Fourth quarter and full year production report for the year
ended 30 September 2019
Strong quarterly performance demonstrates ability to deliver on
Vision 2020
Salient features for the quarter ended 30 September 2019
-- Quarterly operational improvement with reef tonnes mined up
8.0% to 1 248.2 kt and tonnes milled up 6.9% to 1 291.2 kt
-- Platinum Group Metals ('PGMs') recovery was 84.7% with
production up 11.4% to 38.0 koz (Q3 2019: 34.1 koz)
-- Chrome recovery at 61.0% (Q3 FY 2019: 65.5%) with production
up 2.4% to 341.9 kt (Q3 334.0 kt)
-- Third party chrome concentrate production at 69.4 kt, up 17.4% from Q3 2019
-- Stripping ratio quarter on quarter has increased by 24.1% to
10.3 m(3) :m(3) (Q3 2019: 8.3 m(3) :m(3) )
-- Continued investment in fleet capacity and upgrades with
second Caterpillar 6050 to be commissioned in Q1 of financial year
2020
Salient features for the year ended 30 September 2019
-- Reef tonnes mined and milled at 4 627.1 kt and 4 836.0 kt respectively
-- PGMs recovery at 82.1% with production of 139.7 koz
-- Chrome recovery at 62.0% with chrome production at 1 290.0 kt
-- Third party chrome concentrate production of 241.1 kt
-- PGM price of US$1 081/oz, an increase of 17.1% from 2018
-- Chrome price received down 12.9% to US$162/t
-- Pit layout substantially complete with pit design optimisation now underway
Commenting on the production results, Tharisa CEO Phoevos
Pouroulis, said:
"In the year under review Tharisa significantly reset its mining
operations, with a revised pit layout, an improvement in waste
stripping, and the debottlenecking of the production plants. Though
this translated into lower production than last year's record
performance, the significant work done provides Tharisa with a
clear path to delivering on our Vision 2020 strategy. The key
remaining investment to achieve our production goal, the Vulcan
plant, is under construction and remains firmly on track for
commissioning in calendar Q4 2020. We have focussed our energy in
the right places and have invested in both our workforce and
machinery, which will ensure we have the right tools to achieve our
targets. Extremely pleasing is our Zimbabwean development pipeline,
especially with Karo Platinum completing phase one of the
exploration programme with positive results apparent at this early
stage."
Safety
Safety is one of Tharisa's core values and the Company continues
to strive for zero harm at its operations. An LTIFR of 0.27 per 200
000 man hours worked was recorded at the end of the quarter.
Production update
The production update for the quarter and year ended 30
September 2019 is as follows:
Quarter Quarter Quarter Quarter Year Year
ended ended on quarter ended ended ended
30 Sep 30 Jun movement 30 Sep 30 Sep 30 Sep
2019 2019 % 2018 2019 2018
------------ -------- -------- ------------ -------- ---------
Reef mined kt 1 248.2 1 155.4 8.0 1 179.7 4 627.1 4 875.0
m(3)
Stripping ratio : m(3) 10.3 8.3 24.1 7.2 8.3 7.9
Reef milled kt 1 291.2 1 207.3 6.9 1 216.7 4 836.0* 5 105.3
PGM flotation
feed kt 965.2 889.1 8.6 892.8 3 605.9 3 718.1
PGM rougher feed
grade g/t 1.44 1.45 (0.7) 1.48 1.47 1.51
PGM recovery % 84.7 82.1 3.2 84.1 82.1 84.1
6E PGMs produced koz 38.0 34.1 11.4 35.7 139.7 152.2
Average PGM contained
metal basket
price US$/oz 1 211 1 064 13.8 928 1 081 923
Average PGM contained
metal basket
price ZAR/oz 17 792 15 297 16.3 13 067 15 531 12 038
Cr(2) O(3) ROM
grade % 18.3 17.8 2.8 18.3 18.1 18.2
Chrome recovery % 61.0 65.5 (6.9) 64.5 62.0 66.0
Chrome yield % 26.5 27.7 (4.3) 27.9 26.7 28.4
Chrome concentrates
produced (excluding
third party) kt 341.9 334.0 2.4 339.2 1 290.0 1 448.0
Metallurgical
grade kt 252.4 259.4 (2.7) 240.3 977.9 1 080.3
Specialty grades kt 89.5 74.6 20.0 98.9 312.1 367.7
Third party chrome
production kt 69.4 59.1 17.4 56.0 241.1 221.8
Metallurgical
grade chrome
concentrate contract US$/t
price CIF China 148 174 (14.9) 164 162 186
Metallurgical
grade chrome
concentrate contract ZAR/t
price CIF China 2 203 2 525 (12.8) 2 313 2 525 2 415
Average exchange
rate ZAR:US$ 14.7 14.4 2.1 14.1 14.4 13.1
----------------------- ------------ -------- -------- ------------ -------- --------- --------
(*) includes the processing of 99.0 kt of commissioning tails
through the processing plants for the year ended 30 September
2019
Mining
Reef tonnes mined continued the trend of steady improvement at
the Tharisa Mine with an increase of 8.0% as compared to the
previous quarter, to 1 248.2 kt (Q3 2019: 1 155.4 kt), bringing
total tonnes mined for the 2019 year to 4 627.1 kt, slightly down
from the previous year's 4 875.0 kt. Reef tonnes milled saw an
improvement of 6.9% for the quarter to 1 291.2 kt (Q3 2019: 1 207.3
kt) resulting in total reef milled of 4 836.0 kt (2018: 5 105.3 kt)
for the year under review.
