Saving Grace
2 days ago
Yes, $1.2Billion invested infrastructure, preparing for massive commercial operation. Mine will process 50-60 thousand tons of ore daily.
A second Refinery is under construction with everything in place. This is a massive commercial operation. SMG massive conveyor system in place.
Hycroft is expected to have a workforce of over 500 when it's said a done. All infrastructure is prepared, in place and ready.
Hycroft Mine Expansion Winnemucca, Nevada
SMG provided conceptual, final mechanical and structural engineering and design of belt conveyors including transfer structures and chutes. A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.
http://www.smgengr.com/material-handling-systems.html
A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.
Massive belt conveyors including transfer structures and chutes.
CEO Diane Garrett said; We have a tremendous amount of infrastructure already on site at Hycroft Mining Holding Corporation – infrastructure that, if planned and purchased today, would exceed well over a billion dollars. That advantage means we’re ahead of the curve of a typical developer.
https://www.linkedin.com/company/hycroftmining
SMG massive conveyor system.
http://www.smgengr.com/material-handling-systems.html
Hycroft Mining: Infrastructure and Equipment Owned by Hycroft
Hycroft Mine CEO Dr. Diane Garrett
https://packaged-media.redd.it/ia8klgvnrazc1/pb/m2-res_480p.mp4?m=DASHPlaylist.mpd&v=1&e=1715547600&s=5c5e26ce97c0a9e8876d9370e7fcd9b22683ea16#t=0
Saving Grace
6 days ago
$HYMC video stated, Mine will process 50-60 thousand tons of ore daily.
Hycroft is expected to have a workforce of over 500 when it's said a done. All infrastructure is prepared, in place and ready.
Hycroft Mine Expansion Winnemucca, Nevada
SMG provided conceptual, final mechanical and structural engineering and design of belt conveyors including transfer structures and chutes. A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.
http://www.smgengr.com/material-handling-systems.html
A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.
Massive belt conveyors including transfer structures and chutes.
CEO Diane Garrett said; We have a tremendous amount of infrastructure already on site at Hycroft Mining Holding Corporation – infrastructure that, if planned and purchased today, would exceed well over a billion dollars. That advantage means we’re ahead of the curve of a typical developer.
https://www.linkedin.com/company/hycroftmining
SMG massive conveyor system.
http://www.smgengr.com/material-handling-systems.html
Hycroft Mining: Infrastructure and Equipment Owned by Hycroft
Saving Grace
1 week ago
Underground Mine and would be restart, per filing April 3
Just like I have posted.
WINNEMUCCA, NV, April 3, 2024 – Hycroft Mining Holding Corporation (Nasdaq: HYMC) (“Hycroft” or “the Company”) is pleased to provide an
update for the ongoing 2024 exploration drill program.
The 2024 Brimstone and Vortex drilling is well underway with assays pending on the initial drill holes. This 10-hole program, launched in February 2024, is
targeting the two high-grade underground silver trends discovered in November 2023 (see news release dated November 16, 2023 “Hycroft Drills Best Hole
Ever - Discovers New High-Grade Silver System”). Due to the exciting results achieved, this drill program was launched in February 2024 and will continue
through May 2024 with flexibility to expand the program. The drilling is targeting confirmation of the continuity of the high-grade silver mineralization
between the Vortex-Brimstone trend and the Vortex-Camel trend, expanding both trends along strike and at depth, and enhancing our understanding of
structural controls.
Alex Davidson, Vice President, Exploration, commented “The paradigm is shifting with our understanding of what is controlling the high-grade mineralization
within the expansive Hycroft system. This new understanding of low-angle structural controls has far-reaching implications for the broader district-scale
targets, as well as the high-grade silver discoveries. This has been confirmed through drill data and recent geophysics. This work supports the idea of a
potential underground starter mine at Hycroft, which would contribute to more robust economics and lower initial capital costs generating better value for our
shareholders.”
