

PE2018-20 215.50 216.00 0.50 3.01

PE2018-20 243.25 245.00 1.75 0.60



Hole From To Length (m) Au (g/t)

PE2018-21 49.75 50.75 1.00 1.54*

Interval intersected along the hole, undetermined true thickness.

*VG: Visible Gold or Coarse gold grains

Maxime Bouchard M.Sc.A, Geologist of Laurentia Exploration, a Qualified Person as defined by Canadian NI 43-101, reviewed and approved the geological information of the current drilling reported in this news release. The drilling campaign and the quality control program has been planned and supervised by Maxime Bouchard and Amex's management. The QAQC include insertion of blank or standard every 10 samples on average. The gold values are estimated by Fire Assay with finish by atomic absorption and value over 3 ppm Au are re-analysed by fire Assay with finish by gravimetry by Laboratoire Expert Inc, Rouyn-Noranda. For additional quality assurance and quality control, all samples were crushed to 90% less than 2mm and samples with visible gold were analyse by metallic sieve. Core Logging and sampling was realized by Maxime Bouchard and Alizée Lienard M.Sc.A, Trainee Geologist of Laurentia Exploration.

About Amex

(MORE TO FOLLOW) Dow Jones Newswires

January 23, 2019 06:30 ET (11:30 GMT)



First Hole in Amex 2019 Drill Program Returns -2-





Amex Exploration Inc. is a junior mining exploration company, the primary objective of which is to develop and bring into production viable gold and base metals deposits in mining-friendly jurisdictions. Amex has multiple highly prospective projects: the 100% owned Perron gold project located 110 kilometres north of Rouyn Noranda, Quebec, consisting of 116 adjacent claims covering 4518 hectares; the 100% owned Eastmain River gold properties consisting of 135 claims covering 7,102 hectares and the 100% owned Cameron project located in Lebel-sur-Quévillon, Quebec, comprising 263 claims covering 14,743 hectares. In addition, Amex has an option agreement to acquire a 100% interest in the Gowan Property located near the Kidd Creek Mine.

For further information please contact:

Victor Cantore

President and Chief Executive Officer

Amex Exploration: 514-866-8209

Forward-looking statements:

Except for statements of historical facts, all statements in this news release regarding, without limitation, future plans and objectives are forward-looking statements which involve risks and uncertainties. There can be no assurance that such statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release

> Dow Jones Newswires

January 23, 2019 06:30 ET (11:30 GMT)
๐Ÿ‘๏ธ0
MC2 Atlantis MC2 Atlantis 6 years ago
AMXEF Check it out!

http://www.amexexploration.com/
๐Ÿ‘๏ธ0

Your Recent History

Delayed Upgrade Clock