31 January 2025
Quarterly Activities
Report
For the
period ended 31 December 2024
_______________________________________________________________________________
Highlights:
Karratha Gold Project - ARV 100%
·
Detailed geological mapping, a new geophysical and
structural interpretation and additional rock chip sampling
completed during the quarter across the Carlow Tenement have
improved the understanding of the gold potential and identified
several high priority targets for drilling commencing in early
February 2025.
· Drilling will initially test three targets along a 4km zone
centred around the 374Koz Carlow gold resource. The first diamond hole will test the large Marillion
Electromagnetic ("EM") conductor 500m east of Carlow, followed by
drilling to test for extensions to Carlow down plunge from
high-grade gold intersections.
· Reverse Circulation ("RC") drilling is planned to test below
surface gold occurrences in mineralised veins and chert outcrops at
the Titan Prospect 2km northwest of Carlow and a gravity-low
feature potentially associated with the surface gold at
Titan.
·
Additional rock chip results from selected surface
samples at Titan, announced during the quarter include:
o 553,754
g/t Au & 1,305 g/t Ag (24AR19-075)
o 223,056
g/t Au & 1,195 g/t Ag (24AR19-068)
o 33,389 g/t
Au & 233 g/t Ag (24AR19-061)
·
Rock chip results from selected surface samples at
the Thorpe prospect, 2km south of Carlow, announced during the
quarter include:
o 45.8 g/t
Au, 3.7% Cu & 38.6 g/t Ag (24AR22-020)
o 12 g/t Au,
1.1% Cu & 3.7 g/t Ag (24AR22-014)
o 10.3% Cu,
0.4g/t Au & 69.4 g/t Ag (24AR22-013)
Corporate
·
Firm commitments received for A$4 million
placement with Tranche One completed and $2.09 million
received. An Extraordinary General Meeting to be held 10
February 2025 to approve Tranche Two
·
In December 2024, highly experienced geologist and
mining executive Julian Hanna was appointed Technical Director of
Artemis, then Managing Director on 24 January 2025, post
period-end.
Commenting on the activities during
the quarter, recently appointed Managing Director Julian Hanna
said:
"The December quarter was an important and productive period
for Artemis, as it built the foundation for an exciting drilling
campaign which will initially focus on the Carlow tenement and get
underway soon.
During the quarter, the Carlow tenement continued to yield
further high-grade gold results from selected surface samples of
vein and chert outcrops not only at Titan, but also at the Thorpe
prospect, 2km south of Carlow. While we don't expect that the high
gold grades seen in many of the surface samples will be indicative
of grades that may be intersected in drilling below these samples,
I think the results are very encouraging:
Firstly, they demonstrate that potential still exists for
significant gold discoveries within 2-3kms of our already
substantial Carlow gold and copper deposit. Secondly, when combined
with recent detailed geological mapping and structural
interpretations, our geologists have been able to build a much
clearer understanding of the geology and potential of this well
mineralised area. The next step is to test several of the high
priority targets with RC and diamond drilling commencing in early
February. The three targets to be
drilled in the initial phase have never been effectively
tested.
As
a result of the capital raising in late December, Artemis is now
well funded for the planned drilling around Carlow and progressing
other promising targets at the Karratha Gold
Project. I am fortunate to be able to work with a very experienced
and committed technical and corporate team focused on deploying
these funds towards making discoveries, building the assets and
driving value for shareholders."
Artemis Resources Limited ('Artemis' or the
'Company') (ASX/AIM:
ARV) is pleased to
provide an activities report for the quarter ended
31 December 2024. During this period the Company reported further
high grade surface gold results, completed mapping and a
re-interpretation of the Carlow Tenement, finalised a capital
raising for drilling and other exploration activities and appointed
a new Managing Director.
Karratha Gold Project - ARV 100%
On 10 October 2024, Artemis reported
surface sampling results from its Titan Prospect (Figure 1) which
identified high grade gold and silver assays[1]. Results from the second surface sampling program
were completed at Titan and included a number of samples from the
initial campaign which previously delivered over-limit
assays.
[1] Refer to ASX Announcement dated: 10
October 2024
Figure
1. Karratha Gold Project
tenements showing current known prospects
The second sampling program at Titan
consisted of 97 samples selected from outcropping veins, subsurface
veins and three float samples. Significant
rock chip assay results (>0.5g/t Au) are included in Table
1.
