Vantex Resumes Drilling on Moriss
13 March 2013 - 2:53AM
Marketwired Canada
The management of Vantex Resources Ltd. (TSX
VENTURE:VAX)(FRANKFURT:UD7A)(ALPHA:VAX) announces the start of a 5,000-meter
drilling campaign on the Moriss zone, in the west part of the Galloway project.
20 drill holes with lengths between 250 and 350 metres will be drilled in order
to test the lateral and depth extensions of this gold zone that is now known
over 225 metres on surface and down to 200 metres below surface.
Location of new drill holes : http://media3.marketwire.com/docs/Drill_map.pdf
The Moriss showing forms with the GP and Hendrick showings, the Golden Triangle
area.
Many drill holes that took place on the Moriss showing since 2010 outline an
important gold system comprised of many zones with high gold grades, namely the
Moriss and Moriss North zones. These zones also contain elevated silver grades.
The following table highlights previous drill results from these two zones :
----------------------------------------------------------------------------
Drill Hole Zone Intersection Grade Depth
metres g/t Au metres
----------------------------------------------------------------------------
VPE10-02 Moriss 4.75 7.72 87.0 - 91.75
----------------------------------------------------------------------------
VPE10-06 Moriss 10.50 3.80 97.5 - 108.0
----------------------------------------------------------------------------
VPE10-10 Moriss 5.35 11.40 101.0 - 106.35
----------------------------------------------------------------------------
Moriss
VPE10-11 N(i) 22.50 8.63 84.0 - 106.5
----------------------------------------------------------------------------
Including 5.50 19.06 84.0 - 89.5
----------------------------------------------------------------------------
And 6.00 14.63 100.5 - 106.5
----------------------------------------------------------------------------
And Moriss 6.25 3.07 146.75 - 153.0
----------------------------------------------------------------------------
VPE10-17 Moriss 5.90 5.06 106.3 - 112.2
----------------------------------------------------------------------------
VPE10-18 Moriss N 9.00 7.97 48.0 - 57.0
----------------------------------------------------------------------------
VPE10-19 Moriss 4.15 18.43 103.5 - 106.65
----------------------------------------------------------------------------
VPE10-21 Moriss N 10.50 1.85 124.5 - 135.0
----------------------------------------------------------------------------
Moriss 4.50 1.86 145.5 - 150.0
----------------------------------------------------------------------------
VPE10-23 MorissN 3.00 16.32 54.0 - 57.0
----------------------------------------------------------------------------
VPE11-24 Moriss 5.30 24.87 98.6 - 103.9
----------------------------------------------------------------------------
VPE11-25 Moriss 6.85 12.93 99.15 - 106.0
----------------------------------------------------------------------------
VPE11-27 Moriss 6.70 3.84 107.3 - 114.0
----------------------------------------------------------------------------
VPE11-28 Moriss 2.00 2.00 129.0 - 131.0
----------------------------------------------------------------------------
VPE11-29 Moriss 2.00 7.32 45.0 - 47.0
----------------------------------------------------------------------------
VPE11-30 MorissN 3.00 1.54 54.1 - 57.1
----------------------------------------------------------------------------
VPE11-37 Moriss N 6.00 7.79 94.5 - 100.5
----------------------------------------------------------------------------
VPE11-42 Moriss 5.00 5.11 98.6 - 103.6
----------------------------------------------------------------------------
VPE12-50 Moriss N 6.20 59.51 58.0 - 64.2
----------------------------------------------------------------------------
et Moriss 5.05 5.09 117.85 - 122.9
----------------------------------------------------------------------------
(i)Moriss North
The drilling program will be under the supervision of Daniel Kelly, geological
engineer and Qualified Person under NI 43-101. This press release was read and
approved by Mr. Kelly.
For additional information on Vantex Resources, visit our website at:
http://www.vantexressources.com.
FOR FURTHER INFORMATION PLEASE CONTACT:
Guy Morissette
CEO
819-763-5096
http://www.vantexressources.com/
Wayne Carlon
VP Business Development
902-857-1043
waynecarlon@eastlink.ca
Vantex Resources (TSXV:VAX)
Historical Stock Chart
From Dec 2024 to Jan 2025
Vantex Resources (TSXV:VAX)
Historical Stock Chart
From Jan 2024 to Jan 2025
Real-Time news about Vantex Resources Ltd (TSX Venture Exchange): 0 recent articles
More Vantex Resources Ltd. News Articles