Calibre Mining Corp. (TSX-V: CXB) (the “Company” or “Calibre”) is
pleased to report additional results for the on-going 2018 diamond
drilling program on the Eastern Borosi Gold-Silver Project,
Nicaragua (the “Project”). Exploration and drilling on the
Project is being funded by Calibre’s JV partner IAMGOLD Corporation
(“IAMGOLD”).
Highlights
- Drill holes on the La Luna
gold-silver vein-structure include additional high-grade intercepts
with drill hole LL18-020 returning;
-
- 8.71 metres grading 6.78
g/t Au and 5.3 g/t Ag (6.86 AuEq) including 4.38
metres grading 13.22 g/t Au and 9.5 g/t Ag (13.37 AuEq)
from the Main structure (124.24 – 132.95m) and,
-
- 26.8 metres grading 1.23
g/t Au and 30.1 g/t Ag (1.69 AuEq) including 4.45
metres grading 4.96 g/t Au and 151.5 g/t Ag (7.29 AuEq)
from a newly discovered Sulphide-Rich Zone (142.5 – 169.27m).
- The 2018 diamond drilling program
has to date completed 44 holes totaling 9,276.5 metres with results
for six holes reported in this news release. Drilling with
two diamond drill rigs is on-going with additional drill results
pending.
- Work on the northern extension to
the La Luna South structure has also included a detailed surface
rock sampling program. A total of 19 rock samples have been
collected with individual samples including 110.3 g/t Au, 18.3 g/t
Au, 17.0 g/t Au, 12.8 g/t Au, and 12.4 g/t Au. Drill hole
LL18-020 is the northernmost drill hole on the high-grade zone with
the anomalous rock samples extending a further 400 metres to the
north.
President and CEO Greg Smith stated: “These
additional drilling results at the La Luna gold-silver deposit have
extended the high-grade portion of the vein-structure intersected
early this year 100 metres to the north and the discovery remains
open. Additionally, the latest drilling includes a
sulphide-rich zone intersected below the main structure which is a
new discovery providing further potential at La Luna. Recent
surface rock sampling has returned high grade results up to 110.3
g/t Au from similar sulphide rich material extending several
hundred metres to the north of discovery drill hole LL18-020
providing immediate step-out drill targets.”
Highlights of the recent H2 2018 Diamond
Drilling
Hole ID |
Target |
From m |
To m |
Length (m) |
AuEq (g/t) |
Au (g/t) |
Ag (g/t) |
Pb (ppm) |
Zn (ppm) |
LL18-020 |
Main Structure |
124.24 |
132.95 |
8.71 |
6.86 |
6.78 |
5.34 |
40 |
142 |
|
incl. |
127.16 |
131.54 |
4.38 |
13.37 |
13.22 |
9.48 |
70 |
158 |
|
Sulphide Zone |
142.50 |
169.27 |
26.77 |
1.69 |
1.23 |
30.05 |
8896 |
9688 |
|
incl. |
155.36 |
159.81 |
4.45 |
7.29 |
4.96 |
151.5 |
52210 |
54630 |
|
|
|
|
Notes: |
|
- H2 2018 Drilling
Highlights. See final table for complete recent results. |
|
|
|
|
|
|
- Intervals are core
lengths / true width are estimated to be 80-90% of lengths |
|
|
|
|
|
|
- Length weighted
averages from uncut assays. |
|
|
|
|
|
|
- g/t AuEq calculated
using $1300/oz gold and $20.0/oz silver |
H2 2018 Diamond Drilling
ProgramDrilling to date in 2018 has consisted of step out
holes following up on previous high grade intercepts on a series of
structures. Total holes completed to date: 44 - (3 Veta Loca
“B”, 3 Guapinol, 12 Cadillac-Jaguar, 6 East Dome, 4 Main Blag, 12
La Luna, and 4 San Cristobal). Total meterage to date 2018
(completed holes): 9,276.5 metres - (468.17m Veta Loca “B”, 590.17m
Guapinol, 2,414m Cadillac-Jaguar, 2,052.72 East Dome, 1,238.29m
Main Blag, 1,994.88m La Luna, and 518.49m San Cristobal). The
complete assay results for the recently received six drill holes
are provided in the Table 2 below. Drill hole details and
maps can be found on Calibre’s website
www.calibremining.com.
Recent results have expanded on the high-grade
discovery at the La Luna Zone. Drill hole LL18-020 on the La
Luna South Structure intersected 8.71 metres grading 6.78
g/t Au and 5.3 g/t Ag (6.86 AuEq) including 4.38
metres grading 13.22 g/t Au and 9.5 g/t Ag (13.37 AuEq)
from the Main structure (124.24 – 132.95m) and, 26.8 metres
grading 1.23 g/t Au and 30.1 g/t Ag (1.69 AuEq) including
4.45 metres grading 4.96 g/t Au and 151.5 g/t Ag (7.29
AuEq) from a second Sulphide-Rich Zone (142.5 –
169.27m). The new intersects are approximately 100 metres
north of LL18-012 which intersected 15.9 metres grading
6.28 g/t AuEq (5.75 g/t Au and 34.3 g/t Ag between 53.0
and 68.9 metres) including 4.65 metres grading 17.78 g/t Au
and 32.5 g/t Ag (18.28 AuEq). Previous drilling on
the structure also includes LL10-002 which intersected 11.0
metres grading 3.96 g/t Au and 33.6 g/t Ag (4.48 g/t
AuEq). The high grade portion of the La Luna South
structure is now defined by a series of drill holes over a strike
length of 250 metres and down to a vertical depth of 150
metres. Mineralization remains open along strike and down
dip. The g/t AuEq calculated using $1300/oz gold and $20.0/oz
silver.
