Canadian Premium Sand Inc. Provides Operational Update and Announces Plans for a US Facility
04 November 2024 - 11:00PM
Canadian Premium Sand Inc. (“
CPS”
or the “
Company”) (TSXV: CPS) is pleased to
provide an operational update for its pattern solar glass
manufacturing facility in Selkirk, Manitoba (the “
Selkirk
Project”) and announces plans for a pattern solar glass
manufacturing facility in the United States.
Operational Update
To advance the $272 million indications of
support previously announced on September 18, 2024 for the Selkirk
Project, the Company has submitted the detailed application for
$100 million in non-dilutive financial support and is now entering
the due diligence phase. The Company is working on formalizing
elements of the $72 million financial support from the Province of
Manitoba and has held discussions with Manitoba based indigenous
groups related to their participation in the Selkirk Project of
$100 million utilizing the federal Indigenous Loan Guarantee
Program.
Plans for a US Facility and a Strategic
Glass Manufacturing Partner
The implementation of the Inflation Reduction
Act (the “IRA”) in the US has resulted in strong
growth in solar installations and onshoring efforts within the
solar supply-chain. As a result, solar panel manufacturing capacity
is expected to increase from 12GW in 2022 to 52GW by the end of
2025. IRA policies also provide an incentive to end users of solar
panels to maximize domestic content in solar panel installations,
driving solar energy suppliers to locate and expand their
manufacturing facilities in the US.
CPS customers in
the US have expressed a desire for domestic solar glass supply, in
addition to the Company’s low-carbon supply from the Selkirk
Project. To address this, the Company evaluated sites with existing
and under-utilized buildings, utility supply, logistics
infrastructure and environmental permits to support a pattern solar
glass manufacturing operation in the US. With this evaluation
complete, the Company has selected a site that meets these criteria
providing the opportunity for a lower capital cost facility to
supplement the Selkirk Project.
The Company is now preparing plans to re-purpose
a former glass manufacturing facility in the US to produce 4GW per
year of solar glass and is advancing discussions with a potential
strategic glass manufacturing partner to jointly develop this site.
This strategic partner would bring glass manufacturing expertise,
purchasing power for equipment and raw materials and in-house
engineering capability. Re-purposing an existing manufacturing
facility with a strategic partner will allow CPS to de-risk both
the development of the project and operation of the facility.
CPS has established a wholly owned US
subsidiary, CPS Glass USA Corp., and has applied for the US
Department of Energy’s investment tax credit. The allocation
decision for this application is expected in Q1 2025.
Strong Competitive Positioning and
Long-Term Strategy
The Company’s low-iron sand deposit in Manitoba
can support capacity for both proposed facilities for over 20
years. With both facilities providing a total of 10GW of solar
glass combined, the Company is preparing to become the largest
supplier of patterned solar glass and the only vertically
integrated glass manufacturer in North America.
With manufacturing operations in both Canada and
the US, each offering two distinct value propositions to its
customers, CPS is positioning itself to be the preferred supplier
of solar glass, providing a complete solution to its customers:
- low-carbon
supply of solar glass from the Selkirk Project,
- supply of
domestic content solar glass from the US facility, and
- on-shoring of
solar glass supply chain eliminating the cost, carbon emissions and
logistical burden of the current Asia Pacific solar glass supply
chain.
“Establishing 10GW supply of both low-carbon and
US manufactured ultra clear pattern solar glass aligns CPS with the
supply chain goals of our North American customers”, stated Glenn
Leroux, President & CEO of CPS. “Alignment with a strategic
glass manufacturing partner supports the execution of our North
American strategy and vision.”
About Canadian Premium Sand
Inc.
The Company is developing North American
manufacturing capacity for ultra high-clarity pattern solar glass
through multiple Company-owned facilities, utilizing high-purity
low-iron silica sand from its wholly owned Wanipigow quarry leases.
The Company’s low-carbon facility located in Selkirk, Manitoba will
utilize renewable Manitoba hydroelectricity and produce 6GW of
low-carbon solar glass. The Company’s facility located in the US
will produce 4GW of domestic solar glass. With 10GW of annual
proposed solar glass manufacturing capacity, the Company is well
positioned to become the largest and preferred supplier in North
America. The Company is a reporting issuer in Ontario, Alberta and
British Columbia. Its shares trade on the TSXV under the symbol
"CPS".
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
CONTACT
INFORMATION:
Canadian Premium Sand Inc. |
Glenn Leroux |
President and Chief Executive Officer |
glenn.leroux@cpsmail.com |
|
Investor Relations |
IR@cpsmail.com |
587.355.3714 |
www.cpsglass.com |
Forward-Looking Information
Certain statements contained in this press
release constitute forward-looking statements relating to, without
limitation, expectations, intentions, plans and beliefs, including
information as to the future events, results of operations and the
Company’s future performance (both operational and financial) and
business prospects. In certain cases, forward-looking statements
can be identified by the use of words such as “expects”,
“estimates”, “forecasts”, “intends”, “anticipates”, “believes”,
“plans”, “seeks”, “projects” or variations of such words and
phrases, or state that certain actions, events or results “may” or
“will” be taken, occur or be achieved. Such forward-looking
statements reflect the Company's beliefs, estimates and opinions
regarding its future growth, results of operations, future
performance (both operational and financial), and business
prospects and opportunities at the time such statements are made,
and the Company undertakes no obligation to update forward-looking
statements if these beliefs, estimates and opinions or
circumstances should change. Forward-looking statements are
necessarily based upon a number of estimates and assumptions made
by the Company that are inherently subject to significant business,
economic, competitive, political and social uncertainties and
contingencies. Forward-looking statements are not guarantees of
future performance. In particular, this press release contains
forward-looking statements pertaining, but not limited, to: the
expectation that significant shareholder value will be created in
2025 by commercializing the Selkirk Project; the financing of the
Selkirk Project and US facility; the anticipated market for the
Company's patterned solar glass; future development plans; industry
activity levels; industry conditions pertaining to the solar glass
manufacturing industry; the ability of and manner by which the
Company expects to meet its capital needs; and the Company's
objectives, strategies and competitive strengths. By their nature,
forward-looking statements involve numerous current assumptions,
known and unknown risks, uncertainties and other factors which may
cause the actual results, performance or achievements of the
Company to differ materially from those anticipated by the Company
and described in the forward-looking statements. The
forward-looking information and statements contained in this
document speak only as of the date hereof and the Company does not
assume any obligation to publicly update or revise them to reflect
new events or circumstances, except as may be required pursuant to
applicable laws.
Canadian Premium Sands (TSXV:CPS)
Historical Stock Chart
From Nov 2024 to Dec 2024
Canadian Premium Sands (TSXV:CPS)
Historical Stock Chart
From Dec 2023 to Dec 2024