Sample No
|
Easting
|
Northing
|
Au g/t
|
Cu %
|
Ag g/t
|
Co ppm
|
Zn %
|
24AR19-075*
|
505863
|
7699466
|
553.754
|
0.023
|
1,305
|
37.3
|
0.01
|
24AR19-068*
|
505860
|
7699470
|
223.056
|
0.022
|
1,195
|
70.3
|
0.012
|
24AR19-061*
|
505855
|
7699471
|
33.389
|
0.015
|
233
|
76.2
|
0.008
|
24AR19-032
|
504980
|
7699364
|
7.48
|
0.007
|
0.37
|
16
|
0.009
|
24AR19-047
|
505019
|
7699515
|
5.72
|
0.003
|
3.2
|
3.4
|
0.001
|
24AR19-030
|
505004
|
7699346
|
1.97
|
0.016
|
0.54
|
27.3
|
0.019
|
24AR19-040
|
504902
|
7699708
|
1.19
|
0.008
|
0.66
|
46.7
|
0.034
|
24AR19-005
|
505029
|
7699502
|
0.85
|
0.004
|
0.54
|
3.8
|
0.004
|
24AR19-007
|
505305
|
7699616
|
0.55
|
0.005
|
0.46
|
6.9
|
0.012
|
24AR19-069
|
507728
|
7699313
|
0.54
|
0.005
|
0.51
|
1.1
|
0.001
|
Table 1.
Significant rock chip assay results from recent
sampling
* Assay
results for Au from FA with gravimetric finish, reported as the
average of triplicates.
Results from the initial Titan
surface sampling program were reported on 15 and 16 August 2024.
Due to the high gold content of some samples, the analytical
laboratory was unable to quantify actual gold values. These
over-limit assays have now been quantified and returned assay results which are included in Table
2.
Sample_No
|
Easting
|
Northing
|
kg0.02
|
GRAV_Assay 1_Au%*
|
GRAV_Assay 2_Au%*
|
GRAV_Assay 3_Au%*
|
Average Au %*
|
Au
g/t
|
Ag
g/t
|
**24AR11-005
|
505860.00
|
7699470.00
|
0.17
|
68.90
|
70.74
|
68.13
|
69.26
|
692,579.50
|
3,000
|
24AR19-075
|
505863.00
|
7699466.00
|
0.27
|
55.43
|
54.92
|
55.77
|
55.38
|
553,754.90
|
1,305
|
**24AR11-008
|
505863.00
|
7699466.00
|
0.15
|
49.95
|
44.98
|
46.65
|
47.19
|
471,937.80
|
1,775
|
24AR19-068
|
505860.00
|
7699470.00
|
0.30
|
22.41
|
22.00
|
22.50
|
22.31
|
223,056.70
|
1,195
|
**24AR11-004
|
505855.00
|
7699471.00
|
0.32
|
4.48
|
4.49
|
4.56
|
4.51
|
45,103.70
|
344
|
24AR19-061
|
505855.00
|
7699471.00
|
0.27
|
3.10
|
3.15
|
3.77
|
3.34
|
33,389.90
|
233
|
**24AR11-002
|
505852.00
|
7699473.00
|
0.37
|
0.74
|
0.74
|
0.75
|
0.74
|
7,440.00
|
212
|
24AR19-032
|
504980.00
|
7699364.00
|
0.89
|
-
|
-
|
-
|
-
|
7.50
|
0.37
|
24AR19-047
|
505019.00
|
7699515.00
|
1.32
|
-
|
-
|
-
|
-
|
5.70
|
3.20
|
24AR19-030
|
505004.00
|
7699346.00
|
0.76
|
-
|
-
|
-
|
-
|
2.00
|
0.54
|
24AR19-040
|
504902.00
|
7699708.00
|
1.96
|
-
|
-
|
-
|
-
|
1.20
|
0.66
|
24AR19-005
|
505029.00
|
7699502.00
|
0.77
|
-
|
-
|
-
|
-
|
0.90
|
0.54
|
24AR19-007
|
505305.00
|
7699616.00
|
0.57
|
-
|
-
|
-
|
-
|
0.60
|
0.46
|
***24AR19-069
|
507728.00
|
7699313.00
|
2.13
|
-
|
-
|
-
|
-
|
0.50
|
0.51
|
Table 2. Significant
(>0.5g/t Au) gold results from rock chip samples collected at
the Titan prospect and include results previously reported as over
limit (i.e., >10,000g/t Au - refer ASX announcement 16th August
2024).