H2 2018 drilling also tested the La Luna North
Zone located 800 metres to the north on what is interpreted to be a
sub-parallel structure with intercepts including LL18-021 with 1.10
metres at 1.59g/t AuEq (1.01 g/t Au and 37.4 g/t Ag) and LL18-022
with 5.85 metres at 0.60 g/t AuEq (0.56 g/t Au and 2.7 g/t
Ag). Results are pending for a third hole LL18-023.
Work on the northern extension to the La Luna
South structure has also included a detailed surface rock sampling
program. A total of 19 rock samples have been collected and
analyzed with 16 samples returning greater than one gram per tonne
gold and nine samples returning greater than five grams per tonne
gold including individual samples grading 110.3 g/t Au, 18.3 g/t
Au, 17.0 g/t Au, 12.8 g/t Au, and 12.4 g/t Au. The samples
define two linear trends interpreted to be the extension of the two
mineralized structures intersected in drill hole LL18-020.
LL18-020 is the northernmost drill hole on the high-grade zone and
the anomalous rock samples extend a further 400 metres north
providing immediate drill targets along the Main Structure.
The second trend of anomalous samples include several samples with
high base metal concentrations and this NE trending, 200 metre long
zone is interpreted as the extension of the deeper Sulphide-Rich
structure intersected in LL18-020.
Additional drilling has been completed on the
Main Blag Deposit and first pass drilling has tested the San
Cristobal Structure with results pending. The 2018 Diamond
Drilling program is on-going with additional drilling to be
completed on the high-grade Cadillac Discovery.
IAMGOLD / Calibre – Eastern Borosi
Project Exploration to date on the Eastern Borosi Project
has outlined several tens of kilometres of highly prospective
mineralized structures located in an historic gold-silver mining
district. Low sulphidation epithermal gold-silver
mineralization intersected on the Eastern Borosi Project is hosted
within porphyritic andesite and consists of structurally
controlled, high energy quartz-carbonate vein breccias,
vein-stockworks and discrete smokey quartz veins containing fine
grained sulphide minerals. Targets have been defined by
surface soil and rock sampling, trenching and previous
drilling.
IAMGOLD has completed the First Option having
made US$450,000 in payments to Calibre and completed US$5 million
in expenditures and has vested a 51% interest in the Eastern Borosi
Project. IAMGOLD has entered the Second Option with the right
to earn a further 19% in the Project (by completing additional cash
payments totalling $450,000 and further exploration expenditures
totaling $5 million) having paid the first and second installments
of $150,000 each and funding the on-going 2018 work program.
The total potential investment by IAMGOLD to earn a 70% interest in
the Project is US$10.9 million.
2018 Exploration and Drilling
Program The 2018 exploration and drilling program
continues. Additional drilling has been completed in 2018 on
existing zones and new targets with holes completed on the Main
Blag Deposit, first pass drilling on the San Cristobal Structure,
and current drilling consisting of step out holes on the Cadillac
Discovery. In addition to the drilling, target generative
exploration is on-going consisting on wide-spaced soil sampling and
surface rock sampling over selected areas.
Calibre Mining Best
PracticeCalibre is committed to best practice standards
for all exploration, sampling and drilling. Drilling was
completed by independent firm Continental Drilling.
Analytical quality assurance and quality control includes the
systematic insertion of blanks, standards and duplicates.
Samples are placed in sealed bags and shipped directly to Bureau
Veritas Lab in Managua, Nicaragua for sample preparation and then
to Vancouver, Canada for 50 gram gold fire assay and ICP-MS multi
element analyses. The technical content in this news release
was read and approved by Gregory Smith, P.Geo, President and CEO of
the Company who is the Qualified Person as defined by NI
43-101.
About Calibre Mining
Corp.Calibre owns a 100% interest in over
413 km2 of mineral concessions in the Mining Triangle of Northeast
Nicaragua including the Primavera Gold-Copper Project and Santa
Maria Gold Project. Additionally the Company has optioned to
IAMGOLD (176 km2) and Centerra Gold (253 km2) concessions covering
an aggregate area of 429 km2 and is party to a joint venture on the
33.6 km2 Rosita D gold-copper-silver project with Rosita Mining
Corporation and Century Mining. Major shareholders of Calibre
include gold producer B2Gold Corp, Lukas Lundin and management.
Calibre Mining Corp.