The revised pit layout has been largely completed and the
previously mined in-pit material has been removed. The stripping
ratio quarter on quarter has increased by 24.1% to 10.3 m(3) :m(3)
(Q3 2019: 8.3 m(3) :m(3) ) resulting in an annualised stripping
ratio of 8.3 m(3) :m(3.)
A second Caterpillar 6050 face shovel is scheduled to be
operational before the end of December 2019, with various other
capital items ordered or delivered, resulting in further
improvements in the overall fleet age profile, capacity and
efficiency.
Processing
PGM production increased by 11.4% to 38.0 koz (6E basis) (Q3
2019: 34.1 koz) compared to the previous quarter with recoveries
increasing by 3.2% to 84.7% (Q3 2019: 82.1%). Annualised PGM
recoveries were steady at 82.1% (2018: 84.1%). PGM grade for the
quarter was maintained at 1.44 g/t (Q3 2019: 1.45 g/t) resulting in
a rougher feed grade of 1.47 g/t for the year.
Chrome concentrate production quarter on quarter increased by
2.4% to 341.9 kt (Q3 2019: 334.0 kt) delivering overall production
of 1 290.0 kt (2018: 1 448.0 kt) for the year. Chrome recoveries
were down quarter on quarter at 61.0% (Q3 2019: 65.5%) with
recoveries for the year at 62.0% (2018: 66.0%) as a result of
instability in the average feed grade into the plant which is being
rectified as the mine increases its run of mine stockpile ahead of
the crushing circuit. Quarterly grade improved by 2.8% from 17.8%
to 18.3%, giving an annualised CR(2) 0(3) ROM grade of 18.1%
compared to 18.2% in the previous year. Of the total chrome
concentrate produced for the quarter 252.2 kt was metallurgical
grade, while specialty grade production increased by 20.0% to 89.5
kt.
The chrome production for the quarter from the K3 chrome plant
was 69.3 kt (Q3 2019: 59.1 kt) with total K3 production for the
year being 241.1 kt (2018: 221.8 kt).
Market update
The average PGM contained metal basket price for the quarter was
US$1 211/oz (ZAR17 792/oz), an increase of 13.8% in US$ terms and
16.3% in ZAR terms, while year on year average PGM prices received
were up by 17.1% to US$ 1 081/oz (2018: US$ 923/oz) and 29.0% up to
ZAR 15 531/oz (2018: ZAR 12 038 /oz).
The average chrome price received for the quarter was down 14.9%
at US$148/t (Q3 2019: US$174/t) with an annualised 12.9% decrease
in price received to US$162/t (2018: US$186/t). Disappointingly,
spot prices have thus far failed to rise above US$160/t.
Outlook
Construction on the Vulcan Plant has commenced, with civil works
due to be completed before Christmas. Orders for long lead items
have been placed and the construction schedule is on track for cold
commissioning in calendar year 2020.
Tharisa is on track to achieve its Vision 2020 targets of 2 Mt
chrome concentrate and 200 koz of PGMs on an annualised basis by
the end of calendar year 2020.
Tharisa's FY2020 production guidance is 155 koz to 165 koz PGMs
(6E basis) and 1.45 Mt to 1.55 Mt of chrome concentrates.
The above information has not been reported on or reviewed by
Tharisa's auditors.
Paphos, Cyprus
09 October 2019
JSE Sponsor
Investec Bank Limited
Investor relations contacts:
Ilja Graulich (Head of Investor Relations and
Communications)
+27 11 996 3500
+27 83 604 0820
igraulich@tharisa.com
Daniel Thöle (Investor Relations and Communications)
+27 11 996 3500
Financial PR contacts:
Bobby Morse / Augustine Chipungu
+44 020 7466 5000
tharisa@buchanan.uk.com
Broker contacts:
Peel Hunt LLP (UK Joint Broker)
Ross Allister / James Bavister / David McKeown
+44 207 7418 8900
BMO Capital Markets Limited (UK Joint Broker)
Jeffrey Couch / Thomas Rider
+44 020 7236 1010
Berenberg (UK Joint Broker)
Matthew Armitt / Detlir Elezi
+44 20 3207 7800
Nedbank Limited (acting through its Corporate and Investment
Banking division) (RSA Broker)
Shabbir Norath
+27 11 295 6575
This information is provided by RNS, the news service of the
London Stock Exchange. RNS is approved by the Financial Conduct
Authority to act as a Primary Information Provider in the United
Kingdom. Terms and conditions relating to the use and distribution
of this information may apply. For further information, please
contact rns@lseg.com or visit www.rns.com.
END
DRLUWOSRKAARRAA
(END) Dow Jones Newswires
October 09, 2019 02:00 ET (06:00 GMT)
Tharisa (LSE:THS)
Historical Stock Chart
From Apr 2024 to May 2024
Tharisa (LSE:THS)
Historical Stock Chart
From May 2023 to May 2024