TX annual planned maintenance
and catalyst change on Feb. 4.
Total Port Arthur 232.0 Key process units shut due n/a
to poor economic conditions
on Mar. 24
Valero Corpus 340.0 20,000-b/d FCCU in East n/a
Plant shut; West Plant
50,000-b/d FCCU at reduced
rates since mid-Dec. for
economic reasons.
Valero McKee, TX 170.0 Smaller of two crude units May/
at 60,000-b/d to shut in June
May for 14 days; 55,000-b/d
to shut in May for 21 days.
Valero Norco, LA 250.0 Upgrade project to build 2012
a new diesel hydrotreater
unit moved from 2010 to
4th-quarter 2012, the Co.
said on Jan. 27.
Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a
TX rates since mid-Dec. for
economic reasons.
Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
rates since mid-Dec. for
economic reasons.
Valero Three Rivers 95.0 24,000-b/d FCCU at reduced n/a
TX rates since mid-Dec. for
economic reasons.
MID-CONTINENT
BP Whiting, 410.0 Planned maintenane continues End
IN on Mar. 16 at the smaller of Mar
3 crude units. The work began
in early March and is expected Early
to conclude by the end of the Apr
month or by early April.
Conoco Billings, 61.0 On Mar. 5 the Co. delayed for Jan.
MT one year an expansion project 2010
which will increase capacity
to 71,000 bbls. Construction of
a new crude is now scheduled
to begin in January 2010.
Co. said April 14 that planed
work was ongoing at the refinery.
Co. did not give more specifics.
Frontier El Dorado 130.0 Hydrotreater in restart and Mar.
KS expected to produce product by 28-29
Mar. 28-29, the Co. said.
A coker turnaround and expan- Mid-
sion project was delayed until Aug.
Mid-July, and subsequently
delayed until August.
Frontier Cheyenne 52.0 12,000-b/d FCCU at planned Mar
WY rates on Mar. 27 following two 27
weeks of planned maintenance.
The refinery is operating at re-
duced rates for economic reasons.
Marathon Robinson 204.0 Crude unit, two coker units n/a
shut Mar. 9 for planned main-
tenance; no restart timing
available.
Sunoco Toledo, OH 160.0 FCCU turnaround lasting 6 weeks 4Q08
planned for 4q 2008 or 1Q 2009
Sunoco Tulsa, Okla. 85.0 Turnaround maintenance will n/a
take place in Feb., the Co.
said on Feb. 5.
Refinery could close by end
of 2009 if buyer not found.
Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012
for completion in 2009 has been
shifted to 2012, the Co. said
on Jan. 27.
ROCKY MOUNTAINS
Suncor Commerce City 90.0 32,000-b/d crude unit, n/a
CO 10,500-b/d reformer will
shut in March for planned
maintenance, the Co. said
on Jan. 26.
WEST COAST
Alon Paramount 55.0 Hydrocracker project post-
CA poned indefinitely, the Co.
said on Feb. 4
Tesoro Wilmington 105.0 Reformer and Coker units,
CA which underwent work in March April
are back at normal rates.
Valero Benicia 144.0 Hydrocracker in restart April April 2
CA 2 after two-week turnaround.
Back to planned rates, co. said April 6