“Greg Smith”
Greg Smith,
P.Geo.President and CEO
For further information contact:Ryan King604
628-1012www.calibremining.com
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Cautionary Note Regarding Forward
Looking Statements
This news release contains certain
forward-looking statements. Any statements that express or involve
discussions with respect to predictions, expectations, beliefs,
plans, projections, objectives, assumptions or future events or
performance (often, but not always, using words or phrases such as
“expects” or “does not expect”, “is expected”, “anticipates” or
“does not anticipate” “plans”, “estimates” or “intends” or stating
that certain actions, events or results “ may”, “could”, “would”,
“might” or “will” be taken, occur or be achieved) are not
statements of historical fact and may be “forward-looking
statements”. Forward-looking statements are subject to a
variety of risks and uncertainties which could cause actual events
or results to materially differ from those reflected in the
forward-looking statements.
Safe Harbor Statement under the United
States Private Securities Litigation Reform Act of 1995:
Except for the statements of historical fact contained herein, the
information presented constitutes “forward-looking statements”
within the meaning of the Private Securities Litigation Reform Act
of 1995. Such forward-looking statements including but not
limited to those with respect to the price of gold, potential
mineralization, reserve and resource determination, exploration
results, and future plans and objectives of the Company involve
known and unknown risks, uncertainties and other factors which may
cause the actual results, performance or achievement of Calibre to
be materially different from any future results, performance or
achievements expressed or implied by such forward-looking
statements. There can be no assurance that such statements
will prove to be accurate as actual results and future events could
differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on
forward-looking statements.
Table 2 Eastern Borosi Project – H2-2018
Drilling Results
Hole ID |
Target |
From m |
To m |
Length (m) |
Au (g/t) |
Ag (g/t) |
Pb (ppm) |
Zn (ppm) |
LL18-017 |
La Luna
S. Ext. |
|
|
No significant Values |
|
|
LL18-018 |
La Luna
South |
103.70 |
104.60 |
0.90 |
0.24 |
1.8 |
20 |
26 |
LL18-019 |
La Luna South |
187.41 |
212.03 |
24.62 |
0.46 |
2.4 |
43 |
161 |
including |
|
202.41 |
212.03 |
9.62 |
0.74 |
3.1 |
72 |
126 |
with |
|
202.41 |
205.15 |
2.74 |
1.25 |
5.2 |
132 |
184 |
|
|
253.15 |
254.67 |
1.52 |
0.41 |
5.3 |
28 |
110 |
LL18-020 |
La Luna South |
23.68 |
29.16 |
5.48 |
0.37 |
1.7 |
32 |
206 |
|
|
124.24 |
132.95 |
8.71 |
6.78 |
5.3 |
40 |
142 |
including |
|
127.16 |
131.54 |
4.38 |
13.22 |
9.5 |
70 |
158 |
with |
|
127.16 |
130.10 |
2.94 |
18.31 |
11.6 |
72 |
96 |
|
|
142.50 |
169.27 |
26.77 |
1.23 |
30.1 |
8896 |
9688 |
including |
|
143.66 |
150.60 |
6.94 |
0.87 |
11.6 |
332 |
587 |
and |
|
152.13 |
159.81 |
7.68 |
3.09 |
89.7 |
30270 |
31710 |
with |
|
155.36 |
159.81 |
4.45 |
4.96 |
151.5 |
52210 |
54630 |
LL18-021 |
La Luna North |
162.00 |
163.17 |
1.17 |
0.33 |
2.6 |
1142 |
1984 |
|
|
167.75 |
169.27 |
1.52 |
0.56 |
1.4 |
868 |
526 |
|
|
202.00 |
203.10 |
1.10 |
1.01 |
37.4 |
1897 |
6034 |
|
|
208.00 |
210.25 |
2.25 |
0.23 |
0.9 |
12 |
69 |
|
|
213.75 |
219.75 |
6.00 |
0.25 |
2.9 |
36 |
153 |
LL18-022 |
La Luna North |
123.15 |
123.52 |
0.37 |
0.35 |
1.4 |
27 |
59 |
|
|
136.00 |
137.00 |
1.00 |
1.54 |
2.3 |
26 |
124 |
|
|
174.68 |
175.08 |
0.40 |
1.59 |
5.7 |
981 |
1457 |
|
|
205.40 |
211.25 |
5.85 |
0.56 |
2.7 |
489 |
968 |
|
|
217.00 |
222.75 |
5.75 |
0.12 |
3.7 |
2333 |
5921 |
|
|
226.20 |
227.22 |
1.02 |
1.94 |
6.6 |
1049 |
2280 |
LL18-023 |
La Luna
North |
|
|
results pending |
|
|
|
|
|
|
|
Notes: |
|
- H2 2018 recent
results. |
|
|
|
|
|
|
- Intervals are core
lengths / true width are estimated to be 80-90% of lengths |
|
|
|
|
|
|
- Length weighted
averages from uncut assays. |
Calibre Mining (TSXV:CXB)
Historical Stock Chart
From Oct 2024 to Nov 2024
Calibre Mining (TSXV:CXB)
Historical Stock Chart
From Nov 2023 to Nov 2024