Northern Freegold Resources Ltd. (TSX VENTURE: NFR)(OTCBB: NFRGF)(FRANKFURT: 8NG) is pleased to announce results for the first nine drill holes completed on the Revenue Zone gold-rich porphyry system on the road-accessible Freegold Mountain Project, located 70 km west of Carmacks, Yukon. Several holes returned long intersections of gold, copper and molybdenum mineralization in the Revenue Zone.

Highlights include:


--  Hole RVD11-019 - 304.8 metres averaging 0.47 g/t Au, 3.68 g/t Ag, 0.12%
    Cu and 0.02% Mo (0.95 g/t AuEq), including 121.7 metres averaging 0.93
    g/t Au, 6.2 g/t Ag, 0.16% Cu and 0.03% Mo (1.64 g/t AuEq).

--  Hole RVD11-022 - 157.5 metres averaging 0.31 g/t Au, 3.1 g/t Ag, 0.14%
    Cu and 0.01% Mo (0.73 g/t AuEq), including 44 metres of 0.42 g/t Au,
    4.53 g/t Ag, 0.19% Cu and 0.01% Mo (0.99 g/t AuEq).

--  The holes reported here include in-fill and step-out holes drilled
    within and around the currently defined Revenue Target Deposit.
    Mineralization extends the Target Deposit 200m eastward, 300m northward
    and an additional 200m depth.

--  The deposit is open laterally and at depth. Two diamond drills continue
    to operate on the property.

Selected Drill Intervals from Revenue Zone(1)
------------------------------------------------------------------------
Drill Hole     From     To   Length     Au     Ag     Cu     Mo     AuEq
                              (m)(2)  (g/t)  (g/t)    (%)    (%) (g/t)(3)
------------------------------------------------------------------------
RVD11-014     282.2  492.3    210.1   0.20   1.94   0.07   0.01     0.46
------------------------------------------------------------------------
Incl.         300.9  330.7     29.8   0.39   1.54   0.18   0.02     1.02
------------------------------------------------------------------------
And           387.9  409.9     22.0   0.38   1.59   0.05   0.01     0.62
------------------------------------------------------------------------
And           452.6  465.5     12.9   0.50   1.64   0.13   0.03     1.10
------------------------------------------------------------------------
And           479.1  485.1      6.1   1.24  11.67   0.24   0.00     1.92
------------------------------------------------------------------------
RVD11-016      12.0   57.2     45.2   0.66   1.35   0.06   0.00     0.82
RVD11-016A    377.3  483.0    105.8   0.07   1.49   0.09   0.05     0.79
------------------------------------------------------------------------
Incl.         391.4  427.4     36.0   0.10   2.37   0.15   0.11     1.66
------------------------------------------------------------------------
RVD11-019      42.8  347.6    304.8   0.47   3.68   0.12   0.02     0.95
------------------------------------------------------------------------
Incl.          55.2   89.0     33.8   0.35   5.26   0.24   0.01     1.06
------------------------------------------------------------------------
And           141.5  263.2    121.7   0.93   6.20   0.16   0.03     1.64
------------------------------------------------------------------------
RVD11-020     192.9  222.5     29.6   0.47   2.58   0.07   0.00     0.69
------------------------------------------------------------------------
RVD11-020     242.4  399.1    156.7   0.16   2.53   0.10   0.00     0.42
------------------------------------------------------------------------
Incl.         338.3  351.2     13.0   0.63   9.01   0.32   0.00     1.45
------------------------------------------------------------------------
And           362.4  379.0     16.7   0.34   4.45   0.15   0.01     0.79
------------------------------------------------------------------------
RVD11-020     437.5  502.7     65.2   0.41   3.28   0.14   0.00     0.77
------------------------------------------------------------------------
RVD11-022      52.6  210.1    157.5   0.31   3.10   0.14   0.01     0.73
------------------------------------------------------------------------
Incl.          72.3   95.4     23.1   0.36   4.37   0.20   0.01     0.94
------------------------------------------------------------------------
And           102.9  147.3     44.4   0.42   4.53   0.19   0.01     0.99
------------------------------------------------------------------------
And           161.9  204.1     42.2   0.25   3.12   0.14   0.01     0.71
------------------------------------------------------------------------
RVD11-022     236.1  304.7     68.6   0.33   2.46   0.12   0.03     0.97
------------------------------------------------------------------------
RVD11-022     461.6  501.8     40.2   0.22   2.53   0.03   0.03     0.60
------------------------------------------------------------------------
(1) Please refer to table at end of release for complete set of results.
(2) True widths unkown
(3) Au equivalent metal prices: US$1,016.00/oz gold, US$2.95/lb copper,
US$15.82/oz silver and US$34.88/kg molybdenum (3 yr average; no discount for
metallurgical recovery in contained metal figures).

