Anfield Energy Inc. (TSX.V: AEC; OTCQB: ANLDF; FRANKFURT: 0AD) (“Anfield” or “the Company”) is pleased to announce that it has received final approvals for its drill permit application to commence a 20-hole, 20,000-foot rotary drill program at its Slick Rock uranium and vanadium project, located in San Miguel County, Colorado. Permits approvals included the Bureau of Land Management, the Colorado Division of Resources Mining and Safety, and a Special Use Permit from San Miguel County, Colorado to allow access via county roads for the drilling project. The permits allow drilling between the months of June and September. Anfield will use local contractors to complete the drilling.

Anfield expects to commence the drill program in the third quarter of 2024. This is a crucial step in Anfield’s plan to secure a large mine permit for Slick Rock as the Company looks towards future uranium and vanadium production.

Corey Dias, Anfield’s CEO commented: “We are very pleased to commence development at Slick Rock as this project is integral to our hub-and-spoke uranium and vanadium production strategy. The 20-hole drill program, which will start during the third quarter of 2024, will allow us to both verify and upgrade our known resource at site and meet the criteria to secure a large mine permit from the appropriate agency. Our aim is to have both the Slick Rock and Velvet-Wood mines ready for production ahead of the restart of the Shootaring Canyon mill, with initial feed ready for transport once the mill is ready to receive it.”

The drill program will be used to collect geological information related to uranium mineralization in the area. Activities include minor repairs to the access roads, preparation of drill sites, drilling with mud rotary drilling equipment, data collection and reclamation of drill sites. Three or four of the drill holes will be converted into groundwater monitoring and observation wells to establish baseline aquifer parameters.

Qualified Persons

Douglas L. Beahm, P.E., P.G., principal engineer at BRS Inc., is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical content of this news release.

About Anfield

Anfield is a uranium and vanadium development and near-term production company that is committed to becoming a top-tier energy-related fuels supplier by creating value through sustainable, efficient growth in its assets. Anfield is a publicly traded corporation listed on the TSX-Venture Exchange (AEC-V), the OTCQB Marketplace (ANLDF) and the Frankfurt Stock Exchange (0AD). Anfield is focused on its conventional asset centre, as summarized below:

Arizona/Utah/Colorado – Shootaring Canyon Mill

A key asset in Anfield’s portfolio is the Shootaring Canyon Mill in Garfield County, Utah. The Shootaring Canyon Mill is strategically located within one of the historically most prolific uranium production areas in the United States, and is one of only three licensed uranium mills in the United States.

Anfield’s conventional uranium assets consist of mining claims and state leases in southeastern Utah, Colorado, and Arizona, targeting areas where past uranium mining or prospecting occurred. Anfield’s conventional uranium assets include the Velvet-Wood Project, the Frank M Uranium Project, the West Slope Project, as well as the Findlay Tank breccia pipe. A NI 43-101 PEA has been completed for the Velvet-Wood Project. The PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and, resultantly, there is no certainty that the included preliminary economic assessment would be realized. All conventional uranium assets are situated within a 200-mile radius of the Shootaring Mill.

Technical Disclosure

Table 1. Anfield’s existing conventional uranium-vanadium project portfolio resources.

Project Location Classification Tons (kt) UraniumGrade(% U3O8) ContainedUranium(Mlbs U3O8) VanadiumGrade(% V2O5) ContainedVanadium(Mlbs V2O5)
Velvet-Wood Utah M & I 811 0.29 % 4.6 -   -
    Inferred 87 0.32 % 0.6 0.404 % 7.3
West Slope Colorado Indicated 1,367 0.197 % 5.4 -   -
    Inferred 1,367 -   - 0.984 % 26.9
    Historic* 630 0.31 % 3.9 1.59 % 20.0
Slick Rock Colorado Inferred 1,760 0.224 % 7.9 1.35 % 47.1
Frank M Utah Historic* 1,137 0.101 % 2.3 -   -
Findlay Tank Arizona Historic* 211 0.226 % 1.0 -   -
Date Creek/Artillery Peak Arizona Historic* 2,602 0.054 % 2.8    
Marquez-Juan Tafoya New Mexico Historic* 7,100 0.127 % 18.1    

 

* The Company’s Qualified Person has not done sufficient work to classify these historic estimates as current mineral resources and Anfield is not treating such historical resources as current mineral resources.

Velvet-Wood: The PEA for Velvet-Wood/Slick Rock was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer, of BRS Inc., Harold H. Hutson, P.E., P.G., Carl D. Warren, P.E., P.G., and Terence P. (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. (May 6, 2023). Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. GT cut-off varies by locality from 0.25%-0.50%.

West Slope: NI 43-101 resource estimate for the JD-6, JD-7, JD-8 and JD-9 properties, completed by BRS Inc. (effective March 2022); Historic resource estimate for the SR-11, SR-13A, SM-18 N, SM-18 S, LP-21 and CM-25 properties, completed by Behre Dolbear for Cotter Corporation (August 2007). Indicated and Inferred resources using GT cut-off of 0.1 ft% eU3O8; historic resources using cut-off of 0.05% U3O8.

