Pantheon Resources PLC Operational Update (4610N)
09 August 2017 - 4:00PM
UK Regulatory
TIDMPANR
RNS Number : 4610N
Pantheon Resources PLC
09 August 2017
9 August, 2017
Pantheon Resources plc
Operational Update
Pantheon Resources plc ("Pantheon" or "the Company"), the
AIM-quoted oil and gas exploration company with a working interest
in several conventional projects in Tyler and Polk Counties,
onshore East Texas, is pleased to provide the following update:
VOBM#2H, Polk County
Pantheon is pleased to confirm that the fracture stimulation
procedure ("Frac") on the VOBM#2H well, designed to remediate near
wellbore skin damage caused during horizontal and deviated
drilling, has been completed.
Initial results indicate that the Frac has been successful, with
the well, which is presently in the process of recovering frac
water, flowing both gas and oil to surface. The Company cautions
however that it is too early to make an accurate assessment as to
the ultimate performance of the well until the remaining frac water
has been recovered, production tubing installed and flow testing
completed.
A workover rig is required to install the production tubing and
this procedure and subsequent testing is estimated to take a
further three weeks on a trouble free basis. Results will be
reported at the conclusion of testing operations.
VOBM#4, Tyler County
The operator has been notified that the mobilisation and
delivery of the drilling rig, contracted for the planned sidetrack
of the VOBM#4 well is now expected during the second week of
September 2017. This is due to the third party currently utilising
the rig, requiring it for longer than initially forecast.
Further information:
+44 20 7484
Pantheon Resources plc 5361
Jay Cheatham, CEO
Justin Hondris, Director, Finance
and Corporate Development
Stifel Nicolaus Europe Limited (Nominated +44 20 7710
Adviser and broker) 7600
Callum Stewart
Ashton Clanfield
Nicholas Rhodes
+44 20 3727
FTI Consulting 1000
Ed Westropp
James Styles
For further information on Pantheon Resources plc, see the
website at: www.pantheonresources.com
In accordance with the AIM Rules - Note for Mining and Oil &
Gas Companies - June 2009, the information contained in this
announcement has been reviewed and signed off by Jay Cheatham, a
qualified Chemical & Petroleum Engineer, who has over 40 years'
relevant experience within the sector.
The information contained within this RNS is considered to be
inside information prior to its release.
Neither the contents of the Company's website nor the contents
of any website accessible from hyperlinks on the Company's
website
This information is provided by RNS
The company news service from the London Stock Exchange
END
DRLDGGDICUGBGRI
(END) Dow Jones Newswires
August 09, 2017 02:00 ET (06:00 GMT)
Pantheon Resources (LSE:PANR)
Historical Stock Chart
From Apr 2024 to May 2024
Pantheon Resources (LSE:PANR)
Historical Stock Chart
From May 2023 to May 2024