Mr. Davidson also commented: “The Vortex-Brimstone trend is a series of well-defined high-grade veins that remains open in both directions and at depth. The
Vortex-Camel trend is a structurally controlled system that has become more apparent as we continue our work that also remains open in both directions and at
depth.”
Diane R. Garrett, President and CEO stated: “The exploration and on-going technical work at Hycroft is solidifying our belief that the potential of this asset has
yet to be fully understood. Through our work and on-going communications and marketing to the investing public, our story is resonating positively and we are
pleased to see that reflected in the recent performance of our share price.
“Not only does our team continue to deliver incredibly strong exploration results, fueling this project forward, but they also continue to demonstrate a
commitment to health and safety at site continuing to maintain a 0.00 TRIFR
Tweet Share On Facebook
Drilling extends Vortex west ~100 meters
Multiple intervals exceeding 1000 g/t silver
Significant gold intercepts being encountered
WINNEMUCCA, Nev., Oct. 3, 2024 /PRNewswire/ -- Hycroft Mining Holding Corporation (Nasdaq: HYMC) ("Hycroft" or "the Company") announces additional drill results from the 2024 exploration drill program (the "Drill Program") at the Hycroft Mine, located in Nevada, a Tier-1 mining jurisdiction.
Webinar
HYMC, Next Target, The Moon!
https://www.otcmarkets.com/filing/conv_pdf?id=17425150&guid=p9Q-kn8hn_NeJth
Hycroft Mine CEO Dr. Diane Garrett
https://packaged-media.redd.it/ia8klgvnrazc1/pb/m2-res_480p.mp4?m=DASHPlaylist.mpd&v=1&e=1715547600&s=5c5e26ce97c0a9e8876d9370e7fcd9b22683ea16#t=0
Saving Grace
2 weeks ago
Yes, $1.2Billion invested infrastructure, preparing for massive commercial operation. Mine will process 50-60 thousand tons of ore daily.
A second Refinery is under construction with everything in place. This is a massive commercial operation. SMG massive conveyor system in place.
Hycroft is expected to have a workforce of over 500 when it's said a done. All infrastructure is prepared, in place and ready.
Hycroft Mine Expansion Winnemucca, Nevada
SMG provided conceptual, final mechanical and structural engineering and design of belt conveyors including transfer structures and chutes. A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.
http://www.smgengr.com/material-handling-systems.html
A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.
Massive belt conveyors including transfer structures and chutes.
CEO Diane Garrett said; We have a tremendous amount of infrastructure already on site at Hycroft Mining Holding Corporation – infrastructure that, if planned and purchased today, would exceed well over a billion dollars. That advantage means we’re ahead of the curve of a typical developer.
https://www.linkedin.com/company/hycroftmining
SMG massive conveyor system.
http://www.smgengr.com/material-handling-systems.html
Hycroft Mining: Infrastructure and Equipment Owned by Hycroft
Saving Grace
2 weeks ago
Technical Update: Hycroft advanced with metallurgical test and engineering work necessary for designing a sulfide milling operation during the third quarter of 2024. Crushing, grinding, and flotation work has identified significant improvements in gold and silver flotation recoveries compared to the current technical report that increase the economic benefits to the project. The Company completed the future Tailing Storage Facility designs that will extend material storage capacity and will meet new and emerging safety and environmental regulations for these types of facilities. Hycroft is continuing test work for identifying the optimal inputs and operating parameters for processing sulfide ore, and it continues to conduct trade-off studies to assess whether roasting technology could offer superior economics compared to pressure oxidation (“POX”) technology for the Hycroft Mine.
The Company’s Quarterly Report on Form 10-Q for the period ended September 30, 2024, is available at www.sec.gov/edgar. See “Cautionary Note Regarding Forward-Looking Statements” below.
Saving Grace
3 weeks ago
Join Diane and Alex on December 10th-at-12 PM-ET/9AM-PT
Hycroft Mining: Town Hall & Year in Review
Join President & CEO Diane R. Garrett and VP of Exploration Alex Davidson as they present Hycroft Mining's key achievements and strategic outlook. A live Q&A session will follow the presentation.
