RNS Number : 4424K
  Melrose Resources PLC
  19 December 2008
   

 FOR IMMEDIATE RELEASE  19 December 2008


    Melrose Resources plc

    Drilling Update

    Melrose Resources plc (LSE: MRS) ("Melrose" or "the Company"), the oil and gas exploration, development and production company, today
provides an update on its drilling operations.

    Bulgaria

    In late October 2008, Melrose announced the results of the successful Kavarna No.1 exploration well, which made a gas discovery in the
Black Sea, offshore Bulgaria. The well encountered a well developed, gas bearing Paleocene reservoir formation and the initial reserves
estimate for the discovery was 24 Bcf. Prior to running open hole logs a strong gas influx occurred into the wellbore and for safety reasons
it became necessary to plug and re-drill the well. 

    The replacement well, Kavarna No.2, has now been drilled and encountered 125 feet of net gas pay with an average porosity of 27%. These
new well data have confirmed the initial reserves estimate. 

    The Kavarna discovery is located approximately 7 kilometers to the east of the Melrose operated Galata gas field and 8 kilometers to the
west of the Kaliakra discovery announced in early 2008. Given Kavarna's close proximity to the Galata field, the Kavarna No.2 well is
currently being completed with a sub-sea tree to enable the well to be tied back to the Galata field facilities for production in the third
quarter 2009. The Kaliakra discovery, which contains estimated reserves of 47 Bcf, is scheduled to be tied back to the Galata facilities for
first production in 2010. 

    Egypt

    In Egypt, the North Dikirnis No.1 exploration well has been successfully drilled by the EDC-54 rig a on a prospect located approximately
3 kilometers north of the West Dikirnis field. The well reached a total depth of 9,000 feet and encountered 29 feet of net pay in the
Qawasim formation with an average porosity of 23%. The well was flow tested at a rate of 7.7 MMcfpd of gas with 244 bpd of condensate and
the initial reserves estimate for the discovery is in the range 3 Bcfe to 5 Bcfe. Similar to Melrose's other recent discoveries in the Nile
Delta, North Dikirnis No.1 will be tied back to existing facilities for production and is expected to come on stream in 2009.

    The EDC-54 rig has now moved to drill the East Dikirnis exploration prospect in the El Mansoura concession which has unrisked reserves
potential of 49 Bcfe with an estimated chance of success of 48%. 

    The EDC-9 rig has completed operations on the West Dikirnis No.7 well which is the first horizontal oil producer to be drilled in the
West Dikirnis field. The well reached a total depth of 11392 feet and an 810 feet long horizontal section was successfully drilled within
the oil rim reservoir. The well is currently being tied back for testing and long term production and the EDC-9 rig is moving location to
drill West Dikirnis No.10 as the second horizontal development well in the field.


    Commenting on the update, David Thomas, Chief Executive said:

    "We are pleased with the results from the Kavarna No.2 well, which confirm that the discovery has excellent reservoir quality and a net
pay interval over 50% thicker than previously encountered in the area. This bodes well for the remaining exploration potential on the
Galata-Kaliakra geologic trend. The North Dikirnis No.1 well results in Egypt are also positive and we look forward to bringing the well on
stream next year to provide incremental production volumes."

    For further information please contact

 Melrose Resources plc

 Robert Adair, Executive Chairman                                0131 221 3360
 David Thomas, Chief Executive Officer
 Munro Sutherland, Finance Director

 Buchanan Communications Limited
 Ben Willey/Ben Romney                                           0207 466 5000

    or visit www.melroseresources.com

    Glossary:
    Bcf - billion cubic feet of gas 
    Bcfe - billion cubic feet of gas equivalent 
    bpd - barrels of oil or condensate per day
    boepd - barrels of oil equivalent per day   
    Mbbls - thousand barrels of oil or condensate 
    MMcfpd - million cubic feet of gas per day

This information is provided by RNS
The company news service from the London Stock Exchange
 
  END 
 
DRLFKFKNOBDDOBD

Management Resource Solu... (LSE:MRS)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Management Resource Solu... Charts.
Management Resource Solu... (LSE:MRS)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Management Resource Solu... Charts.