Revenue Target Deposit

Based on an evaluation of historic and 2010 drill hole data from the Revenue Zone gold-rich porphyry system the following target deposit was defined (See news release Feb. 24, 2011):


Revenue Zone Target Deposit
---------------------------------------------------------------------------
                Potential         Potential        Potential      Potential
Range of        Ounces of         Ounces of           Lbs of         Lbs of
Potential            Gold            Silver           Copper     Molybdenum
Tonnes             (Grade)           (Grade)          (Grade)        (Grade)
---------------------------------------------------------------------------
40 to 110          0.7 to            5.0 to           130 to           9 to
Million         1.1 M Ozs        10.0 M Ozs        280 M lbs       18 M lbs
                  (0.3 to           (2.7 to         (0.11 to      (0.007 to
                  0.5 g/t)          3.7 g/t)           0.14%)        0.011%)
---------------------------------------------------------------------------

The target deposit extends for 1500 m in an eastward direction, and from surface to a depth of 250 m. It is open laterally and to depth. The goal of the 2011 drilling on the Revenue zone is to upgrade the Target Deposit to Inferred Resource, and to expand on the Target Deposit.

The project is being managed by GeoVector Management Inc. of Ottawa, Ontario http://www.geovector.ca under the supervision of A. Armitage, Ph.D., P.Geo. Dr. Armitage is the Exploration Manager for Northern Freegold and is the Qualified Person, as defined by NI 43-101, for the Freegold Mountain Project. Dr. Armitage has reviewed the technical information in this release.