Slick Rock: The PEA for Velvet-Wood/Slick Rock was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer, of BRS Inc., Harold H. Hutson, P.E., P.G., Carl D. Warren, P.E., P.G., and Terence P. (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. (May 6, 2023). Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. GT cut-off varies by locality from 0.25%-0.50%.

Frank M: Historic Technical Report for Frank M, prepared for Uranium One Americas, was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer of BRS Inc., and Andrew C. Anderson, P.E., P.G. Senior Engineer/Geologist of BRS Inc., dated June 10, 2008. Frank M historic resource used a GT cut-off of 0.25%.

Findlay Tank: Historic Technical Report for Findlay Tank, prepared for Uranium One Americas, was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer of BRS Inc., dated October 2, 2008. Findlay Tank historic resource used a grade cut-off of 0.05% eU3O8.

Artillery Peak: Artillery Peak Exploration Project, Mohave County, Arizona, 43-101 Technical Report, authored by Dr. Karen Wenrich, October 12, 2010. GT cut-off varies by locality from 0.01%-0.05%.

Marquez-Juan Tafoya: The Historical Technical Report, Preliminary Economic Assessment, for Marquez-Juan Tafoya, prepared for Uranium Energy Corporation, was authored by Douglas L. Beahm, P.E., P.G., Principal Engineer of BRS Inc., and Terence P. McNulty, P.E., PhD, McNulty & Associates, dated June 9, 2021. The mineral resources are reported at a 0.60 GT cut-off.

On behalf of the Board of DirectorsANFIELD ENERGY INC.Corey Dias, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact:Anfield Energy, Inc.Clive MostertCorporate Communications780-920-5044contact@anfieldenergy.comwww.anfieldenergy.com

Safe Harbor Statement

THIS NEWS RELEASE CONTAINS “FORWARD-LOOKING STATEMENTS”. STATEMENTS IN THIS NEWS RELEASE THAT ARE NOT PURELY HISTORICAL ARE FORWARD-LOOKING STATEMENTS AND INCLUDE ANY STATEMENTS REGARDING BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS REGARDING THE FUTURE.

EXCEPT FOR THE HISTORICAL INFORMATION PRESENTED HEREIN, MATTERS DISCUSSED IN THIS NEWS RELEASE CONTAIN FORWARD-LOOKING STATEMENTS THAT ARE SUBJECT TO CERTAIN RISKS AND UNCERTAINTIES THAT COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM ANY FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH STATEMENTS. STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS THAT ARE PRECEDED BY, FOLLOWED BY, OR THAT INCLUDE SUCH WORDS AS “ESTIMATE,” “ANTICIPATE,” “BELIEVE,” “PLAN” OR “EXPECT” OR SIMILAR STATEMENTS ARE FORWARD-LOOKING STATEMENTS. RISKS AND UNCERTAINTIES FOR THE COMPANY INCLUDE, BUT ARE NOT LIMITED TO, THE RISKS ASSOCIATED WITH MINERAL EXPLORATION AND FUNDING AS WELL AS THE RISKS SHOWN IN THE COMPANY’S MOST RECENT ANNUAL AND QUARTERLY REPORTS AND FROM TIME-TO-TIME IN OTHER PUBLICLY AVAILABLE INFORMATION REGARDING THE COMPANY. OTHER RISKS INCLUDE RISKS ASSOCIATED FUTURE CAPITAL REQUIREMENTS AND THE COMPANY’S ABILITY AND LEVEL OF SUPPORT FOR ITS EXPLORATION AND DEVELOPMENT ACTIVITIES. THERE CAN BE NO ASSURANCE THAT THE COMPANY’S EXPLORATION EFFORTS WILL SUCCEED OR THE COMPANY WILL ULTIMATELY ACHIEVE COMMERCIAL SUCCESS. THESE FORWARD-LOOKING STATEMENTS ARE MADE AS OF THE DATE OF THIS NEWS RELEASE, AND THE COMPANY ASSUMES NO OBLIGATION TO UPDATE THE FORWARD-LOOKING STATEMENTS, OR TO UPDATE THE REASONS WHY ACTUAL RESULTS COULD DIFFER FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS. ALTHOUGH THE COMPANY BELIEVES THAT THE BELIEFS, PLANS, EXPECTATIONS AND INTENTIONS CONTAINED IN THIS NEWS RELEASE ARE REASONABLE, THERE CAN BE NO ASSURANCE THOSE BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS WILL PROVE TO BE ACCURATE. INVESTORS SHOULD CONSIDER ALL OF THE INFORMATION SET FORTH HEREIN AND SHOULD ALSO REFER TO THE RISK FACTORS DISCLOSED IN THE COMPANY’S PERIODIC REPORTS FILED FROM TIME-TO-TIME.

THIS NEWS RELEASE HAS BEEN PREPARED BY MANAGEMENT OF THE COMPANY WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS.

Anfield Energy (TSXV:AEC)
Historical Stock Chart
From Oct 2024 to Nov 2024 Click Here for more Anfield Energy Charts.
Anfield Energy (TSXV:AEC)
Historical Stock Chart
From Nov 2023 to Nov 2024 Click Here for more Anfield Energy Charts.