We welcome your questions in advance - please reply to this email with any topics you'd like addressed during the event.
Hycroft has a long and successful history of oxide heap leaching operations. Today, the company is focused on completing the technical studies to transition Hycroft into the next phase of commercial operations by installing a milling circuit for processing the sulfide ore.
The Hycroft mine is permitted for both heap leach and milling operations and currently has extensive infrastructure on site including three-stage crushing facilities, leach pad capacity, and two Merrill Crowe plants with refinery.
In addition, the Company is engaged in a robust exploration drill program, applying a first principles approach to the Hycroft Mine. Through our understanding and interpretation of mineralization controls, we have been targeting the potential high-grade feeder zone(s) at depth. Hycroft announced the discovery of a new high-grade silver system at and drilled the ‘best hole ever’ in the mine’s more than 30-year history. That drill campaign resulted in the discovery of two very high-grade silver trends at depth. Drilling in this area is on-going. In addition, it is the Company’s belief that our new understanding of this system has relevant application to the district scale land package and that there is potential for new additional discoveries outside the known resource area
The Hycroft Mine is located in the Sulfur Mining District, 54 miles west of Winnemucca, and straddles Humboldt and Pershing counties, in Nevada. The mine is accessible year-round via Nevada State Route 49 (Jungo Road) and encompasses approximately 64,000 acres, including both patented and unpatented claims.
Gold Mineral Resources at Hycroft are 10.6 million ounces of Measured & Indicated ("M&I") and 3.4 million ounces of Inferred.
Silver Mineral Resources are 361.0 million ounces of Measured & Indicated and 96.0 million ounces of Inferred.
In March 2023, Hycroft completed an Initial Assessment on the Hycroft Mine.
https://hycroftmining.com/hycroft-mine/overview/
Saving Grace
4 weeks ago
Join Diane and Alex on December 10th at 12 PM ET / 9 AM PT
Hycroft Mining: Town Hall & Year in Review
Join President & CEO Diane R. Garrett and VP of Exploration Alex Davidson as they present Hycroft Mining's key achievements and strategic outlook. A live Q&A session will follow the presentation.
We welcome your questions in advance - please reply to this email with any topics you'd like addressed during the event.
Hycroft has a long and successful history of oxide heap leaching operations. Today, the company is focused on completing the technical studies to transition Hycroft into the next phase of commercial operations by installing a milling circuit for processing the sulfide ore.
The Hycroft mine is permitted for both heap leach and milling operations and currently has extensive infrastructure on site including three-stage crushing facilities, leach pad capacity, and two Merrill Crowe plants with refinery.
In addition, the Company is engaged in a robust exploration drill program, applying a first principles approach to the Hycroft Mine. Through our understanding and interpretation of mineralization controls, we have been targeting the potential high-grade feeder zone(s) at depth. Hycroft announced the discovery of a new high-grade silver system at and drilled the ‘best hole ever’ in the mine’s more than 30-year history. That drill campaign resulted in the discovery of two very high-grade silver trends at depth. Drilling in this area is on-going. In addition, it is the Company’s belief that our new understanding of this system has relevant application to the district scale land package and that there is potential for new additional discoveries outside the known resource area
The Hycroft Mine is located in the Sulfur Mining District, 54 miles west of Winnemucca, and straddles Humboldt and Pershing counties, in Nevada. The mine is accessible year-round via Nevada State Route 49 (Jungo Road) and encompasses approximately 64,000 acres, including both patented and unpatented claims.
Gold Mineral Resources at Hycroft are 10.6 million ounces of Measured & Indicated ("M&I") and 3.4 million ounces of Inferred.
Silver Mineral Resources are 361.0 million ounces of Measured & Indicated and 96.0 million ounces of Inferred.
In March 2023, Hycroft completed an Initial Assessment on the Hycroft Mine.
https://hycroftmining.com/hycroft-mine/overview/