Significant Gold, Copper and Silver Assay Intercepts
------------------------------------------------------------------------
Drill Hole     From     To   Length     Au     Ag     Cu     Mo     AUEQ
                              (m)(2)  (g/t)  (g/t)    (%)    (%) (g/t)(3)
------------------------------------------------------------------------
RVD11-014     18.84  35.50    16.66   0.68   1.32   0.06   0.00     0.84
------------------------------------------------------------------------
RVD11-014     48.40 112.55    64.15   0.16   0.72   0.07   0.00     0.34
------------------------------------------------------------------------
Incl.         89.45 111.00    21.55   0.31   1.44   0.10   0.00     0.56
------------------------------------------------------------------------
RVD11-014    165.95 276.20   110.25   0.11   1.95   0.05   0.01     0.32
------------------------------------------------------------------------
Incl.        185.50 231.50    46.00   0.15   2.16   0.07   0.02     0.51
------------------------------------------------------------------------
RVD11-014    282.20 492.25   210.05   0.20   1.94   0.07   0.01     0.46
------------------------------------------------------------------------
Incl.        300.90 330.65    29.75   0.39   1.54   0.18   0.02     1.02
------------------------------------------------------------------------
and          387.85 409.85    22.00   0.38   1.59   0.05   0.01     0.62
------------------------------------------------------------------------
and          452.60 465.46    12.86   0.50   1.64   0.13   0.03     1.10
------------------------------------------------------------------------
and          479.05 485.14     6.09   1.24  11.67   0.24   0.00     1.92
------------------------------------------------------------------------
RVD11-015    292.25 320.00    27.75   0.08   1.45   0.07   0.02     0.41
------------------------------------------------------------------------
RVD11-015    341.00 346.90     5.90   0.02   0.99   0.06   0.02     0.40
------------------------------------------------------------------------
RVD11-016     12.00  57.20    45.20   0.66   1.35   0.06   0.00     0.82
------------------------------------------------------------------------
Incl.         20.88  27.43     6.55   3.15   1.55   0.07   0.00     3.32
------------------------------------------------------------------------
RVD11-016A   201.75 220.15    18.40   0.22   1.74   0.10   0.00     0.46
------------------------------------------------------------------------
RVD11-016A   236.85 363.63   126.78   0.05   0.69   0.05   0.01     0.27
------------------------------------------------------------------------
Incl.        287.50 296.90     9.40   0.18   1.34   0.11   0.00     0.42
------------------------------------------------------------------------
and          301.66 317.48    15.82   0.06   0.76   0.05   0.01     0.25
------------------------------------------------------------------------
and          322.80 342.84    20.04   0.01   0.77   0.05   0.05     0.63
------------------------------------------------------------------------
and          349.50 361.00    11.50   0.02   1.34   0.11   0.02     0.44
------------------------------------------------------------------------
RVD11-016A   377.25 483.00   105.75   0.07   1.49   0.09   0.05     0.79
------------------------------------------------------------------------
             391.35 427.35    36.00   0.10   2.37   0.15   0.11     1.66
------------------------------------------------------------------------
RVD11-016A   492.85 510.54    17.69   0.03   0.86   0.05   0.01     0.20
------------------------------------------------------------------------
             446.23 481.66    35.43   0.03   0.83   0.05   0.02     0.38
------------------------------------------------------------------------
RVD11-018     47.60  52.27     4.67   0.14   2.78   0.13   0.02     0.63
------------------------------------------------------------------------
RVD11-018    119.77 135.00    15.23   0.04   0.20   0.01   0.02     0.23
------------------------------------------------------------------------
RVD11-018    196.50 211.50    15.00   0.05   0.66   0.03   0.01     0.18
------------------------------------------------------------------------
RVD11-018    253.50 258.00     4.50   0.16   1.30   0.07   0.00     0.35
------------------------------------------------------------------------
RVD11-018    298.50 301.50     3.00   0.02   0.35   0.01   0.05     0.54
------------------------------------------------------------------------
RVD11-018    307.50 319.50    12.00   0.05   0.40   0.01   0.01     0.23
------------------------------------------------------------------------
RVD11-018    389.50 401.00    11.50   0.12   1.43   0.08   0.00     0.34
------------------------------------------------------------------------
RVD11-018    451.33 457.50     6.17   0.02   0.35   0.03   0.02     0.24
------------------------------------------------------------------------
RVD11-018    463.50 501.40    37.90   0.04   0.75   0.04   0.01     0.25
------------------------------------------------------------------------
RVD11-019     29.10  36.45     7.35   0.16   1.51   0.09   0.01     0.43
------------------------------------------------------------------------
RVD11-019     42.75 347.58   304.83   0.47   3.68   0.12   0.02     0.95
------------------------------------------------------------------------
Incl.         55.20  89.00    33.80   0.35   5.26   0.24   0.01     1.06
------------------------------------------------------------------------
and          110.45 124.25    13.80   0.21   2.13   0.11   0.03     0.74
------------------------------------------------------------------------
and          141.50 263.17   121.67   0.93   6.20   0.16   0.03     1.64
------------------------------------------------------------------------
and          290.94 304.20    13.26   0.21   1.86   0.09   0.02     0.66
------------------------------------------------------------------------
RVD11-019    380.50 387.50     7.00   0.29   0.38   0.02   0.00     0.37
------------------------------------------------------------------------
RVD11-020    106.40 117.41    11.01   0.51   3.19   0.13   0.00     0.84
------------------------------------------------------------------------
RVD11-020    183.00 231.85    48.85   0.31   1.86   0.06   0.00     0.47
------------------------------------------------------------------------
Incl.        192.94 222.54    29.60   0.47   2.58   0.07   0.00     0.69
------------------------------------------------------------------------
RVD11-020    242.40 399.07   156.67   0.16   2.53   0.10   0.00     0.42
------------------------------------------------------------------------
Incl.        338.25 351.20    12.95   0.63   9.01   0.32   0.00     1.45
------------------------------------------------------------------------
and          362.35 379.00    16.65   0.34   4.45   0.15   0.01     0.79
------------------------------------------------------------------------
RVD11-020    437.54 502.69    65.15   0.41   3.28   0.14   0.00     0.77
------------------------------------------------------------------------
Incl.        483.11 494.70    11.59   1.73  13.49   0.54   0.01     3.09
------------------------------------------------------------------------
RVD11-021     14.57  27.56    12.99   0.11   1.35   0.06   0.00     0.27
------------------------------------------------------------------------
RVD11-021     58.56  67.85     9.29   0.10   0.88   0.04   0.00     0.24
------------------------------------------------------------------------
RVD11-021    117.50 130.53    13.03   0.09   1.26   0.08   0.00     0.30
------------------------------------------------------------------------
RVD11-022     52.60 210.10   157.50   0.31   3.10   0.14   0.01     0.73
------------------------------------------------------------------------
Incl.         72.30  95.35    23.05   0.36   4.37   0.20   0.01     0.94
------------------------------------------------------------------------
and          102.85 147.25    44.40   0.42   4.53   0.19   0.01     0.99
------------------------------------------------------------------------
and          161.90 204.10    42.20   0.25   3.12   0.14   0.01     0.71
------------------------------------------------------------------------
RVD11-022    215.00 362.15   147.15   0.19   1.56   0.08   0.02     0.56
------------------------------------------------------------------------
Incl.        236.10 304.70    68.60   0.33   2.46   0.12   0.03     0.97
------------------------------------------------------------------------
RVD11-022    368.15 381.10    12.95   0.06   0.99   0.03   0.02     0.34
------------------------------------------------------------------------
RVD11-022    440.23 456.40    16.17   0.07   0.81   0.05   0.01     0.32
------------------------------------------------------------------------
RVD11-022    461.60 501.80    40.20   0.22   2.53   0.03   0.03     0.60
------------------------------------------------------------------------

