Kinbauri Gold Corp. ("Kinbauri") (TSX VENTURE:KNB)(FRANKFURT:3KG.DE) has
completed its successful in-fill drilling program at El Valle (two holes that
were initiated during the in-fill program will be completed during the 2nd half
of 2008). The results received to date will form the basis for a new 43-101
compliant technical report and Scoping Study, both of which are presently
underway.


Six of the 11 holes reported in this release are in Area 107 zone and are
highlighted by the following intercepts:


- 8.6 g Au/t, 45.5 g Ag/t and 2% Cu over 14.25 m in 08KV1160,

- 26.6 g Au/t, 9.9 g Ag/t and 0.5% Cu over 7.4 m as well as 41.9 g Au/t, 0.2 g
Ag/t and 0.3% Cu over 3.5 m in 08KV1161.


The remaining five holes complete the in-fill drilling of the Black Skarn North
zone.


Recent drill results

Assays for the latest 11 in-fill holes are summarized as follows:



HOLE (DDH)(1)  From     To Interval   %     Au     Ag      Cu  Zone/Section
                 (m)    (m)      (m) (2)  (g/t)  (g/t)     (%)           (3)
--------------------------------------------------------------------------
08KV1166      80.20  81.55     1.35  34  15.75  86.30    1.98     BSN/12.5
                                                         less
                                                         than
08KV1166      86.10  87.70     1.60   "   2.55   0.32    0.01
--------------------------------------------------------------------------
08KV1165     255.85 259.00     3.15  89   2.18   4.00    0.05     A107/9.5
--------------------------------------------------------------------------
08KV1164      62.25  65.45     3.20  80   2.54   6.76    0.13     BSN/1025
08KV1164      67.20  72.80     5.60   "   3.73   7.24    0.19
--------------------------------------------------------------------------
08KV1163     118.40 127.50     9.10  23   1.00   9.50    0.96     BSN/12.5
08KV1163     133.40 135.60     2.20   "   2.53  13.22    0.36
08KV1163     140.00 142.50     2.50   "   6.11  65.50    2.61
08KV1163     207.00 219.60    12.60   "   3.83  33.18    1.46
--------------------------------------------------------------------------
08KV1161     191.00 209.10    18.10  97  13.74   5.22    0.37     A107/9.5
including    201.70 209.10     7.40   "  26.59   9.92    0.51
08KV1161     224.30 238.40    14.10   "  11.76   0.20    0.09
including    234.90 238.40     3.50   "  41.85   0.24    0.29
08KV1161     243.60 245.10     1.50   "   1.47   0.49    0.25
--------------------------------------------------------------------------
08KV1160      64.95  88.40    23.45  67   5.81  30.29    1.36     A107/9.5
including     70.40  84.65    14.25   "   8.60  45.46    2.02
--------------------------------------------------------------------------
08KV1158       No Au intercepts greater than 2g/t                 BSN/11.5
--------------------------------------------------------------------------
08KV1155      48.00  50.40     2.40  72   2.33  22.83    1.19       BSN/10
including     49.30  50.40     1.10   "   2.88  30.20    1.85
08KV1155      58.30  68.10     9.80   "   1.05   8.12    0.58
08KV1155      80.05  81.50     1.45   "   0.77  11.30    0.58
08KV1155      82.90  84.30     1.40   "   2.06  13.00    0.66
--------------------------------------------------------------------------
08KV1151     174.45 176.25     1.80  88   2.15   1.60    0.17    A 107/8.5
08KV1151     193.20 196.10     2.90   "   7.51   6.98    0.04
including    194.70 196.10     1.40   "  12.65   7.60    0.06
--------------------------------------------------------------------------
08KV1150      61.35  63.20     1.85  67   3.60  19.60    0.80   A 107/1175
--------------------------------------------------------------------------
08KV1146     298.60 303.45     4.85  99   2.81   4.07    0.75     A 107/10
including    301.45 303.45     2.00   "   4.08   6.40    1.09
--------------------------------------------------------------------------
(1) See Schedules A and B for Location. (2) Percentage estimate of True 
Thicknesses. (3) BSN - Black Skarn North, A107 -Area 107;



The underground drill program at El Valle and Carles is being supervised by Mr.
Santiago Gonzalez-Nistal, Kinbauri Espana's senior geologist, with quality
control being provided by Dr. C. F. Gleeson, P. Eng., Kinbauri's Vice-President
of Exploration: both are qualified persons as defined by N.I. 43-101.  Details
of Kinbauri's Assay and Quality Assurance Programs are reported in a press
release of February 27th, 2008.


This press release was prepared by Drs V. N. Rampton, P. Eng and C. F. Gleeson,
P. Eng. in their capacity as qualified persons.


Schedules are available at the following address:
http://media3.marketwire.com/docs/KNB-0916.pdf


About Kinbauri

Kinbauri is a TSXV - Tier 1 Mineral Exploration Company focused on the
development of mineral properties, primarily precious metal prospects in
northwestern Spain, Nevada and Canada. Its immediate focus is to expand and
upgrade resources to reserves at the El Valle property in Asturias, Spain in
order to start operations at the mine and existing mill complex there in 2010.
It currently has 48,752,695 common shares issued and outstanding.


THIS PRESS RELEASE WAS PREPARED BY KINBAURI GOLD CORP. THE TSX VENTURE EXCHANGE
DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.


This press release contains certain forward-looking statements, which are based
on the opinions and estimates of management at the date the statements are made,
and are subject to a variety of risks and uncertainties and other factors that
could cause actual events or results to differ materially from those projected.
Kinbauri undertakes no obligation to update forward-looking statements if
circumstances or management's estimates or opinions should change. The reader is
cautioned not to place undue reliance on forward-looking statements.


OR VISIT:

Kinbauri Gold's Hub at http://www.agoracom.com/IR/kinbauri where investors can
post questions and receive answers or review questions and answers already
posted by other investors.


Kinbauri Gold Corp Com Npv (TSXV:KNB)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Kinbauri Gold Corp Com Npv Charts.
Kinbauri Gold Corp Com Npv (TSXV:KNB)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Kinbauri Gold Corp Com Npv Charts.