Amarillo Gold Drills 35.7 m (True Width) of 2.67 g/t Au in First Results from Infill Drill Program at Mara Rosa Project, Brazil
02 February 2011 - 1:30AM
Marketwired
Amarillo Gold Corp. (TSX VENTURE: AGC) ("Amarillo" or the
"Company") is pleased to announce results from the current resource
definition drilling program of the Posse gold deposit at its Mara
Rosa project in Goias state. These six drill holes represent the
first 1251m of drilling of the planned 7000m, (34 hole) infill
drilling program, which is designed to upgrade existing inferred
resources to the indicated and measured categories. This work is an
integral part of the pre-feasibility study (PFS) currently
underway. The drill assay results are summarized in Table 1 below.
Table 1: Composite Assay Results
------------------------------------
Hole No. From (metres) To (metres) Interval True Width Grade (g/t Au)
(metres) (metres)
MRP0015 57 62 5.0 4.8 0.82
66 71 5.0 4.8 0.74
MRP0016 33 54 21.0 19 1.15
MRP0017 129 156 27.0 24.5 1.18
MRP0018 48 85 37.0 35.7 2.67
MRP0019 177 216 39.0 35.4 1.11
MRP0020 117 128 11.0 10 0.79
Notes: All drill hole samples consist of split HQ diamond drill core. The
samples were sent to Acme Laboratories in Goiania, Brazil, and Vancouver,
Canada. Gold is determined using fire assay using 30g aliquots with an ICP
finish. All samples are subject to a chain of custody and are submitted with
standards and blanks to check the assay results. The laboratories also use
internal standards and repeat analysis. For the results reported in this
release all the standards, blanks and repeats delivered acceptable results.
Intercepts were calculated using a minimum of a 0.5 g/t cut off where any
one sample point lies within a 5m intersection averaging at least 0.5 g/t
Au. True width was determined assuming the mineralization has an average dip
of 45 degrees.
Table 2 provides the drill hole locations. Figure 1 depicts the
location of the drill holes in relation to the Posse Pits and
previous drill collars.
Table 2: Collar information for the drill holes reported in Table 1.
----------------------------------------------------------------------------
Hole No. Total depth Azimuth Dip Easting UTM Northing Elevation
(metres) (degrees) (degrees) UTM (metres)
MRP0015 140.40 140.00 60.00 696489 8454211 446
MRP0016 129.35 140.00 70.00 696582 8454251 433
MRP0017 200.05 140.00 70.00 696438 8454307 441
MRP0018 110.20 140.00 60.00 696667 8454383 435
MRP0019 267.30 140.00 70.00 696455 8454404 443
MRP0020 255.05 140.00 70.00 696376 8454226 440
Notes: Collars located by hand held GPS and are yet to be surveyed to high
resolution.
The results are as expected when compared to the current
resource model.
Drill holes MPR0034, MPR0033 are currently in progress with one
rig moving to MPR0036, 20 holes have been completed in the program
to date with a total of 4890m drilled. Several holes are at the
laboratory awaiting assay.
The qualified person for this report as per the NI 43-101
guidelines is Buddy Doyle, B. App. Sc. Member AUSIMM, a geologist
of 30 years experience.
To view Figure 1. Location Map: showing drill holes reported in
table 1 in relation to previous, current and planned drill holes,
please visit the following link:
http://media3.marketwire.com/docs/Figure%201%20Amarillo%20Gold%2002-01-11.pdf
ABOUT AMARILLO:
Amarillo Gold Corp. is focused on the acquisition, definition,
and discovery of gold resources in Brazil. Its principal projects
are Mara Rosa in the state of Goias, and Lavras do Sul in the state
of Rio Grande do Sul. The Posse Deposit at Mara Rosa contains
650,000 ounces of gold indicated from 12.4 MTonnes @ 1.62 g/t Au,
and 471,000 ounces of gold inferred from 13.8 MTonnes @ 1.38 g/t Au
at a 0.5 g/t cut-off grade (Independent NI 43-101 compliant
preliminary economic assessment study conducted by Whitehouse and
Hoogvliet). The Mara Rosa project is in the economic evaluation
stage. The Posse deposit is located in an area of excellent
infrastructure some 35 km NE of Yamana's Chapada open pit Cu-Au
operation, 105 km NE of Serra Grande's underground Au mine, 105 km
NNW of Anglo American's Ni laterite project (in construction), 95
km NW of Votarintim's Niquelandia Ni laterite mine, and
approximately 60 kms NE of Yamana's Pilar Au project (in
feasibility). Grid power to the site was established during the
previous open pit mining operation and the Serra da Mesa
hydro-electric dam lies 35 km to the east. A new railroad is being
constructed within 1.6 km of the project.
The Lavras do Sul property is an advanced exploration stage
project with encouraging gold mineralization discovered and defined
by more than 15,000 metres of drilling. Lavras do Sul is also
located near excellent infrastructure. The Company also has a
portfolio of earlier stage projects. All properties under
Amarillo's management are located in areas of good infrastructure
and mining-friendly communities.
ON BEHALF OF THE BOARD OF DIRECTORS:
AMARILLO GOLD CORP.
Per: Buddy Doyle, President
FORWARD LOOKING STATEMENTS:
This news release contains Forward Looking Statements regarding
our intentions and plans. Various factors may prevent or delay our
plans, including but not limited to, contractor availability and
performance, weather, access, mineral prices and success and
failure of the exploration and development carried out at various
stages of the program. Readers should review risk factors
applicable to junior mining exploration companies generally to
understand the variety of risks that can affect the Company.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Contacts: Amarillo Gold Corp. + 1-604-689-1799 (Canada)
+55-31-3261-5974 (Brazil) info@amarillogold.com
www.amarillogold.com
Amarillo Gold (TSXV:AGC)
Historical Stock Chart
From Jun 2024 to Jul 2024
Amarillo Gold (TSXV:AGC)
Historical Stock Chart
From Jul 2023 to Jul 2024