In November 2024, Artemis reported
further encouraging surface sample results from Thorpe prospect,
2km south of the Carlow deposit[2]. 52
samples were sent for analysis for gold and other elements.
Assay results >0.5g/t gold are included in Table
3.
[2] Refer to ASX Announcement dated: 28
November 2024
Sample_No
|
Easting
|
Northing
|
Au_GPT
|
Cu_%
|
Agppm
|
Coppm
|
Znppm
|
24AR22-020
|
508407.0
|
7696627.0
|
45.8
|
3.7
|
38.6
|
469.0
|
47.0
|
24AR22-014
|
507735.0
|
7696860.0
|
12.0
|
1.1
|
3.7
|
201.0
|
1225.0
|
24AR22-006
|
508061.0
|
7696621.0
|
5.9
|
1.0
|
17.8
|
95.0
|
11.0
|
24AR22-031
|
507556.0
|
7696843.0
|
3.4
|
2.5
|
4.2
|
177.5
|
708.0
|
24AR22-026
|
508499.0
|
7696639.0
|
3.0
|
2.1
|
24.4
|
606.0
|
58.0
|
24AR22-045
|
508426.0
|
7696359.0
|
2.9
|
0.0
|
0.1
|
10.6
|
292.0
|
24AR22-025
|
508509.0
|
7696631.0
|
2.1
|
0.8
|
10.6
|
292.0
|
174.0
|
24AR22-009
|
507790.0
|
7696939.0
|
1.6
|
6.1
|
13.5
|
225.0
|
1400.0
|
24AR22-004
|
508034.0
|
7696620.0
|
1.4
|
0.8
|
21.0
|
169.0
|
13.0
|
24AR22-048
|
507808.0
|
7696923.0
|
1.2
|
2.8
|
2.2
|
133.0
|
971.0
|
24AR22-003
|
508030.0
|
7696618.0
|
1.1
|
1.6
|
200.0
|
98.5
|
6.0
|
24AR22-008
|
508459.0
|
7696615.0
|
0.9
|
0.4
|
8.6
|
8.5
|
210.0
|
24AR22-023
|
508296.0
|
7696622.0
|
0.8
|
0.7
|
22.6
|
55.0
|
62.0
|
24AR22-027
|
508448.0
|
7696645.0
|
0.8
|
0.2
|
6.2
|
69.3
|
35.0
|
24AR22-016
|
507818.0
|
7696912.0
|
0.8
|
6.2
|
5.6
|
317.0
|
2080.0
|
24AR22-022
|
508400.0
|
7696621.0
|
0.7
|
0.5
|
10.4
|
45.1
|
57.0
|
24AR22-015
|
507720.0
|
7696863.0
|
0.5
|
1.8
|
21.9
|
45.5
|
280.0
|
24AR22-021
|
508406.0
|
7696629.0
|
0.5
|
0.4
|
8.7
|
43.8
|
40.0
|
24AR22-011
|
507608.0
|
7696862.0
|
0.5
|
2.6
|
7.1
|
240.0
|
1370.0
|
24AR22-013
|
507574.0
|
7696875.0
|
0.4
|
10.3
|
69.4
|
135.0
|
110.0
|
Table 3 -
Thorpe assay results >0.5 g/t Au and >1%
Cu
High-grade gold, copper and silver
assay results from the Thorpe prospect are from selected samples of
outcropping veins sampled along three interpreted structures, each
trending SW-NE and East-West for approximately 2km strike
length.
Figure 2. Carlow Tenement - gravity image showing selected gold assays
from surface rock chip samples and Titan gravity-low feature
(blue). Shows Carlow resource and Marillion EM target within
interpreted 4km long northwest trending prospective zone, in red
dash outline.
As a result of encouraging surface
gold results within the Carlow tenement (Figure 2), combined with
detailed geological mapping and the recent
geophysical and structural interpretation several high priority
targets have been identified for
drilling. These occur within a wide prospective zone centred
around the Carlow deposit.
Post period-end, Artemis announced
an initial phase of diamond and RC drilling to test three high
priority targets with drilling expected to commence in early
February 2025[3]. Despite proximity to
Carlow, these three targets are previously untested.