Sampling Methodology, Quality Control and Assurance

All core samples from diamond drilling completed by Northern Freegold in 2011 follow NI 43-101 approved QA/QC protocols including insertion of blanks, commercial standards and duplicate core samples. For the 2011 program, core samples are split and shipped to ALS Laboratory's (ALS) sample preparation facility in Whitehorse. Samples submitted to this lab are prepared for shipping by logging into the ALS system, prepared by drying, crush to appropriate particle size and representatively split to a smaller size for shipping. The prepped samples are shipped to the main North American laboratory in North Vancouver, BC for final pulverizing and analysis. Samples were analyzed for gold by fire assay (FA) with an atomic absorption finish (AA) on 30 gram samples. All samples having more than 1,000 ppm gold were re-assayed by FA and a gravimetric finish. Each sample is also sent for multi-element analysis by the ICP-MS method, which includes Cu, Ag, Mo and W.

As part of in-house QA/QC ALS inserts certified gold standards, which are purchased from CDN Resource Labs. Standards are inserted and three pulp duplicates are analyzed for every 20 samples. Random additional repeats are also analyzed as required. Results from all internal QC samples and repeats are reported.

About Northern Freegold

Northern Freegold is a well-financed rapidly advancing Canadian-based precious metals exploration and development company. NFR brings local expertise and strong management to focus on the development of economic mineral resources on the district-scale Freegold Mountain gold and copper project in the Yukon and the Burro Creek gold and silver property in Arizona. For further information and maps outlining the projects, please visit www.northernfreegold.com.

On behalf of the Board of Directors

Tim Termuende, P. Geo., Interim CEO and President

Cautionary Note Regarding Forward-Looking Statements The information in this press release includes certain "forward-looking statements" All statements, other than statements of historical fact, included herein including, without limitation, plans for and intentions with respect to the company's properties, statements regarding intentions with respect to obligations due for various projects, strategic alternatives, quantity of resources or reserves, timing of permitting, construction and production and other milestones, are forward looking statements. Statements concerning Mineral Reserves and Mineral Resources are also forward-looking statements in that they reflect an assessment, based on certain assumptions, of the mineralization that would be encountered and mining results if the project were developed and mined in the manner described. Forward-looking statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from NFR's expectations include the uncertainties involving the need for additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; the need for cooperation of government agencies and First Nation groups in the exploration, and development of properties; and the need to obtain permits and governmental approval. NFR's forward looking statements reflect the beliefs, opinions and projections of management on the date the statements are made. NFR assumes no obligation to update the forward looking statements if management's beliefs, opinions, projections, or other factors should they change.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts: Northern Freegold Resources Ltd. Julie Hajduk Investor Relations Manager 604.893.8757 or Toll Free: 1.877.893.8757 604.893.8758 (FAX) www.northernfreegold.com

Northern Freegold Resour... (TSXV:NFR)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Northern Freegold Resour... Charts.
Northern Freegold Resour... (TSXV:NFR)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Northern Freegold Resour... Charts.