Latest drilling results from Sekisovskoye underground project,
Kazakhstan
Hambledon Mining Plc (AIM: HMB), the Kazakhstan gold mining and
development company, continues to advance its underground drill
programme to validate and expand the geological resources at
Sekisovskoye and today reports the results of a further 18 drill
holes.
Key results from the programme during July and August 2011 are
as follows:
-- Eighteen holes drilled over a total of 2,300 metres
-- Significant intersections since the last update include:
-- Hole 30 - 14m at 1.48 g/t Au
-- Hole 31 - 8.6m at 1.49 g/t Au, 5m at 2.49 g/t Au
-- Hole 37 - 2m at 13.46 g/t Au
-- Hole 47 - 3m at 10.87 g/t Au
To date, a total of 47 drill holes over 7,100m have been
completed in the upper levels of the underground ore zones and the
results are consistent with the modelling previously carried out
but with increases in the overall widths of mineralisation when
compared with the drilling undertaken in the 1990s and historically
in the Soviet era.
The assays were carried out in the Altai Ken-Bayitu laboratory
with independent verification to be undertaken by the Alex Stewart
Group in Karabalta, Kyrgyzstan.
The Sekisovskoye deposit comprises approximately ten large
mineralised zones intermingled with numerous narrow and sinuous
mineralisation zones. The zones of mineralisation show wide
variation in thickness from 0.35 metres to 30 metres, with a
weighted average of 5.5 metres. The zones display a localised pinch
and swell structure, with variable gold and silver content. The
large average width makes for easier and lower cost mining.
The results are providing the basis for the upgraded modelling
of Sekisovskoye which will form the basis for the stope definition
and detailed mine engineering that is being undertaken by Golders
Associates UK, and Canada. Upon completion of these studies later
in 2011, Hambledon will be able to update its mineable reserve
statement.
Appendix 1 - Sekisovskoye 2011 - Drill result summary as of 31
August, hole 30 to hole 47.
? HOLE COORDINATES DEPTH GOLD MINERALIZATION_ore intervals
X Y Z AZI DIP drilled core total FROM TO LENGTH AA-AKB LAB, AU, g/t
30 D126 7576.407 6715.926 324.062 41.5 -27 115.5 115.5 115.5 1 4 3 2.85
7 13 6 1
21 22 1 2.26
30 36 6 1.49
46 60 14 1.48
63 66 3 2.52
69 71 2 1.65
78 79 1 1.56
86.4 89 2.6 1.68
92 97 5 1.04
100 102 2 1.33
31 D86 7559.236 6928.334 323.636 225 -18 181.3 181.3 181.3 116 118 2 1.15
121 122 1 1.04
124.7 126 1.3 1.16
130 135 5 2.49
139.4 148 8.6 1.49
170 171 1 1.15
32 D115 7541.651 6738.482 323.435 228 -73.5 250 250 250 0 1 1 1.3
6 10 4 1.23
13 14 1 1.29
33 34 1 1.09
37 39 2 2.68
66 67 1 2.23
147 151 4 1.34
217.5 219 1.5 2.28
33 D116 7541.659 6738.356 323.539 228 -60 201.6 201.6 201.6 0 1 1 3.28
15 16 1 1
18 19 1 1.5
23 24 1 2.44
61 62 1 6.75
65 66 1 6.71
34 D57 7332.731 6870.816 324.676 230 -77 149.3 149.3 149.3 105 108 3 2.65
35 D65 7453.485 6934.315 326.136 44 30 84 84 84 23 24 1 2.38
39 40 1 1.15
36 D118 7541.778 6736.933 323.621 228 -42 158 158 158 4 7 3 1
10 11 1 1
37 D119 7523.007 6722.977 325.42 225 0 129.3 129.3 129.3 23 25 2 13.46
42 43 1 1.24
75 76 1 1.04
101 104 3 2.56
38 D104 7494.813 6754.091 324.199 225 -62 270 270 270 2 3 1 1.74
6 7 1 2.08
23 24 1 2.5
77 78 1 1.1
119 120 1 2.49
155 158 3 1.55
160 161 1 1.55
190 191 1 1
201 202 1 1.86
243 244 1 1.86
39 D75 7511.239 6936.383 326.051 225 36 51 51 51 4 5 1 6.85
16 17 1 1.02
40 PR3 7213.092 6993.171 327.696 262 -70 50 50 50 2 3 1 1.67
17 18 1 1.29
39 40 1 1.36
41 D105 7495.413 6753.228 324.65 223 -50 231.7 231.7 231.7 N/A N/A N/A N/A
42 PR1 7213.566 6993.779 327.714 60 -70 70.5 70.5 70.5 N/A N/A N/A N/A
19 23 4 2.14
28 29 1 1
56 57 1 1.39
43 D107 7495.413 6753.228 324.65 226 -37 216 216 216 N/A N/A N/A N/A
44 PR4 7214.291 6994.311 331.513 60 52 50 50 50 0 1 1 2.82
10 11 1 1.02
45 PR2 7214.974 6994.831 328.029 60 50 40 40 40 11 12 1 2
14 15 1 1.15
18 22 4 1.45
31 33 2 2.35
46 PR1.1 7213.48 6994.6 327.81 60 -70 26.3 26.3 26.3 4 5 1 1.4
10 11 1 1.72
14 15 1 1.04
18 19 1 5.12
24 25 1 3.4
47 PR1.2 7213.91 6994.87 327.87 60 -70 40.5 40.5 40.5 20 23 3 10.87
Qualified Person
Information in this report relating to the exploration results
is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM,
FAusIMM, MCIM, Chartered Mining Engineer, Chief Executive Officer
of Hambledon Mining plc. Timothy Daffern has in excess of 22 years'
experience in mineral project development and evaluation including
exploration and is a Qualified Person under the AIM Rules.
ENQUIRIES:HAMBLEDON MINING:Telephone +44 (0)207 233 1462Charles
Zorab
FAIRFAX I.S. PLC (NOMAD AND JOINT BROKER):Telephone +44 (0)207
598 5368Ewan Leggat/Katy Birkin
TAVISTOCK COMMUNICATIONS:Telephone +44 (0)207 920 3150Ed
Portman/Jos Simson
Altyngold (LSE:ALTN)
Historical Stock Chart
From Jun 2024 to Jul 2024
Altyngold (LSE:ALTN)
Historical Stock Chart
From Jul 2023 to Jul 2024