[3] Refer to ASX Announcement dated: 28
January 2025
Summary of planned drilling on Carlow tenement - March
quarter3
· The
first diamond hole will test the Marillion Target, a large EM
conductor 500m east of Carlow resource and near the base of the
Andover Intrusion
· Diamond drilling will then test the potential for significant
extensions to the Carlow resource, down plunge from previous
high-grade gold intersections
· RC
drilling is then planned across the Titan Prospect 2km northwest of
Carlow, as an initial test of widespread high-grade gold
occurrences at surface
Corporate
In December Artemis Resources
announced the Company had received firm commitments for a capital
raising of A$4 million (before costs).
The raise received strong support from
sophisticated and institutional investors[4].
The first tranche of the raising has
been completed, with Artemis issuing 287 million shares on 20
December 2024, with funds totalling $2.09m[5].
The second tranche to raise
$1,991,000 will see the Company issue 284,428,571 shares at $0.007
under Listing Rule 7.1 and is subject to shareholder approval of
additional capacity at an Extraordinary General Meeting
(EGM).
Post period-end, a notice of meeting
has been lodged and the EGM is scheduled for 11am on the 10
February 2025 at Level 2, 10 Ord Street, West Perth WA
6005[6].
The Company will also issue
approximately 67,321,429 broker options with an exercise price of
$0.015 and expiry date of 2 years after issue.
Funds from the raising will be
applied to drilling and further exploration at the Company's
Karratha Gold Project.
Post period-end, Artemis Resources
announced the appointment of highly experienced geologist and
mining executive Julian Hanna as Managing Director[7].
This appointment follows his role as
Senior Technical Advisor, where he was pivotal in developing the
Company's exploration strategy. Mr Hanna brings decades of
experience, having led successful exploration and mining companies
including Western Areas Ltd for 12 years and MOD Resources Ltd for
7 years, which resulted in significant discoveries and long life
mining operations.
[4] Refer to ASX Announcement dated: 16
December 2024
[5] Refer to ASX Announcement dated: 31
December 2024
[6] Refer to ASX Announcement dated: 9
January 2025
[7] Refer to ASX Announcement dated: 8
January 2025
This announcement was approved for
release by the Board.
For further information contact
Julian Hanna / Managing Director
Julian.hanna@artemisresources.com.au
Artemis Resources Ltd
|
Guy Robertson, Chairman
Julian Hanna, Managing
Director
|
|
Zeus (Nomad & Broker)
|
Antonio Bossi / James Bavister
/
Gabriella Zwarts
|
|
info@artemisresources.com.au
Tel: +44 20 3829
5000
|
Appendix 1
Schedule of tenement holdings at end of Q2 FY2025. All are in
Western Australia
Competent Person
Statement
The information in this report that
relates to Exploration Results was prepared/compiled by Mr Adrian
Hell BSc (Hons), a Competent Person who is a member of the
Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Hell
is a technical consultant to Artemis Resources Ltd. Mr Hell has
sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the 'Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves". Mr
Hell consents to the inclusion in this report of the matters based
on his information in the form and context in which it
appears.
No New Information
To the extent that this announcement
contains references to prior exploration results and Mineral
Resource Estimates for the Carlow Gold/Copper Project which have
been cross referenced to previous market announcements made by the
Company, unless explicitly stated, no new information is contained.
The Company confirms that it is not aware of any new information or
data that materially affects the information included in the
relevant market announcements and, in the case of estimates of
Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market
announcements continue to apply and have not materially
changed.
About Artemis Resources
Artemis Resources (ASX/AIM:ARV) is a
gold, copper and lithium focused resources company with projects in
the West Pilbara region of Western Australia.
The Company's main projects
include;
·
Karratha Gold Project including the Carlow Castle
gold/copper project
·
Karratha Lithium Project including the high-grade
Mt Marie Lithium Prospect and the Osborne Lithium JV (Artemis 49%;
GreenTech Metals (ASX:GRE 51%)
·
Paterson Central Gold/Copper project in the
Paterson Province (located adjacent to Greatland Gold's gold-copper
discovery at Havieron and 42km from the Telfer gold
mine)
·
Artemis owns the Radio Hill processing plant,
located only 35km from Karratha
·
In December 2024, Artemis applied for a 340km2
exploration licence to cover a large, interpreted intrusion
("Cassowary Intrusion8") 440km east of Kalgoorlie.
The intrusion is undrilled and target is potential IOCG-type Cu/Au
mineralisation
8 Refer to ASX
Announcement dated: 28 January 2025