Bedford Metals Obtains Satellite Survey Results on the Sheppard
Lake Uranium Project, Northern Saskatchewan
VANCOUVER, British
Columbia, Aug. 12, 2024 (GLOBE NEWSWIRE) -- Bedford Metals Corp.
(TSX-V: BFM, FWB: O8D, ISIN: CA0762301012) (the “Company” or
“Bedford”) is pleased to announce the results of its VNIR (Visible
Near Field Infrared) and SWIR (Shortwave Infrared) satellite
investigation at its Sheppard Lake Uranium Project, which adjoins
the Ubiquity Lake Uranium project, just south of the Athabasca
Basin, Saskatchewan.
The statistical
analysis, conducted by Dr. Neil Pendock, PhD in Applied
Mathematics, successfully identified several positive indicators.
Of particular interest was the identification of methane gas,
believed to be produced by altered clays, particularly illite. This
finding is significant because unconformity-style uranium deposits
in the Athabasca Basin are often associated with hydrothermal
events that produce illite.
The investigation
revealed a series of discrete methane anomalies correlating to a
northwest-trending fault, with the southern end terminating at the
TZ1 anomaly located on the Ubiquity Lake claims. Additionally,
hydrogen gas was noted, adhering strongly to the northwest-trending
fault. This trend has led to the outlining of a broader exploration
corridor, approximately 8km in length and 1.5km in width. This
corridor will form the first line of investigation for field crews
in 2024.
Peter Born, President
of Bedford, commented, “The results of the satellite survey at
Sheppard Lake are highly encouraging. The identification of key
methane and hydrogen anomalies along the northwest-trending fault
provides us with a clear exploration focus. We are excited to begin
field investigations in this newly identified corridor and build on
these promising findings.”
Bedford remains
committed to conducting all exploration and development work in an
environmentally responsible manner and in consultation with local
stakeholders. The Company prioritizes minimizing its environmental
footprint and ensuring that all operations are sustainable and
responsible.
Additionally, Bedford
values its relationships with local communities and indigenous
groups and is committed to working collaboratively to ensure that
its activities bring positive benefits to the region.
Background: The Region of Interest (ROI) is close
to the Carpenter Lake Uranium Project of ALX Resources. The project
is located along the Cable Bay Shear Zone (CBSZ), parallel to the
Virgin River Shear Zone, which hosts Cameco's Centennial uranium
deposit. It is 95 km west of Cameco's past-producing Key Lake
uranium mine and 45 km southeast of the Centennial deposit.
The dominant
lithologies are granite gneiss and granite pegmatite, with lesser
mafic gneiss, pelitic schist, and scattered mafic dykes. The CBSZ
is delineated by three parallel electromagnetic conductor axes,
suggesting the hanging wall, footwall, and middle of a conductive
panel of graphitic or sulfide-rich rocks. The project is situated
on basement-type unconformity-related uranium deposits, similar to
the Millennium, Eagle Point, and P-Patch deposits.
The area remains
underexplored despite strong radiometric and base metal
geochemistry indicators. Previous exploration includes airborne
gravity gradiometer and VTEM surveys, radon-in-water and in-soil
surveys, lake sediment sampling, and detailed follow-up geochemical
surveys. These efforts have identified multiple high-priority
targets across the CBSZ.
Dr. Peter Born, P.Geo., is the designated
qualified person as defined by National Instrument 43-101, and the
President of the Company, and is responsible for and has approved
the technical information in this release.
About Bedford
Metals Corp.
Bedford Metals Corp. is a mineral exploration
company. We create value for our shareholders by identifying and
developing highly prospective mineral exploration opportunities.
Our strategy is to advance our projects from discovery to
production.
The Close Lake Uranium Project
lies on the eastern side of the Athabasca Basin, adjoining claims
held by Cameco Corporation, the largest uranium producer in the
world. The claim is approximately 245 hectares and lies within the
primary exploration corridor, which hosts the Keys Lake Mine, the
Cigar Lake Mine, and the McArthur River Mine. Access to the
property is done through a network of roads and trails.
The Ubiquity Lake Uranium
Project, covering 1382 hectares, lies just south of the
bottom lip of the Athabasca Basin, adjacent to ALX Uranium’s
Carpenter Lake Project to the east. Situated near the Cable Bay
Shear Zone, parallel to the Virgin River Shear Zone, which hosts
Cameco’s Centennial uranium deposit, the project holds immense
potential. Furthermore, it is located 100 km west of Cameco’s
past-producing Key Lake uranium mine, underscoring the strategic
significance of its location.
The Sheppard Lake Uranium
Project covers an area of approximately 2250 hectares and
adjoins the Ubiquity Lake Project to the southeast. The project
area is characterized by rocks of the Mudjatik domain, where
uranium mineralization is typically basement-hosted, situated
within shears or faults, and formed through hydrothermal
redistributions of dissolved metals and subsequent redox
reactions.
For further information, please contact the
Company at info@bedfordmetals.com or 604-622-1199 or visit the
Company’s website at www.bedfordmetals.com.
On behalf of the
Board,
Bedford Metals
Corp.
“Peter Born”
President
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
This news release may include forward-looking
statements that are subject to risks and uncertainties. All
statements within, other than statements of historical fact, are to
be considered forward looking. Although the Company believes the
expectations expressed in such forward-looking statements are based
on reasonable assumptions, such statements are not guarantees of
future performance and actual results or developments may differ
materially from those in forward-looking statements. There can be
no assurances that such statements will prove accurate and,
therefore, readers are advised to rely on their own evaluation of
such uncertainties. We do not assume any obligation to update any
forward-looking statements except as required under the applicable
laws.
CONTACT:
MRKT360 INC
https://mrkt360.com
Alex
Zertuche
alexz@mrkt360.com
For E.S.T Office Hours, Call 1 416-477-0587
Photos accompanying this announcement are available
at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/bd2abbf9-bafc-4b08-ade6-cab17ff5a700
https://www.globenewswire.com/NewsRoom/AttachmentNg/05afdcdb-1d54-4998-be39-f9f7a94c7ea8
https://www.globenewswire.com/NewsRoom/AttachmentNg/30a2a3cb-6611-4dcb-87ad-ffd00f2dc603
Bedford Metals (TG:O8D)
Historical Stock Chart
From Oct 2024 to Nov 2024
Bedford Metals (TG:O8D)
Historical Stock Chart
From Nov 2023 to Nov 2024